Attachment_-_Drawings.pdf
PDF 5 MB Posted
- Attached to
- Replace Boat Ramp Federal contract opportunity
- Solicitation number
- 140P6423B0009
About this file
This notice solicits bids for a replace boat ramp project at Voyageurs National Park in Kabetogama, Minnesota. Work includes removing an existing concrete boat ramp, constructing a new ramp area within a dry dock, and site restoration. The estimated value is between $250,000 to $500,000. The firm-fixed price construction contract will follow St. Louis County, Minnesota wage requirements. Bids are due by the date specified in solicitation number 140P6423B0009 issued by the National Park Service Midwest Region. The project is set aside 100% for total small businesses classified under NAICS code 237990. A mandatory site visit will be held and offerors must register in SAM and complete ORCA to be eligible for award.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Questions_and_Answers_0001.pdf | ||
| Sol_140P6423B0009_Amd_0001.pdf | ||
| Bid_Schedule_-_Replace_Boat_Ramp.pdf | ||
| Sol_140P6423B0009.pdf | ||
| Attachment_-_Submittal_List.xlsx | XLSX spreadsheet | |
| Attachment_-_Limitations_on_Subcontracting_Report.xlsx | XLSX spreadsheet | |
| Wage_Determination_-_St_Louis_Co.pdf | ||
| Specifications_-_Replace_Boat_Ramp.pdf | ||
| Bid_Schedule_-_Replace_Boat_Ramp.xlsx | XLSX spreadsheet | |
| Attachment_-_Notice_to_Contractors.pdf | ||
| Attachment_-_Construction_Contract_Admin.pdf |
Show all 11
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AutoCAD SHX Text
ROCK
AutoCAD SHX Text
LITTLE
AutoCAD SHX Text
ARKANSAS
AutoCAD SHX Text Agate Fossil Beds NM
AutoCAD SHX Text Apostle Islands NL
AutoCAD SHX Text Arkansas Post NMEN
AutoCAD SHX Text Badlands NP
AutoCAD SHX Text Brown v. Board of Education NHS
AutoCAD SHX Text Buffalo NR
AutoCAD SHX Text Cuyahoga Valley NRA
AutoCAD SHX Text Dayton Aviation Heritage NHP
AutoCAD SHX Text Effigy Mounds NM
AutoCAD SHX Text Fort Larned NHS
AutoCAD SHX Text Fort Scott NHS
AutoCAD SHX Text Fort Smith NHS
AutoCAD SHX Text Fort Union Nat. Trading Post NHS
AutoCAD SHX Text George Rogers Clark NHP
AutoCAD SHX Text George Washington Carver NM
AutoCAD SHX Text Grand Portage NM
AutoCAD SHX Text Harry S Truman NHS
AutoCAD SHX Text Herbert Hoover NHS
AutoCAD SHX Text Homestead NM of America
AutoCAD SHX Text Hopewell Culture NHP
AutoCAD SHX Text Hot Springs NP
AutoCAD SHX Text Indiana Dunes NL
AutoCAD SHX Text Isle Royale NP
AutoCAD SHX Text James A Garfield NHS
AutoCAD SHX Text Jefferson NEM
AutoCAD SHX Text Jewel Cave NM
AutoCAD SHX Text Keweenaw NHP
AutoCAD SHX Text Knife River Indian Villages NHS
AutoCAD SHX Text Lincoln Boyhood NMEM
AutoCAD SHX Text Mississippi NRRA
AutoCAD SHX Text Missouri NRR
AutoCAD SHX Text Mount Rushmore NMEM
AutoCAD SHX Text Niobrara NSR
AutoCAD SHX Text Ozark NSR
AutoCAD SHX Text Pea Ridge NMP
AutoCAD SHX Text Perry's Victory IPM
AutoCAD SHX Text Pictured Rocks NL
AutoCAD SHX Text Pipestone NM
AutoCAD SHX Text Saint Croix NSR
AutoCAD SHX Text Scotts Bluff NM
AutoCAD SHX Text Sleeping Bear Dunes NL
AutoCAD SHX Text Theodore Roosevelt NP
AutoCAD SHX Text Ulysses S Grant NHS
AutoCAD SHX Text Voyageurs NP
AutoCAD SHX Text William Howard Taft NHS
AutoCAD SHX Text Wilson's Creek NB
AutoCAD SHX Text Wind Cave NP
AutoCAD SHX Text
FORT SMITH
AutoCAD SHX Text
MEMPHIS
AutoCAD SHX Text
OKLAHOMA
AutoCAD SHX Text
MISSISSIPPI
AutoCAD SHX Text
LOUISANA
AutoCAD SHX Text
WEST VIRGINIA
AutoCAD SHX Text
PENNSYLVANIA
AutoCAD SHX Text
NEBRASKA
AutoCAD SHX Text
KANSAS
AutoCAD SHX Text
IOWA
AutoCAD SHX Text
MISSOURI
AutoCAD SHX Text
OHIO
AutoCAD SHX Text
MICHIGAN
AutoCAD SHX Text
WISCONSIN
AutoCAD SHX Text
MINNESOTA
AutoCAD SHX Text
INDIANA
AutoCAD SHX Text
TOLEDO
AutoCAD SHX Text
ST. LOUIS
AutoCAD SHX Text
KANSAS CITY
AutoCAD SHX Text
DULUTH
AutoCAD SHX Text
CLEVELAND
AutoCAD SHX Text
CINCINNATI
AutoCAD SHX Text
MILWAUKEE
AutoCAD SHX Text
LINCOLN
AutoCAD SHX Text
TOPEKA
AutoCAD SHX Text
JEFFERSON CITY
AutoCAD SHX Text
INDIANAPOLIS
AutoCAD SHX Text
COLUMBUS
AutoCAD SHX Text
LANSING
AutoCAD SHX Text
MADISON
AutoCAD SHX Text
ST. PAUL
AutoCAD SHX Text
DES MOINES
AutoCAD SHX Text
BISMARCK
AutoCAD SHX Text
NORTH DAKOTA
AutoCAD SHX Text
SOUTH DAKOTA
AutoCAD SHX Text
PIERRE
AutoCAD SHX Text
ILLINOIS
AutoCAD SHX Text
SPRINGFIELD
AutoCAD SHX Text
DAYTON
AutoCAD SHX Text
DETROIT
AutoCAD SHX Text
MINNEAPOLIS
AutoCAD SHX Text
AKRON
AutoCAD SHX Text
FORT WAYNE
AutoCAD SHX Text
CHICAGO
AutoCAD SHX Text
SIOUX FALLS
AutoCAD SHX Text
ROCHESTER
AutoCAD SHX Text
GREEN BAY
AutoCAD SHX Text
OKLAHOMA CITY
AutoCAD SHX Text
ST. LOUIS
AutoCAD SHX Text
OKLAHOMA
AutoCAD SHX Text
TENNESEE
AutoCAD SHX Text
KENTUCKY
AutoCAD SHX Text
COLORADO
AutoCAD SHX Text
WYOMING
AutoCAD SHX Text
MONTANA
AutoCAD SHX Text
SASKATCHEWAN
AutoCAD SHX Text
MANITOBA
AutoCAD SHX Text
ONTARIO
AutoCAD SHX Text
ONTARIO
AutoCAD SHX Text
OMAHA
AutoCAD SHX Text
CHEYENNE
AutoCAD SHX Text
SPRINGFIELD
AutoCAD SHX Text
PEORIA
AutoCAD SHX Text
DENVER
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
ASHLAND
AutoCAD SHX Text
BRAINERD
AutoCAD SHX Text
VIRGINIA
AutoCAD SHX Text
HIBBING
AutoCAD SHX Text
BAYFIELD
AutoCAD SHX Text
LITTLE
AutoCAD SHX Text
MARAIS
AutoCAD SHX Text
GRAND
AutoCAD SHX Text
PORTAGE
AutoCAD SHX Text
LAKE SUPERIOR
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
MICHIGAN
AutoCAD SHX Text
WISCONSIN
AutoCAD SHX Text
MINNESOTA
AutoCAD SHX Text
WISCONSIN
AutoCAD SHX Text
CANADA
AutoCAD SHX Text
UNITED
AutoCAD SHX Text
STATES
AutoCAD SHX Text
MINNESOTA
AutoCAD SHX Text
ONTARIO
AutoCAD SHX Text
FORT
AutoCAD SHX Text
FRANCES
AutoCAD SHX Text
AutoCAD SHX Text
GRAND
AutoCAD SHX Text
RAPIDS
AutoCAD SHX Text
AutoCAD SHX Text
DULUTH
AutoCAD SHX Text
GRAND
AutoCAD SHX Text
MARAIS
AutoCAD SHX Text
AutoCAD SHX Text
VOYAGEURS
AutoCAD SHX Text
NATIONAL PARK
AutoCAD SHX Text
INTERNATIONAL
AutoCAD SHX Text
FALLS
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
RAY
AutoCAD SHX Text
KOOCHICHING COUNTY
AutoCAD SHX Text
ST. LOUIS COUNTY
AutoCAD SHX Text
RAINY RIVER DISTRICT ONTARIO
AutoCAD SHX Text
ST. LOUIS COUNTY MINNESOTA
AutoCAD SHX Text
CANADA
AutoCAD SHX Text
UNITED STATES
AutoCAD SHX Text
KABETOGAMA
AutoCAD SHX Text
PENINSULA
AutoCAD SHX Text
RAINY
AutoCAD SHX Text
LAKE
AutoCAD SHX Text
KABETOGAMA
AutoCAD SHX Text
LAKE
AutoCAD SHX Text
BLACK BAY
AutoCAD SHX Text
NAMAKAN LAKE
AutoCAD SHX Text
SAND
AutoCAD SHX Text
POINT
AutoCAD SHX Text
LAKE
AutoCAD SHX Text V.C.
