Attachment C - Tank Data Sheet.xlsx
XLSX spreadsheet 110 KB Posted
- Attached to
- API Fuel Tank Inspection - Wright Patterson, AFB Federal contract opportunity
- Solicitation number
- W9128F25QA018
About this file
This file is a tank data sheet template containing multiple sections for recording detailed information about fuel storage tanks and related infrastructure. The template includes fields for capturing tank specifications (capacity, dimensions, construction details), inspection information (dates, conditions, recommendations), safety features (alarms, containment, leak detection), and contact information for facility personnel. While the template itself is blank, it appears to be designed for use in government fuel tank management and inspection programs based on fields referencing DLA Energy, Army Corps of Engineers, and military facilities. No specific tank data or requirements are populated in this template.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Attachment A - General Installation Security Requirements.pdf | ||
| Attachment J - Previous Inspection Report.pdf | ||
| Attachment G - Return To Service Letter.docx | DOCX document | |
| Wage Determination.pdf | ||
| Attachment 1 - CLIN Schedule.pdf | ||
| Attachment B - Fuel Storage Tank List.xlsx | XLSX spreadsheet | |
| Attachment E - Inspection Teleconference Briefing Template.docx | DOCX document | |
| Attachment F - API Internal Inspection Template.docx | DOCX document | |
| Attachment 2 - Performance Work Statement (PWS).pdf | ||
| Attachment 4-Addendum to 52.212-1.pdf | ||
| Attachment D - Monthly Contractors Progress Management and Status Report.xlsx | XLSX spreadsheet | |
| Combined Synopsis-Solicitation Wright Patterson AFB.pdf |
Show all 12
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PMP
| Defense Logistics Agency | ||
| Energy Division (DLA-E) | ||
| Project Management Plan (PMP) | ||
| Construct Product Containment Areas, Replace Secondary Containment Areas (Fort Indiantown Gap, PA) | ||
| DLA-E Project Number P-006858-08 | ||
| November 2010 | ||
| US Army Corps | ||
| Of Engineers® | ||
| Omaha District | ||
| PROJECT CONCEPT DOCUMENT | ||
| I. General Information | ||
| DLA-E Project Name: | Construct Product Containment Areas, Replace Secondary Containment Areas (Fort Indiantown Gap, PA) | |
| DLA-E Project Number: | P-006858-08 | |
| DLA-E Project Manager: | Rick Rivera | |
| DLA-E Contact Information: | (703) 767-8286; rick.rivera@dla.mil | |
| Date: | 12-Nov-10 | |
| Section One – Customer Goals | ||
| II. BUSINESS JUSTIFICATION (State the reason this project is needed and what problem or issue the project will resolve. Describe the impacts to the organization if the project is not approved.) | ||
| Upgrades and repairs to the fueling facilities and supporting systems are required to prevent a fuel release that could contaminate the soil and groundwater or start a fire that could damage the fuel equipment and injure personnel. | ||
| III. PROJECT DESCRIPTION (Provide a high-level overview of the project objectives. Include a brief list of desired project outcomes.) | ||
| Project Objectives: |
Identify and resolve deficiencies such that the installation will avoid potential fuel releases that could harm the environment and personnel. Upgrades/repairs will comply with Federal, State, and Local Standards.
Minor Repair and Minor Construction activities will include but not be limited to the following:
- install a secondary spill containment at the JP-8 truck issue racks;
- install three (3) ground vehicle refueling stations;
- replace secondary spill containment for three (3) 6,000 gallon refuelers;
- install pipe supports;
- repair emergency fuel shutoff switches; and
- install tank overfill protection system.
Desired Project Outcomes:
- Provide detailed trip report to stakeholders for review and approval
- Receive necessary review comments and approvals from stakeholders
- Develop 35% design and cost estimate
- Prepare and distribute RFP to Fuels MATOCs
- Perform repairs in quality-focused manner
- Complete work by 11-Nov-2011
| IV. PROJECT COSTS (Provide high-level estimates if known.) | |||||
| $885,868.17 ($65,619.84 for SIOH) | |||||
| V. TIMEFRAME | |||||
| Is there a critical completion date? | YES | NO | Date required: | N/A | |
| Desired completion date if not critical: | 11-Nov-11 | ||||
| Section Two – USACE Project Information | |||||
| VI. PLANNING ESTIMATES (Provide a high-level estimate of project completion.) | |||||
| $1,150,000 (including additional deficiencies identified during site visit) | |||||
| VII. BUSINESS AREAS IMPACTED (List all business units impacted by this project.) | |||||
| - Special Projects (Project Management) |
- Design Branch (Mechanical Engineering, Civil Engineering, Electrical Engineering)
- Cost Engineering (Cost Estimation)
- Program Analysts (Budgeting)
- Contracting (Contract Management)
| Section Three: Review Committee | |
| V. SELECTION COMMITTEE REVIEW | |
| Date of Review: | |
| Comments: | |
| Project Reviewed/Denied: | |
| Project Priority: | |
| IX. SIGNATURES OF REVIEW COMMITTEE |
| PROJECT CHARTER | ||
| I. GENERAL INFORMATION | ||
| DLA-E Project Name: | Construct Product Containment Areas, Replace Secondary Containment Areas (Fort Indiantown Gap, PA) | |
| DLA-E Project Number: | P-006858-08 | |
| DLA-E Project Manager: | Rick Rivera | |
| Date: | 12-Nov-10 | |
| II. PROJECT OVERVIEW (Describe the product or service of the project, the reason the project was undertaken, and the purpose of the project) | ||
| Identify and validate any existing deficiencies in fueling facilities that may result in a fuel release that could contaminate the soil and groundwater or start a fire that could damage the fuel equipment and injure personnel. Prepare designs detailing the necessary upgrades and/or repairs to the fueling facilities, and execute those repairs. | ||
| III. PROJECT OBJECTIVES (Describe the overall objectives of the project and what factors will determine the success of the project.) | ||
| Identify and resolve deficiencies such that the installation will avoid potential fuel releases that could harm the environment and personnel. Upgrades/repairs will comply with Federal, State, and Local Standards. |
Minor Repair and Minor Construction activities will include but not be limited to the following:
- install a secondary spill containment at the JP-8 truck issue racks;
- install three (3) ground vehicle refueling stations;
- replace secondary spill containment for three (3) 6,000 gallon refuelers;
- install pipe supports;
- repair emergency fuel shutoff switches; and
- install tank overfill protection system.
