Attachment H.xlsx
XLSX spreadsheet 15 KB Posted
- Attached to
- TRAFFIC DATA COLLECTION SERVICES State and local contract opportunity
- Solicitation number
- 5400023978
- Issued by
- Richland County, South Carolina
About this file
This is a price list attachment for a Traffic Data Collection Services contract with the State of South Carolina. The document outlines 22 line items for various traffic counting and data collection services, segmented by location type and methodology. Line items 1-15 cover non-Interstate system counts, including 7-day, 48-hour, 24-hour, and 72-hour directional and non-directional volume counts with speed and vehicle classification capabilities, as well as automated pedestrian and bicycle counts. Line items 16-18 specify counts exclusively on the Interstate system, while line items 19-22 address both Interstate and non-Interstate routes, including Bluetooth origin-destination studies. Quantities range from 20 to 6,100 units depending on the service type, with unit prices currently listed as $0.
The price list indicates all unit prices are currently blank or set to zero, with corresponding yearly and 6-year contract totals also showing $0, suggesting this is a template awaiting bidder pricing submissions. The document includes 2020 baseline data showing contractor and staff totals for certain line items. Bidders are required to complete this attachment with their proposed pricing for each service line item. The contract structure allows for flexible quantities across various traffic data collection methodologies, accommodating different roadway configurations and study durations to meet South Carolina's transportation data collection needs.
View the file
Other files for this state and local contract opportunity
| File | Type | Posted |
|---|---|---|
| Attachment F.csv | CSV file | |
| Attachment J.xlsx | XLSX spreadsheet | |
| Revised #2 Attachment H.xlsx | XLSX spreadsheet | |
| Revised Attachment H (5).xlsx | XLSX spreadsheet | |
| Solicitation Document.docx | DOCX document | |
| Amendment 1.docx | DOCX document | |
| Attachment D.pdf | ||
| Attachment E.pdf | ||
| Amendment 2.docx | DOCX document | |
| Attachment G.csv | CSV file | |
| Extension of Award Posting.docx | DOCX document | |
| Amendment 3.docx | DOCX document | |
| Intent to Award.docx | DOCX document | |
| Attachment I.xlsx | XLSX spreadsheet |
Show all 14
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
New Price List Attachment D
| Line items 1 - 15 are for counts not on the Interstate system | ||||||||||
| Line # | Description | Qty Range | Unit | Quantities | Unit Price | TOTAL | 2020 #s | Contractor | Staff | Total/year |
| 1 | 7 day, non-directional, speed and vehicle classification count | 1 and above | Each Location | 50 | $ - 0 | Per Counter | 2884 | 3195 | 6079 | |
| 2 | 7 day, directional, speed and vehicle classification count | 1 and above | Each Counter | 100 | $ - 0 | Per Lane | 2173 | 716 | 2889 | |
| 3 | Forty-eight (48) hour, non-directional, volume count | 1 and above | Each Location | 300 | $ - 0 | |||||
| 4 | Forty-eight (48) hour, directional, volume count | 1 and above | Each Counter | 300 | $ - 0 | |||||
| 5 | Forty-eight (48) hour, one-way ramp volume count | 1 and above | Each Location | 500 | $ - 0 | |||||
| 6 | Forty-eight (48) hour, directional, speed and vehicle classification count | 1 and above | Each Counter | 6,100 | $ - 0 | |||||
| 7 | Forty-eight (48) hour, directional, speed and vehicle classification count by lane | 1 and above | Each Lane | 3,000 | $ - 0 | |||||
| 8 | Twenty-four (24) hour, non-directional, volume count | 1 and above | Each Location | 3,000 | $ - 0 | |||||
| 9 | Twenty-four (24) hour, directional, volume count | 1 and above | Each Counter | 100 | $ - 0 | |||||
| 10 | Twenty-four (24) hour, one-way ramp volume count | 1 and above | Each Location | 1,300 | $ - 0 | |||||
| 11 | Twenty-four (24) hour, directional, speed and vehicle classification count | 1 and above | Each Counter | 100 | $ - 0 | |||||
| 12 | Twenty-four (24) hour, directional, speed and vehicle classification count by lane | 1 and above | Each Lane | 100 | $ - 0 | |||||
| 13 | 72-hour directional classification counts using non-intrusive counters. 4 lanes total | 1 and above | Each Location | 20 | $ - 0 | |||||
| 14 | 72-hour directional classification counts using non-intrusive counters. Above 4 lanes total | 1 and above | Each Location | 20 | $ - 0 | |||||
| 15 | Automated Pedestrian/Bicycle Counts | 1 and above | per unit for a 7 day study | 50 | $ - 0 | |||||
| Line items 16 - 18 are for counts on the Interstate system | ||||||||||
| 16 | Twenty-four (24) hour, directional, volume count | 1 and above | Each Direction | 60 | $ - 0 | |||||
| 17 | Forty-eight (48) hour, directional, speed and vehicle classification count by lane | 1 and above | Each Lane | 80 | $ - 0 | |||||
| 18 | Seventy-two (72), directional, speed and vehicle classification count by lane | 1 and above | Each Lane | 20 | $ - 0 | |||||
| Line items 19 - 22 are for Interstate or none Interstate routes | ||||||||||
| 19 | 72-hour Interstate directional classification counts using non-intrusive counters. 4 lanes total | 1 and above | Each Location | 20 | $ - 0 | |||||
| 20 | 72-hour Interstate directional classification counts using non-intrusive counters. 6 lanes total | 1 and above | Each Location | 20 | $ - 0 | |||||
| 21 | 72-hour Interstate directional classification counts using non-intrusive counters. Above 6 lanes total | 1 and above | Each Location | 20 | $ - 0 | |||||
| 22 | Bluetooth Origin-Destination Studies | 1 and above | Per unit per week | 100 | $ - 0 | |||||
| Yearly total: | $ - 0 | |||||||||
| 6 year total: | $ - 0 |
ESRI_MAPINFO_SHEET
DO NOT EDIT
For Esri use only
File details come from the government source that posted it. Updated .