This document provides details for a federal solicitation to rehabilitate the Red Bluff Campground. The solicitation was issued by the Department of Agriculture Forest Service seeking interested parties to coordinate a pre-bid site visit by July 26th, 2021 through contact with Darren Morris. The solicitation and attached documents contain full details regarding the campground rehabilitation project, including required services, response timing and contractual terms. Interested vendors should review the solicitation package for all project and bidding requirements prior to the listed coordination deadline for a pre-bid site visit.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Pre-Bid Q-A.docx | DOCX document | |
| Attachment C - Plans - Part 1A.pdf | ||
| Attachment G - Davis Bacon Wage Determination - Building.pdf | ||
| 12445521B0005.pdf | ||
| Attachment E - Plans - Part 2.pdf | ||
| Attachment A - Schedule of Items.xlsx | XLSX spreadsheet | |
| Attachment B - Specifications.pdf | ||
| Attachment F - Davis Bacon Wage Determination - Highway.pdf | ||
| Attachment H - Davis Bacon Wage Determination - Heavy.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DOUBLE UNIT
23 SINGLE CAMPSITES, 2 DOUBLE CAMP SITES, 1 HOST SITE
LEGEND
NORTH LOOP CAMP SITES
22 SINGLE SITES & 1 HOST SITE
2 DOUBLE SITES
NMSB-2; CT-3
(1200 AMPS)
PANEL 21
(400 AMPS)
1,3 (3) 300 kcmil AL, (1)#4 CuGr - 3"C
2,4 (3) 300 kcmil AL, (1)#4 CuGr - 3"C
9,11 (3) 300 kcmil AL, (1)#4 CuGr - 3"C
5,7 (3) #4/0 AL,
#6 CuGr - 3"C
2,4 (3) 300 kcmil AL, #4 CuGr - 3"C
5,7 (2) Sets (3) 350 AL, (1)#1 CuGr - 3"C
(4) Sets (3) 500 kcmil AL, (1)250 kcmil CuGr - 3.5"C
TRANSFORMER
5,7 (3) 300 kcmil AL, (1)#4 CuGr - 3"C
1,3 (3) 300 kcmil AL, (1)#4 CuGr - 3"C
(4)Sets (3) 500 kcmil AL, (1)250 kcmil CuGr - 3.5"C
1,3 - 3 Sets (3) 350 kcmil AL, (1)#4 CuGr - 3"C
6,8 (3) 300 kcmil AL, (1)#4 CuGr - 3"C
2,4 (3) 300 kcmil AL, (1)#4 CuGr - 3"C
2,4 (3) 350 kcmil AL, (1)#4 CuGr - 3"C
1,3(3) 300 kcmil AL, (1)#4 CuGr - 3"C
5,7(3) #1/10AL,
(1)#4 CuGr - 3"C
PANEL 20
(400 AMPS)
TRANSFORMER
PANEL 10
(600 AMPS)
NMSB-1; CT-2
(1200 AMPS)
9,11 (3) Sets 250 kcmil AL, (1)#2/0 CuGr - 3"C
2,4 (3) #1/0AL,
(1)#6 CuGr - 2"C
2 SEE KEY NOTES
1 SEE KEY NOTES
NEW UTILITY COMPANY TRANSFORMER, COORDINATE LOCATION
AND INSTALL REQUIREMENTS WITH UTILITY COMPANY
NEW SERVICE PANEL OR SUBPANEL
NEW PRIMARY UNDERGROUND CONDUCTORS. COMPLY WITH UTILITY
COMPANY REQUIREMENTS.
NEW UNDERGROUND SERVICE CONDUCTORS AND FEEDERS
6,8 (2) Separate 120V
Crk's ea. with (2) #10 Cu
(1) #12 CuGr 2" C
6,8 (3) 350 kcmil AL, (1)#4 CuGr - 3"C
6,8 (2) Separate 120V
Crk's ea. with (2) #10 Cu
(1) #12 CuGr 2" C
6,8 - 2 Sets (3) 350 kcmil AL, (1)#1 CuGr - 3"C
1,3 (3) #1/0AL,
(1)#6 CuGr - 2"C
SHOWER
BUILDING
WELL HOUSE
SINGLE TOILET BLDG
DOUBLE TOILET BLDG
EXISTING TRANSFORMER
CONTRACTOR SHALL
COORDINATE WITH UTILITY
PROVIDER FOR EXACT
LOCATION OF TRANSFORMER
AND PRIMARY CONDUCTORS
SEE KEY NOTES
3 SEE KEY NOTES
GROUP LOOP CAMP SITES
9 DOUBLE SITES
NOTE; PRIMARY CONDUCTORS,
TRANSFORMER/METER, 1220 AMP
SERVICE PANEL AND FEEDER TO
400 AMP AND SUBPANEL INCLUDED
IN THE BASE BID.
SINGLE LEAF GATE
DRAWN
DESIGNER
STAMPS, LOGOS, AND SEALS
PROJECT NAME
DRAWING TITLE
CHECKED
ARCHIVE NO.
DATE
PROJECT NO.
DRAWING SHEET NO.
DATENO.
REVISION / ISSUE
OFSHEET
United States Department of Agriculture Forest Service
4/1 5/2
1 0 7:
M
AR
YB
RO
W
N C:
\U
SE
RS
\M
AR
YB
RO
W
N\
DO
CU
ME
NT
S\
MA
RK
T W
AI
N\
RE
D
BL
UF
F
RE
CR
EA
TI
ON
A
RE
A\
DW
G' S\
CD
'S
\F
IN
AL
\C
IV
IL
F
IE
LD
S
ET
\A
RC
HI
VE
S
ET
\F
IN
AL
A
RC
HI
VE
S
ET
\F
IN
AL
A
RC
HI
VE
S
ET
\09
-R
DR
-0
4D -E
.D W
G;
R09
EASTERN REGION
RED BLUFF
RECREATION
AREA
NORTH & GROUP
LOOPS
MARK TWAIN
NATIONAL FOREST
POTOSI-FREDERICKTOWN
RANGER DISTRICT
ELECTRIC PLAN
4/30/2021 090505-RDR2021-0004D-E1001
R.KELL
M.BROWN
R.KELL
E-01 69 102
KEY NOTES
1. Utility Company's transformer, main Distribution Panels and feeder locations are approximate and may be shifted with COR approval to minimize re-grading, tree removal and provide separation from individual spurs.
Transformer, panel locations, and feeder corridors shall be staked in the field and reviewed and approved by COR prior to the start of any electrical work.
2. The Contractor is responsible for all coordination with the electric utility provider, Crawford Electric. Grant Stack @ 800-677-2667, ext. 145, is the primary contact for the Utility provider.
3. In addition to the electrical work shown on the drawings and specified in the specifications, the Contractor shall provide all material, labor and supervision, including payment of all fees, required by the Utility Company for providing placement of the transformers, primary distribution of the transformers, metering and equipment and connection required to tie into the main distribution Boards. Coordination with Utility Company shall include the necessary upgrading of the primary distribution system to meet the electrical demand of the Base Bid and the Optional /bid item for the campground's
South Loop, which will include two 800-amp Main Service Boards (120/240 volt, single phase). The Contractor shall provide the COR with copies of all permit applications, specifications, drawings and other requirements provided by the utility company for review and approval prior to the start of any electrical work.
4. The electrical drawings are schematic in nature and not intended to show exact routing or all equipment, devices, connections and materials that are required. The Contractor is required to provide all additional equipment, materials and labor necessary to complete the electrical system and make it fully operational in accordance with the Contract and National Cod (NFPA
70) latest addition.
5. Electrical work shall be done by Missouri Licensed electricians or apprentices under the direct supervisions of a Missouri Licensed Electrician.
Copies of the Electricians' licenses shall be provided to the COR for review and approval prior to the start of any electrical work. No electrical work shall be performed onsite unless a Missouri licensed electrician is on site and overseeing the work.
6. See Specification Section 26 0010 - General Technical Provisions for
Electrical Distribution Systems Alternatives, which allows the Contractor to submit for review and approval alternative distribution layouts.
7. Electrical circuit directories shall be typed, neat and legible and be installed on the inside cover of each panel door. The Directory shall be durable and protected from weather degradation.
8. All road crossing shall be directional boring. No trenching or cuts across existing roadways will be permitted.
9. All nonmetallic conduit not having the proper NEMA and UL markings will not be accepted, only gray colored conduit will be accepted.
10. All service and feeder conductor terminations shall be rated at 75 degrees
Celsius or higher.
11. The Contractor may increase the size of feeder conductors in order to reduce the number of different wire sizes shown in the feeder schedule. The
Electrical shop drawings required in the Specifications shall accurately indicate the sizing of all conductors. In no case shall feeder sizes be reduced from what is indicated without supporting calculations which have been prepared and signed by a licensed Missouri Electrical Engineer. All such changes and supporting calculations shall be submitted with the
Electrical System Shop drawings required in sectio 260010 of the
Specifications.
1. Connect feeder to the 200-amp Panel (Panel 11) pre-installed CXT modular
Pumphouse Building. This pre-installed panel is labeled in the Panel schedule as Panel
11. The Manufacturer's actual Panel layout may be different that what is shown for interior electrical requirements. Coordinate with CXT manufacturer to determine connection location and connection requirements.
2. Connect feeder to the 200-amp Panel which is pre-installed in the CXT modular
Shower House Building. Coordinate with Shower House manufacturer to determine connection location and connection requirements.
3. Provide and install (1) 20 amp all weather duplex GFCI outlet, box and cover on the exterior of the two CXT toilet buildings and also provide and install one surface mounted wall pack fixture, model WPG-50K28W-S with pre-installed photocell by
SuperBrightLED.com or approved equal on each of the toilet buildings. Place the light on a separate circuit from the duplex receptacle as shown on the panel schedule.
Locations shall be directed by the COR. /color and/or finish shall be as selected by the
COR.