| IV. BUSINESS JUSTIFICATION (State the reason this project is needed and what problem or issue the project will resolve. Describe the impacts to the organization if the project is not approved.) | |
| Upgrades and repairs to the fueling facilities and supporting systems are required to prevent a fuel release that could contaminate the soil and groundwater or start a fire that could damage the fuel equipment and injure personnel. | |
| V. RESOURCE COSTS AND ESTIMATES (Provide cost estimates if known, including monies already expended such as a feasibility study or consulting time.) | |
| - Project Management: $4,500 |
- Mechanical Engineering: $6,000
- Civil Engineering: $6,000
- Electrical Engineering: $3,000
- Cost Estimating: $2,500
- Budgeting: $1,000
- Contract Management: $3,500
| VI. ROLES AND RESPONSIBILITIES (List the stakeholders and their responsibilities.) | |
| - Gregory Etter: Project Manager, POL-DX |
- Michael Deeker: Civil Engineer, POL-DX
- Joseph Pesek: Mechanical Engineer, POL-DX
- James Hugar, Team Lead, Army Petroleum Center VII. Signatures (Include signature lines for the project sponsor, project manager, key stakeholders, customers, and vendors.)
| VIII. Attachments (List the attachments to the charter here.) | ||
| Sign in sheet for site visit to Fort Indiantown Gap, PA (XX-Sep-2010) | ||
| PROJECT KICK-OFF MEETING AGENDA | ||
| I. GENERAL INFORMATION | ||
| DLA-E Project Name: | Construct Product Containment Areas, Replace Secondary Containment Areas (Fort Indiantown Gap, PA) | |
| DLA-E Project Number: | P-006858-08 | |
| USACE Project Manager: | Gregory Etter | |
| Date: | XX-Sep-2010 | |
| II. AGENDA ITEMS | ||
| 1. Introductions | Review MIPRs and project description | |
| 2. Project charter | ||
| 3. Project purpose | Review MIPRs and project description | |
| 4. Project objectives | Review MIPRs and project description | |
| 5. Roles and responsibilities | Role of POL-DX | |
| 6. Questions | ||
| PROJECT SCOPE STATEMENT | ||
| I. GENERAL INFORMATION | ||
| DLA-E Project Name: | Construct Product Containment Areas, Replace Secondary Containment Areas (Fort Indiantown Gap, PA) | |
| DLA-E Project Number: | P-006858-08 | |
| USACE Project Manager: | Gregory Etter | |
| Date: | 12-Nov-10 | |
| II. PROJECT OVERVIEW (Describe the product or service of the project, the reason the project was undertaken, and the purpose of the project.) | ||
| Identify and validate any existing deficiencies in fueling facilities that may result in a fuel release that could contaminate the soil and groundwater or start a fire that could damage the fuel equipment and injure personnel. Prepare designs detailing the necessary upgrades and/or repairs to the fueling facilities, and execute those repairs. | ||
| III. PROJECT GOALS AND OBJECTIVES (Describe the project goals using the SMART (Specific, Measureable, Agreed to, Realistic, Time Bound) formula. These goals will be used to measure and determine the project’s success at its conclusion.) | ||
| Project Goals: |
- Provide detailed trip report to stakeholders for review and approval
- Receive necessary review comments and approvals from stakeholders
- Develop 35% design and cost estimate
- Prepare and distribute RFP to Fuels MATOCs
- Perform repairs in quality-focused manner
- Complete work by 11-Nov-2011
Project Objectives:
Identify and resolve deficiencies such that the installation will avoid potential fuel releases that could harm the environment and personnel. Upgrades/repairs will comply with Federal, State, and Local Standards.
Minor Repair and Minor Construction activities will include but not be limited to the following:
- install a secondary spill containment at the JP-8 truck issue racks;
- install three (3) ground vehicle refueling stations;
- replace secondary spill containment for three (3) 6,000 gallon refuelers;
- install pipe supports;
- repair emergency fuel shutoff switches; and
- install tank overfill protection system.
| IV. COMPREHENSIVE LIST OF PROJECT DELIVERABLES (These are the products or services that must be produced in order to fulfill the goals of the project. Deliverables should have measureable, verifiable results and outcomes. Identify critical success factors.) | |
| - Site visit with members of the POL-DX; |
- Trip report including deficiency description and recommended solutions;
- Final (Draft) SOW for review;
- RTA (Final Draft) SOW for distribution to Fuels MATOC pool of contractors;
- Award amount for project execution by Fuels MATOC;
- Contractor kickoff meeting at installation;
- Construction completion.
| V. COMPREHENSIVE LIST OF PROJECT REQUIREMENTS (Requirements are the specifications of the deliverables.) | |
| - Designs and constructed upgrades/repairs should be in compliance with existing Federal, State, and Local standards; |
- Design and construction efforts shall be derived from approvals by DLA-E and APC to remedy identified deficiencies.
| VI. EXCLUSIONS FROM SCOPE (List all deliverables or requirements that are not part of this project.) | |
| N/A | |
| VII. TIME AND COST ESTIMATE (Include initial estimates of time and resources. These are estimates only and will be updated after additional project planning activities are completed.) | |
| - Total time estimate: 415 days |
- Site Visit: 4 days
- Trip Report prepared, reviewed, and approved by DLA-E and APC: 28 days
- RTA SOW prepared, reviewed, and distributed to Fuels MATOC contractors: 90 days
- Bids received and Task Order awarded: 45 days
- Construction: 248 days
- Total cost estimate: $1,150,000 (including additional deficiencies identified during site visit) VIII. ROLES AND RESPONSIBILITIES (Include a roles-and-responsibilities chart, detailing project responsibilities.)