AutoCAD SHX Text
ASH
AutoCAD SHX Text
RIVER
AutoCAD SHX Text
KABETOGAMA
AutoCAD SHX Text
LAKE
AutoCAD SHX Text V.C.
AutoCAD SHX Text V.C.
AutoCAD SHX Text
RAINY LAKE
AutoCAD SHX Text
TO
AutoCAD SHX Text
INTERNATIONAL
AutoCAD SHX Text
FALLS,
AutoCAD SHX Text
MINNESOTA
AutoCAD SHX Text
TO
AutoCAD SHX Text
ORR,
AutoCAD SHX Text
MINNESOTA
AutoCAD SHX Text
GANNON
AutoCAD SHX Text
CREEK
AutoCAD SHX Text
RIVER
AutoCAD SHX Text
ASH
AutoCAD SHX Text
SUPERIOR
AutoCAD SHX Text
NATIONAL
AutoCAD SHX Text
FOREST
AutoCAD SHX Text
CRANE
AutoCAD SHX Text
LAKE
AutoCAD SHX Text
RAT
AutoCAD SHX Text
ROOT
AutoCAD SHX Text
RIVER
AutoCAD SHX Text
KETTLE FALLS
AutoCAD SHX Text
U.S. CUSTOMS
AutoCAD SHX Text
CANADA
AutoCAD SHX Text
UNITED STATES
AutoCAD SHX Text
TO ORR,
AutoCAD SHX Text
MINNESOTA
AutoCAD SHX Text
AND
AutoCAD SHX Text
AutoCAD SHX Text
WOODENFROG
AutoCAD SHX Text
AutoCAD SHX Text
CRANE LAKE
AutoCAD SHX Text
AutoCAD SHX Text
VOYAGEURS NATIONAL PARK
AutoCAD SHX Text
BASIC DATA:
AutoCAD SHX Text
STATE
AutoCAD SHX Text
NATIONAL PARK SERVICE
AutoCAD SHX Text
INTERIOR REGIONS 3, 4, AND 5
AutoCAD SHX Text
REGION
AutoCAD SHX Text
COUNTY
AutoCAD SHX Text
DEPARTMENT OF THE INTERIOR
AutoCAD SHX Text
UNITED STATES
AutoCAD SHX Text
LOCATION WITHIN PARK
AutoCAD SHX Text
NAME OF PARK
AutoCAD SHX Text
TITLE OF DRAWING
AutoCAD SHX Text
COVER
AutoCAD SHX Text
KABETOGAMA LAKE VISITOR CENTER
AutoCAD SHX Text 80071
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
KOOCHICHING
AutoCAD SHX Text
MINNESOTA
AutoCAD SHX Text
OF
AutoCAD SHX Text
PKG.
AutoCAD SHX Text
NO.
AutoCAD SHX Text
SHEET
AutoCAD SHX Text
DRAWING NO.
AutoCAD SHX Text
KOOCHICHING
AutoCAD SHX Text
MINNESOTA
AutoCAD SHX Text
CONSTRUCTION DRAWINGS
AutoCAD SHX Text
QUALITY DESIGN CERTIFICATION
AutoCAD SHX Text
OR
AutoCAD SHX Text
OR
AutoCAD SHX Text Development (Title I)
AutoCAD SHX Text Prepared in Accordance with Design
AutoCAD SHX Text by Design Development (Title I)
AutoCAD SHX Text Construction Drawing Not Preceded
AutoCAD SHX Text Approved by Superintendent on
AutoCAD SHX Text Variance from Design Development (Title I)
AutoCAD SHX Text Project Manager
AutoCAD SHX Text Drawing No.
AutoCAD SHX Text Date
AutoCAD SHX Text Date
AutoCAD SHX Text Sheet
AutoCAD SHX Text Mark
AutoCAD SHX Text
REVISION
AutoCAD SHX Text Date
AutoCAD SHX Text Initial
AutoCAD SHX Text
PMIS - 225133
AutoCAD SHX Text
REGIONAL MAP PROJECT LOCATION
AutoCAD SHX Text C:\Users\tbentley\Desktop\VOYA Kab\VOYA Kabetogama Ramp COVER.dwg
AutoCAD SHX Text
MWR
AutoCAD SHX Text
PROJECT AREA
AutoCAD SHX Text
AutoCAD SHX Text
VOYAGEURS NATIONAL PARK
AutoCAD SHX Text
KABETOGAMA LAKE BOAT RAMP REPLACEMENT
AutoCAD SHX Text SHEEET SUBSHEET SHEET TITLE SUBSHEET SHEET TITLE SHEET TITLE SHEET TITLE 1 COVER COVER 2 C00 GENERAL NOTES - REPRESENTATIONAL PHOTOGRAPHS C00 GENERAL NOTES - REPRESENTATIONAL PHOTOGRAPHS GENERAL NOTES - REPRESENTATIONAL PHOTOGRAPHS 3 C01 CONSTRUCTION LIMITS, STAGING, AND PROTECTION MEASURES C01 CONSTRUCTION LIMITS, STAGING, AND PROTECTION MEASURES CONSTRUCTION LIMITS, STAGING, AND PROTECTION MEASURES 4 C02 SITE PLAN EXISTING CONDITIONS AND REMOVALS C02 SITE PLAN EXISTING CONDITIONS AND REMOVALS SITE PLAN EXISTING CONDITIONS AND REMOVALS 5 C1 SITE PLAN, GRADING PLAN, SITE GEOMETRY AND NOTES C1 SITE PLAN, GRADING PLAN, SITE GEOMETRY AND NOTES SITE PLAN, GRADING PLAN, SITE GEOMETRY AND NOTES 6 C2 RAMP LONGITUDINAL PROFILE AND SECTIONS C2 RAMP LONGITUDINAL PROFILE AND SECTIONS RAMP LONGITUDINAL PROFILE AND SECTIONS 7 C3 JOINT, REINFORCEMENT & FINISHING PLANS C3 JOINT, REINFORCEMENT & FINISHING PLANS JOINT, REINFORCEMENT & FINISHING PLANS 8 C4 DETAILSC4 DETAILSDETAILS
AutoCAD SHX Text
SHEET INDEX
AutoCAD SHX Text 2/23/2023
AutoCAD SHX Text
VICINITY
AutoCAD SHX Text
MAP
AutoCAD SHX Text
PARK
AutoCAD SHX Text
MAP
AutoCAD SHX Text
SCALE OF KILOMETERS
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
SCALE OF MILES
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
SCALE OF MILES
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
NORTHERN
MINNESOTA
GENERAL NOTES:
1. ALL CONSTRUCTION SHALL BE IN CONFORMANCE WITH THESE PLANS, REFERENCED STANDARDS AND SPECIFICATIONS, AND GENERAL CONDITIONS IN THE CONTRACT.
2. THE CONTRACTOR SHALL BE RESPONSIBLE FOR DETERMINATION OF ALL FINAL QUANTITIES AND METHODS IN ORDER TO CONDUCT THE WORK PRIOR TO SUBMITTING THEIR BID.
3. PROVIDE ALL SUBCONTRACTORS WITH ALL THE NECESSARY CONSTRUCTION DOCUMENT SHEETS AND INFORMATION APPLICABLE TO THEIR AREA OF WORK AS WELL AS WORK
INFLUENCED BY OR INFLUENCES WORK BY OTHER TRADES. .
4. ENSURE THAT ALL REQUIRED COORDINATION IS DONE BEFORE BEGINNING ANY CONSTRUCTION. IT IS THE CONTRACTOR'S RESPONSIBILITY TO OBTAIN ALL REQUIRED
AUTHORIZATION FOR DEMOLITION FROM RESPONSIBLE AGENCIES, CONTRACTING OFFICER AND REPRESENTATIVE, PARK STAFF POINT OF CONTACT, AND FULLY ACKNOWLEDGE
PRIOR TO COMMENCING WORK ON SITE.
5. THE CONTRACTOR SHALL BE RESPONSIBLE FOR MEETING ALL INSPECTION CRITERIA AND SCHEDULES.
6. THE CONTRACTOR SHALL NOT EXCAVATE, REMOVE OR OTHERWISE DISTURB ANY MATERIAL, STRUCTURE OR PART OF A STRUCTURE WHICH IS LOCATED OUTSIDE THE LINES OR
GRADES, ESTABLISHED FOR THIS PROJECT, EXCEPT WHERE SUCH EXCAVATIONS OR REMOVAL IS PROVIDED IN THE CONTRACT, PLANS, OR SPECIFICATIONS.
7. ALL PROPERTY DAMAGED BY CONSTRUCTION ACTIVITIES SHALL BE RESTORED TO A CONDITION EQUAL TO OR BETTER THAN EXISTING AT THE CONTRACTORS EXPENSE. PHOTO
DOCUMENT EXISTING CONDITIONS AND REVIEW WITH PARK CONTRACTING OFFICER REPRESENTATIVE (COR) TO AVOID MIS-IDENTIFICATION OF PRE-EXISTING DAMAGE AS
CONSTRUCTION ACTIVITY CAUSED.
8. ALL WORK AND ALL MATERIALS FURNISHED SHALL BE IN CONFORMITY WITH THE REQUIREMENTS, AND/OR TESTING REQUIREMENTS THAT ARE SPECIFIED IN THE CONTRACT
DOCUMENTS.
9. THE SPECIFICATIONS, NOTES AND PLANS CALL ATTENTION TO CERTAIN REQUIRED FEATURES OF THE CONSTRUCTION BUT DO NOT IMPLY TO COVER ALL MEANS AND METHODS
OF CONSTRUCTION.