GENERAL NOTES
BASE BID
AutoCAD SHX Text
ASPHALT ENTRANCE ROAD
AutoCAD SHX Text
ONLY
AutoCAD SHX Text E
AutoCAD SHX Text H
AutoCAD SHX Text
ONLY
AutoCAD SHX Text
ONLY
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text
ONLY
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
HOST
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text F
AutoCAD SHX Text O
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text S
AutoCAD SHX Text T
AutoCAD SHX Text S
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text V
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text E
AutoCAD SHX Text D
AutoCAD SHX Text E
AutoCAD SHX Text P
AutoCAD SHX Text A
AutoCAD SHX Text R
AutoCAD SHX Text T
AutoCAD SHX Text M
AutoCAD SHX Text E
AutoCAD SHX Text N
AutoCAD SHX Text T
AutoCAD SHX Text O
AutoCAD SHX Text F
AutoCAD SHX Text A
AutoCAD SHX Text G
AutoCAD SHX Text R
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text U
AutoCAD SHX Text L
AutoCAD SHX Text T
AutoCAD SHX Text U
AutoCAD SHX Text R
AutoCAD SHX Text E
ELECTRIC PEDESTAL, TYP.
SEE ELECTRIC PLANS FOR
DETAILS
DOUBLE VAULT CXT
H
SINGLE VAULT CXT
EXISTING CXT VAULT
TOILET
EXISTING CXT VAULT
TOILET
EXISTING PAVILION
NEW ASPHALT RESURFACING
IN PARKING LOT--35 SPACES
NEW PAVILLION
SEE ARCHITECTURAL
DRAWINGS FOR
POWER AND LIGHTING
1,3 (3) #1/0 AL,
(1) #6 CuGr - 2"C
2,4 (3) 300 kcmil, AL
(1) #4 CuGr - 3"C
TRANSFORMER
5,7 (3) 300 kcmil, AL
(1) #4 CuGr - 3"C
4 SETS (2) 300 kcmil, AL
(1) #3/0 CuGr
6,8 (3) 350 kcmil, AL
(1) #4 CuGr - 3"C
2,4 (3) #1/0 AL,
(1) #6 CuGr - 2"C
5,7 (3) 350 kcmil AL,
(1) #4 CuGr - 3"C
9,11 (3) 350 kcmil AL,
(1) #4 CuGr - 3"C
PANEL - 30
(200 AMPS)
1,3 (2) SEPARATE 120V CIRCUITS EA
WITH (2) #8 Cu (1) #10 CuGr - 2" C
SEE KEY NOTE #3 SHEET E-01
PUMPHOUSE
KEY NOTE 2
PANEL - 31
(100 AMPS)
4 SETS (2) 300 kcmil, AL
(1) #3/0 CuGr
SMSB-4; CT-5
(800 AMPS)
TRANSFORMER
KEY NOTE 1
7 (2) #10 Cu,
(1) #10 CuGr - 1"C
1,3 (3) #1/0 AL,
(1) #6 CuGr - 2"C
KEY NOTE 3
APPLIES TO SITES
1,2,3,4,& 5
SMSB-3
(T-4 800 AMPS)
10,12 (2) SEPARATE 120V
CIRCUITS EA WITH (2) #8 Cu
(1) #10 CuGr-2"C, SEE KEY
NOTE #3 SHEET E-01
9,11 (2) SEPARATE 120V
CIRCUITS EA WITH (2) #8 Cu
(1)#10 CuGr - 2"C, SEE KEY
NOTE #3 SHEET E-01
NEW UTILITY COMPANY TRANSFORMER, COORDINATE LOCATION
AND INSTALL REQUIREMENTS WITH UTILITY COMPANY
NEW SERVICE PANEL OR SUBPANEL
NEW PRIMARY UNDERGROUND CONDUCTORS. COMPLY WITH
UTILITY COMPANY REQUIREMENTS.
NEW UNDERGROUND SERVICE CONDUCTORS AND FEEDERS
DRAWN
DESIGNER
STAMPS, LOGOS, AND SEALS
PROJECT NAME
DRAWING TITLE
CHECKED
ARCHIVE NO.
DATE
PROJECT NO.
DRAWING SHEET NO.
DATENO.
REVISION / ISSUE
OFSHEET
United States Department of Agriculture Forest Service
4/2 0/2
1 0 8:
M
AR
YB
RO
W
N C:
\U
SE
RS
\M
AR
YB
RO
W
N\
DO
CU
ME
NT
S\
MA
RK
T W
AI
N\
RE
D
BL
UF
F
RE
CR
EA
TI
ON
A
RE
A\
DW
G' S\
CD
'S
\F
IN
AL
\C
IV
IL
F
IE
LD
S
ET
\A
RC
HI
VE
S
ET
\F
IN
AL
A
RC
HI
VE
S
ET
\F
IN
AL
A
RC
HI
VE
S
ET
\09
-R
DR
-0
4D -E
.D W
G;
R09
EASTERN REGION
RED BLUFF
CAMPGROUND
SOUTH LOOP
MARK TWAIN
NATIONAL FOREST
POTOSI-FREDERICKTOWN
RANGER DISTRICT
ELECTRIC SITE PLAN
4/30/2021 090505-RDR2021-0004D-E1002
R.KELL
M.BROWN
R.KELL
E-02 70 102
SCALE: 1" = 50'
KEY NOTES:
1. THERE IS AN EXISTING PANEL IN THE PUMP HOUSE WHICH
SHALL BE REMOVED AND REPLACED WITH A NEW PANEL.
DISCONNECT AND ABANDON EXISTING SERVICE CONDUCTORS
AND RUN NEW FEEDER CONDUCTORS IN CONDUIT FROM PANEL
TO SMSB 3 (CRK 6,8).
2. PARKING LOT LIGHT LOCATIONS TO BE STAKED IN THE FIELD BY
THE COR.
3. REMOVE EXISTING PEDESTAL AND REPLACE WITH NEW 50/30/20
AMP PEDESTALS, PROVIDE NEW FEEDER CONDUCTORS AS
INDICATED.
LEGEND
1. Utility Company's transformer, main Distribution Panels and feeder locations are approximate and may be shifted with COR approval to minimize re-grading, tree removal and provide separation from individual spurs.
Transformer, panel locations, and feeder corridors shall be staked in the field and reviewed and approved by COR prior to the start of any electrical work.
2. The Contractor is responsible for all coordination with the electric utility provider, Crawford Electric. Grant Stack @ 800-677-2667, ext. 145, is the primary contact for the Utility provider.
3. In addition to the electrical work shown on the drawings and specified in the specifications, the Contractor shall provide all material, labor and supervision, including payment of all fees, required by the Utility Company for providing placement of the transformers, primary distribution of the transformers, metering and equipment and connection required to tie into the main distribution Boards. Coordination with Utility Company shall include the necessary upgrading of the primary distribution system to meet the electrical demand of the Base Bid and the Optional /bid item for the campground's
South Loop, which will include two 800-amp Main Service Boards (120/240 volt, single phase). The Contractor shall provide the COR with copies of all permit applications, specifications, drawings and other requirements provided by the utility company for review and approval prior to the start of any electrical work.
4. The electrical drawings are schematic in nature and not intended to show exact routing or all equipment, devices, connections and materials that are required. The Contractor is required to provide all additional equipment, materials and labor necessary to complete the electrical system and make it fully operational in accordance with the Contract and National Cod (NFPA
70) latest addition.
5. Electrical work shall be done by Missouri Licensed electricians or apprentices under the direct supervisions of a Missouri Licensed Electrician.
Copies of the Electricians' licenses shall be provided to the COR for review and approval prior to the start of any electrical work. No electrical work shall be performed onsite unless a Missouri licensed electrician is on site and overseeing the work.
6. See Specification Section 26 0010 - General Technical Provisions for
Electrical Distribution Systems Alternatives, which allows the Contractor to submit for review and approval alternative distribution layouts.
7. Electrical circuit directories shall be typed, neat and legible and be installed on the inside cover of each panel door. The Directory shall be durable and protected from weather degradation.
8. All road crossing shall be directional boring. No trenching or cuts across existing roadways will be permitted.
9. All nonmetallic conduit not having the proper NEMA and UL markings will not be accepted, only gray colored conduit will be accepted.
10. All service and feeder conductor terminations shall be rated at 75 degrees
Celsius or higher.
11. The Contractor may increase the size of feeder conductors in order to reduce the number of different wire sizes shown in the feeder schedule. The
Electrical shop drawings required in the Specifications shall accurately indicate the sizing of all conductors. In no case shall feeder sizes be reduced from what is indicated without supporting calculations which have been prepared and signed by a licensed Missouri Electrical Engineer. All such changes and supporting calculations shall be submitted with the
Electrical System Shop drawings required in section 260010 of the
Specifications.
