Attachment C - Specifications - Page 1.docx
DOCX document 19 KB Posted
- Attached to
- Trail Improvements - LDWF - Addendum No. 1 - Specification Revisions Date Issued: 10/22/2025 Your State and local contract opportunity
- Solicitation number
- 3000025552
- Issued by
- East Baton Rouge Parish, Baton Rouge City, Louisiana
About this file
This document is a Specifications Attachment (Attachment C) for Request for Proposal (RFx) 3000025552 issued by the Louisiana Department of Wildlife and Fisheries (LDWF), specifically for trail improvement work at Russell Sage Wildlife Management Area (WMA) located in Monroe, Louisiana. The project involves constructing and improving an existing ATV/UTV trail approximately 1 mile in length within a 38,213-acre area, which includes reshaping the road with a 4:1 slope, installing culverts at major drains, and resurfacing the trail with #57 limestone. The scope of work requires the contractor to provide all materials and labor, including approximately three 24"x 40' polymer-coated corrugated metal pipe culverts and capping the road with 4' to 6' of #57 limestone (approximately 2,500 tons).
The contractor will be responsible for field verification of all dimensions and site conditions, providing necessary equipment like a dozier, track hoe, and road grader, and ensuring proper material handling and site security. The project contact is Mitch McGee, reachable at 318-343-4044. No specific budget, funding source, or contract term is explicitly stated in the document. The specifications emphasize the contractor's responsibilities for accurate site assessment, material preservation, and daily site security, with a focus on executing the trail improvement work precisely and professionally.
View the file
Other files for this state and local contract opportunity
| File | Type | Posted |
|---|---|---|
| 3000025552-1.pdf | ||
| Addendum No. 1.docx | DOCX document | |
| Revised Attachment C - Specifications - Page 1.docx | DOCX document | |
| Attachment D - Trail Map - Page 1.pdf | ||
| 3000025552.pdf | ||
| Attachment A - Special Terms and Conditions Pages 1-13.docx | DOCX document | |
| Attachment B - Job Site Verification Form - Page 1.docx | DOCX document |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Attachment C – Specifications RFx 3000025552
Scope of work:
The Contractor shall provide all materials and labor to make improvements to an existing ATV/UTV trail for the Louisiana Department of Wildlife and Fisheries (LDWF).
Location:
Russell Sage WMA 120 Bud Smith Road Monroe, LA 71202
LDWF Contact Mitch McGee 318-343-4044
Specifications:
The Contractor shall be responsible for the following:
· ATV/UTV trail is approximately 1 mile in length, 38,213-acres.
· Reshaping road with 4:1 slope
· Provide culvert installation at major drains, reshaping ditches and resurfacing trail with #57 limestone.
· Approximately three 24"x 40' 14-gauge polymer coated corrugated metal pipe culverts
· Cap road with 4’ to 6’ of #57 limestone, approximately 2500 tons.
· Dozier, track hoe and road grader shall be provided by the Contractor.
General Information:
· The Contractor shall be responsible for field verifying all dimensions and existing site conditions of work to be performed. The Contractor shall inspect and verify information provided herein on existing materials and equipment, etc. is correct and inform the Project Manager (PM) of any errors or questions prior to commencement of work.
· The Contractor shall take all precautions necessary to prevent damages when delivering materials to site and provide covering to prevent rusting.
· The Contractor shall secure the building, and any sensitive items at the end of each workday in accordance with the designated unit POC.
File details come from the government source that posted it. Updated .