IX. ASSUMPTIONS (List all project assumptions.)
X. CONSTRAINTS (List all project constraints.)
XI. SIGNATURES (Include signatures for the project sponsor, project manager, key stakeholders, customers, and vendors.)
| COMMUNICATIONS PLAN | ||
| I. GENERAL INFORMATION | ||
| DLA-E Project Name: | Construct Product Containment Areas, Replace Secondary Containment Areas (Fort Indiantown Gap, PA) | |
| DLA-E Project Number: | P-006858-08 | |
| USACE Project Manager: | Gregory Etter | |
| Date: | 12-Nov-10 |
| COMMUNICATION | RECIPIENTS | METHOD | TIMING | PREPARED BY | ||
| Draft Trip Report | - Army Petroleum Center; | |||||
| - Charles Rickard; | Upon completion | Mike Deeker, Joe Pesek | ||||
| Final RFP | - Army Petroleum Center; | |||||
| - Charles Rickard; | e-mail, FTP | Upon completion | Mike Deeker, Joe Pesek, Doug Larsen | |||
| RTA RFP | MATOC Contractors | e-mail, FTP | Upon completion | Mike Deeker, Joe Pesek, Doug Larsen |
| RESOURCES, MATERIALS, SUPPLIES, AND EQUIPMENT LIST | |||||
| I. GENERAL INFORMATION | |||||
| DLA-E Project Name: | Construct Product Containment Areas, Replace Secondary Containment Areas (Fort Indiantown Gap, PA) | ||||
| DLA-E Project Number: | P-006858-08 | ||||
| USACE Project Manager: | Gregory Etter | ||||
| Date: | 12-Nov-10 | ||||
| II. RESOURCES, MATERIALS, SUPPLIES, AND EQUIPMENT NEEDED | |||||
| TASK | MATERIALS NEEDED | QUANTITY | APPROXIMATE COST | ||
| Perform site visit | Mechanical, Civil engineers | 1 EA | $1,200 per day |
| QUALITY MANAGEMENT PLAN | ||
| I. GENERAL INFORMATION | ||
| DLA-E Project Name: | Construct Product Containment Areas, Replace Secondary Containment Areas (Fort Indiantown Gap, PA) | |
| DLA-E Project Number: | P-006858-08 | |
| USACE Project Manager: | Gregory Etter | |
| Date: | 12-Nov-10 | |
| II. PROJECT OVERVIEW (Provide an overview of the project, including its primary goals.) | ||
| Identify and validate any existing deficiencies in fueling facilities that may result in a fuel release that could contaminate the soil and groundwater or start a fire that could damage the fuel equipment and injure personnel. Prepare designs detailing the necessary upgrades and/or repairs to the fueling facilities, and execute those repairs. | ||
| III. QUALITY STANDARDS AND REGULATIONS (Note any quality policies, standards, or regulations the project team will be required to follow.) | ||
| Ensure that recommendations and preliminary designs conform to current design requirements and safety standards. | ||
| IV. QUALITY CRITERIA (Provide a detailed list of the quality criteria needed to consider the deliverables complete and correct. Include each deliverable and its quality criteria.) | ||
| - Conforms to preliminary design requirements; |
- Meets safety standards;
- Completed on time;
- System performs as required by the Installation;
| V. QUALITY ASSURANCE PRODECURES (List the activities and processes that will be used to monitor adherence to the quality criteria.) | |
| - Initial kickoff meeting by member of Omaha District to explain project goals and quality requirements; |
- Daily oversight performed by local District;
- Unscheduled visits by Omaha District representative(s);
| VI. QUALITY MANAGEMENT ROLES AND RESPONSIBILITIES (Include a roles and responsibility chart detailing who’s responsible for which quality activities.) | |
| - Technical quality: POL-DX (Mike Deeker, Joe Pesek); |
- Execution quality: Rapid Response representative (Todd Wolpert);
- Overall project quality: Project Manager (Greg Etter) VII. SIGNATURES (Include signature lines for the project sponsor, project manager, and those responsible for quality assurance and review.)
| PROJECT STATUS REPORT | ||
| I. GENERAL INFORMATION | ||
| DLA-E Project Name: | Construct Product Containment Areas, Replace Secondary Containment Areas (Fort Indiantown Gap, PA) | |
| DLA-E Project Number: | P-006858-08 | |
| USACE Project Manager: | Gregory Etter | |
| Date: | 12-Nov-10 | |
| II. PROGRESS MADE SINCE LAST REPORTING PERIOD | ||
| - Site visit performed on XX-XX-2010; |
- Supplemental maps and surveys provided by Installation;
- Trip report distributed on XX-XX-2010;
| III. SCHEDULED AND ACTUAL COMPLETION DATES | |
| XXXXXXXX | |
| IV. PROGRESS EXPECTED THIS REPORTING PERIOD NOT COMPLETED |
| V. PROGRESS EXPECTED NEXT REPORTING PERIOD | |
| - Comments on trip report due XX-XX-2010; |
- Final RFP distributed for review and comment;
| VI. ISSUES | ||||
| - None | ||||
| ACTION ITEM LOG | ||||
| I. GENERAL INFORMATION | ||||
| DLA-E Project Name: | ||||
| DLA-E Project Number: | ||||
| USACE Project Manager: | ||||
| II. ACTION ITEM LOG | ||||
| ID | DATE REPORTED | ACTION ITEM | ASSIGNED TO | DATE RESOLVED |
| CHANGE REQUEST FORM | |
| I. GENERAL INFORMATION | |
| DLA-E Project Name: | |
| DLA-E Project Number: | |
| Requestor Name: | |
| Requestor’s Contact Info: | |
| Date of Request: | |
| Date Request Approved/Denied: | |
| Section One – Change Request Information | |
| II. DESCRIPTION OF CHANGE REQUEST (Include a detailed description of the requested scope change.) |
III. BUSINESS JUSTIFICATION FOR CHANGE (Describe how the business, project, or product will benefit from the requested change.)