10. ALL WORK SHALL BE ACCOMPLISHED TO THE HIGHEST QUALITY CRAFTSMANSHIP INDUSTRY STANDARDS FOR EACH RESPECTIVE TRADE.
11. ALL WORK SHALL BE ACCOMPLISHED IN STRICT ACCORDANCE WITH ALL APPLICABLE LOCAL, STATE, AND FEDERAL CODES AND REGULATIONS.
12. APPARENT ERRORS, DISCREPANCIES OR OMISSIONS ON THE DRAWINGS SHALL BE BROUGHT TO THE CONTRACTING OFFICER'S ATTENTION AS SOON AS THE DISCREPANCY OR
OMISSION IS FOUND. CONTRACTOR SHALL NOT PROCEED WITH WORK AT THE DISCREPANCY OR OMISSION PRIOR TO RECEIVING DIRECTION FROM THE COR.
13. IF DESIGN SPECIFICATION DISCREPANCIES ARE FOUND BETWEEN THESE PLANS AND ANY OTHER CONTRACT DOCUMENT, THE SPECIFICATIONS REQUIREMENT SHALL BE USED.
14. ALL COMMUNICATION REQUESTING CLARIFICATION, DIRECTION AND OR REQUEST FOR INFORMATION (RFI) SHALL BE IN WRITTEN FORM. SUBMIT ALL COMMUNICATION
REQUESTS TO COR AND ONLY WRITTEN RESPONSES FROM THE CO OR COR WILL BE CONSIDERED APPROVED/AUTHORIZED.
15. THE GOVERNMENT WILL NOT BE RESPONSIBLE TO PAY FOR ANY UN-APPROVED MATERIALS NOR MATERIALS NOT INCORPORATED INTO THE SCOPE OF THE PROJECT WORK.
16. AFTER COMPLETION OF CONSTRUCTION, PERFORM SITE CLEANUP OPERATION TO REMOVE ALL TRASH, DEBRIS, EXCESS MATERIALS AND EQUIPMENT. IT SHALL BE THE
CONTRACTOR'S RESPONSIBILITY TO SHOW THE PROJECT SITE CLEAN FOR FINAL ACCEPTANCE.
17. CONTINUOUS ACCESS SHALL BE MAINTAINED FOR THE SURROUNDING AREAS DURING DEMOLITION AND CONSTRUCTION OF THE PROPOSED WORK.
VEHICLE AND EQUIPMENT REQUIREMENTS, LIMITATIONS, AND TRANSPORTATION TO PROJECT SITE:
1. ALL VEHICLES AND EQUIPMENT ACCESSING VOYAGEURS NATIONAL PARK GROUNDS SHALL BE IN PROPER WORKING ORDER WITH NO VISIBLE SIGN OF FUEL OR FLUID LEAK OR
INAPPROPRIATE DISCHARGE. THE COR AND PARK STAFF RESERVE THE RIGHT TO REFUSE ENTRY OR REQUIRE REMOVAL OF ANY VEHICLE OR EQUIPMENT DEMONSTRATING DISREPAIR OR
MALFUNCTION.
2. ALL VEHICLES AND EQUIPMENT SHALL BE OF A SIZE AND MANEUVERABILITY TO NAVIGATE THE EXISTING PARK ROADS AND PROJECT WORK AREAS WITH MINIMAL OVERRUN INTO
UNDISTURBED ADJACENT AREAS. ALL DAMAGE TO PAVEMENT, STRUCTURES, OR PARK LANDSCAPE SHALL BE REPAIRED, REPLACED, OR RESTORED TO EXISTING CONDITIONS OR BETTER AT
NO ADDITIONAL COST TO THE GOVERNMENT.
3. THE CONTRACTOR SHALL BE RESPONSIBLE FOR PROTECTION OF ALL EXISTING AMENITIES WITHIN THE IMMEDIATE AREA OF ACTIVE EQUIPMENT USE (PLYWOOD OR SIMILAR) TO AVOID
MARRING OR OTHER IMPACT DAMAGES. THIS INCLUDES BUT IS NOT LIMITED TO TREES, FENCES, PAVEMENTS, DOCKS, STRUCTURES.
4. THE COR RESERVES THE RIGHT TO REQUIRE ADDITIONAL PROTECTION MEASURES BE PROVIDED AT NO ADDITIONAL COST TO THE GOVERNMENT IF CONSTRUCTION PRACTICES PROVE TO
PLACE THE PARK AMENITIES AT RISK TO DAMAGE OR CONTRACTOR PROACTIVE PROTECTION EFFORTS PROVE TO BE INSUFFICIENT.
5. THE CONTRACTOR SHALL ADHERE TO PARK DEFINED EXOTIC PLANT BEST MANAGEMENT PRACTICES TO AVOID INTRODUCTION INTO THE KABETOGAMA ECOSYSTEM. THIS INCLUDES CHECK
OF TOOLS, VEHICLES AND EQUIPMENT, STAFF WORK SHOES AND CLOTHING TO AVOID MUD, SEED, OR PLANT MATERIAL FROM OFF SITE. CONSTRUCTION MATERIALS STOCKPILED OFF SITE
AT POINT OF PROCUREMENT (AGGREGATE) SHALL ALSO AVOID INTRODUCTION OF EXOTIC PLANT MATERIAL INTO THE PARK.
6. ALL VEHICLES OR EQUIPMENT THAT WILL BE WITHIN THE WATER SHALL BE INSPECTED FOR ABSENCE OF AQUATIC INVASIVE SPECIES. PROCESS OF DECONTAMINATION SHALL INCLUDE
REMOVAL OF ANY VISUAL AQUATIC PLANTS OR INVASIVE SPECIES FROM EQUIPMENT, REQUIRE EQUIPMENT TO BE DRAINED AND DRY FOR A PERIOD OF 5 CALENDAR DAYS IF PREVIOUSLY
WITHIN WATERBODIES WITHIN OTHER PROJECT SITES. ONCE MOBILIZED TO LAKE KABETOGAMA AND OPERATING EXCLUSIVELY WITHIN LAKE KABETOGAMA, ADDITIONAL INSPECTIONS FOR
AQUATIC OR INVASIVE SPECIES ARE NOT REQUIRED WHILE DEDICATED PRESENCE ON THIS SITE ONLY.
SITE REPRESENTATIVE PHOTO GALLERY:
1. THE FOLLOWING PHOTOGRAPHS, TAKEN AUGUST 2022, DEPICT EXISTING CONTEXT OF THE EXISTING BOAT RAMP FOR CONTRACTOR REFERENCE ONLY AND DOES NOT FULLY PHOTO
DOCUMENT THE ENTIRETY OF THE PROJECT AREA NOR CHANGES THAT MAY HAVE TAKEN PLACE SINCE THE DATE OF THE PHOTO TAKEN. BIDDING CONTRACTORS REMAIN RESPONSIBLE
FOR FAMILIARIZING THEMSELVES WITH THE SITE TO THE EXTENT THEY DETERMINE IN ORDER TO PREPARE THEIR BID. THE AWARDED CONTRACTOR SHALL REMAIN RESPONSIBLE FOR
TAKING PRE-CONSTRUCTION PHOTOGRAPHS REQUIRED IN THE SPECIFICATIONS WITHIN THESE DOCUMENTS.
TOP OF RAMP VIEWING TOWARDS LAKE VIEW TOWARDS SHORE FROM FIXED DOCK
TRANSITION AREAS FROM ASPHALT TO RAMP AND PEDESTRIAN WALK ENLARGEMENT OF EXPOSED RAMP TURN DOWN CURB
ORIGINAL RAMP DESIGN DETAILS ORIGINAL RAMP DESIGN GRADING PLAN
EXISTING DESIGN CONDITIONAL NOTES:
1. THE ORIGINAL KABETOGAMA BOAT RAMP WAS DESIGNED IN 1985 BY THE MINNESOTA DEPARTMENT OF NATURAL RESOURCES. THE TWO EXCERPTS PROVIDED HERE ARE FOR THE
CONTRACTOR'S CONVENIENCE ONLY AS TO HOW THE EXISTING RAMP HAS BEEN CONSTRUCTED. THE NATIONAL PARK SERVICE ASSUMES NO LIABILITY FOR THE ACCURACY OF THE
ORIGINAL 1985 DESIGN DOCUMENTS OR THAT THE EXISTING KABETOGAMA BOAT RAMP IS CONSTRUCTED TO THE ENTIRETY OF THESE EXCERPTS FROM THE CONSTRUCTION DOCUMENTS.
2. THE CONTRACTOR SHALL RECEIVE THESE 1985 DESIGN EXCERPTS MERELY TO INFORM OF POTENTIAL EXISTING CONDITIONS. ANY ASSUMPTIONS OR EXPECTATIONS FROM VIEWING THESE
DESIGN EXCERPTS SHALL NO RELIEVE THE CONTRACTOR OF FAMILIARIZING THEMSELVES WITH THE SITE AND BIDDING WORK BASED ON THE CONSTRUCTION DOCUMENTS UNDER THIS
SCOPE OF WORK AND CONTRACTOR CONDUCTED FIELD INVESTIGATIONS.
AutoCAD SHX Text C:\Users\tbentley\Desktop\VOYA Kab\C00 NOTES AND REP PHOTOS.dwg
AutoCAD SHX Text
2/2/2023 4:22:08 PM
AutoCAD SHX Text
PARK 172 PROJECT 80071
AutoCAD SHX Text
PMIS NO.
AutoCAD SHX Text 255133
AutoCAD SHX Text
SHEET
AutoCAD SHX Text
OF 8
AutoCAD SHX Text
VOYAGEURS NATIONAL PARK, INTERNATIONAL FALLS, MINNESOTA
AutoCAD SHX Text
DATE:
AutoCAD SHX Text 02/23/2023
AutoCAD SHX Text
DRAWING NO.