GENERAL NOTES
OPTIONAL BID ITEM 1
SOUTH LOOP (SL)
AutoCAD SHX Text
ASPHALT PARKING
AutoCAD SHX Text S1
AutoCAD SHX Text A
AutoCAD SHX Text B
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text
AutoCAD SHX Text E-08
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text S1
AutoCAD SHX Text F
AutoCAD SHX Text O
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text S
AutoCAD SHX Text T
AutoCAD SHX Text S
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text V
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text E
AutoCAD SHX Text D
AutoCAD SHX Text E
AutoCAD SHX Text P
AutoCAD SHX Text A
AutoCAD SHX Text R
AutoCAD SHX Text T
AutoCAD SHX Text M
AutoCAD SHX Text E
AutoCAD SHX Text N
AutoCAD SHX Text T
AutoCAD SHX Text O
AutoCAD SHX Text F
AutoCAD SHX Text A
AutoCAD SHX Text G
AutoCAD SHX Text R
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text U
AutoCAD SHX Text L
AutoCAD SHX Text T
AutoCAD SHX Text U
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
UTILITY
TRANS
CT-2
NMSB-1
1200A
PANEL 10
600 A
PANEL 11
200 A
RV 17 RV 19 RV 21 RV 24 RV 20 RV 22 RV 23 RV 23 RV 18 RV 18
CRK 6,8
CRK 5,7
D-2
C
CRK 1,3
C
CRK 2,4
B
H
CRK 9,11
F
PANEL LOCATED IN
PUMP HOUSE. SEE KEY
NOTE 01 SHEET E-01
SIZE BASED ON
REQUIREMENTS
FROM UTILITY
COMPANY
CXT 200 A
SHOWER
RV 16 RV 14 RV 12 RV 10 RV 15 RV 13
CRK 1,3
CRK 6,8
D-1
C
CRK 2,4
C
PANEL 10
600 A
RV 11 RV 9
UTILITY
TRANS
CT-4
NMSB-2
1200A
PANEL 20
400 A
PANEL 21
400 A
RV 08 RV 08 RV 07 RV 07 RV 09 RV 09 RV 06 RV06
CRK 5,7
CRK 1,3
E
C
CRK 2,4
C
CRK 9,11
C
H
CRK 6,8
E
CXT RV 02 RV 04 RV 06 RV 01 RV 03 RV 05
CRK 6,8 (2)
single poles
CRK 1,3
A
C
CRK 2,4
D
PANEL 20
400 A
RV 07 RV 08
CXT RV 02 RV 02 RV 03 RV 03 RV 04 RV 04
CRK 1,3
B
CRK 2,4
C
PANEL 21
400 A
RV01 RV01 RV05 RV05
CRK 5,7
B
HOST
CRK 6,8 (2)
single poles
A
SIZE BASED ON
REQUIREMENTS
FROM UTILITY
COMPANY
SEE FEEDER SCHEDULE
NOTES:
1. CONTRACTOR SHALL COORDINATE WITH UTILITY PROVIDER TO
DETERMINE REQUIREMENTS FOR CURRENT TRANSFORMERS
(CT), METERING, TRANSFORMER INSTALLATION AND ALL
GROUNDING AND BONDING FOR TRANSFORMERS AND OTHER
SERVICE EQUIPMENT. THE CONTRACTOR SHALL PAY ALL FEES
AND PROVIDE ALL MATERIAL AND WORK REQUIRED BY THE
UTILITY PROVIDER IN PROVIDING AND CONNECTING THE
PRIMARY POWER SYSTEM TO THE SERVICE PANELS.
2. PANEL 11 AND THE 200A PANEL IN THE CXT SHOWER BUILDING
SHALL COME PRE-INSTALLED BY THE MANUFACTURER OF THE
PRE-FABRICATED BUILDING. CONTRACTOR SHALL COORDINATE
WITH THE VENDOR/ SUPPLIER TO DETERMINE HOOKUP/
CONNECTION LOCATION AND REQUIREMENTS. LOCATIONS
SHOWN IN THE DRAWINGS ARE SCHEMATIC AND NOT MEANT TO
INDICATE ACTUAL LOCATION.
NORTH AND GROUP LOOP ONE-LINE POWER PLANS
DRAWN
DESIGNER
STAMPS, LOGOS, AND SEALS
PROJECT NAME
DRAWING TITLE
CHECKED
ARCHIVE NO.
DATE
PROJECT NO.
DRAWING SHEET NO.
DATENO.
REVISION / ISSUE
OFSHEET
United States Department of Agriculture Forest Service
4/1 5/2
1 1 0:
M
AR
YB
RO
W
N C:
\U
SE
RS
\M
AR
YB
RO
W
N\
DO
CU
ME
NT
S\
MA
RK
T W
AI
N\
RE
D
BL
UF
F
RE
CR
EA
TI
ON
A
RE
A\
DW
G' S\
CD
'S
\F
IN
AL
\C
IV
IL
F
IE
LD
S
ET
\A
RC
HI
VE
S
ET
\F
IN
AL
A
RC
HI
VE
S
ET
\F
IN
AL
A
RC
HI
VE
S
ET
\09
-R
DR
-0
4D -E
-7 .D
W G;
R09
EASTERN REGION
RED BLUFF
RECREATION
AREA
NORTH & GROUP
LOOPS
MARK TWAIN
NATIONAL FOREST
POTOSI-FREDERICKTOWN
RANGER DISTRICT
ONE-LINE POWER
DIAGRAMS
4/30/2021 090505-RDR2021-0004D-E6003
R.KELL
M.BROWN
R.KELL
E-03 71 102
BASE BID
AutoCAD SHX Text F
AutoCAD SHX Text O
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text S
AutoCAD SHX Text T
AutoCAD SHX Text S
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text V
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text E
AutoCAD SHX Text D
AutoCAD SHX Text E
AutoCAD SHX Text P
AutoCAD SHX Text A
AutoCAD SHX Text R
AutoCAD SHX Text T
AutoCAD SHX Text M
AutoCAD SHX Text E
AutoCAD SHX Text N
AutoCAD SHX Text T
AutoCAD SHX Text O
AutoCAD SHX Text F
AutoCAD SHX Text A
AutoCAD SHX Text G
AutoCAD SHX Text R
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text U
AutoCAD SHX Text L
AutoCAD SHX Text T
AutoCAD SHX Text U
AutoCAD SHX Text R
CT-4 RV 15 RV 13 RV 16 RV 14 RV 17 RV 18
CRK 6,8
CRK 1,3
B
CRK 2,4
B
SMSB-3
800A
RV 19 RV
HOST
UTILITY
TRANS
PANEL 30
200A
PANEL 31
100A
CRK 5,7
D2
CRK 9,11
D-2
B
SIZE BASED ON
REQUIREMENTS FROM
UTILITY COMPANY
F-1
RV 03 RV 04 RV 05 RV 08 RV 09 RV 10
CRK 1,3
B
CRK 5,7
C
SMSB-4
800A
RV 06 RV 07
CRK 6,8
D2
CRK 2,4
C
RV 02RV 01 RV 11 RV 12
CT-4
UTILITY
TRANS
SIZE BASED ON
REQUIREMENTS FROM
UTILITY COMPANY
SOUTH LOOP ONE-LINE POWER PLANS
F-1
OPTIONAL BID ITEM NO. 1
DRAWN
DESIGNER
STAMPS, LOGOS, AND SEALS
PROJECT NAME
DRAWING TITLE
CHECKED
ARCHIVE NO.
DATE
PROJECT NO.
DRAWING SHEET NO.
DATENO.
REVISION / ISSUE
OFSHEET
United States Department of Agriculture Forest Service
4/1 5/2
1 1 0:
M
AR
YB
RO
W
N C:
\U
SE
RS
\M
AR
YB
RO
W
N\
DO
CU
ME
NT
S\
MA
RK
T W
AI
N\
RE
D
BL
UF
F
RE
CR
EA
TI
ON
A
RE
A\
DW
G' S\
CD
'S
\F
IN
AL
\C
IV
IL
F
IE
LD
S
ET
\A
RC
HI
VE
S
ET
\F
IN
AL
A
RC
HI
VE
S
ET
\F
IN
AL
A
RC
HI
VE
S
ET
\09
-R
DR
-0
4D -E
-7 .D
W G;
R09
EASTERN REGION
RED BLUFF
RECREATION
AREA
SOUTH LOOP
MARK TWAIN
NATIONAL FOREST
POTOSI-FREDERICKTOWN
RANGER DISTRICT
ONE-LINE POWER
DIAGRAMS
4/30/2021 090505-RDR2021-0004D-E6004
R.KELL
M.BROWN
R.KELL
E-04 72 102
AutoCAD SHX Text F
AutoCAD SHX Text O
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text S
AutoCAD SHX Text T
AutoCAD SHX Text S
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text V
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text E
AutoCAD SHX Text D
AutoCAD SHX Text E
AutoCAD SHX Text P
AutoCAD SHX Text A
AutoCAD SHX Text R
AutoCAD SHX Text T
AutoCAD SHX Text M
AutoCAD SHX Text E
AutoCAD SHX Text N
AutoCAD SHX Text T
AutoCAD SHX Text O
AutoCAD SHX Text F
AutoCAD SHX Text A
AutoCAD SHX Text G
AutoCAD SHX Text R
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text U
AutoCAD SHX Text L
AutoCAD SHX Text T
AutoCAD SHX Text U
AutoCAD SHX Text R
DRAWN
DESIGNER
STAMPS, LOGOS, AND SEALS
PROJECT NAME
DRAWING TITLE
CHECKED
ARCHIVE NO.
DATE
PROJECT NO.
DRAWING SHEET NO.
DATENO.
REVISION / ISSUE
OFSHEET
United States Department of Agriculture Forest Service
4/1 5/2
1 1 0:
M
AR
YB
RO
W
N C:
\U
SE
RS
\M
AR
YB
RO
W
N\
DO
CU
ME
NT
S\
MA
RK
T W
AI
N\
RE
D
BL
UF
F
RE
CR
EA
TI
ON
A
RE
A\
DW
G' S\
CD
'S
\F
IN
AL
\C
IV
IL
F
IE
LD
S
ET
\A
RC
HI
VE
S
ET
\F
IN
AL
A
RC
HI
VE
S
ET
\F
IN
AL
A
RC
HI
VE
S
ET
\09
-R
DR
-0
4D -E
-7 .D
W G;
R09
EASTERN REGION
RED BLUFF
RECREATION
AREA
NORTH & GROUP
LOOPS
MARK TWAIN
NATIONAL FOREST
POTOSI-FREDERICKTOWN
RANGER DISTRICT
PHASE PANEL AND
FEEDER SCHEDULE
4/30/2021 090505-RDR2021-0004D-E6005
R.KELL
M.BROWN
R.KELL
E-05 73 102
BASE BID
AutoCAD SHX Text F
AutoCAD SHX Text O
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text S
AutoCAD SHX Text T
AutoCAD SHX Text S
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text V
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text E
AutoCAD SHX Text D
AutoCAD SHX Text E
AutoCAD SHX Text P
AutoCAD SHX Text A
AutoCAD SHX Text R
AutoCAD SHX Text T
AutoCAD SHX Text M
AutoCAD SHX Text E
AutoCAD SHX Text N
AutoCAD SHX Text T
AutoCAD SHX Text O
AutoCAD SHX Text F
AutoCAD SHX Text A
AutoCAD SHX Text G
AutoCAD SHX Text R
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text U
AutoCAD SHX Text L
AutoCAD SHX Text T
AutoCAD SHX Text U
AutoCAD SHX Text R
DRAWN
DESIGNER
STAMPS, LOGOS, AND SEALS
PROJECT NAME
DRAWING TITLE
CHECKED
ARCHIVE NO.
