This document set contains construction drawings for the Oregon Department of Public Safety Standards and Training (DPSST) Domestic Water Heater (DWH) Replacement project located at 4190 Aumsville Highway SE, Salem, Oregon. The project involves replacement of two parallel domestic hot water boilers, associated storage tanks, recirculation pumps, piping systems, and related mechanical and electrical equipment at the North Eugene facility. The construction documents are 100% complete design drawings dated June 1, 2026, prepared by Systems West Engineers. The scope includes demolition of existing equipment, installation of new equipment in phases to maintain facility operations, and integration with building automation systems. Two boiler options are specified: RBI Dominator 1350 non-condensing multi-stage boilers with 1,350,000 BTU/hour input and 1,134,000 BTU/hour output. The base bid scope retains existing domestic hot water storage tanks for reuse, while Alternate #1 includes replacement of both storage tanks with new Niles Steel Tank S-48-120 units (860-gallon capacity each). Construction is phased to maintain one operational boiler system throughout the work, with new equipment tested and connected before demolition of existing parallel systems.

The project includes comprehensive plumbing, mechanical, and electrical work with detailed specifications for piping materials, sizing calculations, equipment schedules, and control systems integration. Plumbing design follows the 2023 Oregon Plumbing Specialty Code with Type L copper piping as the basis of design and pressure drop calculations at 4 feet water column per 100 feet. Mechanical systems include two Greenheck SQ-7-M1-VG combustion air fans (500 CFM each) and associated ductwork. Electrical work provides dedicated circuits and connections for two RBI Dominator 1350 boilers, circulation pumps, mixing valve (Leonard Nucleus NV-300-LF), and building automation system integration through panelboard E-L1S. The contractor is responsible for site verification of existing conditions, necessary cutting and patching, protection of operational systems during construction, and fire protection treatment repairs. All work coordinates with the facility remaining operational, requiring facility staff coordination for all shutdowns.

View the file

Other files

File Type Posted
Attachment B-Technical Specs~1.pdf PDF
S-DASOBO-00017465-ITB.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

725 A Street Springfield, OR 97477 541.342.7210 systemswestengineers.com

NORTH

EUGENE, OREGON

JUNE 2026

OWNER:

Oregon DPSST

4190 Aumsville Hwy SE Salem, OR 97317

p. 503.385.7849 Operation Planner & Fleet Manager Contact: Michael Anderson Michael.anderson@dpsst.oregon.gov

MECHANICAL & ELECTRICAL:

Systems West Engineers

725 A Street Springfield, OR 97477

p. 541.342.7210 www.systemswestengineers.com Contact: Steven Savich, PM ssavich@systemswestengineers.com

V I C I N I T Y M A P

NOT TO SCALE

DATE:

DRAWN:

CHECKED:

PROJECT:

DESIGNED:

OWNER:

LOCATION:

MARK DATE DESCRIPTION

/3

/2

:0 :4

A

M P

LO

T

T E

D B

Y J

S H

O N

Oregon Department of Public Safety Standards and Training

100% CONSTRUCTION DOCUMENTS

DPSST DWH REPLACEMENT

DPSST DWH

REPLACEMENT

4190 Aumsville Hwy SE, Salem, OR 97317

Oregon Department of Public Safety Standards and Training

COVER SHEET

- CONTACTS,

VICINITY MAP,

& SHEET LIST

06.01.2026

250024.01

G001

JSH

JSH

GNL

100%

CONSTRUCTION

DOCUMENTS

SHEET LIST

G001 COVER SHEET - CONTACTS, VICINITY MAP, & SHEET LIST

P001 LEGEND, GENERAL NOTES, & SHEET LIST

P121 FLOOR PLAN - LEVEL 1 - PLUMBING

P401 ENLARGED PLANS - PLUMBING

P501 PLUMBING DETAILS & DIAGRAMS

P601 PLUMBING SCHEDULES

M001 LEGEND, GENERAL NOTES, & SHEET LIST

M401 ENLARGED PLANS - MECHANICAL

M601 DETAILS, DIAGRAMS, AND SCHEDULES

E001 LEGEND, GENERAL NOTES, SCHEDULES, DIAGRAMS, & SHEET LIST

E101 DEMOLITION PLAN - LEVEL 1

E121 FLOOR PLAN - LEVEL 1

© Systems West Engineers, Inc. 2026. The signature in this document is encrypted. Editing this document is prohibited. (OAR 820)

EXPIRES: 06-30-2027

JA NUA RY 14 , 2020

DIGITALLY SIGNED

RE

GI

STERED PROFESSIONALENGINEER# 95772

OREGONN

A

T

E

J . J E NK

I N S

P L U M B I N G L E G E N D

PIPING GENERAL ABBREVIATIONS

SYMBOL ABBREV. DESCRIPTION

PLUMBING PIPING:

FUEL PIPING:

FI

DV

BV

BFV

CHV

GV

GBV

PRV

AV

SV

AV

RV

TPS

COTG, FCO

WCO

FD

HB

HB

PIPING UP

PIPING DOWN

SLOPE OF PIPE IN DECIMALS OF FEET

CAPPED PIPE

PIPE REDUCING FITTING: CONCENTRIC,

ECCENTRIC

DIRECTION OF FLOW

DRAIN VALVE

UNION

PUMP

BALL VALVE

BUTTERFLY VALVE

CHECK VALVE

GATE VALVE

GLOBE VALVE

ECCENTRIC PLUG VALVE

AUTOMATIC CONTROL

VALVE: 2-WAY

AUTOMATIC CONTROL

VALVE: 3-WAY

FLEXIBLE PIPE CONNECTION

WYE STRAINER

PRESSURE REGULATING VALVE

SOLENOID VALVE

RELIEF VALVE

TEMPERATURE/PRESSURE

SAFETY VALVE

THERMOMETER

PRESSURE GAUGE

TEST PLUG

FLOW INDICATOR

METER, SELF-CONTAINED

CLEANOUT TO GRADE, FLOOR

CLEANOUT

WALL CLEANOUT

FLOOR DRAIN

HOSE BIBB (DIAGRAM)

WATER HAMMER ARRESTOR

REDUCED-PRESSURE PRINCIPLE

BACKFLOW PREVENTER

DOUBLE CHECK

BACKFLOW PREVENTER

HOSE BIBB (PLAN)

