Attachment C - Price Sheet - Page 1.pdf
PDF 119 KB Posted
- Solicitation number
- 3000024612
- Issued by
- East Baton Rouge Parish, Baton Rouge City, Louisiana
About this file
This document is an Attachment C - Price Sheet for RFx #3000024612, which appears to be a solicitation for emergency response and recovery services. The price sheet outlines detailed pricing for one-time activation costs with and without mobile office space, including provisions for two transport vehicles and initial 30-day service coverage. The document also includes pricing for additional transport vehicles, ongoing operational costs, and hourly rates for various personnel roles such as Storage Site Supervisor, Transport Driver, Recovery Team Leader, Safety Officer, and other specialized positions.
The pricing structure is comprehensive, with hourly rates specified as inclusive rates that cover overtime, mobilization, demobilization, travel expenses, lodging, meals, personnel, overhead, supplies, and required equipment. These rates are to be applied for the duration of an emergency response, with costs to be included either in the one-time activation cost or in the hourly rates. The pricing model suggests this is a contract for emergency management, recovery, and logistics services, potentially for a state or local government agency that requires flexible, rapid-response capabilities for complex operational scenarios.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
RFx #3000024612 Attachment C - Price Sheet
Line No.
Description Unit of Measure
Bid Price
1 One-time Activation Cost:
With Mobile Office Space provided.
The Contractor to provide two transport vehicles.
Activation cost to include all provisions for the first 30 days of services.
Each
2 One-time Activation Cost:
Without Mobile Office Space provided.
The Contractor to provide two transport vehicles.
Activation cost to include all provisions for the first 30 days of services.
Each
3 Additional Transport Vehicle:
Cost per month
Month
4 Operational Cost:
With Mobile Office Space provided.
Monthly cost after initial 30 days that are included in Line 1 Activation Cost
Month
5 Operational Cost:
Without Mobile Office Space provided Monthly cost after initial 30 days that are included in Line 2 Activation Cost
Month
6 Storage Site Supervisor Hour 7 Storage Site Supervisor Administrative Assistant Hour 8 Storage Site Operator Hour 9 Site Protection (Security) Personnel Hour 10 Transportation Supervisor Hour 11 Transport Driver / Recovery Specialist Hour 12 Forklift Operator Hour 13 Recovery Team Leader Hour 15 Scribe Hour 16 Photographer Hour 17 Safety Officer for Recovery Team Hour
Hourly rates – will be inclusive rates, which include overtime costs, mobilization and demobilization, and any other travel expenses such as lodging and meals for the duration of the emergency. All expenses for personnel, overhead, travel, supplies and required equipment must be included either in the one-time activation cost and/or in the hourly rates.
File details come from the government source that posted it. Updated .