About this file
This is a Firm Fixed Price (FFP) and Indefinite Delivery/Indefinite Quantity (IDIQ) pricing schedule for landscape maintenance services solicited by George Mason University through RFP GMU-KS0811-26. The contract will cover comprehensive landscape maintenance across six George Mason University campuses and facilities: Fairfax, Arlington, Science and Technology (Prince William), Point of View, Potomac Science Center, and Smithsonian Mason School of Conservation. The contract base term runs for 12 months from March 1, 2027, through February 29, 2028, with Potomac Science Center and SMSC having a nine-month contract period. The Fairfax Campus encompasses multiple areas including Johnson Center, recreation facilities, housing areas, and several off-campus properties. Offerors must submit complete proposals for entire campuses; partial campus offerings will not be accepted. All questions and proposals must be submitted electronically through Bonfire.
The pricing structure requires contractors to submit a monthly FFP cost that automatically calculates to an annual total for the base scope services. Additionally, contractors must provide IDIQ/T&M labor rates for 14 specified landscape maintenance positions ranging from landscape laborers to certified arborists. An optional Tab 3 addresses snow removal services on a T&M basis, covering 22 equipment and labor categories including various trucks, loaders, snow blowers, materials, and crew positions. Contractors may submit "No Bid" responses for categories they cannot provide or propose additional services in blank cells. Material, equipment, and parts for T&M services will be billed at actual cost with supporting invoices required. All additional services require a University purchase order prior to performance, except in emergency situations. The pricing schedule notes that numbers round to the nearest penny and references Virginia Code 40.1-28.10 regarding minimum wage requirements.
View the file
Other files
Show all 14
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
1. FFP Pricing
ATTACHMENT C - FFP PRICING SCHEDULE - TAB 1 REQUIRED
Contractor must provide a Monthly Firm, Fixed Price (FFP) for the FFP Services Portion of this RFP in the table below. Offerors may offer on one or more Campuses but partial offers for campuses will not be accepted. As an example, if you are offering on the Fairfax Campus it must be the entirety of the Fairfax Campus including all facilities/areas listed under Fairfax Campus.
The Yearly Cost will calculate automatically based on the Monthly Price provided. The Contractor shall only complete the cells that are blank and unlocked for editing. Failure to complete this form or modifying it without approval may result in your Offer being scored lower. The Contractor MUST complete Tab 1 and Tab 2 of this Pricing Schedule. Tab 2 is for providing your IDIQ/T&M Rates. Tab 3 is OPTIONAL if you are able to provide snow removal services you will provide your T&M Rates in Tab 3 for this service.
A link to the Code of Virginia § 40.1-28.10. Minimum wages increases is also available here : https://law.lis.virginia.gov/vacode/40.1-28.10/ *If you have any issues completing the Pricing Schedule or have other concerns/questions please contact the Buyers listed at the top of the RFP document via Bonfire.
*Please note that these numbers round up to nearest penny.
| FAIRFAX CAMPUS | |
| 4400 University Dr. Fairfax, VA 22030 | |
| POP = Period of Performance | Contract Period 1 Pricing |
PoP 1: 03/01/2027 - 02/29/2028 (12 Month Base Term)
SPACES MONTHLY ANNUAL
| 1 | FAIRFAX MAIN CAMPUS (Grand Total of 1a-1g) | $0.00 | $0.00 |