IV. IMPACTS OF NOT MAKING THE CHANGE (Describe how the business, project, or product will be impacted if the change is not made.)
V. ALTERNATIVES TO CHANGE (Describe any known alternatives to the change.)
| Section Two – Project Manager Input |
| VI. IMPACTS OF THE CHANGE (Describe the impacts of this change to the project schedule, budget, and quality.) |
VII. ALTERNATIVES TO CHANGE (Describe alternative solutions to the change.)
VIII. RECOMMENDATIONS TO THE CHANGE CONTROL BOARD (Describe the project manager’s recommendation to approve or deny the change. Include justification for the recommendation.)
| Section Three – Change Control Board | ||
| Recommendation: (Include a discussion concerning the goals of the project. Does this change significantly impact the goals of the project such that the project goals can no longer be met? Should this change be considered a new project or phase two of the existing project, etc.) | ||
| Date of Review: | ||
| Signature: | ||
| QUALITY MANAGEMENT PLAN | ||
| I. GENERAL INFORMATION | ||
| DLA-E Project Name: | Construct Product Containment Areas, Replace Secondary Containment Areas (Fort Indiantown Gap, PA) | |
| DLA-E Project Number: | P-006858-08 | |
| USACE Project Manager: | Gregory Etter | |
| Date: | 12-Nov-10 | |
| II. PROJECT OVERVIEW (Describe the final product or service of the project, the reason the project was undertaken, and the purpose of the project. Include a description of the business problem that was solved by implementing the project.) | ||
| Identify and validate any existing deficiencies in fueling facilities that may result in a fuel release that could contaminate the soil and groundwater or start a fire that could damage the fuel equipment and injure personnel. Prepare designs detailing the necessary upgrades and/or repairs to the fueling facilities, and execute those repairs. | ||
| III. PROJECT GOALS AND OBJECTIVES (Identify the goals that were met during this project and compare them to the goals on the scope statement.) | ||
| Project Goals: |
- Provide detailed trip report to stakeholders for review and approval
- Receive necessary review comments and approvals from stakeholders
- Develop 35% design and cost estimate
- Prepare and distribute RFP to Fuels MATOCs
- Perform repairs in quality-focused manner
- Complete work by 11-Nov-2011 Project Objectives:
Identify and resolve deficiencies such that the installation will avoid potential fuel releases that could harm the environment and personnel. Upgrades/repairs will comply with Federal, State, and Local Standards.
Minor Repair and Minor Construction activities will include but not be limited to the following:
- install a secondary spill containment at the JP-8 truck issue racks;
- install three (3) ground vehicle refueling stations;
- replace secondary spill containment for three (3) 6,000 gallon refuelers;
- install pipe supports;
- repair emergency fuel shutoff switches; and
- install tank overfill protection system.
| IV. PROJECT DELIVERABLES AND MILESTONES (Identify the major deliverables or milestones met, their due dates according to the final plan, their actual delivery dates, and stakeholder acceptance dates.) | |
| XXXXXXX | |
| V. PROJECT BUDGET (Give a final overview of the project budget and variances from the budget.) | |
| $885,868.17 total, with $65,619.84 set aside for SIOH | |
| VI. QUALITY ASSURANCE (Document acceptance of the quality criteria and inspections.) |
VII. COMMENTS (Include any information that reminds stakeholders of agreements made concerning deliverables that were moved to phase two of the project, major problems that were encountered and how they were resolved, risk events that need further explanation, etc.)