SYMBOL ABBREV. DESCRIPTION SYMBOL ABBREVIATION DESCRIPTION

ø

SHEET NUMBER

SECTION LETTER

SHEET NUMBER

DIAMETER

NEW TO EXISTING POINT OF CONNECTION

NOTE REFERENCE MARKER

PLAN OR DETAIL REFERENCE MARKER

SECTION REFERENCE MARKER

EQUIPMENT MARKER

EXISTING SHOWN LIGHT

NEW WORK SHOWN BOLD

EXISTING TO BE REMOVED

P301

PLAN OR DETAIL NUMBER

S=0.01

ABC ABOVE CEILING

ABS ACRYLONITRILE BUTADIENE STYRENE

AC AIR COMPRESSOR

ACFM ACTUAL CUBIC FEET PER MINUTE

ACT ACOUSTICAL CEILING TILE

AD AREA DRAIN

ADA AMERICANS WITH DISABILITY ACT

AFF ABOVE FINISHED FLOOR

AFG ABOVE FINISHED GRADE

AFS AUTOMATIC FIRE SPRINKLER

AHJ AUTHORITY HAVING JURISDICTION

ALT ALTERNATE

ANSI AMERICAN NATIIONAL STANDARDS

INSTITUTE

ARCH ARCHITECT/ARCHITECTURAL

ASHRAE AMERICAN SOCIETY OF HEATING,

REFRIGERATING, & AIR-CONDITIONING

ASME AMERICAN SOCIETY OF MECHANICAL

ENGINEERS

ASPE AMERICAN SOCIETY OF PLUMBING

ENGINEERS

ASSE AMERICAN SOCIETY OF SANITARY

ENGINEERING

AVTR ACID VENT THROUGH ROOF

AWWA AMERICAN WATER WORKS ASSOCIATION

BAS BUILDING AUTOMATION SYSTEM

BFF BELOW FINISHED FLOOR

BFP BACKFLOW PREVENTER

BLDG BUILDING

BHP BRAKE HORSEPOWER

BOP BOTTOM OF PIPE

BTUH BRITISH THERMAL UNITS PER HOUR

CFCI CONTRACTOR FURNISHED/

CONTRACTOR INSTALLED

CFH CUBIC FEET PER HOUR

CFM CUBIC FEET PER MINUTE

CFOI CONTRACTOR FURNISHED/

OWNER INSTALLED

CGA COMPRESSED GAS ASSOCIATION

CI CAST IRON

CLG CEILING

CMU CONCRETE MASONRY UNIT

CO CLEANOUT

CONC CONCRETE

CONT CONTINUATION

COTG CLEANOUT TO GRADE

CPVC CHLORINATED POLYVINYL CHLORIDE

CR CONTROL RELAY

(D) DEMOLISH, DEMOLITION

DBA DECIBELS ACOUSTIC

DCDA DOUBLE CHECK DETECTOR ASSEMBLY

DCV DOUBLE CHECK VALVE

DF DRINKING FOUNTAIN

DFU DRAINAGE FIXTURE UNIT

DIA DIAMETER

DI DUCTILE IRON

DI WATER DEIONIZED WATER

DN DOWN

DW DISTILLED WATER

DWG DRAWING

(E) EXISTING

ECM ELECTRONICALLY COMMUTATED MOTOR

EEM ENERGY EFFICIENCY MEASURE

ELEC ELECTRICAL

EPDM ETHYLENE PROPYLENE-DIENE MONOMER

EWT ENTERING WATER TEMPERATURE

FA FIRE ALARM

FD FLOOR DRAIN

FDC FIRE DEPARTMENT CONNECTION

FFE FINISHED FLOOR ELEVATION

FLA FULL LOAD AMPS

FPM FEET PER MINUTE

FS FLOOR SINK

FT FEET

FT WC FEET WATER COLUMN

FU FIXTURE UNIT

GAL GALLON

GALV GALVANIZED

GI GREASE INTERCEPTOR

GPD GALLONS PER DAY

GPF GALLONS PER FLUSH

GPH GALLONS PER HOUR

GPM GALLONS PER MINUTE

HDPE HIGH-DENSITY POLYETHYLENE

HOA HAND-OFF-AUTOMATIC

HP HORSEPOWER

HVAC HEATING, VENTILATING, &

AIR CONDITIONING

HZ HERTZ

IAPMO INTERNATIONAL ASSOCIATION OF

PLUMBING, MECHANICAL OFFICIALS

ID INSIDE DIAMETER

IE INVERT ELEVATION

IN INCH, INCHES

IN WC INCHES WATER COLUMN

IPS IRON PIPE SIZE

IW INDIRECT WASTE

KW KILOWATT

KWH KILOWATT-HOUR

LBS POUNDS

LAV LAVATORY

LF LINEAR FEET

LPG LIQUIFIED PETROLEUM GAS

LWT LEAVING WATER TEMPERATURE

MAX MAXIMUM

MBH THOUSAND BTUS PER HOUR

MCA MINIMUM CIRCUIT AMPACITY

MECH MECHANICAL

MFR MANUFACTURER

MIN MINIMUM

MOP MAXIMUM OVERCURRENT PROTECTION

MS MOTOR STARTER

(N) NEW

NA NOT APPLICABLE

NC NORMALLY CLOSED

NEMA NATIONAL ELECTRICAL

MANUFACTURERS ASSOCIATION

NFPA NATIONAL FIRE PROTECTION ASSOCIATION

NIC NOT IN CONTRACT

(NL) NEW LOCATION

NO NORMALLY OPEN

NPSH NET POSITIVE SUCTION HEAD

NPT NATIONAL PIPE THREAD

NTS NOT TO SCALE

OD OUTSIDE DIAMETER

OFCI OWNER FURNISHED/

CONTRACTOR INSTALLED

OFOI OWNER FURNISHED/

OWNER INSTALLED

OH OVERHEAD

OPSC OREGON PLUMBING SPECIALTY CODE

OSHA OCCUPATION SAFETY AND HEALTH

ADMINISTRATION

PD PRESSURE DROP

PDI PLUMBING & DRAINAGE INSTITUTE

PE POLYETHELENE

PEX CROSS-LINKED POLYETHELENE

PLBG PLUMBING

POC POINT OF CONNECTION

PH PHASE

PP POLYPROPYLENE

PPH POUNDS PER HOUR

PPM PARTS PER MILLION

PRV PRESSURE REGULATING VALVE

PSI POUNDS PER SQUARE INCH

PSIG POUNDS PER SQUARE INCH GAUGE

PTFE POLYTETRAFLUOROETHYLENE (TEFLON)

PVC POLYVINYL CHLORIDE

PVDF POLYVINYLIDENE FLUORIDE

(R) RELOCATE

RD ROOF DRAIN

REQ'D REQUIRED

RO REVERSE OSMOSIS

RP/RPBP REDUCED PRESSURE PRINCIPLE

BACKFLOW PREVENTER

RPM REVOLUTIONS PER MINUTE

SCCR SHORT CIRCUIT CURRENT RATING

SCFM STANDARD CUBIC FEET PER MINUTE

SCH SCHEDULE

SDR STANDARD DIMENSIONAL RATIO

SPKR SPRINKLER

SQFT SQUARE FEET

SS STAINLESS SEEL

TMV THERMOSTATIC MIXING VALVE

TP TRAP PRIMER

TPA TRAP PRIMER ARRAY

TSP TOTAL STATIC PRESSURE

TYP TYPICAL

U URINAL

UG UNDERGROUND

UL UNDERWRITERS LABORATORY

UON UNLESS OTHERWISE NOTED

UPC UNIFORM PLUMBING CODE

UV ULTRAVIOLET

V VOLTAGE

VFD VARIABLE FREQUENCY DRIVE

VTR VENT THROUGH ROOF

W WATT

WB WET BULB

WC WATER CLOSET

WG WATER GAUGE

WH WALL HYDRANT

WHA WATER HAMMER ARRESTOR

WSFU WATER SUPPLY FIXTURE UNITS

DIA

P521

P101

GENERAL NOTES

A. THE FACILITY WILL REMAIN IN OPERATION DURING CONSTRUCTION. COORDINATE ALL SHUTDOWNS

AND CONSTRUCTION ACTIVITY WITH FACILITIES STAFF.

B. SIZE AND LOCATION OF ALL PIPING AND OTHER MECHANICAL EQUIPMENT IS APPROXIMATE.

CONTRACTOR SHALL SITE VERIFY THE LOCATION OF EXISTING PIPING AND EQUIPMENT AND

CONSTRUCT WORK FROM FIELD DIMENSIONS. CONTRACTOR SHALL MAKE ADJUSTMENTS NECESSARY

TO ACCOMMODATE MINOR DEVIATIONS AT NO COST TO OWNER.

C. FINE (LIGHT) LINE WORK INDICATES EXISTING PIPING AND OTHER MECHANICAL EQUIPMENT. BOLD

(HEAVY) LINE WORK INDICATES NEW PIPING AND OTHER MECHANICAL EQUIPMENT.

D. IT IS RESPONSIBILITY OF THE CONTRACTOR TO PROVIDE CUTTING AND PATCHING TO ALLOW THE

INSTALLATION OF MATERIALS AND EQUIPMENT AS SPECIFIED AND SHOWN ON DRAWINGS.

E. WHERE (E) FIRE PROTECTIVE TREATMENT ON STRUCTURAL MEMBERS IS DAMAGED OR REMOVED AS A

RESULT OF WORK, REPAIR TREATMENT TO MATCH (E).

DEMOLITION NOTES

A. REVIEW DEMOLITION DRAWINGS FOR ITEMS TO REMAIN, TO BE RETAINED FOR RELOCATION, OR TO BE SALVAGED TO THE OWNER. REFER TO ARCHITECTURAL DOCUMENTS FOR ADDITIONAL REQUIREMENTS.

B. DEMOLISH EQUIPMENT, FIXTURES, DEVICES, PIPING, CONDUIT, FITTINGS, AND APPURTENANCES INTERIOR TO THE BUILDING THAT ARE MADE OBSOLETE BY THE NEW WORK AND/OR ARE ABANDONED

AND NO LONGER IN USE.

C. PROTECT AND MAINTAIN OPERABLE EXISTING EQUIPMENT, FIXTURES, OR SYSTEMS THAT ARE

INDICATED TO REMAIN, INCLUDING ELECTRICAL POWER, CONTROLS, AND RELATED SYSTEMS

REQUIRED TO MAINTAIN OPERABILITY.

D. EXISTING CONDITIONS SHOWN ARE BASED ON RECORD DOCUMENTS AND LIMITED FIELD

OBSERVATIONS OF ACCESSIBLE AREAS AND MAY NOT SHOW THE ENTIRE SCOPE OF DEMOLITION

WORK. OMISSION OF EXISTING EQUIPMENT, FIXTURES, DEVICES, PIPING, CONDUIT, FITTINGS, AND APPURTENANCES FROM THE DEMOLITION DRAWINGS DOES NOT RELIEVE THE CONTRACTOR OF THE RESPONSIBILITY TO PROVIDE DEMOLITION OF SYSTEMS THAT ARE MADE OBSOLETE BY THE NEW WORK, ARE ABANDONED, OR AS OTHERWISE REQUIRED TO PERFORM THE WORK DESCRIBED HEREIN.

E. PROTECT AND MAINTAIN SERVICES TO REMAIN OPERATIONAL THAT PASS THROUGH THE AREA OF CONSTRUCTION. WHERE IT IS NOT POSSIBLE TO MAINTAIN THESE SERVICES INTACT, REPLACE, REROUTE, MODIFY, OR PROVIDE NEW AS REQUIRED TO MAINTAIN SERVICES.

CONTROLS

SYMBOL DESCRIPTION

DP

P

PROCESS PIPING SIGNAL

ELECTRICAL SIGNAL

PRESSURE MEASUREMENT

TEMPERATURE MEASUREMENT

FLOW MEASUREMENT

ELECTRICAL CURRENT/POWER

S = SENSOR

T = TRANSMITTER

RELAY OR SWITCH

C = ELECTRIC CURRENT

FS = FLOW SWITCH

HP = HIGH PRESSURE

LP = LOW PRESSURE

A ACTUATOR - ELECTRIC

ES

AI

ALARM

VFD

CWP-2

INPUT/OUTPUT POINT

EMERGENCY STOP SWITCH

AI = ANALOG INPUT

AO = ANALOG OUTPUT

DI = DIGITAL INPUT

DO = DIGITAL OUTPUT

FUNCTION DESIGNATION

S/S = START/STOP

EQUIPMENT CONTROL PANEL

(W/EQUIP. INDICATED UNDERLINED)

CP = CONTROL PANEL

FAP = FIRE ALARM PANEL

MC = MOTOR CONTROLLER

VFD = VARIABLE FREQUENCY DRIVE

ECM = ELECTRICALLY COMMUTATED MOTOR

T

P

F S

HP

R

E C

RELAY

DP = DIFFERENTIAL POWER

1C LAB SINK SERVICE FITTING TAG

CW POTABLE COLD WATER

HW POTABLE HOT WATER

HWR POTABLE HOT WATER RETURN

NP NON-POTABLE COLD WATER

W SANITARY WASTE

PW PUMPED SANITARY WASTE

V SANITARY PLUMBING VENT

G NATURAL GAS

HTHW POTABLE HOT WATER - HIGH TEMP (140°F OR HIGHER)

IW SANITARY INDIRECT WASTE

FIRE SPRINKLER ZONE BOUNDARY

ROOM NUMBER

Room Name

ROOM MARKER

ROOM NAME

A

A

S

TPS

M

RP

DCV

AHU-12 TYPE - NUMBER

FIXTURE MARKERTYPE - NUMBERS-1

PHASING AND ALTERNATE SCOPE:

DEMOLITION & NEW WORK WILL BE PERFORMED IN PHASES & INCLUDES BASE & ALTERNATE SCOPE

OPTIONS.

ALTERNATE #1: ALTERNATE SCOPE INCLUDES REPLACING THE TWO (E) HOT WATER STORAGE TANKS WITH NEW. CONFIRM ALTERNATE SCOPE PRIOR TO STARTING DEMOLITION. ISOLATE & DRAIN ONE OF THE EXISTING STORAGE TANKS & EXAMINE TANK INTERIOR TO DETERMINE CONDITION OF THE TANK LINER & GENERAL INSIDE WALL CONDITION. IF THE (E) TANK CONDITION IS NOT ADEQUATE, REPLACE BOTH TANKS

WITH (N).

CONSTRUCTION PHASING - BASE SCOPE:

PHASE 1 : (D) ONE OF THE TWO PARALLEL DOMESTIC HOT WATER BOILERS, STORAGE TANK

RECIRCULATION PUMP, & ASSOCIATED PIPING WHILE THE SECOND BOILER & STORAGE TANK

RECIRCULATION PUMP REMAINS FULLY OPERATIONAL. PROTECT (E) FULLY OPERATIONAL BOILER SYSTEM

DURING CONSTRUCTION PROCESS.

PHASE 2: INSTALL (N) BOILERS, (N) BOILER PUMPS, (N) MASTER MIXING VALVE, (N) DHW RECIRCULATION PUMP AND ALL ASSOCIATED PIPING ACCORDING TO THE NEW WORK PLUMBING PLANS AND DIAGRAMS.

TEST AND CLEAN THE (N) INSTALLED EQUIPMENT AND PIPING. CONNECT NEW BOILERS SYSTEM TO THE

BUILDING (E) DOMESTIC HOT WATER DISTRIBUTION SYSTEM.