DATE
PROJECT NO.
DRAWING SHEET NO.
DATENO.
REVISION / ISSUE
OFSHEET
United States Department of Agriculture Forest Service
4/1 5/2
1 1 0:
M
AR
YB
RO
W
N C:
\U
SE
RS
\M
AR
YB
RO
W
N\
DO
CU
ME
NT
S\
MA
RK
T W
AI
N\
RE
D
BL
UF
F
RE
CR
EA
TI
ON
A
RE
A\
DW
G' S\
CD
'S
\F
IN
AL
\C
IV
IL
F
IE
LD
S
ET
\A
RC
HI
VE
S
ET
\F
IN
AL
A
RC
HI
VE
S
ET
\F
IN
AL
A
RC
HI
VE
S
ET
\09
-R
DR
-0
4D -E
-7 .D
W G;
R09
EASTERN REGION
RED BLUFF
RECREATION
AREA
NORTH & GROUP
LOOPS
MARK TWAIN
NATIONAL FOREST
POTOSI-FREDERICKTOWN
RANGER DISTRICT
PHASE PANEL AND
FEEDER SCHEDULE
(CONT.)
4/30/2021 090505-RDR2021-0004D-E6006
R.KELL
M.BROWN
R.KELL
E-06
74 102BASE BID
AutoCAD SHX Text F
AutoCAD SHX Text O
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text S
AutoCAD SHX Text T
AutoCAD SHX Text S
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text V
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text E
AutoCAD SHX Text D
AutoCAD SHX Text E
AutoCAD SHX Text P
AutoCAD SHX Text A
AutoCAD SHX Text R
AutoCAD SHX Text T
AutoCAD SHX Text M
AutoCAD SHX Text E
AutoCAD SHX Text N
AutoCAD SHX Text T
AutoCAD SHX Text O
AutoCAD SHX Text F
AutoCAD SHX Text A
AutoCAD SHX Text G
AutoCAD SHX Text R
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text U
AutoCAD SHX Text L
AutoCAD SHX Text T
AutoCAD SHX Text U
AutoCAD SHX Text R
SOUTH LOOP PHASE PANEL SCHEDULES
OPTIONAL BID ITEM NO. 1
DRAWN
DESIGNER
STAMPS, LOGOS, AND SEALS
PROJECT NAME
DRAWING TITLE
CHECKED
ARCHIVE NO.
DATE
PROJECT NO.
DRAWING SHEET NO.
DATENO.
REVISION / ISSUE
OFSHEET
United States Department of Agriculture Forest Service
4/1 5/2
1 1 0:
M
AR
YB
RO
W
N C:
\U
SE
RS
\M
AR
YB
RO
W
N\
DO
CU
ME
NT
S\
MA
RK
T W
AI
N\
RE
D
BL
UF
F
RE
CR
EA
TI
ON
A
RE
A\
DW
G' S\
CD
'S
\F
IN
AL
\C
IV
IL
F
IE
LD
S
ET
\A
RC
HI
VE
S
ET
\F
IN
AL
A
RC
HI
VE
S
ET
\F
IN
AL
A
RC
HI
VE
S
ET
\09
-R
DR
-0
4D -E
-7 .D
W G;
R09
EASTERN REGION
RED BLUFF
RECREATION
AREA
SOUTH LOOP
MARK TWAIN
NATIONAL FOREST
POTOSI-FREDERICKTOWN
RANGER DISTRICT
PHASE PANEL AND
FEEDER SCHEDULE
(CONT.)
4/30/2021 090505-RDR2021-0004D-E6007
R.KELL
M.BROWN
R.KELL
E-07 75 102
AutoCAD SHX Text F
AutoCAD SHX Text O
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text S
AutoCAD SHX Text T
AutoCAD SHX Text S
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text V
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text E
AutoCAD SHX Text D
AutoCAD SHX Text E
AutoCAD SHX Text P
AutoCAD SHX Text A
AutoCAD SHX Text R
AutoCAD SHX Text T
AutoCAD SHX Text M
AutoCAD SHX Text E
AutoCAD SHX Text N
AutoCAD SHX Text T
AutoCAD SHX Text O
AutoCAD SHX Text F
AutoCAD SHX Text A
AutoCAD SHX Text G
AutoCAD SHX Text R
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text U
AutoCAD SHX Text L
AutoCAD SHX Text T
AutoCAD SHX Text U
AutoCAD SHX Text R
FINISHED GRADE
4 " TOP SOIL
BACKFILL
MARKER TAPE WITH WORDS
"CAUTION ELECTRIC LINE
BURIED BELOW"
M
I N
M
I N
ELECTRICAL CONDUCTORS IN
NON-METALLIC CONDUIT
6"MIN.
GENERAL ELECTRICAL TRENCHING DETAIL (TYP.)
Cross Section View
No Scale
GROUND
4" SAND BEDDING MATERIAL
BENEATH CONDUIT
TRENCHING NOTES:
1. FOR EXISTING ROADS AND SPURS, TRENCH
CUTS WILL NOT BE PERMITTED. USE
DIRECTIONAL DRILLING OR OTHER METHODS
APPROVED BY COR.
2. THE POWER DISTRIBUTION SYSTEM SHALL BE
TRENCHED AND BACKFILLED PRIOR TO
PLACEMENT OF ROAD OR SPUR BASE OR
SUBBASE MATERIAL.
3. CARE SHALL BE TAKEN WHEN BACKFILLING,
PLACING AND PULLING CONDUCTORS TO AVOID
DAMAGE AND COSTLY REPAIR COSTS DURING
MEGGER TESTING.
GRADE
P E
R
M A
N U
F A
C T
U R
E R
S
I N
S T
R U
C T
I O
N S
24"
12"
4"
2"
PEDESTAL PANELBOARD,
SEE ENLARGED DETAILS
ABOVE
TERMINAL BAR
WIRE OPENING
CONCRETE BASE
GRADE
12"
FROM PREVIOUS
UTILITY PEDESTAL OR
PANEL
TO NEXT UTILITY PEDESTAL
(WHERE APPLICABLE)
TERMINAL BAR
WIRE OPENING
50A 30A 20A
GFI
S
P
A
C
E
RV UTILITY PEDESTAL DETAIL
NO SCALE
CONCRETE BASE
MAIN LUGS SHALL BE RATED FOR ALUMINUM
CONDUCTORS AND 039 OPTION (350 MCM) LUGS WILL BE
REQUIRED FOR SOME INSTALLATIONS (SEE ELECTRICAL
SITE PLAN E-01 FOR LOCATIONS.)
W/30A
SP CB
GFI W/20A
SP CB
W/50A
SP CB
TREATED 2X6
BOARDS
USE (4) 5 / 8" Ø 216 STAINLESS
STEEL CARRIAGE BOLTS AT
EACH CONNECTION POINT.
TYPICAL ELECTRICAL DISTRIBUTION STRUCTURE
NOT TO SCALE
2X6 RAFTERS, 3/4" B-B OR BETTER PLYWOOD ROOF
SHEATHING, OWENS CORNING BERKSHIRE SHINGLES
OR APPROVED EQUAL. COLOR SELECTED BY COR.
UNDERLAYMENT SHALL BE GRACE ICE AND WATER
SHIELD OR APPROVED EQUAL. ALUMINUM DRIP EDGE
NEMA 3R WIRING TROUGH FOR SPLICES AND
CONDUIT CONNECTIONS
SPLICE DISTRIBUTION WIRES SIZED FOR VOLTAGE
DROP DOWN TO CONDUCTOR SIZES THAT
DISTRIBUTION BREAKERS CAN ACCOMMODATE AND
PER NEC FOR AMPACITY. USE COMPRESSION
(SLEEVE) TYPE CONNECTIONS FOR SPLICES.
TREATED 6X6
WOOD POSTS
EXPANSION
FITTINGS
FOR ALL
CONDUITS
(TYP)
SET WOOD POSTS MINUMUM 48" IN
CONCRETE IN EARTH MINUMUM CONCRETE
IS TO BE 18" DIAMETER
SERVICE CONDUITS TO METER DO
NOT PASS THROUGH WIREWAY.
WP
GFI
METER AND/OR
WIRING TROUGH
ON BACK SIDE
TYPICAL SPUR
MIDWEST ELECTRIC
MODEL U075GP6 OR
APPROVED EQUAL
SEE NOTE 2, BELOW
PROVIDE AT ALL OUTDOOR
PANEL LOCATIONS A CAST IN
PLACE CONCRETE SLAB
REINFORCED WITH #4 BAR @ 8"
O.C. EACH WAY AND LOCATED
AT MID-DEPTH. GRADE
SUBGRADE TO BE FLAT AND
LEVEL BENEATH THE SLAB AND
SLOPE SURROUNDING
GROUND TO PROVIDE POSITIVE
DRAINAGE AWAY FROM SLAB.
CENTER THE DISTRIBUTION
STRUCTURE WITHIN THE SLAB
AS DIRECTED BY COR. 18" Ø
CONCRETE PIERS SHALL BE
SEPARATED FROM THE SLAB
BY 30# FELT PAPER. CHAMFER
ALL EXPOSED EDGES.