| VIII. FINAL ACCEPTANCE AND SIGNATURES (Provide a way for each stakeholder to indicate their acceptance of the project and sign their name.) | ||
| Accept / Decline | Stakeholder Name: | |
| Accept / Decline | Stakeholder Name: | |
| Accept / Decline | Stakeholder Name: | |
| Accept / Decline | Stakeholder Name: | |
| Accept / Decline | Stakeholder Name: | |
| Accept / Decline | Stakeholder Name: |
mailto:rick.rivera@dla.mil Project Status Report
| 4/7/11 | Week Ending | 12-Feb-22 |
| Confidential and proprietary information - Not for distribution beyond initial recipients |
PROJECT NAME: Replace Roadway, Install Dispenser and Spill Containment Area, and Construct Canopies
| Current Health | Green | Project Manager | 31-Dec-99 | Phone |
| Prior Health | Green | Project Sponsor | 31-Dec-99 | Phone |
| Schedule Health | Green | Customer Contact | 31-Dec-99 | Phone |
| PROJECT DESCRIPTION/SCOPE | Demolish and Repair roadway. |
| Percent of Project Schedule Completed | |
| 25-Mar-00 | % Complete |
| Project Expense / Budget to date | |
| $ 80,000.00 | Budget (K) |
| $ 62,000.00 | Expense to date (K) |
| Progress of Phases | ||||||||
| Validation (Trip) | Trip Report Completed | Trip Report Comments Due | PASB Submitted | Final SOW | Final AOW | |||
| Comments Due | RTA SOW | Proposal | ||||||
| Due | Tech. | |||||||
| Analysis | Source | |||||||
| Selection | Award Date | NTP | ||||||
| Projected Date | 03/15/04 | 04/21/04 | 07/01/04 | 07/01/04 | 07/01/04 | 07/01/04 | 07/01/04 | |
| Actual Date | 04/15/04 | 05/15/04 | 07/30/04 | 07/30/04 | 07/30/04 | 07/30/04 | 07/30/04 |
PROJECT STATUS (Date / Provide project status here. Leave old status reports to build a chronology of project status) (Example: 04/07/04 Project on track. Testing scheduled using the ABC environment)
| SECTION 2. PROJECT BUDGET / COST TRACKING | ||||
| Funding Document(s) | $ | Date | Change # | Comments |
| SP0600MRXXXXXX | ||||
| SP0600MRXXXXXX | (enter revised budget if approved through change process) | |||
| SP0600MRXXXXXX | ||||
| SP0600MRXXXXXX | ||||
| Total Budget | $0 |
| SECTION 3. PROJECT INFORMATION (insert lines when needed) | |
| DATE | ACCOMPLISHMENTS (DESCRIPTION) |
DATE DECISIONS MADE
DATE ISSUES/ACTION ITEMS ASSIGNED TO DUE DATE
| RISK/UPDATE | TRIGGER (Event to watch for) | MITIGATION PLAN | Probability | Impact | Risk Index | |
| 31-Dec-99 | ||||||
| 31-Dec-99 | ||||||
| 31-Dec-99 | ||||||
| 31-Dec-99 | ||||||
| 31-Dec-99 | ||||||
| DATE | CONCERNS REQUIRING MANAGEMENT ATTENTION | DATE RESOLVED |
CHANGE # CHANGE
| SECTION 4. PROJECT SCHEDULE (PROJECT TIMELINE OR MILESTONES) (insert lines where needed) | |||||
| ITEM | START DATE | TARGET FINISH | |||
| DATE | ACTUAL FINISH DATE | ITEM STATUS/ HEALTH | COMMENTS |
| Green | |
| Green | |
| Green | |
| Red | |
| Green | |
| Yellow | |
| Red | |
| Green | |
| Yellow | |
| Red | |
| Green | |
| Yellow | |
| Red | |
| Green | |
| Yellow | |
| Red | |
| Green | |
| Yellow | |
| Red | |
| Green | |
| Yellow | |
| Red | |
| Green | |
| Yellow | |
| 1) Office Button/Excel Options/Popular/Top options for working with Excel - | |
| Check box Show Developer tab in Ribbon | |
| 2) Click Developer Tab | |
| 3) In Controls group click Insert | |
| 4) In Active X controls click on the bottom rightmost icon - More controls | |
| 5) Select Calendar Control 12.0 and click OK | |
| 6) Draw a box on the spreadsheet about 10 rows high and 5 columns wide | |
| 7) Right click on the calendar and select Properties | |
| 8) Change LinkedCell (blank) to be the cell you want the date to be in (A1, | |
| G6 for example) | |
| 9) Click Design Mode in Controls group to exit Design Mode and have the | |
| calendar work | |
| 10) Click on a date in the calendar and you should see that date in the cell | |
| you entered in step 8 | |
| 11) To make further changes click Developer tab, Controls group, Design | |
| Mode, Click the calendar and change whatever |
| Green | |
| Yellow | |
| Make sure the Developer tab is showing in the ribbon (the toolbar at the top of the page). If it isn't, then click the "Office" button at the top left, then choose "Excel Options". This will bring up a pop up window. Put a check mark in the "Show Developer Tab in the Ribbon" option, then click "OK". | Red |
| 2-Jan-00 | |
| Click on the "Developer" tab. Click on the small arrow below the "Insert" tab and choose "ActiveX Controls". Click the last icon in the list ("More controls"). | |
| 3-Jan-00 | |
| Choose "Calendar Control" and press "OK". | |
| 4-Jan-00 | |
| Click on a cell in your worksheet where you would like to place the calendar. Click the "Design Mode" button to turn off design mode and return to normal operation. |
80000 62000 http://www.ehow.com/how_5745005_add-down-calendar-excel-2007.html GanttChart Gantt Chart 31-Dec-99