AutoCAD SHX Text
SUBSHEET
AutoCAD SHX Text
DESIGNER:
AutoCAD SHX Text
CADD:
AutoCAD SHX Text
TECH REVIEW:
AutoCAD SHX Text
MJB
AutoCAD SHX Text
MJB / TLB
AutoCAD SHX Text
TLB
AutoCAD SHX Text
INITIAL
AutoCAD SHX Text
SHEET
AutoCAD SHX Text
REVISION
AutoCAD SHX Text
DATE
AutoCAD SHX Text
GENERAL NOTES REPRESENTATIONAL PHOTOS
AutoCAD SHX Text C00
AVOID ANY OBSTRUCTION OF WATERCRAFT GAINING ACCESS TO AND FROM MARINA TO LAKE
AutoCAD SHX Text
ACTIVE CONSTRUCTION AREA - LIMIT EXTENTS OF WORK WITHIN WATER BODY
AutoCAD SHX Text M A R I N A
AutoCAD SHX Text V I S I T O R C E N T E R
AutoCAD SHX Text
LIMITS OF CONSTRUCTION FENCING
AutoCAD SHX Text
CONTRACTOR TO PROVIDE (2) 'BOAT RAMP CLOSED FOR CONSTRUCTION' METAL SIGNS
AutoCAD SHX Text CONTRACTOR TO PROVIDE 'NO PARKING' SIGNAGE WITHIN CENTER PARKING STALLS. CENTER OF LOT TO SERVE AS TURN AROUND FOR PUBLIC DURING CONSTRUCTION.
AutoCAD SHX Text TURF AREA ALLOWED FOR BULK MATERIAL STAGING - CONTRACTOR TO RESTORE TURF PRIOR TO DEMOBILIZING
AutoCAD SHX Text
DO NOT STAGE MATERIALS OR EQUIPMENT ON JETTY TURF
AutoCAD SHX Text
PUBLIC PARKING SHALL REMAIN AT PERIMETER AND VISITOR CENTER STALLS
AutoCAD SHX Text PRIOR TO COFFER DAMMING AND CONSTRUCTION ACTIVITY, PROVIDE AND INSTALL A WEIGHTED TURBIDITY CURTAIN BARRIER TO CONTAIN SEDIMENT DISCHARGE INTO LAKE
AutoCAD SHX Text ALL DEWATERING ACTIVITIES FROM WITHIN THE WORK AREA SHALL BE PUMPED TO TURF GRASS AREA FOR NATURAL INFILTRATION AND NOT BE DISCHARGED DIRECT INTO THE LAKE. PROVIDE STRAW WATTLE SURROUNDING DISCHARGE AREA FOR FURTHER RUNOFF FILTRATION AND EROSION CONTAINMENT. REMOVE SEDIMENT THAT ACCUMULATES AND RESTORE TURFGRASS UPON COMPLETION OF DEWATERING NEEDS PRIOR TO DEMOBILIZATION.
AutoCAD SHX Text COORDINATE WITH COR ALLOWED LOCATION OF CONCRETE WASHOUT LOCATION. WASHOUT SHALL PROVIDE A FULL CONTAINMENT OF DISCHARGE. WASHOUT MATERIAL SHALL BE TRANSPORTED OFF SITE AND LAWFULLY DISPOSED OF. CONTRACTOR SHALL INCLUDE PROPOSED METHOD OF CONCRETE WASHOUT CONTAINMENT IN PRE-CONSTRUCTION SUBMITTALS WITHIN QUALITY CONTROL OR WASTE MANAGEMENT PLANS
AutoCAD SHX Text
CONSTRUCTION FENCING PER STAGING PLAN THIS SHEET.
AutoCAD SHX Text EXISTING PARK VAULT TOILET BUILDING WILL BE CLOSED AND LOCKED BY NPS DURING THE CONSTRUCTION PROCESS
AutoCAD SHX Text FINAL LIMITS OF TURBIDITY BARRIER TO BE DETERMINED BY CONTRACTOR TO ENSURE ENTIRETY OF WORK AREA WITHIN LAKE IS CAPTURED TO CONTAIN SEDIMENT STIRRED UP FROM CONSTRUCTION ACTIVITY IS NOT DISCHARGED INTO THE GREATER LAKE BODY. (BARRIER AS SHOWN ASSUMES EXISTING CRIB DOCK TO REMAIN IN PLACE)
AutoCAD SHX Text
CONSTRUCTION FENCING PER STAGING PLAN THIS SHEET.
AutoCAD SHX Text C:\Users\tbentley\Desktop\VOYA Kab\C01 CONST LIMITS-STAGING-PROTECTION.dwg
AutoCAD SHX Text
2/16/2023 2:31:24 PM
AutoCAD SHX Text
PARK 172 PROJECT 80071
AutoCAD SHX Text
PMIS NO.
AutoCAD SHX Text 255133
AutoCAD SHX Text
SHEET
AutoCAD SHX Text
OF 8
AutoCAD SHX Text
VOYAGEURS NATIONAL PARK, INTERNATIONAL FALLS, MINNESOTA
AutoCAD SHX Text
DATE:
AutoCAD SHX Text 02/17/2023
AutoCAD SHX Text
DRAWING NO.
AutoCAD SHX Text
SUBSHEET
AutoCAD SHX Text
DESIGNER:
AutoCAD SHX Text
CADD:
AutoCAD SHX Text
TECH REVIEW:
AutoCAD SHX Text
MJB
AutoCAD SHX Text
MJB / TLB
AutoCAD SHX Text
TLB
AutoCAD SHX Text
INITIAL
AutoCAD SHX Text
SHEET
AutoCAD SHX Text
REVISION
AutoCAD SHX Text
DATE
AutoCAD SHX Text
1. THE CONTRACTOR SHALL BE ALLOWED TO CLOSE OFF AND HAVE FULL ACCESS TO THE LIMITS OF PARKING LOT, CONSTRUCTION DISTURBANCE AND IDENTIFIED MATERIALS AND EQUIPMENT STAGING AREA AS SHOWN ON 2/C01 AND COORDINATED WITH THE COR. THE CONTRACTOR SHALL DEVELOP PROPOSED SCHEDULES FOR WORK TO TAKE PLACE IN RESPECTIVE AREAS AND OBTAIN APPROVALS FROM THE CONTRACTING OFFICER AND/OR COR FOR ANY NEED TO TEMPORARILY UTILIZE AREAS OUTSIDE THE CONSTRUCTION LIMITS AND DEFINED STAGING AREA. 2. THE CONTRACTOR SHALL PROVIDE FENCING TO SUFFICIENTLY CLOSE OFF WORK AREA FROM ADJACENT PORTION OF PARKING LOT AND GREENSPACE. CONSTRUCTION FENCING SHALL CONSIST OF 42" MINIMUM HIGH VISIBILITY ORANGE FENCING MESH. POSTS SHALL BE GRAVITY SET ON PAVEMENT AS WELL AS ON GRADE (NO DIRECT BURY OR GROUND DISTURBANCE ALLOWED). 3. ALL SECURITY AND PROTECTION OF CONTRACTOR'S EQUIPMENT AND MATERIALS SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR. THE GOVERNMENT WILL NOT BE LIABLE FOR DAMAGE OR THEFT OF CONTRACTOR'S TOOLS OR EQUIPMENT IF STAGED ON THE GROUNDS OF THE NPS PARKLAND. 4. THE CONTRACTOR SHALL BE RESPONSIBLE FOR PUBLIC SAFETY WHEN CONDUCTING WORK ADJACENT TO PUBLICLY ACCESSED AREAS. PROTECTION SHALL INCLUDE METHODS NECESSARY INCLUDING BUT NOT LIMITED TO FENCING, SIGNAGE, OR DEDICATED INDIVIDUAL TO MONITOR AND DIRECT WHEN THE PUBLIC IS PRESENT ADJACENT TO ACTIVE WORK. 5. LOCATION OF TEMPORARY SERVICES ALLOWED WITHIN THE IMMEDIATE PROJECT AREA - DUMPSTER OR SATELLITE TOILET, WILL BE IDENTIFIED BY COR WITH THE CONTRACTOR DURING PRE-CONSTRUCTION MEETING. MAINTAINING TEMPORARY SERVICES SHALL BE THE CONTRACTOR'S RESPONSIBILITY. 6. STAGING OF MATERIALS ON EXISTING ASPHALT PAVEMENT SHALL PROVIDE SUITABLE LEVEL OF PROTECTION TO PREVENT DAMAGE TO THE PAVEMENT. THIS MAY INCLUDE, AT A MINIMUM, PALLETS OR TIMBERS TO CARRY LOAD OF RIGID MATERIALS (I.E. SHEETPILE) OR SHEET MATERIAL (PLYWD) IF DEPOSITING BULK MATERIALS. 7. STAGING OF MATERIALS ON TURFGRASS SHALL RECEIVE RESTORATION OF TURF PRIOR TO DEMOBILIZATION. RESTORATION SHALL INCLUDE AT A MINIMUM SCARIFY AND DECOMPACTION OF SOIL, BROADCAST SEEDING OF TURF MIX, AND TEMPORARY EROSION CONTROL MATTING (60-DAY BIODEGRADABLE MINIMUM). TURFGRASS MIX TO BE 50% PERENNIAL RYEGRASS, 25% CREEPING RED FESCUE, 15% KENTUCKY BLUEGRASS, AND 10% ANNUAL RYEGRASS ('NATURES FINEST MIDWEST MASTER PREMIUM GRASS SEED MIX' - MENARDS SKU 2661112) OR EQUIVALENT.