1" ABOVE
EXISTING
GRADE
WOOD TREATMENT PER AWPA U1 STND
--WOOD POST CATEGORY UC4B OR UC4C
--PLYWOOD UC4A
--OTHER WOOD UC3
ONLY WOOD CORRECTLY LABELED WILL BE
PERMITTED.
PANEL WIDTH PLUS 16" EA. SIDE
3 / 12 ROOF PITCH
PANEL WIDTH PLUS 32" EA. SIDE
O
R
P
A N
E L
H E
I G
H T
P
L U
S
30# FELT
5'-0"
NOTES:
1. AS PER NEC 551.77, PEDESTAL LOCATIONS SHALL BE AS FOLLOWS:
BACK-IN SITES--ELECTRIC PEDESTAL SHALL BE LOCATED ON LEFT SIDE OF PARKED
VEHICLE ON A LINE THAT IS 5'-7' FROM LEFT EDGE OF SPUR (DRIVER'S SIDE OF RV) UP TO
15' FORWARD FROM REAR OF SPUR.
PULL-THRU SITES--ELECTRIC PEDESTAL SHALL BE LOCATED AT ANY POINT ALONG LINE
THAT IS 5'-7' FROM LEFT EDGE (DRIVER'S SIDE OF PARKED RV) FROM 16' FORWARD OF THE
REAR OF THE PULL-THRU TO THE CENTER POINT BETWEEN THE TWO ROADS THAT GIVES
ACCESS AND EGRESS FROM THE PULL-THRU SITES.
2. PROVIDE SUPPLEMENTAL
"Ø x10' LONG COPPERWELD GROUND ROD ADJACENT TO EACH
PEDESTAL. EXOTHERMIC CONNECTION AT ROD TO #2AWG Cu WIRE CONNECTED TO
SYSTEM GROUNDING CONDUCTOR.
3. WHERE PEDESTALS ARE DAISY-CHAINED ON A SINGLE CIRCUIT, ALTERNATE THE 20 AND 30
AMP BREAKERS TO PHASE CONDUCTORS TO MINIMIZE OVERALL CIRCUIT LOAD
IMBALANCE.
ELECTRICAL
PEDESTAL
LOCATION
5'-7' FROM LEFT
EDGE OF SPUR;
15' OR LESS FROM
REAR OF SPUR
GRAVEL
BASE
LEVEL
GRADE
SURFACE
LEFT (DRIVER'S)
SIDE
REAR OF SPUR
RV UTILITY PEDESTAL LOCATION
NO SCALE
DRAWN
DESIGNER
STAMPS, LOGOS, AND SEALS
PROJECT NAME
DRAWING TITLE
CHECKED
ARCHIVE NO.
DATE
PROJECT NO.
DRAWING SHEET NO.
DATENO.
REVISION / ISSUE
OFSHEET
United States Department of Agriculture Forest Service
4/1 5/2
1 1 0:
M
AR
YB
RO
W
N C:
\U
SE
RS
\M
AR
YB
RO
W
N\
DO
CU
ME
NT
S\
MA
RK
T W
AI
N\
RE
D
BL
UF
F
RE
CR
EA
TI
ON
A
RE
A\
DW
G' S\
CD
'S
\F
IN
AL
\C
IV
IL
F
IE
LD
S
ET
\A
RC
HI
VE
S
ET
\F
IN
AL
A
RC
HI
VE
S
ET
\F
IN
AL
A
RC
HI
VE
S
ET
\09
-R
DR
-0
4D -E
-1 0.D
W G;
(R9)
EASTERN REGION
REDBLUFF
RECREATION
AREA
NORTH, GROUP &
SOUTH LOOPS
MARK TWAIN
NATIONAL FOREST
POTOSI-FREDERICKTOWN
RANGER DISTRICT
SITE ELECTRIC DETAILS
4/30/2021 090505-RDR2021-0004D-E5008
R.KELL
M.BROWN
R.KELL
E-08 76 102
AutoCAD SHX Text F
AutoCAD SHX Text O
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text S
AutoCAD SHX Text T
AutoCAD SHX Text S
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text V
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text E
AutoCAD SHX Text D
AutoCAD SHX Text E
AutoCAD SHX Text P
AutoCAD SHX Text A
AutoCAD SHX Text R
AutoCAD SHX Text T
AutoCAD SHX Text M
AutoCAD SHX Text E
AutoCAD SHX Text N
AutoCAD SHX Text T
AutoCAD SHX Text O
AutoCAD SHX Text F
AutoCAD SHX Text A
AutoCAD SHX Text G
AutoCAD SHX Text R
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text U
AutoCAD SHX Text L
AutoCAD SHX Text T
AutoCAD SHX Text U
AutoCAD SHX Text R
TYPICAL UTILITY PAD-MOUNT
TRANSFORMER 240V/120V
SECONDARY
UTILITY PRIMARY
CONDUCTORS
N G
GROUND BAR
NEUTRAL BAR
TYPICAL PANEL OR ENCLOSED
BREAKER PER PLANS 240V/120V 1Ø
SYSTEM BONDING JUMPER
(NOT BONDED @ SUBPANELS)
NEAREST GROUNDING
ELECTRODE
FINISHED GRADE
NOTE: TYPICAL SERVICE GROUNDING/BONDING PER NEC
ARTICLE -250. ALL WIRE NOT INDICATED SHALL BE SIZED
PER NEC
GROUNDING/BONDING DETAIL
NTS
SEE ADJACENT DETAIL (GROUND ROD
INSTALLATION) FOR GROUNDING LOOP
AND OTHER GROUNDING RODS.
FRONT
PHYSICAL OBSTRUCTION
REAR
MINIMUM 36"
MINUMUM 36" OR AS
REQUIRED BY OBSTRUCTION
ESTIMATED 5'
APPROXIMATE LAYOUT OF SPACE DEDICATED
UTO ELECTRICAL DISTRIBUTION STRUCTURES
MINIMUM
36"
MINIMUM
36"
NOTE: INDICATED FOR
CLEARANCE
PURPOSE ONLY.
DISTRIBUTION PANEL
UTILITY METER
STRUCTURE BACKBOARD
(SEE DETAIL OF STRUCTURE)
12X12 NEMA 3R
WIREWAY
NTS
IRON COVER
10"Ø CONCRETE
PIPE BODY
" Ø X 10" GROUND ROD
LONG COPPER CLAD STEEL
GROUND ROD CLAMP
#2 CU GROUND
BUS
GROUND ROD INSTALLATION
NTS
TYPICAL GROUNDING AT ELECTRICAL
DISTRIBUTION STRUCTURE
#2 AWG TO UTILITY METER (IF
REQUIRED BY UTILITY)
#2 AWG TO DISTRIBUTION
GROUND BUS
ELECTRICAL TYPICAL
DISTRIBUTION STRUCTURE
#2 AWG BARE COPPER
GROUND WIRE MIN 12" BELOW
FINISHED GRADE
"Ø X 10FT LONG Cu WELD
GROUND ROD, EXOTHERMIC
CONNECTION TO GROUND
LOOP (TYP. FOR 4)
BOND TO REBAR IN
CONCRETE SLAB
DRAWN
DESIGNER
STAMPS, LOGOS, AND SEALS
PROJECT NAME
DRAWING TITLE
CHECKED
ARCHIVE NO.
DATE
PROJECT NO.
DRAWING SHEET NO.
DATENO.
REVISION / ISSUE
OFSHEET
United States Department of Agriculture Forest Service
3/1 2/2
1 0 8:
M
AR
YB
RO
W
N C:
\U
SE
RS
\M
AR
YB
RO
W
N\
DO
CU
ME
NT
S\
MA
RK
T W
AI
N\
RE
D
BL
UF
F
RE
CR
EA
TI
ON
A
RE
A\
DW
G' S\
CD
'S
\F
IN
AL
\C
IV
IL
F
IE
LD
S
ET
\A
RC
HI
VE
S
ET
\F
IN
AL
A
RC
HI
VE
S
ET
\F
IN
AL
A
RC
HI
VE
S
ET
\09
-R
DR
-0
4D -E
-1 0.D
W G;
(R9)
EASTERN REGION
REDBLUFF
RECREATION
AREA
NORTH END &
GROUP LOOPS
MARK TWAIN
NATIONAL FOREST
POTOSI-FREDERICKTOWN
RANGER DISTRICT
SITE ELECTRIC DETAILS
(CONT.)
MARCH 2021090505-RDR2021-0004D-E5009
R.KELL
M.BROWN
R.KELL
E-09 74 100
AutoCAD SHX Text
NTS
AutoCAD SHX Text F
AutoCAD SHX Text O
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text S
AutoCAD SHX Text T
AutoCAD SHX Text S
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text V
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text E
AutoCAD SHX Text D
AutoCAD SHX Text E
AutoCAD SHX Text P
AutoCAD SHX Text A
AutoCAD SHX Text R
AutoCAD SHX Text T
AutoCAD SHX Text M
AutoCAD SHX Text E
AutoCAD SHX Text N
AutoCAD SHX Text T
AutoCAD SHX Text O
AutoCAD SHX Text F
AutoCAD SHX Text A
AutoCAD SHX Text G
AutoCAD SHX Text R
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text U
AutoCAD SHX Text L
AutoCAD SHX Text T
AutoCAD SHX Text U
AutoCAD SHX Text R
18"Ø
NOTE: EXACT SIZE TO BE VERIFIED
WITH ENGINEER BASED UPON POLE
MANUFACTURER'S REQUIREMENTS.