| [Project Name] | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| [Company Name] | Today's Date: | 3/6/11 | Sunday | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| (vertical red line) | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| Project Lead: | John Doe | [42] | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| Start Date: | 1/1/11 | Saturday | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| [42] | First Day of Week (Mon=2): | 2-Jan-00 | 12/27/10 | 12/28/10 | 12/29/10 | 12/30/10 | 12/31/10 | 1/1/11 | 1/2/11 | 1/3/11 | 1/4/11 | 1/5/11 | 1/6/11 | 1/7/11 | 1/8/11 | 1/9/11 | 1/10/11 | 1/11/11 | 1/12/11 | 1/13/11 | 1/14/11 | 1/15/11 | 1/16/11 | 1/17/11 | 1/18/11 | 1/19/11 | 1/20/11 | 1/21/11 | 1/22/11 | 1/23/11 | 1/24/11 | 1/25/11 | 1/26/11 | 1/27/11 | 1/28/11 | 1/29/11 | 1/30/11 | 1/31/11 | 2/1/11 | 2/2/11 | 2/3/11 | 2/4/11 | 2/5/11 | 2/6/11 | 2/7/11 | 2/8/11 | 2/9/11 | 2/10/11 | 2/11/11 | 2/12/11 | 2/13/11 | 2/14/11 | 2/15/11 | 2/16/11 | 2/17/11 | 2/18/11 | 2/19/11 | 2/20/11 | 2/21/11 | 2/22/11 | 2/23/11 | 2/24/11 | 2/25/11 | 2/26/11 | 2/27/11 | 2/28/11 | 3/1/11 | 3/2/11 | 3/3/11 | 3/4/11 | 3/5/11 | 3/6/11 | 3/7/11 | 3/8/11 | 3/9/11 | 3/10/11 | 3/11/11 | 3/12/11 | 3/13/11 | 3/14/11 | 3/15/11 | 3/16/11 | 3/17/11 | 3/18/11 | 3/19/11 | 3/20/11 | 3/21/11 | 3/22/11 | 3/23/11 | 3/24/11 | 3/25/11 | 3/26/11 | 3/27/11 | 3/28/11 | 3/29/11 | 3/30/11 | 3/31/11 | 4/1/11 | 4/2/11 | 4/3/11 | 4/4/11 | 4/5/11 | 4/6/11 | 4/7/11 | 4/8/11 | 4/9/11 | 4/10/11 | 4/11/11 | 4/12/11 | 4/13/11 | 4/14/11 | 4/15/11 | 4/16/11 | 4/17/11 | 4/18/11 | 4/19/11 | 4/20/11 | 4/21/11 | 4/22/11 | 4/23/11 | 4/24/11 | 4/25/11 | 4/26/11 | 4/27/11 | 4/28/11 | 4/29/11 | 4/30/11 | 5/1/11 | 5/2/11 | 5/3/11 | 5/4/11 | 5/5/11 | 5/6/11 | 5/7/11 | 5/8/11 | 5/9/11 | 5/10/11 | 5/11/11 | 5/12/11 | 5/13/11 | 5/14/11 | 5/15/11 | 5/16/11 | 5/17/11 | 5/18/11 | 5/19/11 | 5/20/11 | 5/21/11 | 5/22/11 | 5/23/11 | 5/24/11 | 5/25/11 | 5/26/11 | 5/27/11 | 5/28/11 | 5/29/11 | 5/30/11 | 5/31/11 | 6/1/11 | 6/2/11 | 6/3/11 | 6/4/11 | 6/5/11 | 6/6/11 | 6/7/11 | 6/8/11 | 6/9/11 | 6/10/11 | 6/11/11 | 6/12/11 | 6/13/11 | 6/14/11 | 6/15/11 | 6/16/11 | 6/17/11 | 6/18/11 | 6/19/11 | 6/20/11 | 6/21/11 | 6/22/11 | 6/23/11 | 6/24/11 | 6/25/11 | 6/26/11 | 6/27/11 | 6/28/11 | 6/29/11 | 6/30/11 | 7/1/11 | 7/2/11 | 7/3/11 | 7/4/11 | 7/5/11 | 7/6/11 | 7/7/11 | 7/8/11 | 7/9/11 | 7/10/11 | 7/11/11 | 7/12/11 | 7/13/11 | 7/14/11 | 7/15/11 | 7/16/11 | 7/17/11 | 7/18/11 | 7/19/11 | 7/20/11 | 7/21/11 | 7/22/11 | 7/23/11 | 7/24/11 | 7/25/11 | 7/26/11 | 7/27/11 | 7/28/11 | 7/29/11 | 7/30/11 | 7/31/11 | 8/1/11 | 8/2/11 | 8/3/11 | 8/4/11 | 8/5/11 | 8/6/11 | 8/7/11 | 8/8/11 | 8/9/11 | 8/10/11 | 8/11/11 | 8/12/11 | 8/13/11 | 8/14/11 | 8/15/11 | 8/16/11 | 8/17/11 | 8/18/11 | 8/19/11 | 8/20/11 | 8/21/11 | ||||||
| WBS |
Jon: Work Breakdown Structure Level 1: 1, 2, 3, ...
Level 2: 1.1, 1.2, 1.3, ...
Level 3: 1.1.1, 1.1.2, 1.1.3, …
| The WBS is automatically entered, but the formulas are different for different levels. | Tasks | Task |
| Lead | Start |
Jon: Start Date Enter the starting date for this task. To associate the start date with the end of another task, enter a formula in the start date that refers to the end date of that task. End Jon: End Date The ending date is calculated by adding the Duration (calendar days) to the Start date minus 1 day, because the task duration is from the beginning of the Start day to the end of the End day.
Duration (Days) Jon: Duration (Calendar Days) Enter the number of calendar days for the given task. Refer to the Working Days column or use a calendar to determine the corresponding working days. The duration is from the beginning of the Start date to the ending of the End Date.
When the duration is calculated, it is calculated as End Date minus the Start Date plus 1 day, so that a task starting and ending on the same day has a duration of 1 day. % Complete Jon: Percent Complete Update the status of this task by entering the percent complete (between 0% and 100%). Working Days Jon: Working Days Counts the number of working days using the NETWORKDAYS() formula, which excludes weekends. When planning work based upon the number of working days, adjust the Duration until the desired # of working days is reached. Days Complete Jon: Calendar Days Complete This column is calculated by multiplying the Duration by the %Complete and rounding down to the nearest integer. Days Remaining Jon: Calendar Days Remaining This column is calculated by subtracting the Days Complete from the Duration.
Jon: Work Breakdown Structure Level 1: 1, 2, 3, ...
Level 2: 1.1, 1.2, 1.3, ...
Level 3: 1.1.1, 1.1.2, 1.1.3, … The WBS is automatically entered, but the formulas are different for different levels.
Jon: Start Date Enter the starting date for this task. To associate the start date with the end of another task, enter a formula in the start date that refers to the end date of that task.