PHASE 3: (D) THE SECOND DOMESTIC HOT WATER BOILER, STORAGE TANK RECIRCULATION PUMP, &

ASSOCIATED PIPING ONCE THE (N) BOILER SYSTEM IS FULLY OPERATIONAL.

CONSTRUCTION PHASING -

ALTERNATE #1 SCOPE:

PHASE 1 : (D) ONE OF THE TWO PARALLEL DOMESTIC HOT WATER BOILERS, STORAGE TANK

RECIRCULATION PUMP, STORAGE TANK, & ASSOCIATED PIPING WHILE THE SECOND BOILER & STORAGE TANK RECIRCULATION PUMP REMAINS FULLY OPERATIONAL. PROTECT (E) FULLY OPERATIONAL BOILER

SYSTEM DURING CONSTRUCTION PROCESS.

PHASE 2: INSTALL (N) BOILERS, (N) BOILER PUMPS, ONE (N) STORAGE TANK, (N) MASTER MIXING VALVE, (N) DHW RECIRCULATION PUMP AND ALL ASSOCIATED PIPING ACCORDING TO THE NEW WORK PLUMBING PLANS AND DIAGRAMS. TEST AND CLEAN THE (N) INSTALLED EQUIPMENT AND PIPING. CONNECT NEW

BOILERS SYSTEM TO THE BUILDING (E) DOMESTIC HOT WATER DISTRIBUTION SYSTEM.

PHASE 3: (D) THE SECOND DOMESTIC HOT WATER BOILER, STORAGE TANK RECIRCULATION PUMP, STORAGE TANK, & ASSOCIATED PIPING ONCE THE (N) BOILER SYSTEM IS FULLY OPERATIONAL.

PHASE 4: INSTALL THE SECOND (N) HOT WATER STORAGE TANK IN PLACE OF (D) STORAGE TANK AND CONNECT IT TO THE NEW BOILER SYSTEM ACCORDING TO THE PLUMBING PLANS AND DIAGRAMS.

BALANCING VALVE

725 A Street Springfield, OR 97477 541.342.7210 systemswestengineers.com

DATE:

DRAWN:

CHECKED:

PROJECT:

DESIGNED:

OWNER:

LOCATION:

MARK DATE DESCRIPTION

/1

/2

:3

:0

P M

DPSST DWH

REPLACEMENT

P L O

T T

E D

B Y

A

L P

O

N

4190 Aumsville Hwy SE, Salem, OR 97317

Oregon Department of Public Safety Standards and Training

LEGEND,

GENERAL

NOTES, &

SHEET LIST

06.01.2026

250024.01

P001

ALP

ALP

SJS

100%

CONSTRUCTION

DOCUMENTS

SHEET LIST - PLUMBING

P001 LEGEND, GENERAL NOTES, & SHEET LIST

P121 FLOOR PLAN - LEVEL 1 - PLUMBING

P401 ENLARGED PLANS - PLUMBING

P501 PLUMBING DETAILS & DIAGRAMS

P601 PLUMBING SCHEDULES

P L U M B I N G S Y S T E M S B A S I S O F D E S I G N

BASIS OF DESIGN: 2023 OREGON PLUMBING SPECIALTY CODE, APPENDIX A 'RECOMMENDED RULES FOR SIZING THE WATER SUPPLY SYSTEM' PIPING SIZED ON 4 FT W.C./100 FT DROP UNLESS OTHERWISE NOTED, VELOCITIES NOT TO EXCEED 8 FT/S FOR COLD WATER, 5 FT/S FOR HOT WATER, OR 4 FT/S FOR

HOT WATER RETURN. WATER PIPING SIZING ASSUMES TYPE L COPPER AS BASIS OF DESIGN.

DOMESTIC WATER PIPING SYSTEM:

BASIS OF DESIGN: 2023 OREGON PLUMBING SPECIALTY CODE, CHAPTER 7 - 'SANITARY DRAINAGE' AND CHAPTER 9 - 'VENTS'

ALL WASTE PIPING SLOPED AT 1/4-INCH/FT UNLESS OTHERWISE NOTED.

ALL VENT PIPING INSTALLED HORIZONTAL OR SLOPED UPWARDS AT 1/8-INCH/FT UNLESS OTHERWISE NOTED.

SANITARY WASTE AND VENT PIPING SYSTEM:

BASIS OF DESIGN: 2025 OREGON MECHANICAL SPECIALTY CODE, APPENDIX C - 'FUEL GAS'

INDOOR PIPING SIZES SHOWN ON DRAWINGS ASSUMES SCHEDULE 40 BLACK STEEL PIPING WITH THREADED JOINTS AS BASIS OF DESIGN.

NATURAL GAS PIPING SYSTEM:

© Systems West Engineers, Inc. 2026. The signature in this document is encrypted. Editing this document is prohibited. (OAR 820)

EXPIRES: 06-30-2027

JA NUA RY 14 , 2020

DIGITALLY SIGNED

RE

GI

STERED PROFESSIONALENGINEER# 95772

OREGONN

A

T

E

J . J E NK

P401

P401

(E) 3" G

(E) 3" CW

(E) 3" HW

(E) 1" HWR

DEMO SCOPE

NEW SCOPE

(E) 1 1/2" G

(E) 3" G

(E) 3" G

(E) NG UTILITY DN

REFER TO (E) CIVIL PLANS

FOR COORDINATION.

(E) NG METER BY

UTILITY PROVIDER

NORTH

KEY PLAN

NOT TO SCALE

725 A Street Springfield, OR 97477 541.342.7210 systemswestengineers.com

DATE:

DRAWN:

CHECKED:

PROJECT:

DESIGNED:

OWNER:

LOCATION:

MARK DATE DESCRIPTION

AREA OF WORK

/1

/2

:3

:0

P M

DPSST DWH

REPLACEMENT

P L O

T T

E D

4190 Aumsville Hwy SE, Salem, OR 97317

Oregon Department of Public Safety Standards and Training

FLOOR PLAN -

LEVEL 1 -

PLUMBING

06.01.2026

250024.01

P121

ALP

ALP

SJS

100%

CONSTRUCTION

DOCUMENTS

R E F E R E N C E N O T E S :

1 INSTALL NEW 3” NATURAL GAS SEISMIC SHUT OFF VALVE ( BOD: 3” PSC-315 )

DOWNSTREAM OF THE UTILITY GAS METER. MODIFY EXISTING NATURAL GAS PIPING

AS NEEDED TO ACCOMMODATE THE SEISMIC VALVE INSTALLATION. COORDINATE

AND SCHEDULE NATURAL GAS UTILITY SHUT OFF WITH DPSST AND GENERAL

CONTRACTOR PRIOR TO BEGINNING OF WORK.

NORTH

1/4" = 1'-0"1

LEVEL 1 - PLUMBING FLOOR PLAN

© Systems West Engineers, Inc. 2026. The signature in this document is encrypted. Editing this document is prohibited. (OAR 820)

EXPIRES: 06-30-2027

JA NUA RY 14 , 2020

DIGITALLY SIGNED

RE

GI

STERED PROFESSIONALENGINEER# 95772

OREGONN

A

T

E

J . J E NK

(E ) R

P B

P

(E ) R

P B

P

3 4

(E) 3" G

(E) 3" CW

(E) 3" CW

(E) 1" HWR

(E) 3" HW

(E) 1" CW

(E) 1" HW

(E) 1 1/2" G

(E) 1 1/2" CW

(E) 1 1/2" G

(E) 1 1/2" CW

(E) 1 1/2" CW

(E) 1 1/2" CW

(E) 1" HWR

(E) 3" CW

(E) 1 1/2" G

(E) 2" CW (E) 2" CW

(E) 1" HWR

(E) 1 1/4" HW

(E) 2" HW (E) 2" HW

(E) FS

(E) FS 6

(D) B-2

(D) B-2 GAS

SUPPLY

EQUIPMENT

HWST-2 HWST-1

(D)BP-2 (D)BP-1 (D) B-1 GAS

SUPPLY

EQUIPMENT

(D) B-1

(D)RCP-1

(D) ET-1

(E) MOP SINK

(E)

RPBP

(E) EMERGENCY

SHUTOFF BUTTON

(TOP)

B-2

(ABOVE)

B-1

(BELOW)

HWRCP-1

P501

P501

P501

MMV-1

P501

ET-1

HWST-1HWST-2

1 1/2" G

(E) 1 1/2" G

(E) 1 1/2" G

NG PRV

SET @

11" W.C.

1 1/2" NG DN

TO B-1

1 1/2" NG DN

TO B-2

1 1/2" G

NG PRV SET

@ 11" W.C.

BP-1

BP-2

2 1/2" HW

2 1/2" HW

2 1/2" HW TO B-1

2 1/2" HW

2 1/2" HW

2 1/2" HW TO B-2

3" CW

1" HWR

3" HW (140)

3" HW (120)

3" H

W

E

(E

1" H

W R

(E

3" C

W (E

3"

C W

(E

3" C

W

(E) 1 1/2" CW

(E

1/

2" C

W

(E

3" G

(E

3" H

W

(E

1" H

W R

(E

3" C

W

(E

3" G

(E) 1" HWR

(E) EMERGENCY

SHUTOFF BUTTON

P501

P501

P501

P501

NORTH

KEY PLAN

NOT TO SCALE

725 A Street Springfield, OR 97477 541.342.7210 systemswestengineers.com

DATE:

DRAWN:

CHECKED:

PROJECT:

DESIGNED:

OWNER:

LOCATION:

MARK DATE DESCRIPTION

AREA OF WORK

/1

/2

:3

:1

P M

DPSST DWH

REPLACEMENT

P L O

T T

E D

4190 Aumsville Hwy SE, Salem, OR 97317

Oregon Department of Public Safety Standards and Training

ENLARGED

PLANS -

PLUMBING

06.01.2026

250024.01

P401

ALP

ALP

SJS

100%

CONSTRUCTION

DOCUMENTS

NORTH

1/2" = 1'-0"1

LEVEL 1 - ENLARGED PLUMBING DEMOLITION PLAN

NORTH

1/2" = 1'-0"2

LEVEL 1 - ENLARGED PLUMBING FLOOR PLAN

S H E E T N O T E S :

R E F E R E N C E N O T E S :

1 REMOVE (E) BOILER, (E) RECIRCULATION PUMP WITH ASSOCIATED PIPING AND (E)

GAS SUPPLY REGULATOR. CAP OFF THE ASSOCIATED PIPING. .

BASE BID: RETAIN (E) DOMESTIC HOT WATER STORAGE TANK & REUSE WITH

CONNECTED (N) DOMESTIC HOT WATER BOILER.

ALTERNATE #1: (D) DOMESTIC HOT WATER STORAGE TANK & PROVIDE (N).

DEMOLISH (E) DOMESTIC HOT WATER RECIRCULATION PUMP.

DEMOLISH (E) DOMESTIC HOT WATER EXPANSION TANK.