| 1a | Johnson Center | $0.00 | |
| 1b | REC (West Campus Common Areas) | $0.00 | |
| 1c | REC (Aquatic Center) | $0.00 | |
| 1d | FFX E/G Areas | $0.00 | |
| 1e | University TownHouse (4260 Chainbridge Road, Fairfax, VA) | $0.00 | |
| 1f | Eagle Bank Arena | $0.00 | |
| 1g | ALL Housing Areas (supported by FM) | $0.00 | |
| 2 | Mathy House (11020 Popes Head Road, Fairfax, VA 22030) | $0.00 | |
| 3 | Sally-Mathy Lodge (11032 Popes Head Road, Fairfax, VA 22030) | $0.00 | |
| 4 | Sunny-Mathy Cottage (11030 Popes Head Road, Fairfax, VA 22030) | $0.00 | |
| 5 | Liliana Mathy House (11036 Popes Head Road, Fairfax, VA 22030) | $0.00 | |
| 6 | Carty House (10808 Kelly Drive, Fairfax, VA 22030) | $0.00 | |
| 7 | Capitol Connection House (10716 Kelly Drive, Fairfax, VA 22030) | $0.00 | |
| 8 | Student Townhouses: Units A, B, & C (4260 Chain Bridge Rd. Fairfax, VA 22030 ) | $0.00 | |
| 10 | Tallwood/Olli Facility (4210 Roberts Rd. Fairfax, VA 22030) | $0.00 |
CAMPUS TOTAL $0.00 $0.00
ARLINGTON CAMPUS E&G 3351 North Fairfax Drive, Arlington, VA 22201-4426
| PERIOD 1 | ||
| SPACES | MONTHLY | ANNUAL |
8 ARLINGTON CAMPUS $0.00
CAMPUS TOTAL $0.00 $0.00
SCIENCE AND TECHNOLOGY CAMPUS (PRINCE WILLIAM CAMPUS)
10900 University Blvd, Manassas, VA 20110
| PERIOD 1 | ||
| SPACES | MONTHLY | ANNUAL |
| 9 | SCI-TECH CAMPUS (Grand Total of 9a-9e) | $0.00 | $0.00 |
| 9a | Hylton Performing Arts Area | $0.00 | |
| 9b | Beacon Hall Area | $0.00 | |
| 9c | Freedom Aquatic Center Area | $0.00 | |
| 9d | BRL Area | $0.00 | |
| 9e | SciTech Campus E/G Areas | $0.00 |
CAMPUS TOTAL $0.00 $0.00
POINT OF VIEW (POV) FACILITY 7301 Old Spring Dr. Lorton, VA 22079
| PERIOD 1 | |||
| SPACES | MONTHLY | ANNUAL | |
| 10 | POINT OF VIEW CAMPUS | $0.00 |
TOTAL $0.00 $0.00
POTOMAC SCIENCE CENTER CAMPUS 650 Mason Ferry Ave. Woodbridge, VA 22191
| PERIOD 1 | |||
| SPACES | MONTHLY | Contract Period 1 Totals (9 Months) | |
| 11 | POTOMAC SCIENCE CENTER | $0.00 |
TOTAL $0.00 $0.00
SMITHSONIAN MASON SCHOOL OF CONSERVATION (SMSC)
1500 Remount Rd, Front Royal, VA 22630
| PERIOD 1 | |||
| SPACES | MONTHLY | Contract Period 1 Totals (9 Months) | |
| 12 | SMITHSONIAN MASON SCHOOL OF CONSERVATION (SMSC) | $0.00 |
TOTAL $0.00 $0.00
COMBINED FFP TOTALS
*DO NOT COMPLETE* THE SECTION BELOW WILL AUTOMATICALLY TALLY FROM ABOVE
| PERIOD 1 TOTALS | ||
| MONTHLY | ANNUAL | |
| TOTAL | $0.00 | $0.00 |
&14MASTER -- FIRM FIXED PRICING SCHEDULE
(RFP# GMU-1715-21)
&"Arial,Bold"George Mason University Confidential &D Page &P
2. IDIQ-T&M
ATTACHMENT - IDIQ/T&M - TAB 2
The Contractor/Service Provider shall provide the following services on an “As Needed” basis for any services or labor rates outside of the FFP Base Scope (Refer to RFP Section XI. C.). These services will be billed on a time and material (T&M) basis (or as a separate firm fixed priced proposal based off of the negotiated labor rates); Material, equipment, parts etc. shall be billed at actual cost to the contractor and invoices will be required to substantiate the cost. If these services are requested, the Contractor/Service Provider shall provide a written estimate to the Contract Administrator upon request, for approval. Services shall be performed only after a University (eVA) purchase order has been issued except in the case of an emergency. Labor rates, as offered in the vendor’s proposal, are expected to be part of the technical proposal, contract agreement and referenced for the pricing of any additional services.
Offerors may "No Bid" on any categories they cannot provide and/or provide additional categories, equipment, materials and services in the empty cells below (15-46).