Jon: End Date The ending date is calculated by adding the Duration (calendar days) to the Start date minus 1 day, because the task duration is from the beginning of the Start day to the end of the End day.
Jon: Duration (Calendar Days) Enter the number of calendar days for the given task. Refer to the Working Days column or use a calendar to determine the corresponding working days. The duration is from the beginning of the Start date to the ending of the End Date.
When the duration is calculated, it is calculated as End Date minus the Start Date plus 1 day, so that a task starting and ending on the same day has a duration of 1 day.
Jon: Percent Complete Update the status of this task by entering the percent complete (between 0% and 100%).
Jon: Working Days
| Counts the number of working days using the NETWORKDAYS() formula, which excludes weekends. When planning work based upon the number of working days, adjust the Duration until the desired # of working days is reached. | 27 - Dec - 10 | 03 - Jan - 11 | 10 - Jan - 11 | 17 - Jan - 11 | 24 - Jan - 11 | 31 - Jan - 11 | 07 - Feb - 11 | 14 - Feb - 11 | 21 - Feb - 11 | 28 - Feb - 11 | 07 - Mar - 11 | 14 - Mar - 11 | 21 - Mar - 11 | 28 - Mar - 11 | 04 - Apr - 11 | 11 - Apr - 11 | 18 - Apr - 11 | 25 - Apr - 11 | 02 - May - 11 | 09 - May - 11 | 16 - May - 11 | 23 - May - 11 | 30 - May - 11 | 06 - Jun - 11 | 13 - Jun - 11 | 20 - Jun - 11 | 27 - Jun - 11 | 04 - Jul - 11 | 11 - Jul - 11 | 18 - Jul - 11 | 25 - Jul - 11 | 01 - Aug - 11 | 08 - Aug - 11 | 15 - Aug - 11 | |||||||||
| 1-Jan-00 | Task Category 1 | John | 1/05/09 | 1/14/11 | 740 | 0% | 530 | 0 | 740 | ||||||||||||||||||||||||||||||||||
| 1.1 | Sub Task level 2 | 1/05/09 | 1/05/09 | 1 | 0% | 1 | 0 | 1 | |||||||||||||||||||||||||||||||||||
| 1.2 | Sub Task level 2 | 1/05/09 | 1/05/09 | 1 | 0% | 1 | 0 | 1 | |||||||||||||||||||||||||||||||||||
| 1.2.1 | Sub Task level 3 | 1/09/11 | 1/14/11 | 1 | 0% | 5 | 0 | 1 | |||||||||||||||||||||||||||||||||||
| 1.2.2 | Sub Task level 3 | 1/05/09 | 1/05/09 | 1 | 0% | 1 | 0 | 1 | |||||||||||||||||||||||||||||||||||
| 1.3 | Sub Task level 2 | 1/05/09 | 1/05/09 | 1 | 0% | 1 | 0 | 1 | |||||||||||||||||||||||||||||||||||
| 1.4 | Sub Task level 2 | 1/05/09 | 1/05/09 | 1 | 0% | 1 | 0 | 1 | |||||||||||||||||||||||||||||||||||
| 2-Jan-00 | Task Category 2 | Jane | 1/05/09 | 2/22/11 | 779 | 25% | 557 | 194 | 585 | ||||||||||||||||||||||||||||||||||
| 2.1 | Sub Task level 2 | 1/05/09 | 1/11/09 | 7 | 25% | 5 | 1 | 6 | |||||||||||||||||||||||||||||||||||
| 2.2 | Sub Task level 2 | 2/14/11 | 2/22/11 | 7 | 25% | 7 | 1 | 6 | |||||||||||||||||||||||||||||||||||
| 2.3 | Sub Task level 2 | 1/05/09 | 1/11/09 | 7 | 25% | 5 | 1 | 6 | |||||||||||||||||||||||||||||||||||
| 2.4 | Sub Task level 2 | 1/05/09 | 1/11/09 | 7 | 25% | 5 | 1 | 6 | |||||||||||||||||||||||||||||||||||
| 3-Jan-00 | Task Category 3 | Bill | 1/05/09 | 2/07/09 | 34 | 50% | 25 | 17 | 17 | ||||||||||||||||||||||||||||||||||
| 3.1 | Sub Task level 2 | 1/12/09 | 1/17/09 | 6 | 50% | 5 | 3 | 3 | |||||||||||||||||||||||||||||||||||
| 3.2 | Sub Task level 2 | 1/19/09 | 1/24/09 | 6 | 50% | 5 | 3 | 3 | |||||||||||||||||||||||||||||||||||
| 3.3 | Sub Task level 2 | 1/26/09 | 1/31/09 | 6 | 50% | 5 | 3 | 3 | |||||||||||||||||||||||||||||||||||
| 3.4 | Sub Task level 2 | 2/02/09 | 2/07/09 | 6 | 50% | 5 | 3 | 3 | |||||||||||||||||||||||||||||||||||
| 4-Jan-00 | Task Category 4 | Bill | 1/05/09 | 1/05/09 | 1 | 0% | 1 | 0 | 1 | ||||||||||||||||||||||||||||||||||
| 4.1 | Sub Task level 2 | 1/05/09 | 1/05/09 | 1 | 0% | 1 | 0 | 1 | |||||||||||||||||||||||||||||||||||
| 4.2 | Sub Task level 2 | 1/05/09 | 1/05/09 | 1 | 0% | 1 | 0 | 1 | |||||||||||||||||||||||||||||||||||
| 4.3 | Sub Task level 2 | 1/05/09 | 1/05/09 | 1 | 0% | 1 | 0 | 1 | |||||||||||||||||||||||||||||||||||
| 4.4 | Sub Task level 2 | 1/05/09 | 1/05/09 | 1 | 0% | 1 | 0 | 1 |
| TEMPLATE ROWS: Copy and insert the entire section, or just the specific sub tasks, depending on which level you want to use (formulas are different for different WBS levels) | ||||||||
| 1-Jan-00 | Task Category 1 | 1/05/09 | 1/05/09 | 1 | 0% | 1 | 0 | 1 |
| 1.1 | Sub Task level 2 | 1/05/09 | 1/05/09 | 1 | 0% | 1 | 0 | 1 |
| 1.2 | Sub Task level 2 | 1/05/09 | 1/05/09 | 1 | 0% | 1 | 0 | 1 |
| 1.2.1 | Level 3 Task | 1/05/09 | 1/05/09 | 1 | 0% | 1 | 0 | 1 |
| 1.2.2 | Level 3 Task | 1/05/09 | 1/05/09 | 1 | 0% | 1 | 0 | 1 |
| 1.2.2.1 | Level 4 task | 1/05/09 | 1/05/09 | 1 | 0% | 1 | 0 | 1 |
| 1.3 | Sub Task level 2 | 1/05/09 | 1/05/09 | 1 | 0% | 1 | 0 | 1 |
| 1.4 | Sub Task level 2 | 1/05/09 | 1/05/09 | 1 | 0% | 1 | 0 | 1 |
&8Gantt Chart Template by Vertex42.com &8© 2008 Vertex42 LLC
HELP
- Modify the GREEN cells and the Tasks, and Task Lead columns.