AutoCAD SHX Text
ACCESS, STAGING, AND PUBLIC PROTECTION NOTES:
AutoCAD SHX Text
KABETOGAMA AREA ACCESS AND STAGING PLAN
AutoCAD SHX Text
AutoCAD SHX Text C01
AutoCAD SHX Text
NO SCALE
AutoCAD SHX Text
1. THE CONTRACTOR SHALL PROVIDE THE NECESSARY MEANS AND METHODS TO COFFERDAM THE PERIMETER OF THE WORK AREA TO EXTENT NECESSARY TO GAIN ACCESS TO EXISTING RAMP REMOVALS, CONDUCTING EARTHWORK, PLACEMENT OF STONE, FORMING AND CONSTRUCTING THE NEW RAMP. CONTRACTOR SHALL DETERMINE WHETHER TO EXTEND COFFERDAM TO ENCAPSULATE THE CRIB DOCK ADJACENT SOUTH OF RAMP IF NECESSARY TO PERFORM THE WORK'S MEANS AND METHODS. LIMITS OF COFFERDAMMING SHALL BE A REASONABLY MINIMUM EXTENT REQUIRED TO ACCOMPLISH THE PROJECT. 2. SUBMIT THE PROPOSED METHOD OF CREATING A COFFERDAM AND DRY WORK AREA TO CONTRACTING OFFICER FOR REVIEW AND APPROVAL. ACCEPTABLE METHODS MAY INCLUDE BUT NOT BE LIMITED TO THE FOLLOWING: SHEET PILING, WATER FILLED BLADDER DAM PRODUCTS, LARGE SCALE SANDBAGS, OR A COMBINATION OF SUITABLE METHODS. INCLUDE PROPOSED INSTALLATION METHOD AS IT RELATES TO POTENTIAL TURBIDITY OR SEDIMENT DISCHARGE INTO THE LAKE.
AutoCAD SHX Text
COFFERDAM SCOPE OF WORK INTENT NOTES:
AutoCAD SHX Text
CONSTRUCTION LIMITS, STAGING, AND PROTECTION MEASURES
AutoCAD SHX Text C01
AutoCAD SHX Text
AutoCAD SHX Text
1. CONTRACTOR TO PROVIDE SIGNAGE WHERE INDICATED ON ACCESS AND STAGING PLAN DRAWING TO DENOTE BOAT RAMP CLOSED FOR CONSTRUCTION AND BOAT RAMP CLOSED FOR CONSTRUCTION AND AND NO PARKING. SIGNS SHALL BE 80 MIL ALUMINUM WITH BLACK TEXT ON ORANGE . SIGNS SHALL BE 80 MIL ALUMINUM WITH BLACK TEXT ON ORANGE FIELD ('BLACK ON ORANGE'), 24"X36" PANEL SIZE FOR BOAT RAMP CLOSURE ROAD SIGN AND 18"X24" FOR NO PARKING. 2. CONTRACTOR SHALL COORDINATE WITH ST. LOUIS COUNTY TO CONFIRM SIGN PANELS ARE COMPLIANT WITH COUNTY ROADS DEPARTMENT REQUIREMENTS. 3. SIGNS ARE TO BE ATTACHED TO SAWHORSE/SANDWICH BOARD TYPE ON GRADE STRUCTURE. DO NOT DIRECT BURY ANY POSTS INTO THE GROUND DUE TO ARCHEOLOGICAL COMPLIANCE WHICH LIMITS GROUND DISTURBANCE.
AutoCAD SHX Text
PUBLIC NOTIFICATION SIGNS NOTES:
AutoCAD SHX Text
MINIMUM ECOLOGICAL PROTECTION MEASURES REQUIREMENTS
AutoCAD SHX Text
AutoCAD SHX Text C01
NO SCALE
+ 100.00
AutoCAD SHX Text
97.12 +
AutoCAD SHX Text
97.10 +
AutoCAD SHX Text
+ 94.24 (T.O. RAMP) 93.56 (GRADE)
AutoCAD SHX Text + 93.42
AutoCAD SHX Text + 95.34
AutoCAD SHX Text + 97.12
AutoCAD SHX Text + 97.86
AutoCAD SHX Text + 96.18
AutoCAD SHX Text + 96.04
AutoCAD SHX Text + 96.04
AutoCAD SHX Text + 93.64
AutoCAD SHX Text + 97.18 (T.O.W.) 96.00 (B.0.W.)
AutoCAD SHX Text (T.O.W.) 97.02 + (B.O.W.) 93.56
AutoCAD SHX Text (T.O.W.) 97.24 + (B.O.W.) 95.28
AutoCAD SHX Text
+ 86.42 (ESTIMATED)
AutoCAD SHX Text
+ 86.64 (ESTIMATED) (APPROX. 28" SEDIMENT 28" SEDIMENT LAYER OVER CONC.)
AutoCAD SHX Text EXISTING ROLL IN DOCK, VISIBLE IN PHOTOS ON SHEET C00 AND WEB BASED AERIAL IMAGERY WILL BE REMOVED BY NPS PRIOR TO CONTRACTOR COMMENCING WITH WORK ON SITE.
AutoCAD SHX Text PROVIDE NEW SAW CUT ALONG ASPHALT TO PROVIDE UNIFORM CLEAN EDGE TO TIE TO NEW CONCRETE.
AutoCAD SHX Text AVOID DISTURBANCE TO EXISTING WOOD TIMBER TIE WALL AND AGGREGATE PATH/LANDING. COORDINATE WITH COR IF EXISTING VISITOR AMENITIES ARE IN CONFLICT WITH ABILITY TO CONDUCT NEW WORK FOR PERMISSIBLE ALLOWANCES TO REMOVE AND REPLACE.
AutoCAD SHX Text
PROTECT EXISTING POLE LIGHT AND CONCRETE PIER FOOTING.
AutoCAD SHX Text AVOID DISTURBANCE TO EXISTING WOOD POST AND PLYWOOD SIGN PANEL. COORDINATE WITH COR IF TEMPORARY REMOVAL OF SIGN BY CONTRACTOR IS NECESSARY IN ORDER TO COMPLETE THE WORK FOR THE NEW CONCRETE RAMP.
AutoCAD SHX Text LAKE ELEVATION AS TAKEN ON 8-26-2022. WATER ELEVATION SEASONALLY VARIES; HOWEVER AS SHOWN REFLECTS AVERAGE MID TO LATE SUMMER WATERLINE
AutoCAD SHX Text 40'X8' TIMBER CRIB DOCK MAY BE TEMPORARILY RELOCATED AND RE-SET BY CONTRACTOR IF REQUIRED BY CONTRACTOR'S MEANS AND METHODS TO AVOID CONFLICT WITH ABILITY TO PERFORM THE WORK. DOCK MAY REMAIN IF CONTRACTOR CAN CONDUCT WORK WITH IT IN PLACE AND ASSUME ALL RESPONSIBILITY TO RESTORE ANY DAMAGE DUE TO CONSTRUCTION ACTIVITY
AutoCAD SHX Text
EXISTING FLOATING DOCK TO BE REMOVED BY NPS PRIOR TO CONTRACTOR COMMENCING WORK
AutoCAD SHX Text REMOVE EXISTING RIP RAP WHEN ENCOUNTERED TO EXTENTS THAT ARE WITHIN LIMITS OF PERFORMING NEW WORK TO FORM AND POUR NEW RAMP. EXISTING RIP RAP, IF WITHIN GRADATION OF NEW WORK RIP RAP SPECIFIED, MAY BE SALVAGED FOR REUSE OR ALLOWED TO REMAIN IN PLACE AND BUILD NEW RIP RAP APRON OVER EXISTING COMPACTED STONE. SEE SHEET C00 FOR EXCERPT OF ORIGINAL MN DNR CONSTRUCTION DETAIL OF RAMP WHICH INFORMS A BASIS THAT RIP RAP MAY BE ENCOUNTERED.
AutoCAD SHX Text REMOVE EXISTING CONCRETE RAMP AND REBAR IN ITS ENTIRETY AND HAUL OFF SITE TO LAWFULLY DISPOSE OF.
AutoCAD SHX Text CONTRACTOR SHALL PROVIDE MEANS AND METHODS TO ESTABLISH A COFFER DAM AND TURBIDITY BARRIER SURROUND OF ACTIVE WORK AREA BELOW SHORE ELEVATION. SEE COFFER DAM NOTES SHEET C01 FOR LEVEL OF PERFORMANCE. LINE AS SHOWN IS REPRESENTATIONAL; HOWEVER MAY NOT BE ULTIMATELY EXTENT REQUIRED. LIMITS TO BE DETERMINED BY CONTRACTOR IN ORDER TO PERFORM THE WORK
AutoCAD SHX Text
REPRESENTATIONAL RIM AND TOE OF EMBANKMENT TO LAKE
AutoCAD SHX Text C:\Users\tbentley\Desktop\VOYA Kab\C02 EXISTING AND REMOVALS.dwg
AutoCAD SHX Text
2/21/2023 2:38:02 PM
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
SITE REMOVALS PLAN
AutoCAD SHX Text
AutoCAD SHX Text C02
AutoCAD SHX Text 1" = 10'-0"
AutoCAD SHX Text
PARK 172 PROJECT 80071
AutoCAD SHX Text
PMIS NO.
AutoCAD SHX Text 255133
AutoCAD SHX Text
SHEET
AutoCAD SHX Text
OF 8
AutoCAD SHX Text
VOYAGEURS NATIONAL PARK, INTERNATIONAL FALLS, MINNESOTA
AutoCAD SHX Text
DATE:
AutoCAD SHX Text 02/23/2023
AutoCAD SHX Text
DRAWING NO.
