Attachment G.xlsx
XLSX spreadsheet 11 KB Posted
- Attached to
- PAVEMENT DATA COLLECTION State and local contract opportunity
- Solicitation number
- 5400025010
- Issued by
- Richland County, South Carolina
About this file
This file is a pricing schedule attachment (Attachment G) for a Pavement Data Collection contract opportunity in South Carolina. The document presents a tiered cost structure for pavement data collection services organized by system class and road classification. The schedule details unit costs for Interstate highways, Primary roads (classified as PRI >=15 and PRI <15), and Secondary roads (classified as SEC>=10, 10>SEC>=2, and other categories), with mileage quantities specified for each classification. The pricing framework includes costs for cross slope measurements, GPR (Ground Penetrating Radar) services, and retroreflectivity assessments, along with asset-related cost columns for flexible pricing accommodations.
The attachment establishes a comprehensive fee structure with differentiated rates based on road system type and mileage thresholds, allowing for cost calculations across multiple service components including optional services. The unit costs vary significantly by road classification, ranging from lower rates for secondary roads to higher rates for interstate and primary road segments. The document structure accommodates both required and optional service pricing, enabling detailed cost proposals and total cost calculations for the complete scope of pavement data collection work. This pricing schedule serves as the basis for contractor proposals and cost evaluation in the procurement process.
View the file
Other files for this state and local contract opportunity
| File | Type | Posted |
|---|---|---|
| Amendment 1.pdf | ||
| Attachment A.pdf | ||
| Attachment E.pdf | ||
| Attachment F.pdf | ||
| Amendment 2.pdf | ||
| Amendment 3.pdf | ||
| Attachment C.pdf | ||
| Solicitation.pdf | ||
| Attachment B.pdf | ||
| Attachment D.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| System | Class | Mileage | Unit Cost | Total Cost | Optional Services | |||||
| Cross Slope Unit Cost | GPR Unit Cost | Retro Refl. Cost | Asset 1 Cost | Asset 2 Cost | Total Optional Service | |||||
| Interstates | Interstates | 1,702.00 | 0 | |||||||
| Primary | PRI >=15 | 5249.9 | 0 | |||||||
| PRI < 15 | 5301.5 | 0 | ||||||||
| Secondary* | SEC>=10 | 2745.6 | 0 | |||||||
| 10>SEC>=2 | 7601.7 | 0 | ||||||||
| SEC<2 | 1680.7 | 0 | ||||||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
File details come from the government source that posted it. Updated .