- The number of weeks shown in the gantt chart is limited by the maximum number of columns available in Excel.
- The Start Date that you choose determines the first week in the gantt chart.
- Change the first day of the week via cell K8
- Use the slider to adjust the range of dates shown in the gantt chart.
- Only 34 weeks (7 1/2 months) can be shown/printed at one time, because each week uses up 7 columns.
Q: The Working Days column shows "###". How do I fix that?
You need to install the Analysis ToolPak add-in that comes with Excel. Go to Tools > Add-ins, and select Analysis ToolPak.
Q: How do I make Task 2 start the day after the end of Task 1?
Use the following formula for the start date of Task 2:
=EndDate+1 where EndDate is the reference to the cell containing the end date of task 1
Q: How do I add/insert tasks and subtasks?
Copy the entire ROW (or a group of rows) for the type of task(s) you want to add and then right-click on the row where you want to insert the new tasks, then select Insert Copied Cells. You can copy rows from within the gantt chart, or copy rows from the Template Rows.
Important Note: When inserting a new subtask after the last subtask or before the first subtask, you will need to update the formulas for calculating the Level 1 %Complete and Duration (see below) to include the new subtask, because the ranges won't automatically expand to include the additional row.
Q: How do I calculate the %Complete for a Level 1 task based upon the %Complete of all of the associated subtasks?
Example: If Task 1 is on row 10 and the subtasks are on rows 11-14, use the following formula:
=SUMPRODUCT(F11:F14,G11:G14)/SUM(F11:F14)
Q: How do I calculate the Duration for a Level 1 task based upon the largest end date of a sub task?
Example: If the Level 1 task is on row 10 and the sub tasks are on rows 11-14, use the following formula
=MAX(D11:D14)-C10+1
Q: How can I include holidays in the calculation of the Working Days?
You can add a list of holidays to exclude in the NETWORKDAYS function. See Excel's help (F1) for more information.
Q: How do I change the print settings?
Select the entire range of cells that you want to print and then go to File > Print Area > Set Print Area. Then go to File > Page Setup or File > Print Preview and adjust the Scaling and Page Orientation as desired.
Q: How do I use grouping?
You can expand or collapse a group of rows using Excel's "Group and Outline" feature. To define a group of rows, select the rows and go to Data > Group and Outline and select Group ...
Q: How do I change the background color of the bars in the Gantt Chart?
The colors used for the bars in the Gantt Chart are set using Conditional Formatting. The simplest approach for Excel 2002/2003 would be to change the colors via the color palette. Go to Tools > Options > Color tab. Or, you can select all of the cells in the Gantt Chart and go to Format > Conditional Formatting to change the colors.
Sheet1
| DATA FIELD | DESCRIPTION |
| Facility Number | |
| Service | |
| Location | |
| State / Country | |
| City | |
| Inspection Firm | |
| Inspector | |
| Inspection Date | |
| Tank Capacity | |
| Working Capacity | |
| Tank Contents | |
| Manufacturer | |
| Date of Construction | |
| Tank Serial Number | |
| Tank Diameter | |
| Tank Length / Height | |
| Tank Life | |
| Last Formal Inspection | |
| Date of Last Formal Inspection | |
| Tank Condition | |
| Recommended Time Until Next Formal Inspection | |
| Material | |
| Tank Type | |
| Level Alarms | |
| Roof Type | |
| Type of Internal Floating Roof | |
| Type of Internal Floating Roof Seal | |
| Piping Type | |
| Tank Corrosion control | |
| Secondary Containment | |
| Percent Secondary Containment | |
| Leak Detection | |
| Overflow Protection | |
| Vapor control | |
| SPCC | |
| Permit to Operate | |
| Organization | |
| Pressure Vessel | |
| STI | |
| Latitude | |
| Longitude | |
| Chemical Abstract Number | |
| Usage | |
| Color | |
| Primary Contact Name | |
| Primary Contact Phone | |
| Secondary Contact Name | |
| Secondary Contact Phone | |
| Facility Manager Name | |
| Facility Manager Phone | |
| Environmental POC Name | |
| Environmental POC Phone | |
| Environmental POC email | |
| POC Date | |
| Repair Cost | |
| Risk | |
| Legible Name Plate | |
| Status | |
| Date Inactive / Removed |
image1.gif image2.png
File details come from the government source that posted it. Updated .