KEEP (E) PLUMBING FIXTURE / DEVICE IN PLACE. PROTECT PLUMBING FIXTURE /

DEVICE AND ASSOCIATED PIPING DURING THE CONSTRUCTION PROCESS.

(E) FLOOR SINK TO BE REUSED FOR NEW BOILERS DRAINAGE. PROTECT (E) FLOOR

SINK DURING CONSTRUCTION PROCESS.

PROVIDE NEW 3'-2" (W) X 6'-4" (L) X 6" (H) CONCRETE HOUSING PAD TO

ACCOMMODATE NEW BOILERS.

RELOCATE (E) FIRE SPRINKLER PIPING & SPRINKLER HEADS IN THIS AREA AS

NECESSARY TO ACCOMMODATE DEMOLITION & NEW WORK.

EXISTING EMERGENCY SHUT OFF BUTTON TO SHUT OFF THE NATURAL GAS SUPPLY

AND ELECTRICAL POWER SUPPLY TO THE NEW BOILERS. COORDINATE SCOPE OF

WORK WITH ELECTRICAL CONTRACTOR.

1. REFER TO PHASING & ALTERNATE SCOPE NARRATIVE ON P001.

2. EXAMINE ALL EXISTING PIPE PENETRATIONS THROUGH BOILER ROOM WALLS AND

CEILING FOR ASSOCIATED FIRE RATING. REPLACE OR ADD NEW FIRE STOPPING AS

REQUIRED TO PROVIDE 2 HOUR FIRE RATING OF THE EXISTING BOILER ROOM.

© Systems West Engineers, Inc. 2026. The signature in this document is encrypted. Editing this document is prohibited. (OAR 820)

EXPIRES: 06-30-2027

JA NUA RY 14 , 2020

DIGITALLY SIGNED

RE

GI

STERED PROFESSIONALENGINEER# 95772

OREGONN

A

T

E

J . J E NK

HOT WATER

STORAGE

TANK

HOT WATER

STORAGE

TANK

EXP.

TANK

RVRV

HWST-1 HWST-2

BP-1

HWRCP-1

HEAT TRAP

MIN 24"

(E) 3" 120 HW TO FIXTURES

(E) 3" CW

MMV-1

AI

AI

AI

AI

(E) 1" HWR

BOILER

B-1

BOILER

B-2

BP-2

3" NG (2PSI)

1 1/4" NG

1 1/4" NG

2 1/2" HW

2 1/2" HW

2 1/2" HW

2 1/2" HW

(E) 3" NG

2" N

G

2 1/2" HW

2 1/2" HW

(E) 2" 140 HW (E) 3" 140 HW

(E) 2" CW (E) 3" CW

2" C

W

2" C

W 3"

H

W

3" H

W

3" C

W

1" H

W R

3" CW

BOILER

MANUFACTURER

RACK ASSEMBLY

NEW 6" HIGH

CONCRETE

HOUSING PAD.

BALANCING

VALVEET-1

R V

R V

(E)FS (E)FS

T

T

T T

NG PRV SET

AT 11" W.C.

(TYP 2)

AI AI AI

AI

DI

AI

T

AI

T

T

AIAI

AI AI

T T

2 2

POWER

E C

HWRCP-1

DI

B-1 POWER

R

POWER

BY DIV. 26

POWER

TO BOILER

DO

ENABLE/DISABLE

B-2 POWER

R

POWER

BY DIV. 26

DO

ENABLE/DISABLE

POWER

TO BOILER

AO

A. REFER TO PLANS FOR SIZES, LOCATION AND CONTINUATION

FLOOR SINK

INDIRECT DRAIN PIPE

STEEL CHANNEL SUPPORT

AND PIPE CLAMP TYP

1" MIN AIR GAP ABOVE

FLOOD RIM OF FIXTURE

SLOPE

D E T A I L G E N E R A L N O T E S :

EQUIPMENT

ISOLATION

VALVE

MIN 4" DIRT LEG, LINE SIZE.

PROVIDE A MIN OF 6"

CLEARANCE BELOW THE CAP

FOR MAINTENANCE ACCESS

PRV LINE SIZE AS

SHOWN ON PLANS

RECOMMENDED BY THE PRV MFGR

MIN DISTANCE: 3 FEET OR AS

CAPPED

TEE

FLEXIBLE CONNECTOR

EXCEPT WHERE THE GAS APPLIANCE IS SUPPLIED WITH A PRESSURE TEST PORT

ON THE GAS INLET, PROVIDE A CAPPED TEE A MINIMUM OF 10 PIPE DIAMETERS

DOWNSTREAM OF THE PRV.

VENT TO OUTDOORS. TERMINATE WITH SCREENED, DOWNWARD FACING OPENING.

DO NOT REUSE (E) GAS VENT PIPING. UON BY GAS EQUIPMENT OR PRV

MANUFACTURERS, INCREASE PRV VENT SIZE BY ONE SIZE FOR EVERY 10

EQUIVALENT FEET OF LENGTH BEYOND THE FIRST 10 EQUIVALENT FEET. (TYP)

D E T A I L R E F E R E N C E N O T E S :

PIPE HANGER SUPPORT

ADJACENT TO PUMP FLANGE

OR UNION, TYP

VIBRATION ISOLATORS

WHERE SPECIFIED

A. PROVIDE A MINIMUM OF 5 PIPE DIAMETERS BETWEEN BOTH SUCTION AND DISCHARGE

SIDES OF PUMP & TEE, STRAINERS, VALVES, OR 90 DEGREE FITTINGS.

B. ORIENT MOTOR PER MANUFACTURER'S RECOMMENDATIONS.

C. WHERE PUMP DOES NOT HAVE INTEGRAL TAPS FOR PRESSURE PORTS, PROVIDE 1/4-

INCH PIPE WITH ISOLATION VALVE ON EITHER SIDE OF PUMP AS SHOWN AS CLOSE TO

PUMP FLANGES AS POSSIBLE.

PIPE & ISOLATION VALVE WITH

FEMALE THREADING & THREADED

PLUG IN OPEN END

5 PIPE DIAMETERS MIN

D E T A I L G E N E R A L N O T E S :

ROUGHEN SURFACE OF FLOOR AND COAT WITH

EPOXY BONDING AGENT BEFORE CASTING NEW PAD.

PUMP BASES: MIN (6)

1/2"Ø EXP. ANCHORS,

2-1/2" EMBEDMENT

#4 @ 18" O.C. EACH WAYPROVIDE 1/2" MIN TO 1" MAX THICKNESS

OF NON-SHRINK GROUT UNDER PUMP

BASE AFTER ALIGNING PUMP.

SIZE PAD MINIMUM 2"

LARGER THAN EQUIP.

BASE, ALL SIDES

45° CHAMFER

CONCRETE FLOOR#4 (GR 60) DOWELS AT 18" O.C.

EACH WAY, SET IN EPOXY

3000 PSI MIN

6"

1/

2"

725 A Street Springfield, OR 97477 541.342.7210 systemswestengineers.com

DATE:

DRAWN:

CHECKED:

PROJECT:

DESIGNED:

OWNER:

LOCATION:

MARK DATE DESCRIPTION

/1

/2

:3

:1

P M

DPSST DWH

REPLACEMENT

P L O

T T

E D

4190 Aumsville Hwy SE, Salem, OR 97317

Oregon Department of Public Safety Standards and Training

PLUMBING

DETAILS &

DIAGRAMS

06.01.2026

250024.01

P501

ALP

ALP

SJS

100%

CONSTRUCTION

DOCUMENTS

NOT TO SCALE

DHW BOILER SYSTEM DIAGRAM

B A S - DPSST DWH SYSTEM

POINT TYPE POINT NAME

BAS POINT

COMMUNICATION

POINT SOURCE

AI BOILER # 1 FLAME FAIL ALARM PTP B-1

AI BOILER # 1 STAGE CONTROL ALARM PTP B-1

AI BOILER # 1 TEMP IN PTP

AI BOILER # 1 TEMP OUT PTP

AI BOILER # 2 FLAME FAIL ALARM PTP B-2

AI BOILER # 2 STAGE CONTROL ALARM PTP B-2

AI BOILER # 2 TEMP IN PTP

AI BOILER # 2 TEMP OUT PTP

AI BUILDING HOT WATER SUPPLY TEMP PTP

AI MIXING VALVE TEMP COLD IN C MMV-1

AI MIXING VALVE TEMP HOT IN C MMV-1

AI MIXING VALVE TEMP RETURN C MMV-1

AI STORAGE TANK # 1 TEMP PTP

AI STORAGE TANK # 2 TEMP PTP

AO DHW RECIRCULATION PUMP SPEED PTP HWRCP-1

DI DHW RECIRCULATION PUMP STATUS PTP

DI MIXING VALVE ALARM STATUS C MMV-1

DO BOILER # 1 ENABLE/DISABLE PTP

DO BOILER # 2 ENABLE/DISABLE PTP

R E F E R E N C E N O T E S :

1 BOILER RECIRCULATION PUMP CONTROLLED BY THE INTEGRAL BOILER CONTROLS

SYSTEM.

BOILER MANUFACTURER PROVIDED AQUASTAT AND INTERCONNECTED WITH

INTEGRAL BOILER CONTROLS SYSTEM.

S H E E T N O T E S :

1. REFER TO PHASING & ALTERNATE SCOPE NARRATIVE ON P001.

© Systems West Engineers, Inc. 2026. The signature in this document is encrypted. Editing this document is prohibited. (OAR 820)

NOT TO SCALE

FLOOR SINK

NOT TO SCALE

GAS PIPING CONNECTION

NOT TO SCALE

IN-LINE CIRCULATION PUMP

NOT TO SCALE

EQUIPMENT PAD

EXPIRES: 06-30-2027

JA NUA RY 14 , 2020

DIGITALLY SIGNED

RE

GI

STERED PROFESSIONALENGINEER# 95772

OREGONN

A

T

E

J . J E NK

725 A Street Springfield, OR 97477 541.342.7210 systemswestengineers.com

DATE:

DRAWN:

CHECKED:

PROJECT:

DESIGNED:

OWNER:

LOCATION:

MARK DATE DESCRIPTION

/1

/2

:3

:1

P M

DPSST DWH

REPLACEMENT

P L O

T T

E D

4190 Aumsville Hwy SE, Salem, OR 97317

Oregon Department of Public Safety Standards and Training

PLUMBING

SCHEDULES

06.01.2026

250024.01

P601

ALP

ALP

SJS

100%

CONSTRUCTION

DOCUMENTS

NOTES:

1.BOILERS B-1 AND B-2 ARE INTENDED TO BE STACKED. PROVIDE BOILER MANUFACTURER'S RACK ASSEMBLY FOR STACKED BOILERS INSTALLATION.