KEEP DIMENSION WITHIN
3" DIA. BOLT CIRCLE
VERIFY BOLT CIRCLE
W/ POLE MANUFACTURER
PLAN
1" PVC CONDUIT
1/2" PVC CONDUIT
1" PVC CONDUIT
MARKER TAPE WITH WORDS
"CAUTION ELECTRIC LINE
BURIED BELOW"
M
I N
M
I N
GROUND ROD IN
TRENCH BOTTOM @
8'-0" MIN. LENGTH x
3/4"Ø COPPERWELD
WELDED
CONNECTION TO
GROUND ROD
#8 BARE COPPER TO
LUG ON POLE. RUN IN
1/2" PVC CONDUIT
VERIFY DIMENSION W/ POLE
MANUFACTURER
SECTION
4#6
#3@12"
1/2" CHAMFER
STANDARD POLE BASE DETAIL
NOT TO SCALE
18" FOR PARKING
LOT FIXTURES
3'-0"
FINISHED
GRADE
EDGE OF PAVEMENT
FIXTURE
TYPE S-1
REFER TO CONCRETE
POLE BASE DETAIL
S-1 PARKING LOT FIXTURE MOUNTING DETAIL
NOT TO SCALE
S-1 FIXTURE, LITHONIA,
CATALOG #DSXO LED
P1 40K T4M MVOLT
SOA PIRH1FC3V DBLXD,
LAMP: 4813 LUMENS -
4000K, WITH POLE:
SSS20 4G DM19AS VD
IC UL DBLXD.
TOTAL WATTS = 38
CONCRETE BASE AND GENERAL NOTES:
1. SHALL HAVE A SMOOTH LEVEL TOP SURFACE FINISHED WITH A 1/2" RADIUS
EDGING TOOL.
2. ALL REINFORCING STEEL TO CONFORM TO THE REQUIREMENTS FOR
"REINFORCING STEEL".
3. TEMPLATE FOR ANCHOR BOLTS, STAINLESS STEEL ANCHOR BOLTS, NUTS AND
WASHERS TO BE OBTAINED BY CONTRACTOR PRIOR TO CONSTRUCTION OF
BASES.
4. SCORE TOP OF CONCRETE BASE TO SHOW LOCATION OF CONDUIT(S).
5. CONDUIT SIZE - AS SHOWN ON THE PLANS.
6. ALL EXPOSED METAL HARDWARE SHALL BE GALVANIZED OR STAINLESS STEEL.
7. IF THE ELECTRICAL CONDUIT IN THE CONCRETE BASE IS GALVANIZED STEEL,
GROUNDING BUSHINGS SHALL BE USED.
8. THE MINIMUM RADIUS FOR RIGID METALLIC OR NONMETALLIC ELECTRICAL
CONDUIT SHALL BE SIX TIMES THE INSIDE DIAMETER OF THE CONDUIT.
DRAWN
DESIGNER
STAMPS, LOGOS, AND SEALS
PROJECT NAME
DRAWING TITLE
CHECKED
ARCHIVE NO.
DATE
PROJECT NO.
DRAWING SHEET NO.
DATENO.
REVISION / ISSUE
OFSHEET
United States Department of Agriculture Forest Service
4/1 5/2
1 1 0:
M
AR
YB
RO
W
N C:
\U
SE
RS
\M
AR
YB
RO
W
N\
DO
CU
ME
NT
S\
MA
RK
T W
AI
N\
RE
D
BL
UF
F
RE
CR
EA
TI
ON
A
RE
A\
DW
G' S\
CD
'S
\F
IN
AL
\C
IV
IL
F
IE
LD
S
ET
\A
RC
HI
VE
S
ET
\F
IN
AL
A
RC
HI
VE
S
ET
\F
IN
AL
A
RC
HI
VE
S
ET
\09
-R
DR
-0
4D -E
-1 0.D
W G;
(R9)
EASTERN REGION
REDBLUFF
RECREATION
AREA
SOUTH LOOP
MARK TWAIN
NATIONAL FOREST
POTOSI-FREDERICKTOWN
RANGER DISTRICT
SITE PARKING LOT
LIGHTING DETAILS
OPTIONAL BID ITEM
NO. 4
4/30/2021 090505-RDR2021-0004D-E5010
R.KELL
M.BROWN
R.KELL
E-10 78 102
OPTIONAL BID ITEM 1
AutoCAD SHX Text F
AutoCAD SHX Text O
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text S
AutoCAD SHX Text T
AutoCAD SHX Text S
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text V
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text E
AutoCAD SHX Text D
AutoCAD SHX Text E
AutoCAD SHX Text P
AutoCAD SHX Text A
AutoCAD SHX Text R
AutoCAD SHX Text T
AutoCAD SHX Text M
AutoCAD SHX Text E
AutoCAD SHX Text N
AutoCAD SHX Text T
AutoCAD SHX Text O
AutoCAD SHX Text F
AutoCAD SHX Text A
AutoCAD SHX Text G
AutoCAD SHX Text R
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text U
AutoCAD SHX Text L
AutoCAD SHX Text T
AutoCAD SHX Text U
AutoCAD SHX Text R
DOUBLE CXT TOILET
STOP SIGN
DOUBLE SOCIAL
CORE AREA, TYP.
FEE TUBE, GOVERNMENT PURCHASED
AND INSTALLED
3-PANEL INFORMATION KIOSK, INSTALL AS PER
MANUFACTURER'S INSTRUCTIONS, SEE NOTES
ABA WATER HYDRANT, SEE
W/WW DETAILS, P-07
SINGLE UNISEX CXT TOILET
HOST SITE SIGN
5' WIDE CONCRETE WALK
STOP SIGN/ DO
NOT ENTER SIGN
STOP SIGN/DO NOT
ENTER SIGN
DOUBLE UNIT,
PULL-THRU,
TYP.
SITE SIGN POSTS,
TYP.
SOCIAL CORE AREA
LAYOUT, TYP.
WATER WELL SEE
W/WW DETAILS P-08
STOP SIGN
ONE-WAY SIGN
ELECTRIC PEDESTAL,
TYP. SEE ELECTRIC
PLANS FOR DETAILS
ONE WAY SIGN
10'x10' CONCRETE
DUMPSTER PAD AND
WOOD SCREEN, TYP.
CXT SHOWER HOUSE
SEE MANUFACTURER'S
SPECIFICATIONS FOR
SHOWER PAD CONSTRUCTION
AND WW SHEETS P-12,13,14,15
STOP SIGN/ DO
NOT ENTER SIGN
SITE SIGN POSTS,
TYP.
CG LOOP SIGN
RIDGE TOP LOOP
GROUP CAMPING
SOCIAL CORE AREA
LAYOUT, TYP.
ACCESSIBLE
PARKING SIGN
CXT PRECAST CONCRETE
10'X20' PUMP HOUSE
FF 897.50
SEE W/WW DETAILS
RV DUMPING STATION &
DOUBLE TANKS
SEE W/WW DETAILS
P-09,10
5' WIDE CONCRETE
WALK, TYP.
PARKING LAYOUT,
WHEEL STOPS &
PAINT STRIPING
10'x10' CONCRETE
DUMPSTER PAD, TYP.
AND WOOD SCREEN
SINGLE LEAF GATE
NORTH LOOP CAMP SITES
22 SINGLE SITES & 1 HOST SITE
2 DOUBLE SITES
DOUBLE LEAF GATE
ABA WATER HYDRANT, SEE
W/WW DETAILS
ABA WATER HYDRANT, SEE
W/WW DETAILS
ABA WATER HYDRANT, SEE
W/WW DETAILS P-07
GROUP LOOP CAMP SITES
9 DOUBLE SITES
DOUBLE UNIT
HOST HOLDING TANK, SEE P-11
PROPOSED CONCRETE
PAVING (WALKWAYS)
PROPOSED GRAVEL PAVING
(SOCIAL CORE AREAS)
LEGEND
NOTES:
1. 3 PANEL KIOSK SHALL BE ROCKART MODEL
03-460-BS 3 PANEL ANGLED KIOSK, SHED ROOF,
GREEN SHINGLES, ROCKARTSIGNS.COM OR
APPROVED EQUAL. COORDINATE WITH COR.
INSTALLED IN NORTH LOOP (RIDGE TOP).
2. SINGLE PANEL KIOSK SHALL BE ROCKART MODEL
03-460-BS 1 PANEL KIOSK, SHED ROOF, GREEN
SHINGLES, ROCKARTSIGNS.COM OR APPROVED
EQUAL. COORDINATE WITH COR. INSTALLED IN
GROUP LOOP (GROUP CAMPING)
FEE TUBE, GOVERNMENT
PURCHASED AND
INSTALLED
1-PANEL INFORMATION
KIOSK, INSTALL AS PER
MANUFACTURER'S
INSTRUCTIONS, SEE
NOTES
3. CAMPGROUND LOOP SIGNS FOR THIS SITE SHALL
READ AS FOLLOWS:
RIDGE TOP LOOP AND GROUP CAMPING
COORDINATE WITH COR AND DISTRICT
REPRESENTATIVE PRIOR TO PURCHASING AND
INSTALLING THE LOOP SIGN
DRAWN
DESIGNER
STAMPS, LOGOS, AND SEALS
PROJECT NAME
DRAWING TITLE
CHECKED
ARCHIVE NO.
DATE
PROJECT NO.
DRAWING SHEET NO.
DATENO.
