Pre-Bid Q-A.docx
DOCX document 13 KB Posted
- Attached to
- Red Bluff Campground Rehabilitation Federal contract opportunity
- Solicitation number
- 12445521B0005
- Issued by
- Department of Agriculture Forest Service
About this file
This document contains pre-bid questions and answers related to a federal solicitation for the Red Bluff Campground Rehabilitation project. The solicitation is seeking bids to rehabilitate campground facilities within the Red Bluff Campground, including aggregate base placement, grading work, culvert extensions with associated rip-rap armoring, and asphalt paving. Interested parties were instructed to coordinate a pre-bid site visit with the contact provided by July 26th, 2021. The document clarifies that aggregate base item quantities include both asphalt and gravel areas, excess material from existing conditions must be hauled off-site if not used on-site, and the project is tax exempt with the relevant form to be provided to the awardee.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Attachment C - Plans - Part 1A.pdf | ||
| Attachment G - Davis Bacon Wage Determination - Building.pdf | ||
| Attachment F - Davis Bacon Wage Determination - Highway.pdf | ||
| Attachment H - Davis Bacon Wage Determination - Heavy.pdf | ||
| 12445521B0005.pdf | ||
| Attachment D - Plans - Part 1B.pdf | ||
| Attachment E - Plans - Part 2.pdf | ||
| Attachment A - Schedule of Items.xlsx | XLSX spreadsheet | |
| Attachment B - Specifications.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
12445521B0005 Red Bluff Campground Pre-Bid Questions & Answers
Q. Bid item “Aggregate base, MO DOT TYPE 5, 6" In Place QTY (include Shoulder), Placement Method C” – is this to include areas scheduled for asphalt paving or this this for gravel areas within each camp site only?
A. Yes this includes both areas. Except for the 3/8” minus.
Q. Group Campground: Existing conditions include a significant volume of material within the boundary of the perimeter loop drive. The grading plan and other associated plans do not clearly show existing conditions, only depicting final grading contours. See attached photo for reference. Is there a location within the project boundaries for placement of this excess material?
A. No must be hauled off site if not used on site. Line Item 20402 pertains to this question.
Q. Is the project tax exempt?
A. Yes and CO will provide the MO Form 5060 after award.
Q. Culvert extensions: The bid forms include line items for installation of culvert end sections. Is this line item to include costs for rip-rap armoring?
A. Yes if it is reflected in the drawings then it is incidental to the culvert extensions.
File details come from the government source that posted it. Updated .