B O I L E R - H O T W A T E R

TAG MANUFACTURER MODEL TYPE

CAPACITY DESIGN

FLOW

(GPM)

MIN FLOW

[GPM]

DESIGN

PRESS DROP

[ FT WC]

EWT

(°F)

LWT

(°F)

NATURAL GAS OPERATING

WEIGHT

(LBS)

ELECTRICAL

NOTESINPUT

(BTU/HR)

OUTPUT

(BTU/HR)

INPUT

(CFH)

PRESSURE

(IN WC)

VOLTS PHASE MCA MOP

B-1 RBI DOMINATOR 1350 NON

CONDENSING,

MULTI

STAGEBOILER

1,350,000 1,134,000 65 5 2.48 50 140 1,350,000 11.0 805 120 1 11 20 1

B-2 RBI DOMINATOR 1350 NON

CONDENSING,

MULTI

STAGEBOILER

1,350,000 1,134,000 65 5 2.48 50 140 1,350,000 11.0 805 120 1 11 20 1

M I X I N G V A L V E S

TAG MANUFACTURER MODEL TYPE SERVICE LOCATION

FLOW

(GPM)

PRESSURE

DROP

(PSI)

TEMPERATURES (°F) CONNECTIONS (IN) ELECTRICAL

NOTES

EWT LWT

HOT

INLET

COLD

INLET

OUTLET VOLTS PHASE

MMV-1 LEONARD

NUCLEUS

NV-300-LF

DIGITALLY CONTROLLED MIXING

VALVE

DHW BOILER ROOM 135 10 140 120 3 3 3

120 1

P L U M B I N G E X P A N S I O N T A N K S

TAG MANUFACTURER MODEL SERVICE TYPE ORIENTATION LOCATION

VOLUME (GAL) PRESSURE (PSIG)

TEMPERATURE

(°F)

CONNECTIONS (IN) DIMENSIONS

NOTES

TANK ACCEPTANCE MAX PRECHARGE SYSTEM EWT LWT INLET DRAIN

DIA

(IN)

LENGTH

(IN)

WEIGHT

(LBS)

ET-1 AMTROL ST-80VC DHW DIAPHRAGM VERTICAL BOILER ROOM 53 35 175 55 60 50 140 1 1/4 3/4 24 37 296

1. PROVIDE BAS TEMPERATURE SENSORS AND BOILER AQUASTAT TANK CONNECTION.

NOTES:

GENERAL NOTES:

A. SEE SPECIFICATION SECTION FOR ADDITIONAL CONNECTIONS.

P L U M B I N G D H W S T O R A G E T A N K S - A L T E R N A T E # 1

TAG MANUFACTURER MODEL SERVICE LOCATION

VOLUME

(GAL)

PRESSURE

RATING

(PSI)

ASME

STAMP

ORIENTATION

WEIGHT

(LBS)

DIMENSIONS (IN) CONNECTIONS (IN)

NOTESDIA

(IN)

LENGTH

HEIGHT

LEG /

PAD

HEIGHT

INLET OUTLET DRAIN CIRC IN CIRC OUT

HWST-1 NILES STEEL

TANK

S-48-120

DHW

BOILER ROOM 860 125 YES VERTICAL 1567 48 72 - 3 3 1 1/4 2 1/2 2 1/2 1

HWST-2 NILES STEEL

TANK

S-48-120

DHW

BOILER ROOM 860 125 YES VERTICAL 1567 48 72 - 3 3 1 1/4 2 1/2 2 1/2 1

GENERAL NOTES:

A. MOTOR CONTROL FURNISHED BY DIVISION 22.

B. MOTOR CONTROL TYPE: ECM: ECM MOTOR CONTROLLER

C. REFER TO SCHEMATIC DIAGRAMS FOR PUMP CONTROL CONNECTIONS TO BUILDING BAS.

D. REFER TO SECTION 22 11 23 FOR PUMP CONTROLS.

P U M P S

TAG MANUFACTURER MODEL TYPE SERVICE LOCATION

FLOW

(GPM)

HEAD

(FT WC)

DISCHARGE

SIZE

(IN)

WEIGHT

(LBS)

ELECTRICAL

MOTOR

CONTROL

NOTES

HP RPM VOLTS PHASE

HWRCP-1 BELL AND GOSSETT ECOCIRC XL 55-45 ECM DHW RECIRCULATION BOILER ROOM 15 34 1" 22 0.34 3782 208 1

TEMPERATURE SENSOR / TIME CONTROL

BY BAS

BP-1 TACO 1911ECM-SF ECM B-1 TO HWST-1 DHW CIRCULATION BOILER ROOM 65 12 1 1/2" 32 0.60 120 1 TEMPERATURE SENSOR / B1

BP-2 TACO 1911ECM-SF ECM B-2 TO HWST-2 DHW CIRCULATION BOILER ROOM 65 12 1 1/2" 32 0.60 120 1 TEMPERATURE SENSOR / B2

© Systems West Engineers, Inc. 2026. The signature in this document is encrypted. Editing this document is prohibited. (OAR 820)

EXPIRES: 06-30-2027

JA NUA RY 14 , 2020

DIGITALLY SIGNED

RE

GI

STERED PROFESSIONALENGINEER# 95772

OREGONN

A

T

E

J . J E NK

M E C H A N I C A L L E G E N D

DUCTWORK GENERAL GENERAL NOTES

ABBREV ABBREVIATION

ACH AIR CHANGES PER HOUR

AD ACCESS DOOR

AFF ABOVE FINISHED FLOOR

AI ANALOG INPUT

AL ALUMINUM

ALT ALTERNATE

AMP AMPERE

AO ANALOG OUTPUT

APD AIR PRESSURE DROP

BAS BUILDING AUTOMATION SYSTEM

BHP BRAKE HORSEPOWER

BOD BOTTOM OF DUCT

BTUH BRITISH THERMAL UNITS PER HOUR

CFH CUBIC FEET per HOUR CFM CUBIC FEET per MINUTE

CMU CONCRETE MASONRY UNIT

CONC CONCRETE

CONT CONTINUATION

CU FT CUBIC FEET

D DEPTH

(D) DEMOLITION

DB DRY BULB

dBa DECIBELS ACOUSTIC

DDC DIRECT DIGITAL CONTROL

DEMO DEMOLITION

DI DIGITAL INPUT

DN DOWN

DO DIGITAL OUTPUT

DP DIFFERENTIAL PRESSURE

(E) EXISTING

EA EXHAUST AIR

EAT ENTERING AIR TEMPERATURE

ECM ELECTRONICALLY COMMUTATED MOTOR

EER ENERGY EFFICIENCY RATIO

EFF EFFICIENCY

EG EXHAUST GRILLE

ENT ENTERING

ESP EXTERNAL STATIC PRESSURE

EWT ENTERING WATER TEMPERATURE

°F DEGREES FAHRENHEIT

FLA FULL LOAD AMPS

FP FIRE PROTECTION

FPM FEET PER MINUTE

FPS FEET PER SECOND

FT FEET

FT2 SQUARE FEET

FT WC FEET WATER COLUMN

FUT FUTURE

GALV GALVANIZED

GPM GALLONS PER MINUTE

GYPBD GYPSUM WALL BOARD

H HEIGHT

HP HORSEPOWER

HVAC HEATING, VENTILATING,

& AIR CONDITIONING

HZ HERTZ (CYCLES PER SECOND)

IAQ INDOOR AIR QUALITY

IN INCHES

IN WC INCHES WATER COLUMN

A. THE FACILITY WILL REMAIN IN OPERATION DURING CONSTRUCTION. COORDINATE ALL SHUTDOWNS

AND CONSTRUCTION ACTIVITY WITH FACILITIES STAFF.

B. SIZE AND LOCATION OF ALL PIPING AND OTHER MECHANICAL EQUIPMENT IS APPROXIMATE.

CONTRACTOR SHALL SITE VERIFY THE LOCATION OF EXISTING PIPING AND EQUIPMENT AND

CONSTRUCT WORK FROM FIELD DIMENSIONS. CONTRACTOR SHALL MAKE ADJUSTMENTS

NECESSARY TO ACCOMMODATE MINOR DEVIATIONS AT NO COST TO OWNER.

C. FINE (LIGHT) LINE WORK INDICATES EXISTING PIPING AND OTHER MECHANICAL EQUIPMENT. BOLD

(HEAVY) LINE WORK INDICATES NEW PIPING AND OTHER MECHANICAL EQUIPMENT.

D. IT IS RESPONSIBILITY OF THE CONTRACTOR TO PROVIDE CUTTING AND PATCHING TO ALLOW THE

INSTALLATION OF MATERIALS AND EQUIPMENT AS SPECIFIED AND SHOWN ON DRAWINGS.

SYMBOL DESCRIPTION SYMBOL DESCRIPTION

(E) ø OR dia

SHEET NUMBER

SECTION LETTER

SHEET NUMBER

EXISTING

DIAMETER

NEW TO EXISTING POINT OF CONNECTION

NOTE REFERENCE MARKER

PLAN OR DETAIL REFERENCE MARKER

SECTION REFERENCE MARKER W/VIEW DIRECTION

EQUIPMENT MARKER

ROOM NUMBER

EXISTING SHOWN LIGHT

NEW WORK SHOWN BOLD

EXISTING TO BE REMOVED

M-301

Room Name

PLAN OR DETAIL NUMBER

EXHAUST AIR UP

OUTSIDE AIR UP

SUPPLY AIR, & MAKE-UP AIR DUCT DOWN

EXHAUST AIR or OUTSIDE AIR DOWN

EA

OSA

DUCT SIZE

RECTANGLE: WIDTH (IN) x DEPTH (IN) ROUND: DIAMETER(IN) ø

12x6

CONCENTRIC TRANSITION

ECCENTRIC TRANSITION

LATERAL BRANCH

(ROUND OR OVAL)

BEVELED BRANCH

(RECTANGULAR, ROUND, OR OVAL)

RECTANGULAR DUCT ANGLED

CHANGE IN ELEVATION

ROUND DUCT ANGLED

CHANGE IN ELEVATION

DEMOLITION NOTES

A. REVIEW DEMOLITION DRAWINGS FOR ITEMS TO REMAIN, TO BE RETAINED FOR RELOCATION, OR TO

BE SALVAGED TO THE OWNER.

B. DEMOLISH EQUIPMENT, FIXTURES, DEVICES, PIPING, CONDUIT, FITTINGS, AND APPURTENANCES INTERIOR TO THE BUILDING THAT ARE MADE OBSOLETE BY THE NEW WORK AND/OR ARE ABANDONED

AND NO LONGER IN USE.

C. PROTECT AND MAINTAIN OPERABLE EXISTING EQUIPMENT, FIXTURES, OR SYSTEMS THAT ARE

INDICATED TO REMAIN, INCLUDING ELECTRICAL POWER, CONTROLS, AND RELATED SYSTEMS

REQUIRED TO MAINTAIN OPERABILITY.