AutoCAD SHX Text
SUBSHEET
AutoCAD SHX Text
DESIGNER:
AutoCAD SHX Text
CADD:
AutoCAD SHX Text
TECH REVIEW:
AutoCAD SHX Text
MJB
AutoCAD SHX Text
MJB / TLB
AutoCAD SHX Text
TLB
AutoCAD SHX Text
INITIAL
AutoCAD SHX Text
SHEET
AutoCAD SHX Text
REVISION
AutoCAD SHX Text
DATE
AutoCAD SHX Text
1. THE SITE PLAN AS PROVIDED IS BASED ON NPS AVAILABLE INFORMATION AND FIELD MEASUREMENTS. A TOPOGRAPHIC SURVEY HAS NOT BEEN PERFORMED. 2. SPOT ELEVATIONS NOTED ARE NOT TIED TO USGS DATUM. THEY ARE RELATIONAL TO EACH OTHER TO INFORM GENERAL OVERALL TOPOGRAPHIC RELATIONSHIP ACROSS THE PROJECT AREA. 3. THE CONTRACTOR SHALL EMPLOY THEIR MEANS AND METHODS IN FIELD STAKING AND LAYING OUT THE NEW BOAT RAMP TO THE EXTENTS NOTED ON THE LAYOUT PLAN AND DETAILS IN ORDER TO CONSTRUCT THE PROJECT.
AutoCAD SHX Text
SPOT ELEVATIONS AND TOPOGRAPHIC NOTES:
AutoCAD SHX Text GENERAL DEMOLITION AND SITE PREPARATION: 1. DETERMINE THE EXTENT OF DEMOLITION REQUIRED IN ORDER TO PERFORM DETERMINE THE EXTENT OF DEMOLITION REQUIRED IN ORDER TO PERFORM THE CONTRACTED WORK FOR THIS PROJECT. 2. REMOVE AND TRANSPORT DEBRIS IN A MANNER THAT WILL PREVENT REMOVE AND TRANSPORT DEBRIS IN A MANNER THAT WILL PREVENT SPILLAGE ON ADJACENT UNDISTURBED PARK AREAS, ROADS, AND PUBLIC RIGHT-OF-WAY OR PROPERTIES. 3. IDENTIFY WITH COR THE AVAILABLE OPEN SITE AREA AND CONSOLIDATE IDENTIFY WITH COR THE AVAILABLE OPEN SITE AREA AND CONSOLIDATE CONSTRUCTION OPERATIONS AND MATERIAL STORAGE TO MINIMIZE IMPACTS TO THE SURROUNDING LAKE ECOLOGY.
AutoCAD SHX Text
SITE PLAN - EXISTING CONDITIONS AND REMOVALS
AutoCAD SHX Text C02
+ 100.00
AutoCAD SHX Text
97.12 +
AutoCAD SHX Text + 97.86
AutoCAD SHX Text + 97.18 (T.O.W.) 96.00 (B.0.W.)
AutoCAD SHX Text (T.O.W.) 97.02 + (B.O.W.) 93.56
AutoCAD SHX Text (T.O.W.) 97.24 + (B.O.W.) 95.28
AutoCAD SHX Text A
AutoCAD SHX Text A
AutoCAD SHX Text B
AutoCAD SHX Text C
AutoCAD SHX Text C
AutoCAD SHX Text 2+00
AutoCAD SHX Text 1+75
AutoCAD SHX Text 1+50
AutoCAD SHX Text 1+25
AutoCAD SHX Text 1+00
AutoCAD SHX Text B
AutoCAD SHX Text MNDOT CLASS IV RIP RAP AND/OR FIELD STONE. NOTE: MAXIMUM EXTENTS SHOWN. EXISTING EMBEDDED RIP RAP OR REUSE OF EXISTING MAY BE USED TO REDUCE EXTENTS OF NEW MATERIAL REQUIRED.
AutoCAD SHX Text
CONCRETE PAVING NOTES
AutoCAD SHX Text
AutoCAD SHX Text
ALL CONCRETE SHALL BE FORMED AND VIBRATED AS SPECIFIED.
AutoCAD SHX Text
AutoCAD SHX Text
SCREED ALL CONCRETE TO GRADE.
AutoCAD SHX Text
AutoCAD SHX Text V-GROOVE FINISHING SHALL BE DONE AT A 30° ANGLE AS NOTED. GROOVES SHALL BE FORMEDEDGE-TO-EDGE, WITH THE EXCEPTION OF THE 12" SMOOTH AREA FOR THE TOEWALL & 4" CURB.
AutoCAD SHX Text
AutoCAD SHX Text REBAR SPLICES REQUIRE A 30" STAGGERED LAP. TIE WIRE SHALL BE 16 GA. EPOXY COATED WIRE.
AutoCAD SHX Text
AutoCAD SHX Text #6 REBAR SHALL BE TIED AT EACH INTERSECTION OF BARS. SET BARS ON APPROVED SADDLE-TYPE CHAIRS. CHAIRS SHALL BE PLACED 4' O.C. MAXIMUM IN BOTH DIRECTIONS.
AutoCAD SHX Text
AutoCAD SHX Text ALL REINFORCING BARS SHALL HAVE A 2" CLEARANCE FROM ANY FORMED CONCRETE EDGE AND A 3" CLEARANCE FROM NON-FORMED EDGES.
AutoCAD SHX Text
AutoCAD SHX Text REINFORCING BARS SHALL BE CENTERED AT 1/2 THE VERTICAL PAVEMENT THICKNESS, AND AT 1/2 THE HORIZONTAL WIDTH OF THE HEADWALL, TOEWALL & BOTH SIDEWALLS.
AutoCAD SHX Text
AutoCAD SHX Text
EXPANSION & CONTROL JOINTS SHALL BE CONSTRUCTED AS SHOWN AND AS SPECIFIED.
AutoCAD SHX Text
CONSTRUCTION NOTES
AutoCAD SHX Text
AutoCAD SHX Text MNDOT CLASS IV RIP RAP AND/OR FIELD STONE SHALL NOT PROTRUDE ABOVE THE FINISHED SURFACE OF THE CONCRETE RAMP.
AutoCAD SHX Text
AutoCAD SHX Text MNDOT CLASS IV RIP RAP, FIELD STONE, OR A COMBINATION OF BOTH, MAY BE USED AS SHOWN--WHICHEVER OPTION IS MOST COST EFFECTIVE.
AutoCAD SHX Text
AutoCAD SHX Text ONCE DEWATERING AND DEMOLITION OF THE SITE ARE COMPLETE, EXCAVATE TO THE TOP OF THE SUBGRADE ELEVATION.
AutoCAD SHX Text
AutoCAD SHX Text THOROUGHLY DISC/MIX THE TOP 12" OF SUBGRADE MATERIAL. EXCAVATE AND STOCKPILE TOP 12" OF SUBGRADE SOIL ON SITE, AS APPROVED BY THE COR. THOROUGHLY COMPACT AND PROOFROLL THE RESULTING SURFACE (TO INCLUDE THE BOTTOM SURFACES OF THE HEADWALL, SIDEWALLS, TOEWALL, AND RIP RAP AREAS) WITH A 10-TON (MINIMUM), TANDEM-DRUM VIBRATING ROLLER.
AutoCAD SHX Text
AutoCAD SHX Text AFTER LOWER SURFACE COMPACTION AND PROOF-ROLLING, SPREAD AND THOROUGHLY COMPACT STOCKPILED SUBGRADE MATERIAL IN 6" MAXIMUM FINISHED LIFTS. SPREAD ADDITIONAL SUITABLE SUBGRADE SOIL (APPROVED BY THE GEOTECHNICAL TESTING AGENCY) AS NECESSARY, AND COMPACT IN 6" MAXIMUM FINISHED LIFTS. PROOFROLL THE EXISTING RAMP SUBGRADE, AND ALL OTHER SURROUNDING EXCAVATED AREAS POSSIBLE, WITH A 10-TON (MINIMUM), TANDEM-DRUM VIBRATING ROLLER.
AutoCAD SHX Text
AutoCAD SHX Text ALL COMPACTION AND PROOFROLLING ACTIVITIES SHALL BE DONE IN THE PRESENCE OF A REPRESENTATIVE OF THE GEOTECHNICAL TESTING AGENCY AND THE COR.
AutoCAD SHX Text
AutoCAD SHX Text COMPACT THE SURFACE AND SUBRADE (SEE NOTES 4 AND 5) WITH VIBRATION, BUT NATIVE SOIL PROPERTIES MAY PRESENT DIFFICULTIES. IF DIFFICULTY IS ENCOUNTERED, COMPACT THE SURFACE AND SUBGRADE WITH ROLLER IN STATIC MODE.
AutoCAD SHX Text
AutoCAD SHX Text PROOFROLL THE SURFACE AND SUBGRADE (SEE NOTES 4 AND 5) WITH THE ROLLER IN STATIC MODE. PROOFROLL IN 1 (ONE) DIRECTION, COVER THE ENTIRE SURFACE, AND LIMIT SPEED TO APPROXIMATELY 3 MILES PER HOUR.
AutoCAD SHX Text
AutoCAD SHX Text SOFT OR UNSATISFACTORY SOILS IDENTIFIED BY THE REPRESENTATIVE FROM THE GEOTECHNICAL TESTING AGENCY SHALL BE OVEREXCAVATED TO DEPTHS AND LIMITS AS DETERMINED BY THE REPRESNETATIVE, REPLACED WITH SATISFACTORY SOILS, AND RECOMPACTED.
AutoCAD SHX Text
AutoCAD SHX Text PLACE GEOTEXTILE FABRIC AS SPECIFIED, AND ACCORDING TO MANUFACTURER'S RECOMMENDATIONS. SEE SPECIFICATION 31 05 19 GEOTEXTILE.
AutoCAD SHX Text
AutoCAD SHX Text PLACE AND THOROUGHLY COMPACT VIRGIN CLASS 5 BASE AGGREGATE IN 6" FINISHED LIFT. COMPACT WITH ROLLER (IDENTIFIED IN NOTE 4).
AutoCAD SHX Text
AutoCAD SHX Text PROOFROLL VIRGIN CLASS 5 BASE LAYER FOOTPRINT AT FINISHED GRADE WITH ROLLER (IDENTIFIED IN NOTE 4) IN STATIC MODE. PROOFROLL ENTIRE FOOTPRINT IN ONE DIRECTION, NOT EXCEEDING APPROXIMATELY 3 MPH. CONTRACTOR'S GEOTECHNICAL ENGINEER (TESTING AGENCY) SHALL IDENTIFY AREAS WITH UNSUITABLE MATERIAL. CAREFULLY REMOVE UNSUITABLE MATERIAL, REPLACE WITH SUITABLE MATERIAL AS DIRECTED BY THE GEOTECHNICAL ENGINEER (TESTING AGENCY), RECOMPACT, AND PROOFROLL THE FOOTPRINT AGAIN AS NECESSARY.
AutoCAD SHX Text
AutoCAD SHX Text MNDOT CLASS IV RIP RAP AND/OR FIELD STONE SHALL BE TAPERED INTO THE EXISTING GRADE AS SHOWN AT A 3:1 SLOPE. IF RIP RAP AND/OR FIELD STONE IS BEING PLACED IN AN EXCAVATED AREA, THERE IS NO NEED FOR TAPERING, SIMPLY CONSTRUCT THE 4'-WIDE RIP RAP AND/OR FIELD STONE AREA.
AutoCAD SHX Text
AutoCAD SHX Text CUT AND FILL AREAS ADJACENT TO RAMP AS NECESSARY TO ELIMINATE ALL HIGH AND LOW AREAS (ABOVE OR BELOW RAMP SURFACE). CUT AND/OR FILL AREAS ABOVE WATER AND ADJACENT TO THE RAMP OR RIP RAP AND/OR FIELD STONE AREAS SHALL BE TAPERED AT A 5:1 SLOPE IF POSSIBLE.
AutoCAD SHX Text
AutoCAD SHX Text SPREAD AND COMPACT 3" OF APPROVED TOPSOIL, AS SPECIFIED, OVER FILL AREAS ON sSITE AREAS WHICH RECEIVED NEW EARTHWORK ACTIVITIES REQUIRING SEEDING.
AutoCAD SHX Text
AutoCAD SHX Text DISTURBED SOIL AREAS SHALL BE SEEDED WITH A PERENNIAL RYE DOMINANT MIX. TURFGRASS MIX TURFGRASS MIX TO BE 50% PERENNIAL RYEGRASS, 25% CREEPING RED FESCUE, 15% KENTUCKY BLUEGRASS, AND 10% ANNUAL RYEGRASS ('NATURES FINEST MIDWEST MASTER PREMIUM GRASS SEED MIX' - MENARDS SKU 2661112) OR EQUIVALENT
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text 1" = 10'
AutoCAD SHX Text
PARK 172 PROJECT 80071
AutoCAD SHX Text
PMIS NO.
AutoCAD SHX Text 255133
AutoCAD SHX Text
SHEET
AutoCAD SHX Text
OF 8
AutoCAD SHX Text
VOYAGEURS NATIONAL PARK, INTERNATIONAL FALLS, MINNESOTA
AutoCAD SHX Text
DATE:
AutoCAD SHX Text 02/23/2023
AutoCAD SHX Text
DRAWING NO.
AutoCAD SHX Text
SUBSHEET
AutoCAD SHX Text
DESIGNER:
AutoCAD SHX Text
CADD:
AutoCAD SHX Text
TECH REVIEW:
AutoCAD SHX Text
MJB
AutoCAD SHX Text
MJB / TLB
AutoCAD SHX Text
TLB
AutoCAD SHX Text
INITIAL
AutoCAD SHX Text
SHEET
AutoCAD SHX Text
REVISION
AutoCAD SHX Text
DATE
AutoCAD SHX Text
SITE PLAN, GRADING PLAN, SITE GEOMETRY & NOTES
AutoCAD SHX Text C1
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text 1+00
AutoCAD SHX Text 1+25
AutoCAD SHX Text 1+50
AutoCAD SHX Text 1+75
AutoCAD SHX Text 2+00
AutoCAD SHX Text
PVC
AutoCAD SHX Text 1+2.47
AutoCAD SHX Text
PVI
AutoCAD SHX Text 1+28.00
AutoCAD SHX Text
PVT
AutoCAD SHX Text 1+53.53
AutoCAD SHX Text RAMP ELEVATIONS ALONG VERTICAL CURVE PVC = 97.09 = 97.09 97.09 1+10.00 = 96.94 = 96.94 96.94 1+20.00 = 96.54 = 96.54 96.54 1+28.00 = 96.04 = 96.04 96.04 1+35.00 = 95.47 = 95.47 95.47 1+45.00 = 94.47 = 94.47 94.47 PVT = 93.41= 93.4193.41
AutoCAD SHX Text
93.42 (GIVEN WSE)
AutoCAD SHX Text MNDOT CLASS IV RIP RAP AND/OR FIELD STONE, FULL DEPTH FROM CURB TOP TO TOE WALL BOTTOM
AutoCAD SHX Text GEOTEXTILE FABRIC BENEATH BASE COURSE, RIP RAP, SIDEWALL & TOEWALL UP TO TOP OF RIP RAP PROTECTION (SEE SPECIFICATION 31 05 19)
AutoCAD SHX Text
END GEOTEXTILE FABRIC
AutoCAD SHX Text 1+40.00
AutoCAD SHX Text
6" THOROUGHLY COMPACTED VIRGIN CLASS 5 AGGREGATE BASE
AutoCAD SHX Text
EXISTING ACC PAVEMENT
AutoCAD SHX Text
PROFILE: SECTION A-A
AutoCAD SHX Text GEOTEXTILE FABRIC BENEATH BASE COURSE, RIP RAP, SIDEWALL & TOEWALL UP TO TOP OF RIP RAP PROTECTION (SEE SPECIFICATION 31 05 19)
AutoCAD SHX Text
CONSTRUCT TOEWALL WITH 4" CURB
AutoCAD SHX Text 2+5.00
AutoCAD SHX Text
PROP. 7" CONCRETE BOAT RAMP
AutoCAD SHX Text
#6 BARS @ 12" O.C. MAX. BOTH DIRECTIONS
AutoCAD SHX Text
3:1 SLOPE TO EX. GRADE
AutoCAD SHX Text
ELEV=97.11
AutoCAD SHX Text 1+00
AutoCAD SHX Text
SEE DETAIL A
AutoCAD SHX Text
SEE DETAIL B
AutoCAD SHX Text
PROP. 7" CONCRETE BOAT RAMP
AutoCAD SHX Text
#6 BARS @12" O.C. MAX. BOTH DIRECTIONS
AutoCAD SHX Text
6" THOROUGHLY COMPACTED VIRGIN CLASS 5 AGGREGATE BASE
AutoCAD SHX Text
SECTION B-B NTS
AutoCAD SHX Text OVEREXCAVATE SUBGRADE TO 11" DEPTH, THOROUGHLY MIX & COMPACT IN 6" FINISHED LIFTS
AutoCAD SHX Text
SEE DETAIL F
AutoCAD SHX Text
PROP. 7" CONCRETE BOAT RAMP
AutoCAD SHX Text
#6 BARS @12" O.C. MAX. BOTH DIRECTIONS
AutoCAD SHX Text
6" THOROUGHLY COMPACTED VIRGIN CLASS 5 AGGREGATE BASE
AutoCAD SHX Text GEOTEXTILE FABRIC BENEATH BASE COURSE, RIP RAP, SIDEWALL & TOEWALL UP TO TOP OF RIP RAP PROTECTION (SEE SPECIFICATION 31 05 19)
AutoCAD SHX Text
SECTION C-C NTS
AutoCAD SHX Text GEOTEXTILE FABRIC BENEATH BASE COURSE, RIP RAP, SIDEWALL & TOEWALL UP TO TOP OF RIP RAP PROTECTION (SEE SPECIFICATION 31 05 19)
AutoCAD SHX Text OVEREXCAVATE SUBGRADE TO 11" DEPTH, THOROUGHLY MIX & COMPACT IN 6" FINISHED LIFTS
AutoCAD SHX Text
MNDOT CLASS IV RIP RAP AND/OR FIELD STONE
AutoCAD SHX Text
3:1 SLOPE TO EXISTING GRADE REQUIRED UNLESS RIP RAP IS BELOW GRADE
AutoCAD SHX Text
SEE DETAIL G
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
HORIZONTAL SCALE: 1" = 10'
AutoCAD SHX Text
AutoCAD SHX Text
RAMP LONGITUDINAL PROFILE & SECTIONS
AutoCAD SHX Text C2
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
VERTICAL SCALE: 1" = 5'
AutoCAD SHX Text
PARK 172 PROJECT 80071
AutoCAD SHX Text
PMIS NO.
AutoCAD SHX Text 255133
AutoCAD SHX Text
SHEET
AutoCAD SHX Text
OF 8
AutoCAD SHX Text
VOYAGEURS NATIONAL PARK, INTERNATIONAL FALLS, MINNESOTA
AutoCAD SHX Text
DATE:
AutoCAD SHX Text 02/23/2023
AutoCAD SHX Text
DRAWING NO.