REVISION / ISSUE
OFSHEET
United States Department of Agriculture Forest Service
5/4 /21
:1
0 M
AR
YB
RO
W N
C:
\U
SE
RS
\M
AR
YB
RO
W N\
DO
CU
ME
NT
S\
MA
RK
T
W
AI
N\
RE
D
BL
UF
F
RE
CR
EA
TI
ON
A
RE
A\
DW
G'
S\
CD
'S \F
IN
AL
\C
IV
IL
F
IE
LD
S
ET
\A
RC
HI
VE
S
ET
\F
IN
AL
A
RC
HI
VE
S
ET
\F
IN
AL
A
RC
HI
VE
S
ET
\09
-R
DR
-0
4D
-L
.D
W G;
R09
EASTERN REGION
RED BLUFF
RECREATION
AREA
NORTH & GROUP
LOOPS
MARK TWAIN
NATIONAL FOREST
POTOSI-FREDERICKTOWN
RANGER DISTRICT
LANDSCAPE
SITE PLAN
4/30/2021 090505-RDR2021-0004D-L1001
M.BROWN
M.BROWN
K.CONTARDI
L-01 79 102
MAXIMUM WALKWAY SLOPE SHALL NOT EXCEED 5%
ACCESSIBLE PARKING SPACES SHALL BE AS SHOWN ON
PLANS
ACCESSIBLE ROUTES MUST BE IN THE SAME AREA AS THE
GENERAL CIRCULATION PATH
BASE BID
SCALE: 1" = 50'
AutoCAD SHX Text
ASPHALT ENTRANCE ROAD
AutoCAD SHX Text
ONLY
AutoCAD SHX Text E
AutoCAD SHX Text H
AutoCAD SHX Text
ONLY
AutoCAD SHX Text
ONLY
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text
ONLY
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
HOST
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text
AutoCAD SHX Text E-02
AutoCAD SHX Text
AutoCAD SHX Text L-04
AutoCAD SHX Text
AutoCAD SHX Text G-09
AutoCAD SHX Text
AutoCAD SHX Text L-03
AutoCAD SHX Text
AutoCAD SHX Text L-04
AutoCAD SHX Text
AutoCAD SHX Text G-10
AutoCAD SHX Text
AutoCAD SHX Text G-09
AutoCAD SHX Text
AutoCAD SHX Text G-11
AutoCAD SHX Text
AutoCAD SHX Text G-09
AutoCAD SHX Text
AutoCAD SHX Text L-05
AutoCAD SHX Text
AutoCAD SHX Text G-09
AutoCAD SHX Text
AutoCAD SHX Text G-09
AutoCAD SHX Text
AutoCAD SHX Text L-04
AutoCAD SHX Text
AutoCAD SHX Text L-04
AutoCAD SHX Text
AutoCAD SHX Text L-04
AutoCAD SHX Text
AutoCAD SHX Text L-04
AutoCAD SHX Text
AutoCAD SHX Text L-03
AutoCAD SHX Text
AutoCAD SHX Text L-04
AutoCAD SHX Text
AutoCAD SHX Text L-04
AutoCAD SHX Text
AutoCAD SHX Text G-09
AutoCAD SHX Text
AutoCAD SHX Text L-04
AutoCAD SHX Text
AutoCAD SHX Text L-04
AutoCAD SHX Text
AutoCAD SHX Text G-09
AutoCAD SHX Text
AutoCAD SHX Text L-04
AutoCAD SHX Text
ALL
AutoCAD SHX Text L-5,6,7
AutoCAD SHX Text
ALL
AutoCAD SHX Text L-6,7,8
AutoCAD SHX Text
AutoCAD SHX Text G-11
AutoCAD SHX Text 6,7
AutoCAD SHX Text G-09
AutoCAD SHX Text
AutoCAD SHX Text G-09
AutoCAD SHX Text
AutoCAD SHX Text G-09
AutoCAD SHX Text
AutoCAD SHX Text G-09
AutoCAD SHX Text
AutoCAD SHX Text L-04
AutoCAD SHX Text F
AutoCAD SHX Text O
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text S
AutoCAD SHX Text T
AutoCAD SHX Text S
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text V
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text E
AutoCAD SHX Text D
AutoCAD SHX Text E
AutoCAD SHX Text P
AutoCAD SHX Text A
AutoCAD SHX Text R
AutoCAD SHX Text T
AutoCAD SHX Text M
AutoCAD SHX Text E
AutoCAD SHX Text N
AutoCAD SHX Text T
AutoCAD SHX Text O
AutoCAD SHX Text F
AutoCAD SHX Text A
AutoCAD SHX Text G
AutoCAD SHX Text R
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text U
AutoCAD SHX Text L
AutoCAD SHX Text T
AutoCAD SHX Text U
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text
ARCHITECTURAL BARRIERS ACT
AutoCAD SHX Text
ACCESSIBILITY STANDARDS (ABAAG)
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
NORTH LOOP CAMP SITES
22 SINGLE SITES & 1 HOST SITE
2 DOUBLE SITES
GROUP LOOP CAMP SITES
9 DOUBLE SITES
COORDINATE SPECIES
SELECTION & PLACEMENT
OF NATIVE TREES WITH COR.
EXCESS FILL AREA FROM
GRADING OPERATIONS
DRAWN
DESIGNER
STAMPS, LOGOS, AND SEALS
PROJECT NAME
DRAWING TITLE
CHECKED
ARCHIVE NO.
DATE
PROJECT NO.
DRAWING SHEET NO.
DATENO.
REVISION / ISSUE
OFSHEET
United States Department of Agriculture Forest Service
4/1 5/2
1 1 2:
M
AR
YB
RO
W
N C:
\U
SE
RS
\M
AR
YB
RO
W
N\
DO
CU
ME
NT
S\
MA
RK
T W
AI
N\
RE
D
BL
UF
F
RE
CR
EA
TI
ON
A
RE
A\
DW
G' S\
CD
'S
\F
IN
AL
\C
IV
IL
F
IE
LD
S
ET
\A
RC
HI
VE
S
ET
\F
IN
AL
A
RC
HI
VE
S
ET
\F
IN
AL
A
RC
HI
VE
S
ET
\09
-R
DR
-0
4D -L
.D W
G;
R09
EASTERN REGION
RED BLUFF
RECREATION
AREA
NORTH & GROUP
LOOPS
MARK TWAIN
NATIONAL FOREST
POTOSI-FREDERICKBURG
RANGER DISTRICT
LANDSCAPE
SEEDING/PLANTING
PLAN
4/30/2021 090505-RDR2021-0004D-L1002
M.BROWN
M.ROWN
K.CONTARDI
L-02 80 102
NATIVE GRASS MIX FOR AREAS AROUND SPURS
Virginia Wild Rye (Elymus virginiana) @ 3 lbs./acre
Indian Grass (Sorghastrum nutans) @ 3 lbs./acre
Little Blue Stem (Schizachyrium scoparium) @ 2lbs./acre
Supplied by Prairie Nursery, Inc. or Approved Equal
NO MOW FESCUR MIX FOR AREAS AROUND SHOWER/TOILET
BUILDING, WATER HYDRANTS, WELL/HOUSE/DUMPSTATION & FEE
STATIONS
Pre-mixed blend @ 5lbs./1000 SF Blend consists of the following:
Hard Fescue (Fescue brevipila)
Sheep Fescue (Fescue ovina)
Chewings Fescue (Fescue rubra subs. fallax)
Creeping Red Fescue (Fescue rubra, var. rubra)
Supplied by Prairie Nursery, Inc. of Approved Equal)
Native Tree Species to be planted:
Sugar Maple (Acer saccharum)
Short Leaf Pine (Pinus echinata)
White Oak (Quercus alba)
Pin Oak (Quercus palustris)
SEEDING MIXES
SCALE: 1" = 50'
BASE BID
AutoCAD SHX Text
ASPHALT ENTRANCE ROAD
AutoCAD SHX Text
ONLY
AutoCAD SHX Text
ONLY
AutoCAD SHX Text
ONLY
AutoCAD SHX Text
ONLY
AutoCAD SHX Text
HOST
AutoCAD SHX Text
AutoCAD SHX Text L-04
AutoCAD SHX Text
12" CMP
AutoCAD SHX Text
INV IN = 891.8
AutoCAD SHX Text
INV OUT = 887.7
AutoCAD SHX Text F
AutoCAD SHX Text O
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text S
AutoCAD SHX Text T
AutoCAD SHX Text S
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text V
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text E
AutoCAD SHX Text D
AutoCAD SHX Text E
AutoCAD SHX Text P
AutoCAD SHX Text A
AutoCAD SHX Text R
AutoCAD SHX Text T
AutoCAD SHX Text M
AutoCAD SHX Text E
AutoCAD SHX Text N
AutoCAD SHX Text T
AutoCAD SHX Text O
AutoCAD SHX Text F
AutoCAD SHX Text A
AutoCAD SHX Text G
AutoCAD SHX Text R
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text U
AutoCAD SHX Text L
AutoCAD SHX Text T
AutoCAD SHX Text U
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
X
IT
O
N L
Y
SITE SIGN POSTS,
TYP.
ELECTRIC PEDESTAL, TYP.
SEE ELECTRIC PLANS FOR
DETAILS
SINGLE SOCIAL
CORE AREA, TYP.
DOUBLE VAULT CXT, SEE MANUFACTURER'S
SPECIFICATIONS FOR INSTALLATION
CONCRETE WALK
SINGLE SOCIAL
CORE AREA,
PULL THRU SITE
STOP/DO NOT ENTER
SIGNS, TYP.
CAMPGROUND LOOP SIGN,
CREEK LOOP
HOST SITE, DOUBLE DRIVE
H
SINGLE VAULT CXT, SEE MANUFACTURER'S
SPECIFICATIONS FOR INSTALLATION
FEE TUBE SEE MANUFACTURER'S
SPECIFICATIONS FOR INSTALLATION
THREE PANEL KIOSK SEE MANUFACTURER'S
SPECIFICATIONS FOR INSTALLATION
CONCRETE DUMPSTER PAD AND SCREEN
ACCESSIBLE PARKING SPACE
SIGN
EXISTING CXT VAULT
TOILET TO REMAIN
ABA ACCESSIBLE WATER
HYDRANT, SEE W/WW PLANS
NEW ENTRY MONUMENT
AND SIGNS
GOVERNMENT FURNISHED
AND INSTALLED
NEW INFORMATION &
FEE STATION SIGN
GOVERNMENT FURNISHED
AND INSTALLED
EXISTING CXT VAULT
TOILET TO REMAIN
EXISTING PAVILION
NEW ABA ACCESSIBLE
WATER HYDRANT, SEE
W/WW PLANS
PLACE ADJACENT TO
EX. CONCRETE PAD
NEW DOUBLE SWING GATE
SEE SHEETS L-05, L-06, L-07
NEW DOUBLE SWING GATE
SEE SHEETS L-05, L-06, L-07
CAMP SPURS AT SITES 1 THRU ARE TO
BE RECONSTRUCTED (WIDENED AND
LENGTHENED) AND NEW SOCIAL CORE
AREAS AT EACH SITE.