D. EXISTING CONDITIONS SHOWN ARE BASED ON RECORD DOCUMENTS AND LIMITED FIELD

OBSERVATIONS OF ACCESSIBLE AREAS AND MAY NOT SHOW THE ENTIRE SCOPE OF DEMOLITION

WORK. OMISSION OF EXISTING EQUIPMENT, FIXTURES, DEVICES, PIPING, CONDUIT, FITTINGS, AND APPURTENANCES FROM THE DEMOLITION DRAWINGS DOES NOT RELIEVE THE CONTRACTOR OF THE RESPONSIBILITY TO PROVIDE DEMOLITION OF SYSTEMS THAT ARE MADE OBSOLETE BY THE NEW WORK, ARE ABANDONED, OR AS OTHERWISE REQUIRED TO PERFORM THE WORK DESCRIBED HEREIN.

E. PROTECT AND MAINTAIN SERVICES TO REMAIN OPERATIONAL THAT PASS THROUGH THE AREA OF CONSTRUCTION. WHERE IT IS NOT POSSIBLE TO MAINTAIN THESE SERVICES INTACT, REPLACE, REROUTE, MODIFY, OR PROVIDE NEW AS REQUIRED TO MAINTAIN SERVICES.

M-521

M101

MAKE-UP AIR DUCT UPMAS

ABBREV. AAV AUTOMATIC AIR VENT

AC AIR CONDITIONER

ACB ACTIVE CHILLED BEAM

AD AUTOMATIC DAMPER

AF AIR CURTAIN

AHU AIR HANDLING UNIT

AS AIR SEPARATOR

B BOILER

BD BALANCING DAMPER

BDD BACK DRAFT DAMPER

BF BOILER FEED

BF BOOSTER FAN

CB CHILLED BEAM

CC CHILLED WATER COIL

CFP CHEMICAL FEED PUMP

CFT CHEMICAL FEED TANK

CH CHILLER

CP CIRCULATING PUMP

CT COOLING TOWER

CU CONDENSING UNIT

CRU CONDENSATE RETURN UNIT

CV CONTROL VALVE

CWP CHILLED WATER PUMP

EAL EXHAUST AIR LOUVER

EDH ELECTRIC DUCT HEATER

EF EXHAUST FAN

EH EXHAUST HOOD

ET EXPANSION TANK

FC FAN COIL UNIT

FCD FLOW CONTROL DEVICE

FD FIRE DAMPER

FF FINAL FILTER

FSD FIRE SMOKE DAMPER

GF GLYCOL FEEDER

IW INDIRECT WASTE

KW KILOWATT

L LENGTH

LAT LEAVING AIR TEMPERATURE

LBS POUNDS

LON LOCAL OPERATING NETWORK

LVG LEAVING

LWT LEAVING WATER TEMPERATURE

mA MILLIAMPERE

MA MIXED AIR

MAX MAXIMUM

MBH THOUSAND BTUs per HOUR

MCA MINIMUM CIRCUIT AMPACITY

MFR MANUFACTURER

MIN MINIMUM

MIN EFF MINIMUM EFFICIENCY

MOP MAXIMUM OVERCURRENT PROTECTION

(N) NEW

NC NOISE CRITERIA

NC NORMALLY CLOSED

NIC NOT IN CONTRACT

NO NORMALLY OPEN

NR NOT REQUIRED

OAT OUTSIDE AIR TEMPERATURE

OCC OCCUPIED

OFCI OWNER FURNISHED/

CONTRACTOR INSTALLED

OSA OUTSIDE AIR

PD PRESSURE DROP

PH PHASE

PSI POUNDS per SQUARE INCH PSIG POUNDS per SQUARE INCH GAUGE

REQ'D REQUIRED

RH RELATIVE HUMIDITY

RLA RUNNING LOAD AMPS

RPM REVOLUTIONS PER MINUTE

SA SUPPLY AIR

SAT SUPPLY AIR TEMPERATURE

SCFM STANDARD CUBIC FEET PER MINUTE

SP STATIC PRESSURE

SS STAINLESS STEEL

STL STEEL

TEMP TEMPERATURE

TP TOTAL PRESSURE

TSP TOTAL STATIC PRESSURE

TYP TYPICAL

V VOLT

VP VELOCITY PRESSURE

W WATTS

WB WET BULB

WPD WATER PRESSURE DROP

WC WATER COLUMN

WG WATER GAUGE

ABBREVIATIONS EQUIPMENT ABBREVIATIONS

HC HOT WATER COIL

HP HEAT PUMP

HR HEAT RECOVERY EXCHANGER

HRC HEAT RECOVERY COIL

HRU HEAT RECOVERY UNIT

HRV HEAT RECOVERY VENTILATOR

HUM HUMIDIFER

HWP HEATING WATER PUMP

HX HEAT EXCHANGER

L LOUVER

LEF LABORATORY EXHAUST FAN

MUA MAKE UP AIR UNIT

MZ MULTI-ZONE

OAH OUTSIDE AIR HOOD

OBD OPPOSED BLADE DAMPER

OSAL OUTSIDE AIR LOUVER

P PUMP

PF PREFILTER

PHX POOL HEAT EXCHANGER

PTAC PACKAGED TERMINAL AIR

CONDITIONER

RF RETURN FAN

RH RELIEF HOOD

RTU ROOF TOP UNIT

SA SOUND ATTENUATOR

SF SUPPLY FAN

SG SUPPLY GRILLE

SHX STEAM HEAT EXCHANGER

ST STORAGE TANK

TP TOWER PUMP

TU TERMINAL UNIT

UH UNIT HEATER

VD VOLUME DAMPER

VP VACUUM PUMP

ROOM MARKER

ROOM NAME

AHU-12 TYPE - NUMBER

RADIUS

(RECTANGULAR OR ROUND)

BACKDRAFT DAMPER

BD

12ø

PHASING AND ALTERNATE SCOPE:

1. REFER TO PLUMBING DRAWINGS FOR CONSTRUCTION PHASING AND ALTERNATIVE SCOPE OF WORK

WITH IMPACTS TO MECHANICAL WORK.

725 A Street Springfield, OR 97477 541.342.7210 systemswestengineers.com

DATE:

DRAWN:

CHECKED:

PROJECT:

DESIGNED:

OWNER:

LOCATION:

MARK DATE DESCRIPTION

/1

/2

:5

:2

P M

DPSST DWH

REPLACEMENT

P L O

T T

E D

T

K

4190 Aumsville Hwy SE, Salem, OR 97317

Oregon Department of Public Safety Standards and Training

LEGEND,

GENERAL

NOTES, &

SHEET LIST

06.01.2026

250024.01

M001

TKO

TKO

NJJ

100%

CONSTRUCTION

DOCUMENTS

SHEET LIST - MECHANICAL

M001 LEGEND, GENERAL NOTES, & SHEET LIST

M401 ENLARGED PLANS - MECHANICAL

M601 DETAILS, DIAGRAMS, AND SCHEDULES

© Systems West Engineers, Inc. 2026. The signature in this document is encrypted. Editing this document is prohibited. (OAR 820)

EXPIRES: 06-30-2027

JA NUA RY 14 , 2020

DIGITALLY SIGNED

RE

GI

STERED PROFESSIONALENGINEER# 95772

OREGONN

A

T

E

J . J E NK

BD BD

D

BD

SEF E-S11(E) SEF E-S12(E)

(E) 20" VENT

UP THROUGH

ROOF

(E) 14" COMBUSTION

AIR DOWN FROM

ROOF

12ø EA

B-2

(ABOVE)

B-1

(BELOW)

12ø EA

(E) 20" VENT UP THROUGH ROOF

(E) 14" MAS DOWN FROM ROOF

SEF E-S12SEF E-S11 PROVIDE BAS PANEL FOR NEW BOILER

SYSTEM AND COMBUSTION AIR FANS.

COORDINATE PANEL LOCATION WITH

PLUMBING PIPING ALONG WALL.

14x14 MAS

14x14 MAS TO EACH FAN

NORTH

KEY PLAN

NOT TO SCALE

725 A Street Springfield, OR 97477 541.342.7210 systemswestengineers.com

DATE:

DRAWN:

CHECKED:

PROJECT:

DESIGNED:

OWNER:

LOCATION:

MARK DATE DESCRIPTION

AREA OF WORK

/1

/2

:5

:2

P M

DPSST DWH

REPLACEMENT

P L O

T T

E D

4190 Aumsville Hwy SE, Salem, OR 97317

Oregon Department of Public Safety Standards and Training

ENLARGED

PLANS -

MECHANICAL

06.01.2026

250024.01

M401

TKO

TKO

NJJ

100%

CONSTRUCTION

DOCUMENTS

NORTH

1/2" = 1'-0"1

LEVEL 1 - ENLARGED MECHANICAL DEMOLITION PLAN

NORTH

1/2" = 1'-0"2

LEVEL 1 - ENLARGED MECHANICAL FLOOR PLAN

R E F E R E N C E N O T E S :

1 DEMO EXISTING EXHAUST FLUES AND HOODS BACK TO MAIN AS SHOWN.

CONNECT NEW 12" FLUE TO TOP OUTLET OF BOILER. SEE MANUFACTURERS

VENTING INSTRUCTIONS FOR CONNECTION DETAILS.

CONNECT NEW 12" FLUE TO REAR OUTLET OF BOILER. SEE MANUFACTURERS

VENTING INSTRUCTIONS FOR CONNECTION DETAILS.

PROVIDE BAROMETRIC DAMPERS FOR BOILER VENTING AS REQUIRED BY BOILER

MANUFACTURER. INSTALL PER MANUFACTURER GUIDELINES.

S H E E T N O T E S :

1. REFER TO M601 FOR FAN SCHEDULE, DETAILS AND DIAGRAMS.

2. FOR DIV 22 BAS CONTROL WORK REFER TO PLUMBING DRAWINGS.

© Systems West Engineers, Inc. 2026. The signature in this document is encrypted. Editing this document is prohibited. (OAR 820)

EXPIRES: 06-30-2027

JA NUA RY 14 , 2020

DIGITALLY SIGNED

RE

GI

STERED PROFESSIONALENGINEER# 95772

OREGONN

A

T

E

J . J E NK

UNISTRUT ATTACHED TO

EXISTING STRUCTURE

ABOVE.

BACKDRAFT DAMPER

LOCATE AIRFLOW SWITCH ON

FAN OUTLET OR ON FAN INLET

DUCT

UNIT SUPPORT AND VIBRATION

ISOLATION AS SPECIFIED

SEE PLANS FOR DUCT SIZE

AND CONNECTION TO

COMBUSTION AIR MAIN

FLEX CONNECTOR

PROVIDE WIRE MESH COVER

OVER DUCT OR FAN OUTLET

E C

DI

BACKDRAFT DAMPER

FS

R

POWER FROM

ELECTRICAL

PANEL BY DIV 26

POWER TO COMBUSTION AIR

FAN BY DIV 26R

DI

BAS FAN

ENABLE/DISABLE

SIGNAL WIRING

FROM BOILER

CONTROLLER

BY DIV 26

SIGNAL WIRING

TO BOILER

CONTROLLER

BY DIV 26

E C

DI

R E F E R E N C E N O T E S :

1 PROVIDE AIR FLOW SWITCH FOR FAN PROOFING. WIRE SWITCH TO BOILER

CONTROLLER. COORDINATE LINE VOLTAGE WIRING WITH DIV. 26 CONTRACTOR.