AutoCAD SHX Text
SUBSHEET
AutoCAD SHX Text
DESIGNER:
AutoCAD SHX Text
CADD:
AutoCAD SHX Text
TECH REVIEW:
AutoCAD SHX Text
MJB
AutoCAD SHX Text
MJB / TLB
AutoCAD SHX Text
TLB
AutoCAD SHX Text
INITIAL
AutoCAD SHX Text
SHEET
AutoCAD SHX Text
REVISION
DATE
12, 9' X 11' PANELS
AutoCAD SHX Text
28, 9' X 9' PANELS
AutoCAD SHX Text
4, 9' X 8' PANELS
AutoCAD SHX Text
TOEWALL WITH 4" CURB
AutoCAD SHX Text
EXPANSION JOINT (SEE DETAIL C)
AutoCAD SHX Text
ALL OTHER JOINTS ARE CONTROL JOINTS (SEE DETAIL D)
AutoCAD SHX Text
SIDEWALL OUTER EDGES SHALL BE BEVELED (SEE DETAILS F & G)
AutoCAD SHX Text
SIDEWALL OUTER EDGES SHALL BE BEVELED (SEE DETAILS F & G)
AutoCAD SHX Text
12" SMOOTH AREA FOR TOEWALL WITH 4" CURB
AutoCAD SHX Text
V-GROOVE FINISH AT 30°(SEE DETAIL E)
AutoCAD SHX Text
#6 REBAR @12" O.C. MAX BOTH WAYS
AutoCAD SHX Text
#6 REBAR @12" O.C. MAX BOTH WAYS
AutoCAD SHX Text
AutoCAD SHX Text
JOINT, REINFORCEMENT & FINISHING PLANS
AutoCAD SHX Text C3
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text 1" = 10'
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text 1" = 10'
AutoCAD SHX Text
PARK 172 PROJECT 80071
AutoCAD SHX Text
PMIS NO.
AutoCAD SHX Text 255133
AutoCAD SHX Text
SHEET
AutoCAD SHX Text
OF 8
AutoCAD SHX Text
VOYAGEURS NATIONAL PARK, INTERNATIONAL FALLS, MINNESOTA
AutoCAD SHX Text
DATE:
AutoCAD SHX Text 02/23/2023
AutoCAD SHX Text
DRAWING NO.
AutoCAD SHX Text
SUBSHEET
AutoCAD SHX Text
DESIGNER:
AutoCAD SHX Text
CADD:
AutoCAD SHX Text
TECH REVIEW:
AutoCAD SHX Text
MJB
AutoCAD SHX Text
MJB / TLB
AutoCAD SHX Text
TLB
AutoCAD SHX Text
INITIAL
AutoCAD SHX Text
SHEET
AutoCAD SHX Text
REVISION
3, #6 CONTINUOUS BARS
AutoCAD SHX Text
DETAIL B TOEWALL WITH 4" CURB NTS
AutoCAD SHX Text GEOTEXTILE FABRIC BENEATH BASE COURSE, RIP RAP, SIDEWALL & TOEWALL UP TO TOP OF RIP RAP PROTECTION
AutoCAD SHX Text
EX. ACC PAVEMENT
AutoCAD SHX Text
PROP. 7" CONCRETE BOAT RAMP WITH HEADWALL
AutoCAD SHX Text
3, #6 CONTINUOUS BARS
AutoCAD SHX Text
DETAIL A HEADWALL & TIE-IN TO EXISTING ACC PAVEMENT NTS
AutoCAD SHX Text
1" MIN. EXPANSION JOINT (SEE DETAIL C)
AutoCAD SHX Text
PAVEMENT SURFACE
AutoCAD SHX Text
HEAT-POURED, EXPANDABLE JOINT SEALANT
AutoCAD SHX Text
HEAT-RESISTANT BACKER ROD WITH 125% JOINT WIDTH
AutoCAD SHX Text
BITUMINOUS JOINT FILLER MATERIAL
AutoCAD SHX Text
DETAIL C EXPANSION/CONSTRUCTION JOINT NTS
AutoCAD SHX Text
PAVEMENT SURFACE
AutoCAD SHX Text
HEAT-POURED, EXPANDABLE JOINT SEALANT
AutoCAD SHX Text
HEAT-RESISTANT BACKER ROD WITH 125% JOINT WIDTH
AutoCAD SHX Text
INDUCED CRACKING
AutoCAD SHX Text NOTES 1. "T" IS THE THICKNESS OF THE PAVEMENT. "T" IS THE THICKNESS OF THE PAVEMENT. 2. JOINT CREATION SHALL BE COMPLETED WITH 2 CUTS, WITH POWER SAWS THAT JOINT CREATION SHALL BE COMPLETED WITH 2 CUTS, WITH POWER SAWS THAT HAVE SHATTERPROOF DIAMOND-RIMMED BLADES. THE INITIAL CUT SHALL BE " 18" WIDE. 3. INITIAL CONTROL JOINT CUTS SHALL TAKE PLACE WITHIN 6 HOURS OF INITIAL CONTROL JOINT CUTS SHALL TAKE PLACE WITHIN 6 HOURS OF CONCRETE PLACEMENT, OR AS SOON AS SAWING CAN BE CONDUCTED WITHOUT RAVELLING OR DISLODGING AGGREGATE.
AutoCAD SHX Text
DETAIL D CONTROL JOINT NTS
AutoCAD SHX Text
DETAIL E V-GROOVE FINISH NTS
AutoCAD SHX Text
DETAIL F SIDEWALL FOR SECTION B-B NTS
AutoCAD SHX Text
3, #6 CONTINUOUS BARS
AutoCAD SHX Text
3, #6 CONTINUOUS BARS
AutoCAD SHX Text
DETAIL G SIDEWALL FOR SECTION C-C NTS
AutoCAD SHX Text GEOTEXTILE FABRIC BENEATH BASE COURSE, RIP RAP, SIDEWALL & TOEWALL UP TO TOP OF RIP RAP PROTECTION (SEE SPECIFICATION 31 05 19)
AutoCAD SHX Text
3:1 SLOPE TO EXISTING GRADE REQUIRED UNLESS RIP RAP IS BELOW GRADE
AutoCAD SHX Text
DETAIL H CONSTRUCTION JOINT NTS
AutoCAD SHX Text
3, #6 CONTINUOUS BARS
AutoCAD SHX Text
#6 BENT REBAR @12" O.C.
AutoCAD SHX Text
CONSTRUCTION JOINT SEE DETAIL C
AutoCAD SHX Text
#6 REBAR @12" O.C.
AutoCAD SHX Text NOTES 1. CONSTRUCTION JOINT IS REQUIRED ONLY IF RAMP CANNOT BE CONSTRUCTION JOINT IS REQUIRED ONLY IF RAMP CANNOT BE ONLY IF RAMP CANNOT BE IF RAMP CANNOT BE COMPLETED IN ONE CONTINUOUS PLACEMENT. 2. CONSTRUCTION JOINTS SHALL NOT BE EMPLOYED UNLESS APPROVED CONSTRUCTION JOINTS SHALL NOT BE EMPLOYED UNLESS APPROVED BY THE COR. 3. CONTRACTOR SHALL SUBMIT A CONCRETE PLACEMENT PLAN, IF CONTRACTOR SHALL SUBMIT A CONCRETE PLACEMENT PLAN, IF RAMP CANNOT BE COMPLETED IN ONE CONTINUOUS PLACEMENT, TO THE COR FOR APPROVAL. 4. PLACEMENT PLAN SHALL IDENTIFY LOCATIONS OF ALL PROPOSED PLACEMENT PLAN SHALL IDENTIFY LOCATIONS OF ALL PROPOSED CONSTRUCTION JOINTS. 5. CONSTRUCTION JOINTS SHALL BE PLACED AT ELEVATIONS ABOVE CONSTRUCTION JOINTS SHALL BE PLACED AT ELEVATIONS ABOVE THE GIVEN WATER SURFACE ELEVATION - NO UNDERWATER CONSTRUCTION JOINTS SHALL BE PERMITTED.
AutoCAD SHX Text
AutoCAD SHX Text
DETAILS
AutoCAD SHX Text C4
AutoCAD SHX Text
PARK 172 PROJECT 80071
AutoCAD SHX Text
PMIS NO.
AutoCAD SHX Text 255133
AutoCAD SHX Text
SHEET
AutoCAD SHX Text
OF 8
AutoCAD SHX Text
VOYAGEURS NATIONAL PARK, INTERNATIONAL FALLS, MINNESOTA
AutoCAD SHX Text
DATE:
AutoCAD SHX Text 02/23/2023
AutoCAD SHX Text
DRAWING NO.
AutoCAD SHX Text
SUBSHEET
AutoCAD SHX Text
DESIGNER:
AutoCAD SHX Text
CADD:
AutoCAD SHX Text
TECH REVIEW:
AutoCAD SHX Text
MJB
AutoCAD SHX Text
MJB / TLB
AutoCAD SHX Text
TLB
AutoCAD SHX Text
INITIAL
AutoCAD SHX Text
SHEET
AutoCAD SHX Text
REVISION
| Sheets and Views |
| C00 |
| C00 NOTES AND REP PHOTOS.pdf |
| Sheets and Views |
| C02 |
| C01 CONST LIMITS-STAGING-PROTECTION.pdf |
| Sheets and Views |
| C02 |
| OLE1 |
| C02 EXISTING AND REMOVALS.pdf |
| Sheets and Views |
| C02 |
| OLE1 |
| Kabetogama Boat Ramp - MJB Work-C1.pdf |
| Sheets and Views |
| C1 |
| Kabetogama Boat Ramp - MJB Work-C2.pdf |
| Sheets and Views |
| C2 |
| Kabetogama Boat Ramp - MJB Work-C3.pdf |
| Sheets and Views |
| C3 |
| Kabetogama Boat Ramp - MJB Work-C4.pdf |
| Sheets and Views |
| C4 |
File details come from the government source that posted it. Updated .