HOST SITE HOLDING TANK
SEE W/WW PLANS
HOST SITE WATER HYDRANT
SEE W/WW PLANS
ABA ACCESSIBLE WATER
HYDRANT, SEE W/WW PLANS
NEW ASPHALT RESURFACING
IN PARKING LOT--35 SPACES
OPTIONAL BID ITEM 4
STRIPING, VAN ACCESSIBLE PARKING
AND SIGNAGE
OPTIONAL BID ITEM 4
ROAD TO TRAIL ACCESS TO
NEW DAY USE AREA
APPROXIMATE HIGH WATER
FLOOD LINE LEVEL
APPROXIMATE HIGH WATER
FLOOD LINE LEVEL
STOP/DO NOT ENTER
SIGNS, TYP.
ONE WAY SIGNS, TYP.
CONCRETE WALK
NEW PAVILION SEE
PART 2-SHEETS A-01,
A-02, A-03, A-04
OPTIONAL BID ITEM 2
NEW DOUBLE SWING GATE
SEE SHEETS L-05, L-06, L-07
NATIVE TREE PLANTING
COORDINATE SPECIES
WITH COR
NEW DOUBLE SWING GATE
SEE SHEETS L-05, L-06, L-07
OP
TI
ON
AL
B
ID
IT
EM
90+00
90+50
90+96
0+80
0+00
61+50
66+
66+50
67+00
67+50
68+00
T R
A N
S F
O R
M E
R
P
A D
Intersection - (1)
ALIGNMENT: SL LT RL, STA: 62+01.25
ALIGNMENT: Spur 80, STA: 800+00.00
810+00
810+50
810+96
830+
850+00
850+50
850+86
Spur 84
ALIGNMENT: SL LT RL, STA: 64+49.99
ALIGNMENT: Spur 84, STA: 840+00.00
Spur 86
ALIGNMENT: SL LT RL, STA: 65+34.30
ALIGNMENT: Spur 86, STA: 860+00.00
Spur 88
ALIGNMENT: SL LT RL, STA: 66+55.64
ALIGNMENT: Spur 88, STA: 880+00.00
Spur 90
ALIGNMENT: SL LT RL, STA: 67+45.05
ALIGNMENT: Spur 90, STA: 900+00.00
Spur 81
ALIGNMENT: SL RT RL, STA: 62+90.30
ALIGNMENT: Spur 81, STA: 810+00.00
Spur 83
ALIGNMENT: SL RT RL, STA: 63+81.73
ALIGNMENT: Spur 83, STA: 830+00.00
Spur 85
ALIGNMENT: SL RT RL, STA: 64+47.40
ALIGNMENT: Spur 85, STA: 850+00.00
Spur 89
ALIGNMENT: SL RT RL, STA: 66+31.73
ALIGNMENT: Spur 89, STA: 890+00.00
Spur 91
ALIGNMENT: SL RT RL, STA: 66+98.81
ALIGNMENT: Spur 91, STA: 910+00.00
Spur 93
ALIGNMENT: SL RT RL, STA: 67+68.33
ALIGNMENT: Spur 93, STA: 930+00.00
Spur 95
ALIGNMENT: SL RT RL, STA: 68+36.64
ALIGNMENT: Spur 95, STA: 950+00.00
Spur 97
ALIGNMENT: SL RT RL, STA: 69+14.40
ALIGNMENT: Spur 97, STA: 970+00.00
65+
W E
O U
S E
NEW WHEEL STOPS
OPTIONAL BID ITEM 4
COORDINATE GRADING OF
CONCRETE PAD WITH COR.
SINGLE SITE
SPUR, TYP.
DRAWN
DESIGNER
STAMPS, LOGOS, AND SEALS
PROJECT NAME
DRAWING TITLE
CHECKED
ARCHIVE NO.
DATE
PROJECT NO.
DRAWING SHEET NO.
DATENO.
REVISION / ISSUE
OFSHEET
United States Department of Agriculture Forest Service
5/4 /21
:1
2 M
AR
YB
RO
W N
C:
\U
SE
RS
\M
AR
YB
RO
W N\
DO
CU
ME
NT
S\
MA
RK
T
W
AI
N\
RE
D
BL
UF
F
RE
CR
EA
TI
ON
A
RE
A\
DW
G'
S\
CD
'S \F
IN
AL
\C
IV
IL
F
IE
LD
S
ET
\A
RC
HI
VE
S
ET
\F
IN
AL
A
RC
HI
VE
S
ET
\F
IN
AL
A
RC
HI
VE
S
ET
\09
-R
DR
-0
4D
-L
.D
W G;
R09
EASTERN REGION
RED BLUFF
CAMPGROUND
SOUTH LOOP
MARK TWAIN
NATIONAL FOREST
POTOSI-FREDERICKTOWN
RANGER DISTRICT
SITE / PLANTING PLAN
4/30/2021 090505-RDR2021-0004D-L1003
M.BROWN
M.BROWN
R.KELL
L-03 81 102
PROPOSED CONCRETE
PAVING (WALKWAYS &
TRASH BIN AREAS)
PROPOSED GRAVEL PAVING
(SOCIAL CORE AREAS)
LEGEND
PROPOSED ASPHALT
PAVING (CAMP SPURS)
SCALE: 1" = 50'
NATIVE TREE SPECIES
TO BE PLANTED:
Sugar Maple (Acer saccharum)
Short Leaf Pine (Pinus echinata)
White Oak (Quercus alba)
Pin Oak (Quercus palustris)
SEE EROSION CONTROL PLAN
G-08 FOR SEEDING AROUND
CAMPSITES, TOILET BUILDINGS
AND KIOSK AREAS
OPTIONAL BID ITEMS NO. 1 & 4
2. CAMPGROUND LOOP SIGNS FOR THIS SITE SHALL
READ AS FOLLOWS:
CREEK LOOP
COORDINATE WITH COR AND DISTRICT
REPRESENTATIVE PRIOR TO PURCHASING AND
INSTALLING THE LOOP SIGN
NOTES:
1. 3 PANEL KIOSK SHALL BE ROCKART MODEL
03-460-BS 3 PANEL ANGLED KIOSK, SHED ROOF,
GREEN SHINGLES, ROCKARTSIGNS.COM OR
APPROVED EQUAL. COORDINATE WITH COR.
INSTALLED IN SOUTH LOOP (CREEK).
AutoCAD SHX Text
ASPHALT PARKING
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text A
AutoCAD SHX Text B
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text
AutoCAD SHX Text L-04
AutoCAD SHX Text
AutoCAD SHX Text E-08
AutoCAD SHX Text
AutoCAD SHX Text L-04
AutoCAD SHX Text
AutoCAD SHX Text G-09
AutoCAD SHX Text
AutoCAD SHX Text L-07
AutoCAD SHX Text
AutoCAD SHX Text L-04
AutoCAD SHX Text
AutoCAD SHX Text L-04
AutoCAD SHX Text
AutoCAD SHX Text L-04
AutoCAD SHX Text
AutoCAD SHX Text L-04
AutoCAD SHX Text
AutoCAD SHX Text G-09
AutoCAD SHX Text
AutoCAD SHX Text G-09
AutoCAD SHX Text
AutoCAD SHX Text L-04
AutoCAD SHX Text
AutoCAD SHX Text G-09
AutoCAD SHX Text
AutoCAD SHX Text G-11
AutoCAD SHX Text E
AutoCAD SHX Text 6,7
AutoCAD SHX Text G-09
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text
AutoCAD SHX Text L-04
AutoCAD SHX Text
AutoCAD SHX Text L-04
AutoCAD SHX Text
AutoCAD SHX Text G-09
AutoCAD SHX Text
AutoCAD SHX Text G-09
AutoCAD SHX Text
AutoCAD SHX Text L-04
AutoCAD SHX Text E
AutoCAD SHX Text
AutoCAD SHX Text G-10
AutoCAD SHX Text
AutoCAD SHX Text L-04
AutoCAD SHX Text
AutoCAD SHX Text L-04
AutoCAD SHX Text 2,3
AutoCAD SHX Text G-10
AutoCAD SHX Text
AutoCAD SHX Text G-10
AutoCAD SHX Text F
AutoCAD SHX Text O
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text S
AutoCAD SHX Text T
AutoCAD SHX Text S
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text V
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text E
AutoCAD SHX Text D
AutoCAD SHX Text E
AutoCAD SHX Text P
AutoCAD SHX Text A
AutoCAD SHX Text R
AutoCAD SHX Text T
AutoCAD SHX Text M
AutoCAD SHX Text E
AutoCAD SHX Text N
AutoCAD SHX Text T
AutoCAD SHX Text O
AutoCAD SHX Text F
AutoCAD SHX Text A
AutoCAD SHX Text G
AutoCAD SHX Text R
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text U
AutoCAD SHX Text L
AutoCAD SHX Text T
AutoCAD SHX Text U
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
CAMPGROUND
RULES
1. Payment must be made within
30 minutes of arrival.
2. Maximum of 8 people and 2 vehicles per site.
3. Check-in 2:00 p.m. Check-out 12 noon.
4. Quiet Hours: 10:00 p.m. - 6:00 a.m.
5. Dogs must be kept on a leash & quiet.
Do not leave dogs unattended.
6. This is Bear Country-Keep site clean.
Store food in vehicles, not in tents.
7. Burn only wood in fire grates.
8. Tents on pads only.
FOR MORE INFO. SEE CAMPGROUND HOST ON INFO BOARD
www.campsnh.com - 1-888-CAMPS-NH
HOST
CAMP SITE SIGN
SCALE: NTS
SCAL…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .