This document is an attachment (Attachment D) to Contract 1-21-70-08B, detailing a Deployment & Logistics (D&L) breakdown for equipment processing and deployment services. The document appears to be a comprehensive task checklist for technology equipment handling, with detailed time allocations for various warehouse, configuration, logistics, and on-site deployment activities.

The contract covers multiple service categories including warehouse receiving, equipment processing, asset management, configuration, order administration, and on-site deployment services. Key services include long-term equipment storage (up to 360 days), inventory and preparation of used equipment, barcode scanning, equipment assembly, BIOS configuration, imaging services, custom delivery scheduling, on-site implementation, data migration, software management, peripheral setup, and DOD data wiping. The document provides granular task breakdowns with precise time allocations for each activity, ranging from 0.04 to 1.75 hours per task, suggesting a detailed, structured approach to technology equipment management and deployment. The pricing and service model appears designed for flexible, scalable technology refresh and equipment management projects.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

D&L Task Checklist

Attachment D - Deployment & Logistics Breakdown
Contract 1-21-70-08B
SECTION 1: Warehouse Receiving and Processing of Equipment
Unit Time (hr)Tablet/2-in-1 Device QtyTotal Time (hrs)Task DescriptionIncluded (Y/N)
N/AProject0Provide Long-Term Equipment Storage - up to 90 days (per SOW)
N/AProject0Provide Long-Term Equipment Storage - up to 180 days (per SOW)
N/AProject0Provide Long-Term Equipment Storage - up to 360 days (per SOW)
N/AProject0Used Equipment - Inventory and Preparationfor Reuse of Equipment
0.040Bar Code Scan of equipment serial numbers and download into database
N/AProject0Detail asset reporting per customer requirement to include electronic/manual input and transfer per SOW
SECTION 2: Equipment Assembly & Configuration
Unit Time (hr)Tablet/2-in-1 Device QtyTotal Time (hrs)Task DescriptionIncluded (Y/N)
0.300Perform BIOS settings or changes, i.e., Enable/Disable (Wake on LAN) during imaging
N/AProject0Advanced Imaging Services
SECTION 3: Equipment Order Administration and Logistics
Unit Time (hr)Tablet/2-in-1 Device QtyTotal Time (hrs)Task DescriptionIncluded (Y/N)
N/AProject0Creating a Customer Schedule for Staggered Delivery to multiple locations (per SOW) (Schedule Only)
N/AProject0Creating a Customer Schedule for Staggered Delivery to single location (per SOW) (Schedule Only)
N/AProject0Create and implement custom/scanned data/cutsheets per scope of work (per SOW)
1.750Secure Cart Rental *** (unit time is per cart) ***
SECTION 4: On Site Deployment Services
Unit Time (hr)Tablet/2-in-1 Device QtyTotal Time (hrs)Task DescriptionIncluded (Y/N)
N/AProject0End user training: per scope of work
0.500PC Implementation and Data migration between old and new system
N/AProject0Custom Remote On-Site Coordination/Onsite Project Management for larger rollouts (per SOW)
0.500Add/Remove software as required from a computer
0.250Launch virus protection, update and scan
0.170Add peripherals as required via direct connect, scanners, printers, PDA's
0.250Move and place equipment to be re-purposed into storage or re-deployment at single customer location
0.170vPro provisioning via customer-supplied certificate on USB
N/AProject0Configure Intel AMT USB key, install Intel SCS, integrate with MS AD and SCCM (per SOW)
0.350DOD wipe, certify and signoff

Section 1 Grid

Long-Term Equipment Storage - up to 90 days (per SOW)Fraction of D&L (Hrs)Long-Term Equipment Storage - up to 180 days (per SOW)Fraction of D&L (Hrs)Long-Term Equipment Storage - up to 360 days (per SOW)Fraction of D&L (Hrs)Used Equipment - Inventory and Preparationfor Reuse of EquipmentFraction of D&L (Hrs)Bar Code ScanningFraction of D&L (Hrs)Detail Asset Reporting per customer requirement to include electronic/manual input and transfer per SOWFraction of D&L (Hrs)
Storing customer equipment,up to 90 days beyond the statewide contract requirement of 30 calendar days, upon delivery to Contractor. Secure Storage, with regular Inventory checks to ensure no lost product. Provide customer access for inventory confirmation.Storing customer equipment,up to 180 days beyond the statewide contract requirement of 30 calendar days, upon delivery to Contractor. Secure Storage, with regular Inventory checks to ensure no lost product. Provide customer access for inventory confirmation.Storing customer equipment,up to 360 days beyond the statewide contract requirement of 30 calendar days, upon delivery to Contractor. `Secure Storage, with regular Inventory checks to ensure no lost product. Provide customer access for inventory confirmation.This task covers all the vendor effort surounding proper transport, documentation, and secure storage of all used equipment being returned by the customer specifically for reuse by the same customer.Scan equipment barcodes and enter manufacturer's serial numbers into Contractor handheld barcode scanner.0.040Locate and export detailed asset information as needed from Contractor database which includes: site location, customer PO, product description, manufacturer part number, customer asset number, custom asset tags, manufacturer serial number, delivery work order number, delivery location, contact person, and date/time delivered with signature validation
Note: Secure monitored, insured facilities.