IDIQ (T&M RATES)
| DESCRIPTION | Price | Unit | COMMENTS | |
| 0 | EXAMPLE | $100.00 | Per Hour | 2 Hour Minimum |
| 1 | Landscape Maintenance Technician/Laboror | |||
| 2 | Landscape Maintenance Foreman/Crew Leader | |||
| 3 | Landscape Production Manager | |||
| 4 | Specialized Equipment Operator | |||
| 5 | Certified Pesticide Applicator | |||
| 6 | Registered Technician | |||
| 7 | Plant Health Care Specialist | |||
| 8 | Tree Climber | |||
| 9 | Tree Groundsperson | |||
| 10 | Irrigation Technician | |||
| 11 | Irrigation Helper | |||
| 12 | Landscape Designer | |||
| 13 | Certified Arborist | |||
| 14 | Horticulturist | |||
| 15 | ||||
| 16 | ||||
| 17 | ||||
| 18 | ||||
| 19 | ||||
| 20 | ||||
| 21 | ||||
| 22 | ||||
| 23 | ||||
| 24 | ||||
| 25 | ||||
| 26 | ||||
| 27 | ||||
| 28 | ||||
| 29 | ||||
| 30 | ||||
| 31 | ||||
| 32 | ||||
| 33 | ||||
| 34 | ||||
| 35 | ||||
| 36 | ||||
| 37 | ||||
| 38 | ||||
| 39 | ||||
| 40 | ||||
| 41 | ||||
| 42 | ||||
| 43 | ||||
| 44 | ||||
| 45 | ||||
| 46 |
3. Snow Removal (T&M)
ATTACHMENT - IDIQ/T&M - TAB 3
SNOW REMOVAL ONLY (OPTIONAL): The Contractor/Service Provider shall provide the following snow removal services on an “As Needed” basis. These services will be billed on a time and material (T&M) basis (or as a separate firm fixed priced proposal based off of the negotiated labor rates); labor categories and rates shall be provided in as a separate IDIQ/T&M pricing schedule in Bonfire.
All equipment shall include the respective equipment rate AND the required operator on a per-unit, per-hour basis. This hourly rate applies to only the time during which the equipment is on site and either on stand-by or actively in operation per the definitions below. Services shall be performed only after a University (eVA) purchase order has been issued except in the case of an emergency. Labor rates, as offered in the vendor’s proposal, are expected to be part of the technical proposal, contract agreement and referenced for the pricing of any additional services.
Offerors may "No Bid" on any categories they cannot provide and/or provide additional categories, equipment, materials and services in the empty cells below.
| SNOW REMOVAL ONLY (OPTIONAL) IDIQ (T&M RATES) | ||||
| ALL CAMPUSES | ||||
| DESCRIPTION | Unit Price | Unit of Measure | COMMENTS | |
| 0 | Example - Truck with Plow | $250.00 | Per Hour | Minimum 2 Hours |
| 1 | Truck with Plow and Spreader/Sprayer | |||
| 2 | Skid Steer | |||
| 3 | Skid Steer with Pusher Box | |||
| 4 | Mid-Size Loader | |||
| 5 | Mid-Size Loader w/ Push Box | |||
| 6 | Large Laoder w/Push Bucket | |||
| 7 | Large Loader w/ Bucket | |||
| 8 | Ventrac SSV or S70 with Attachments | |||
| 9 | Utility Vehicles (ATV, UTV, etc.) | |||
| 10 | Two Stage Snow Blower | |||
| 11 | Two Stage Snow Broom | |||
| 12 | Crew Member | |||
| 13 | Supervisor | |||
| 14 | Bulk Rock Salt | |||
| 15 | Bag Ice Melt | |||
| 16 | Brine Liquid Pre-Treatment | |||
| 17 | Snow Stake (Installed) | |||
| 18 | Poly-cutting or rubber edges on snow removal blades | |||
| 19 | Heavy Equipment Loader/Backhoe | |||
| 20 | Track Loader | |||
| 21 | Heavy Duty Dump Truck (heavy load capacity/tandem-axel) | |||
| 22 | Dump Fees (for snow removal off-site) | |||
| 23 | ||||
| 24 | ||||
| 25 | ||||
| 26 | ||||
| 27 | ||||
| 28 | ||||
| 29 | ||||
| 30 | ||||
| 31 | ||||
| 32 | ||||
| 33 | ||||
| 34 | ||||
| 35 | ||||
| 36 | ||||
| 37 | ||||
| 38 | ||||
| 39 | ||||
| 40 | ||||
| 41 | ||||
| 42 | ||||
| 43 | ||||
| 44 | ||||
| 45 | ||||
| 46 |
File details come from the government source that posted it. Updated .