2 PROVIDE RELAYS FOR COMBUSTION AIR FAN CONTROL AND INTERLOCK WITH

BOILER. COORDINATE LINE VOLTAGE WIRING WITH DIV. 26 CONTRACTOR.

725 A Street Springfield, OR 97477 541.342.7210 systemswestengineers.com

DATE:

DRAWN:

CHECKED:

PROJECT:

DESIGNED:

OWNER:

LOCATION:

MARK DATE DESCRIPTION

/1

/2

:5

:2

P M

DPSST DWH

REPLACEMENT

P L O

T T

E D

4190 Aumsville Hwy SE, Salem, OR 97317

Oregon Department of Public Safety Standards and Training

DETAILS,

DIAGRAMS,

AND

SCHEDULES

06.01.2026

250024.01

M601

TKO

TKO

NJJ

100%

CONSTRUCTION

DOCUMENTS

NOT TO SCALE

SUSPENDED FAN

NOT TO SCALE

COMBUSTION AIR FAN

B A S P O I N T S L I S T - C O M B U S T I O N A I R F A N

POINT TYPE POINT NAME

BAS POINT

COMMUNICATION

POINT SOURCE

DI BOILER FAN COMMAND STATUS PTP

DI FAN ENABLE/DISABLE PTP

DI BAS FAN COMMAND STATUS PTP

NOTES:

1.INTERLOCK BOILER OPERATION WITH MAKEUP AIR FANS. BOILERS ARE TO BE DISABLED IF FANS ARE OFF.

C O M B U S T I O N A I R F A N S

TAG MANUFACTURER MODEL TYPE

PERFORMANCE WHEEL

UNIT WEIGHT

(LBS)

SOUND LEVEL

(SONES)

MOTOR

MOTOR CONTROL NOTESAIRFLOW

(CFM)

TSP

(IN WC)

POWER (BHP)

(BHP)

TYPE

DIAMETER

(IN)

VOLTS PHASE HP

SEF E-S12 GREENHECK SQ-7-M1-VG MIXED FLOW INLINE 500 0.75 0.12 MIXED FLOW 9 40 11 120 1 0.3 ECM 1

SEF E-S11 GREENHECK SQ-7-M1-VG MIXED FLOW INLINE 500 0.75 0.12 MIXED FLOW 9 40 11 120 1 0.3 ECM 1

© Systems West Engineers, Inc. 2026. The signature in this document is encrypted. Editing this document is prohibited. (OAR 820)

EXPIRES: 06-30-2027

JA NUA RY 14 , 2020

DIGITALLY SIGNED

RE

GI

STERED PROFESSIONALENGINEER# 95772

OREGONN

A

T

E

J . J E NK

E L E C T R I C A L L E G E N D

CONCEALED RACEWAY AND CONDUCTORS. NUMBER OF SLASHES

INDICATES NUMBER OF CONDUCTORS IF MORE THAN TWO. SIZE

OTHER THAN 12 AWG AS NOTED. (APPLIES TO ALL WIRING SYMBOLS)

UNDERGROUND OR UNDERFLOOR RACEWAY

HOMERUN

OVERHEAD POWER LINE

SPLICE

OHD

GROUND CONNECTION

CONDUIT UP

CONDUIT DOWN

JUNCTION BOX

JUNCTION BOX FLUSH WITH FLOOR OR AT GRADE

CONDUIT STUB

CABLE TRAY

ELECTRICAL EQUIPMENT AS NOTED ON DRAWINGS

SURFACE-MOUNTED CABINET, TYPE AS NOTED

MECHANICAL EQUIPMENT DESIGNATOR, SEE SCHEDULES.

REFERENCE NOTE MARKER

PLAN OR DETAIL NUMBER

SHEET NUMBER

EXISTING WORK SHOWN LIGHT

NEW WORK SHOWN BOLD

EXISTING TO BE REMOVED (APPLIES TO DEMOLITION PLANS ONLY)

E-121

E-501

J

J

PB PULL BOX, SIZE AS NOTED OR AS REQUIRED

FB

FB1

SURFACE-MOUNTED PANELBOARD (120/208V)

SURFACE-MOUNTED PANELBOARD (277/480V)

RECESSED PANELBOARD (120/208V)

RECESSED PANELBOARD (277/480V)

CT

T

DISTRIBUTION TRANSFORMER

GROUNDING BUSBAR

SPECIAL PURPOSE RECEPTACLE WITH NEMA CONFIGURATION AS NOTED.L6-30R

PUSH BUTTON STATION

SIMPLEX RECEPTACLE

DUPLEX RECEPTACLE

QUADPLEX RECEPTACLE

FLUSH FLOOR BOX. REFER TO SPECIFICATIONS AND SCHEDULES FOR

DEVICE QUANTITIES AND TYPES.

FLUSH POKE-THROUGH FLOOR BOX. REFER TO SPECIFICATIONS AND

SCHEDULES FOR DEVICE QUANTITIES AND TYPES.

SPLIT-WIRED RECEPTACLE WITH HALF SWITCHED CONTROL VIA MANUAL

CONTROL, OCCUPANCY SENSING CONTROL, OR TIME BASED CONTROL.

REFER TO SPECIFICATIONS AND DRAWINGS.

RECEPTACLE WITH FULL SWITCHED CONTROL VIA MANUAL CONTROL,

OCCUPANCY SENSING CONTROL, OR TIME BASED CONTROL. REFER TO

SPECIFICATIONS AND DRAWINGS.

FB1 FLUSH FLOOR BOX WITH SWITCHED CONTROL VIA MANUAL CONTROL,

OCCUPANCY SENSING CONTROL, OR TIME BASED CONTROL. REFER TO

SPECIFICATIONS AND DRAWINGS.

PT3 FLUSH POKE-THROUGH FLOOR BOX WITH SWITCHED CONTROL VIA MANUAL

CONTROL, OCCUPANCY SENSING CONTROL, OR TIME BASED CONTROL.

REFER TO SPECIFICATIONS AND DRAWINGS.

LETTER DESIGNATOR(S) INDICATE ADDITIONAL RECEPTACLE

CHARACTERISTICS (APPLIES TO ALL RECEPTACLE AND FLOOR BOX TYPES):

A = INTEGRAL AFCI

B = INTEGRAL WITH USB OUTLET(S)

C = SUPPLIED POWER VIA CRITICAL BRANCH (NEC 517)

E = SUPPLIED POWER VIA LIFE SAFETY BRANCH (NEC 517)

G = INTEGRAL GFCI

IG = SUPPLIED POWER VIA AN ISOLATED GRD SYSTEM

P = INTEGRAL SURGE PROTECTIVE DEVICE

S = SUPPLIED POWER VIA OPTIONAL STANDBY BRANCH (NEC 702)

U = SUPPLIED POWER VIA A UPS

WP = WEATHERPROOF AND INTEGRAL GFCI

A

INDICATES RECEPTACLE ROUGH-IN HEIGHT FROM AFF TO CL OF

RECEPTACLE WHEN NOT AT STANDARD MOUNTING HEIGHT.+48"

INDICATES PANELBOARD AND BRANCH CIRCUIT NUMBER SERVING

RECEPTACLE.

2P1:12

INDICATES BRANCH CIRCUIT NUMBER SERVING RECEPTACLE. REFER TO

SHEET NOTES AND REFERENCE NOTES FOR SOURCE.

SURFACE MOUNTED RACEWAY WITH DUPLEX RECEPTACLES

RACEWAYS, BOXES, AND CONDUCTORS

ELECTRICAL EQUIPMENT - PLANS

WIRING DEVICES GENERAL

ABBREVIATIONS

(#) DESIGNATES QUANTITY

A AMPERE (AMP)

AC ALTERNATING CURRENT

AFC AVAILABLE FAULT CURRENT

AFF ABOVE FINISHED FLOOR

AFG ABOVE FINISHED GRADE

AL ALUMINUM

ARCH ARCHITECT/ARCHITECTURAL

ATS AUTOMATIC TRANSFER SWITCH

AWG AMERICAN WIRE GAUGE

BLDG BUILDING

BOCT BOTTOM OF CABLE TRAY

BSC BIOLOGICAL SAFETY CABINET

C. CONDUIT

CENT CENTRIFUGE

CKT CIRCUIT

CL CENTERLINE

CLG CEILING

CRI COLOR RENDERING INDEX

CU COPPER

DC DIRECT CURRENT

DF DRINKING FOUNTAIN

DW DISHWASHER

(E) EXISTING

ECR ENVIRONMENTAL CONTROL ROOM

ELEC ELECTRICAL

EMERG EMERGENCY

EMT ELECTRICAL METALLIC TUBING

EV ELECTRIC VEHICLE

FA FIRE ALARM

FH FUME HOOD

FLA FULL LOAD AMPS

FTL FEED-THROUGH LUGS

GFCI GROUND FAULT CIRCUIT INTERRUPTER

GFP GROUND FAULT PROTECTION

GND GROUND

HP HORSEPOWER

IDF INTERMEDIATE DISTRIBUTION FRAME

INC INCUBATOR

K KELVIN

KW KILOWATT

KWH KILOWATT-HOUR

KV KILOVOLT

KVA KILOVOLT-AMPERE

KVAR KILOVOLT-AMPERE REACTIVE

LED LIGHT EMITTING DIODE

LM LUMENS

LV LOW VOLTAGE

LSI LSI ELECTRONIC TRIP UNIT

LSI/G LSI/G ELECTRONIC TRIP UNIT

LTG LIGHTING

MCA MINIMUM CIRCUIT AMPACITY

MCB MAIN CIRCUIT BREAKER

MCC MOTOR CONTROL CENTER

MDF MAIN DISTRIBUTION FRAME

MDS MAIN DISTRIBUTION SWITCHBOARD

MDP MAIN DISTRIBUTION PANELBOARD

MECH MECHANICAL

MLO MAIN LUG ONLY

MTS MAIN TRANSFER SWITCH

MVA MEGAVOLT-AMPERE

MW MEGAWATT

(N) NEW

(NL) NEW LOCATION

NA NOT APPLICABLE

NIC NOT IN CONTRACT

PA PUBLIC ADDRESS

PE PHOTOELECTRIC CELL

PF POWER FACTOR

PNL PANELBOARD

PV PHOTOVOLTAIC

PVC POLYVINYL CHLORIDE

PWR POWER

(R) REMOVE

(RL) RELOCATE

REFL REFLECTOR

SCCR SHORT CIRCUIT CURRENT RATING

SDP SUB-DISTRIBUTION PANELBOARD

SWBD SWITCHBOARD

TR TAMPER RESISTANT

TTB TELEPHONE TERMINAL BOARD

TV TELEVISION

TYP TYPICAL

UC UNDER CABINET

UG UNDERGROUND

UON UNLESS OTHERWISE NOTED

UPS UNINTERRUPTIBLE POWER SUPPLY

V VOLTAGE

VA VOLT-AMPERE

VP VAPOR PROOF

W WATT

WP WEATHERPROOF

XFMR TRANSFORMER

PT1

ELECTRICAL EQUIPMENT DESIGNATIONS

4 E - SWB - D1 A

VOLTAGE

POWER SOURCE

EQUIPMENT TYPE

2 - 208Y/120V (3-PHASE)