Storage will only be charged if there is a delay in the project schedule and the storage charge is mutually agreed upon by Contractor and the customer.

During the storage period, equipment will be un-palletized to build orders and the remaining equipment will be re-palletized. Note: Secure monitored, insured facilities.

Storage will only be charged if there is a delay in the project schedule and the storage charge is mutually agreed upon by Contractor and the customer.

During the storage period, equipment will be un-palletized to build orders and the remaining equipment will be re-palletized. Note: Secure monitored, insured facilities.

Storage will only be charged if there is a delay in the project schedule and the storage charge is mutually agreed upon by Contractor and the customer.

During the storage period, equipment will be un-palletized to build orders and the remaining equipment will be re-palletized.Boxing up used device and all associated accessories at installation location.Create custom asset report for customer from exported asset report. Format into MS Excel format by sorting report by type of equipment, location, date of delivery, customer purchase order.
Consolidation and documentation of all used equipment at vendor warehouse.Deliver asset report updates to customer in MS Excel format on a regular basis throughout the project for use on customer SharePoint. Ready data for Remedy or Services Desk import and quality checks
Transport upon completion of project of all used equipment back to agency location.Note: Database experts are made available to assist the State in importing and normalizing data in their IT systems
Project Total Hours:0Project Total Hours:0Project Total Hours:0Project Total Hours:0Unit Total:0.040Project Total Hours:0
Units OrderedProjectUnits OrderedProjectUnits OrderedProjectUnits OrderedProjectUnits Ordered0Units OrderedProject
Total Hours0Total Hours0Total Hours0Total Hours0Total Hours0Total Hours0

Grand Total D&L Hours - 0

&"-,Bold"&22NWN Value Added Services (VAS) Task Detail

&12&F &12&D

Section 2 Grid

Perform Bios settings or changes, i.e. WOL (wake on LAN) during imagingFraction of D&L (Hrs)Advanced Imaging ServicesFraction of D&L (Hrs)
Connect computer to power (for desktop, also connect to monitor) and start computer0.100Additional handling necessary to facilitiate imaging services outside of the vendor facility. Covers the additional handling needed for controlled imaging in a customer or secondary secure environment which is different from the final installation location.
Enter BIOS and make changes per SOW, i.e., add asset name, change security access, enable Wake On LAN.0.200
Unit Total:0.300Project Total Hours:0.000
Units Ordered0Units OrderedNA
Total Hours0Total Hours0

Grand Total D&L Hours

&"-,Bold"&22NWN Value Added Services (VAS) Task Detail

&12&F &12&D

Section 3 Grid

Creating a Customer Schedule for Staggered Delivery to multiple locations (per SOW) (Schedule Only)Fraction of D&L (Hrs)Creating a Customer Schedule for Staggered Delivery to single location (per SOW) (Schedule Only)Fraction of D&L (Hrs)Custom Installation DocumentationFraction of D&L (Hrs)Secure Cart Rental (Customer performs installation of Equipment, not included when Contractor performs installation)Fraction of D&L (Hrs)
Assign Contractor team and meet with customer to discuss schedule needs and resource requirements.Assign Contractor team and meet with customer to discuss schedule needs and resource requirements.Meet with customer to identify critical information needed for custom installation documentationComputer equipment is placed on an Contractor-supplied 5’x 2’x 6’ rolling rack. Contractor to organize computers, pad and shrink wrap each rack for damage prevention.
1.250
Meet with customer to merge, communicate and manage all calendar and logistics into a proposed delivery scheduleMeet with customer to merge, communicate and manage all calendar and logistics into a proposed delivery scheduleCreate sample documentation for customer review and approvalAfter delivery, move rack into customer facility per customer's direction.0.250
Review approved schedule and commit resources (personnel, vehicles, and equipment). Sort equipment and accessories. Remove dunnage as required by SOW.Review approved schedule and commit resources (personnel, vehicles, and equipment). Sort equipment and accessories. Remove dunnage as required by SOW.Print custom installation documentation for installation teamCollect rack at customer facility and move to pick up locaiton, i.e., loading dock.0.250
Generate required documents for receiving of equipment by customer at each location - includes, but not limited to, customer packing slips with serial #'s, location and contact information, & delivery instructionsGenerate required documents for receiving of equipment by customer at each location - includes, but not limited to, customer packing slips with serial #'s, location and contact information, & delivery instructionsOrganize printed installation documentation per location and installation date(s)Note: All Racks are left on site with customer for customer use for approximately two weeks. Contractor will pick up all racks at a pre-scheduled date and time at no additional cost to customer.
Upon completion, scan installation documentation to network storage
Note: Coordination with state facilities, IT and asset management personnel is done to ensure efficient accounting of state assets
Project Total Hours:Project Total Hours:Project Total Hours:Unit Total:1.750
Units OrderedProjectUnits OrderedProjectUnits OrderedProjectUnits Ordered2
Total Hours0Total Hours0Total Hours0Total Hours3

