Attachment_D_Schedule_of_Work_Items.docx

DOCX document 30 KB Posted

Attached to
Haulout Research Vessel STURGEON
Solicitation number
140G0121R0021
Issued by

About this file

This document contains a solicitation for haulout, inspection, maintenance, and repair services for the Research Vessel STURGEON. Key details include: The U.S. Geological Survey requires haulout of the vessel from Cheboygan, Michigan to a dry dock for pressure washing and painting of the hull and rub rails, emptying and cleaning of tanks, cleaning and refurbishing of propellers, diagnosing and repairing keel cooler leaks, coating the anchor chain, repairing wet lab deck drains, installing an emergency steering system and other systems. The solicitation number is 140G0121R0021 and proposals are due on or around July 15, 2021 with award by August 13, 2021. Services are to be performed between December 2021 to April 2022. The NAICS code is 336611 with a small business size standard of 1,250 employees, and this RFP will be set aside for small business. The contractor will be responsible for launching the vessel upon completion of inspection, maintenance, and repair services.

View the file

Other files

Show all 17

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

July 10, 2014, Rev 3 Schedule of Pricing Maintenance and Repair of Research Vessel STURGEON

OPTION

SPEC. REF.

WORK ITEM
PRICE
4.1
Hauling, Blocking and Launching
6.1
Hull High Pressure Wash and Visual Inspection
6.2
Underwater Hull Coating
6.3
ABS Survey - Load Line
6.4
Clean and Inspect All Tanks and Voids
6.5
Ultrasonic Gauging of Hull
7.1
Inspect Propulsion Shafts and Propeller in Place
7.2
Inspect, Clean, and Refurbish Propellers
7.3
Remove Propulsion Shafts and Inspect
7.4
Bow Thruster Inspection and Maintenance
7.5
Inspect Rudders
8.1
Diagnose Keel Cooler Leaks
8.1a
Repair Keel Cooler Leaks
8.2
Inspect and Coat Anchor Chain
8.3
Repair Wet Lab Deck Drains
8.4
Install a Helm Pump Emergency Steering System In Lazarette
8.5
Install Limit Switches on Steering System
8.6
Repair Rudder Stops
8.7
Install Heated Windows in Pilot House
8.8
Replace Existing Vinyl Floor Tiles
8.9
Paint Exterior Hull and Rub Rails
8.10
Prepare and Paint Railings on 01 Deck
8.11
Install Ship’s Name as Welded Letters
8.12
Renew Coatings in Lazarette
8.13
Replace 120 V Furuno Radar
8.14
Install New Ceiling System
8.15
Install Propulsion Shaft Stuffing Box Sensors
8.16
Replace Transducers and Repair Transducer Bilge and Valving
8.17
Flush Water Tank Coating Repairs
8.18
Install Cabling for Fisheries Environment for Electronic Data (FEED) System
8.19
Clean Ship
8.20
Provide Support for Inclining Test
8.21
Install Marport Hydrophones on Hull
OPTION
Tbd
Install Hydrophone Housings and Hydrophones

TOTAL

LABOR RATES

Shipyard Labor
$/hr
Crane/forklift
$/hr
Material Markup
%
Subcontractor Markup
%

Shipyard Labor: The Contractor’s fully loaded man-hour rate will be used for negotiating change orders, if necessary. The contractor agrees that the number of man hours included in its price proposal for such modifications shall include only direct production man-hours. For these purposes, direct production man-hours are for skilled labor at the journeyman level expended in direct production, inspection, repair, or installation as exemplified by the following functions:

140G0121R0021 Attachment E Release of Claims

Foremen and Shop Supervisors General Labor Rigging Staging/scaffolding Welding Machinists (inside and outside) Fire Watch Burning Brazing Abrasive cleaning/blasting Tank cleaning Carpentry Electrical Work Lagging Ship-fitting Painting Sheet-metal Work Pipefitting Diesel Mechanics Marine Chemist Nondestructive Testing Navigation/Communications Electronics Hydraulic Crane and winch inspection and maintenance Material handling & Warehousing

Project Management & Engineering: Project Management & Engineering support functions shall be considered to be included in the Offeror’s fully loaded rate for direct production man-hours. Examples of support functions include:

Planning Quality Assurance Testing Engineering Design Lofting

G14PS00428
Attachment D Schedule of Pricing

Amendment 0002

File details come from the government source that posted it. Updated .