Attachment C - Specifications - Pages 1-2.docx

DOCX document 26 KB Posted

Attached to
Fire Suppression System - DMA Bid Cancelled: 08/27/2026 - Addendum No. 1 – Cancellation Date Issued: 08/27/2026 Your reference
Solicitation number
3000026523
Issued by
East Baton Rouge Parish, Baton Rouge City, Louisiana

About this file

This is a specifications document for a fire suppression system replacement project issued by the Department of Military Affairs (DMA) for Hammond Airport in Hammond, Louisiana. The project requires the contractor to furnish all labor, materials, equipment, tools, supervision, and services necessary to replace seven suppression systems across multiple facility locations. The scope includes providing and installing five 50-pound Ansul IND-X Industrial Dry Chemical ABC suppression systems (or equal) in weapons vaults and two 100-pound Ansul IND-X Industrial Dry Chemical ABC suppression systems (or equal), with one unit designated for a weapons vault and one for a maintenance bay battery storage room. Current cylinders exhibit rust and corrosion and are no longer available, necessitating replacement. The contractor must perform field verification of all dimensions and existing site conditions prior to work commencement and coordinate with the designated project manager, Chuck Finch, at (985) 205-7256 or charles.g.finch.nfg@army.mil.

The contractor is responsible for all aspects of project execution, including material delivery protection, site security, equipment storage coordination (subject to project manager approval), and full compliance with applicable State and Local Safety and Environmental requirements, OSHA standards, National Electrical Code, and Parish, City, and State regulations. Work hours are restricted to Tuesday through Friday, 7:00 AM to 5:30 PM, with closure on all recognized state and federal holidays. The contractor must provide a detailed construction work schedule (Gantt-style) 48 hours prior to project start, submit all specification sheets and submittals for pre-approval, and provide one-year workmanship and project warranty beginning from the certificate of completion filing date. The contractor shall supply all required personal protective equipment for employees and is responsible for all material disposal and storage. Weather days are included in contract time, and all warranty documentation must be submitted to the project manager upon completion and final payment.

View the file

Other files

File Type Posted
3000026523-1.pdf PDF
Attachment B - Job Site Verification Form - Page 1.docx DOCX document
3000026523.pdf PDF
Attachment A - Special Terms and Conditions Pages 1-15.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Attachment C – Specifications RFx 3000026523

**If bidding other than specified, please provide manufacturer’s specs for “or equal” items. **

Scope of Work:

The Contractor shall furnish all labor, materials, equipment, tools, supervision, and services necessary to replace seven suppression systems for the Department of Military Affairs (DMA).

Location:

Hammond Airport RC 1501 B Industrial Park Road Hammond, Louisiana 70401

DMA Contact:

Chuck Finch, (985) 205-7256, charles.g.finch.nfg@army.mil

Specification:

The Contractor shall perform the following:

· Provide and install five 50# Ansul IND-X Industrial Dry Chemical ABC or Equal suppression systems. All five shall be installed in weapons vaults.

Specify Suppression System Bidding: _____________________

· Provide and install two 100# Ansul IND-X Industrial Dry Chemical ABC or Equal. One shall be installed in a weapons vault, and one shall be installed in the maintenance bay battery storage room.

Specify Suppression System Bidding: _____________________

Current cylinders exhibit rust and corrosion, and the cylinders are no longer available.

Terms and Conditions:

· The Contractor is responsible for field verifying all dimensions and existing site conditions of work to be performed. The Contractor shall inspect and verify information provided herein on existing materials and equipment, etc. is correct and inform Project Manager (PM) of any errors or questions prior to commencement of work.

· The Contractor shall take all precautions necessary to prevent damages when delivering materials to site and provide covering to prevent rusting.

· The Contractor shall secure the building, and any sensitive items at the end of each workday in accordance with the designated unit POC.

· The Contractor shall take all necessary precautions to prevent damages during repairs, to include movement and parking of equipment on grass, other improved, or unimproved areas surrounding site.

· All work must comply with all applicable State and Local Safety and Environmental requirements. Occupational Safety and Health Administration (OSHA), National Electrical Code (NEC), Parish, City and State regulations will be required. The Contractor will supply all employees with PPE.

· The Contractor must call LA 1-Call and all utility companies prior to digging.

· Hours of operation Tuesday- Friday, 7:00 AM to 5:30 PM and closed on all recognized state and federal holidays.

· The Contractor is responsible to provide storage containers. If an onsite storage area is required, the contractor must confirm a storage location for any materials, fixtures, equipment, trailers, etc. stored on site during the term length of the contract. The location will be approved by the Project Manager during the pre- construction meeting.

· The Contractor must confirm a storage location for all materials stored on site during the term length of the contract. The location will be approved by the Project Manager prior to delivering.

· The Contractor shall contact, prior to mobilization and demobilization, facility point of contact which will be provided herein.

· The Contractor is responsible for disposal and storage of all materials being removed or installed throughout the project.

· The Contractor shall provide a construction work schedule (Gnant like) 48 hours prior to start of work detailing each task of work.

· All specification sheets and submittals must be pre-approved by the Project Manager prior to ordering.

· The Contractor will warranty their workmanship and the completed project for a one year period. One year period starts the date of the filing of the certificate of completion.

· The contractor will provide all associated warranty documents to the Project Manager upon completion and final payment.

· Weather days are included in the contract time.