&"-,Bold"&22NWN Value Added Services (VAS) Task Detail

&12&F &12&D

Section 4 Grid

Training per Customer ScopeFraction of D&L (Hrs)PC Implementation and Data migration between old and new systemFraction of D&L (Hrs)Custom Remote On-Site CoordinationFraction of D&L (Hrs)Add/Remove software as required from a computerFraction of D&L (Hrs)Launch virus protection, update and scanFraction of D&L (Hrs)Add peripherals as required via direct connect, scanners, printers, PDA'sFraction of D&L (Hrs)Move and place equipment to be re-purposed into storage or re-deployment at single customer locationFraction of D&L (Hrs)vPro provisioning via customer-supplied certificate on USBFraction of D&L (Hrs)Configure Intel AMT USB key, install Intel SCS, integrate with MS AD and SCCMFraction of D&L (Hrs)DOD wipe and certify computerFraction of D&L (Hrs)
Design, build and deliver one hour of training per unique customer requirements.Login to the operating system (OS) with a temporary user account assigned by the customer0.150Assign remote on-site Contractor personnel to assist the customer with daily on-site coordination and planning of equipment locations and implementation of the customer's custom installation schedule. Work with customer to organize daily work assignments and complete the validation of complete installation of equipment. Report work progress and escalate equipment replacement as needed.At time of computer installation, login to customer computer with provided credentials.0.050At time of computer installation, login to customer computer with provided credentials.0.050At time of computer installation, attach up to three peripherals and test connections as required by customer.0.170At time of new computer installations, sort equipment to be recycled and equipment to be re-purposed. For re-purposed equipment, stage equipment in temporary on site storage per customer requirements.0.100At customer site, activate vPro AMT on one computer with provided USB key. Confirm activation with customer IT.0.167Assist the Customer with the setup and provisioning of AMT into the Active Directory and Microsoft SCCM per scope of work.Perform wipe of data from internal storage device in computer equipment.0.250
Initiate transfer of single user's data files to customer storage (1GB maximum)0.150Install/uninstall provided software on computer per customer requirements (up to three software programs).0.450Launch virus protection program and search for updates. Launch Quick Scan as required by customer.0.200Move re-purposed equipment to new installation locations on site at current location per customer requirements.0.150Scan manufacturer barcodes and customer property asset tag numbers into Contractor handheld scanner.0.050
After new computer is installed, restore single user's data files to new computer0.100Create custom asset report for customer from exported asset report. Format into MS Excel format by sorting report by type of equipment, asset #, serial #, date of DOD wipe, date of delivery to recycler.0.050
Validate successful migration with customer0.100
Note: Customer requirements as detailed in SOW may require more than one-half hour of time to complete user data migration.
Project Total Hours:Unit Total:0.500Project Total Hours:Unit Total:0.500Unit Total:0.250Unit Total:0.170Unit Total:0.250Unit Total:0.167Project Total Hours:Unit Total:0.350
Units OrderedProjectUnits Ordered0Units OrderedProjectUnits Ordered0Units Ordered0Units Ordered0Units Ordered0Units Ordered0Units OrderedProjectUnits Ordered0
Total Hours0Total Hours0Total Hours0Total Hours0Total Hours0Total Hours0Total Hours0Total Hours0Total Hours0Total Hours0

&"-,Bold"&22NWN Value Added Services (VAS) Task Detail

&12&F &12&D

File details come from the government source that posted it. Updated .