4 - 480Y/277V (3-PHASE)

N - NORMAL POWER (ELECTRIC UTILITY)

E - EMERGENCY POWER (GENERATOR, NEC 700)

R - REQUIRED STANDBY POWER (GENERATOR, NEC 701)

S - OPTIONAL STANDBY POWER (GENERATOR, NEC 702)

BLANK - PANELBOARD

SWB - SWITCHBOARD

T - TRANSFORMER

ATS - AUTOMATIC TRANSFER SWITCH

MTS - MANUAL TRANSFER SWITCH

GEN - GENERATOR

DS - DISCONNECT SWITCH

LOCATION BY BUILDING AND LEVEL

SERIES INDICATOR

D1 - DISTRICT UTILITY PLAN, LEVEL 1

CW1 - CORDLEY HALL WEST, LEVEL 1

CW2 - CORDLEY HALL WEST, LEVEL 2

CW3 - CORDLEY HALL WEST, LEVEL 3

CW4 - CORDLEY HALL WEST, LEVEL 4

CW5 - CORDLEY HALL WEST, LEVEL 5

A - FIRST IN A SERIES OF EQUIPMENT

B - SECOND IN A SERIES OF EQUIPMENT

ETC.

E1A-1 LAB EQUIPMENT DESIGNATOR, SEE SCHEDULES.

AHU-12FUTURE EV CHARGING STATION (ROUGH-IN ONLY)

WALL-MOUNTED EV CHARGING STATION. SINGLE-PORT, DUAL-PORT.

PEDESTAL-MOUNTED EV CHARGING STATION. SINGLE-PORT, DUAL-PORT.

NUMERICAL DESIGNATOR INDICATES EV CHARGING STATION TYPE.

2 = FUTURE LEVEL 2 EV CHARGING STATION, LEVEL 2 EV CHARGING

STATION

3 = FUTURE LEVEL 3 EV CHARGING STATION, LEVEL 3 EV CHARGING

STATION

2 2

F

CONTINUATION LINE

BY DIVISION 26

BY DIVISION 26 COMBUSTION AIR FAN

BY DIVISION 23CIRCULATION PUMP BY DIVISION 22

FIELD WIRING BY DIVISION 26, UON

TO MANUFACTURER WIRING

TYPICAL

D E T A I L G E N E R A L N O T E S :

A. FIELD WIRING REQUIREMENTS SHOWN ARE AS PROVIDED BY BASIS OF DESIGN

MANUFACTURER. COORDINATE ACTUAL REQUIREMENTS WITH OTHER TRADES AND

WITH EQUIPMENT SUPPLIED PRIOR TO COMMENCING WORK.

725 A Street Springfield, OR 97477 541.342.7210 systemswestengineers.com

DATE:

DRAWN:

CHECKED:

PROJECT:

DESIGNED:

OWNER:

LOCATION:

MARK DATE DESCRIPTION

/1

/2

:3 :2

A

M

DPSST DWH

REPLACEMENT

P L O

T T

E D

J

H

O

N

4190 Aumsville Hwy SE, Salem, OR 97317

Oregon Department of Public Safety Standards and Training

LEGEND,

GENERAL

NOTES,

SCHEDULES,

DIAGRAMS, &

SHEET LIST

06.01.2026

250024.01

E001

AJW

JSH

MBR

100%

CONSTRUCTION

DOCUMENTS

SHEET LIST - ELECTRICAL

E001 LEGEND, GENERAL NOTES, SCHEDULES, DIAGRAMS, & SHEET LIST

E101 DEMOLITION PLAN - LEVEL 1

E121 FLOOR PLAN - LEVEL 1

D. BRANCH CIRCUIT SERVES MULTIPLE PIECES OF EQUIPMENT. FIELD WIRING BY DIVISION 26 IS REQUIRED. REFER TO WIRING DIAGRAM AND COORDINATE WITH EQUIPMENT SUPPLIED.

C. UTILIZE EXISTING BRANCH CIRCUIT AND BREAKER PREVIOUSLY SERVING DEMOLISHED EQUIPMENT.

B. FUSED DISCONNECTS FURNISHED BY DIVISION 23 AND INSTALLED BY DIVISION 26. COORDINATE WITH EQUIPMENT SUPPLIED.

A. EQUIPMENT CONNECTION IS CORD AND PLUG TYPE.

NOTES:

2. WHERE INDICATED IN SCHEDULE ABOVE, DISCONNECTS SHALL BE FURNISHED AND INSTALLED BY DIVISION 26. COORDINATE DISCONNECT REQUIREMENTS WITH MECHANICAL.

1. PROVIDE CONDUCTORS WITH TYPE XHHW INSULATION FOR FEEDERS AND BRANCH CIRCUITS BETWEEN VFDS AND THEIR ASSOCIATED MOTORS.

GENERAL NOTES:

SEF E-S12 COMBUSTION AIR FAN 120 1 0.6 5.0 (2) 12 AWG CU, (1) 12 AWG GND. IN 3/4" C. 15/1 E-L1S SEC 3:101 NA DIV 23 NA B,D

SEF E-S11 COMBUSTION AIR FAN 120 1 0.6 5.0 (2) 12 AWG CU, (1) 12 AWG GND. IN 3/4" C. 15/1 E-L1S SEC 3:88 NA DIV 23 NA B,D

BAS BUILDING AUTOMATION SYSTEM 120 1 0.3 2.5 (2) 12 AWG CU, (1) 12 AWG GND. IN 3/4" C. 20/1 E-L1S SEC 3:103 NA NA NA

MMV-1 MIXING VALVE 120 1 0.1 0.8 (2) 12 AWG CU, (1) 12 AWG GND. IN 3/4" C. 20/1 E-L1S SEC 3:105 NA NA NA A

HWRCP-1 HOT WATER CIRCULATION PUMP 208 1 0.75 3.6 (2) 12 AWG CU, (1) 12 AWG GND. IN 3/4" C. 15/2 E-L1S SEC 3:97,99 NA NA NA

BP-2 CIRCULATION PUMP #2 120 1 0.43 3.6 (2) 12 AWG CU, (1) 12 AWG GND. IN 3/4" C. 15/1 E-L1S SEC 3:101 NA DIV 26 NA D

BP-1 CIRCULATION PUMP #1 120 1 0.43 3.6 (2) 12 AWG CU, (1) 12 AWG GND. IN 3/4" C. 15/1 E-L1S SEC 3:88 NA DIV 26 NA D

B-2 BOILER #2 120 1 1.19 9.9 (2) 12 AWG CU, (1) 12 AWG GND. IN 3/4" C. 20/1 E-L1S SEC 2:72 NA NA NA C

B-1 BOILER #1 120 1 1.19 9.9 (2) 12 AWG CU, (1) 12 AWG GND. IN 3/4" C. 20/1 E-L1S SEC 2:70 NA NA NA C

TAG DESCRIPTION VOLTAGE PHASE HP KW FLA FEEDER DESCRIPTION

CIRCUIT BREAKER

(AMPS/POLES)

PANEL

IDENTIFICATION

STARTER

DIVISION

DISCONNECT

DIVISION

VFD

DIVISION

NOTES

MECHANICAL EQUIPMENT CONNECTION SCHEDULE

DEMAND AMPS 7.6 13.8 9.8

CONNECTED AMPS 5.6 11.8 7.8

DEMAND VA 910 1650 1175

PHASE TOTALS CONNECTED VA 675 1415 940 ** 100% PLUS 25% OF THE LARGEST MOTOR

A B C * 10KVA AT 100%, REMAINDER AT 50%

SPACE 0 125 C 126 0 E-L2S

SPACE 0 123 B 124 0 E-L2S

SPACE 0 121 A 122 0 E-L2S 3 225

SPACE 0 119 C 120 0 SPACE

SPACE 0 117 B 118 0 SPACE

SPACE 0 115 A 116 0 SPACE

SPACE 0 113 C 114 0 SPACE

SPACE 0 111 B 112 0 SPACE

SPACE 0 109 A 110 0 SPACE

SPACE 0 107 C 108 0 SPACE

20 1 (NN) EQ: MMV-1 100 105 B 106 0 SPACE

20 1 (NN) EQ: BAS PANEL 300 103 A 104 0 SPACE

15 1 (NN) EQ: SEF E-S12, BP-2 940 101 C 102 0 SPACE

375 99 B 100 0 SPACE

15 2 (NN) EQ: HWRCP-1 375 97 A 98 0 SPACE

95 C 96 (E) LTG: PIT LIGHTS 1 20

20 2 (E) EUH-E-S2 93 B 94 (E) RCPT: PIT GFCI 1 20

91 A 92 0 (E) SPARE 1 20

20 2 (E) EUH-E-S1 89 C 90 0 (E) SPARE 1 20

87 B 88 940 (EN) EQ: SEF E-S11, BP-1 1 15

20 2 (E) CUH-E-S1 85 A 86 (E) ELEVATOR SUMP PUMP 1 15

A P DESCRIPTION WATTS NO. PHASE NO. WATTS DESCRIPTION P A

BREAKER CIR. CIR. BREAKER

MAXIMUM PHASE AMPS 11.8 13.8

TOTAL VOLT-AMPS 3,030 3,735

CONNECTED DEMAND

SUBFEED BREAKER 0 0

NOTES: EXISTING PANEL SUB-FED FROM (E) E-L1S SEC 2

(E) INDICATES EXISTING BREAKER SERVING EXISTING LOAD

(EN) INDICATES EXISTING BREAKER SERVING NEW LOAD

(NN) INDICATES NEW BREAKER SERVING NEW LOAD

MISC. LOADS 400 100% 400

SUBFEED 0 100% 0

MOUNTING: SURFACE RESISTANCE LOADS 0 100% 0

MAIN: MLO AFC: MOTOR LOADS 2630 ** 3335

LOCATION: RECEPTACLES 0 * 0

PHASE: 3 WIRE: 4 LIGHTING 0 125% 0

VOLTS: 120/208 LOAD CLASS VA FACTOR LOAD VA

TYPE: BOLT ON AMPS: 600 CONN. DEMAND DEMAND

PANEL: (E) E-L1S SEC 3

PANEL SCHEDULE

NOT TO SCALE

PARTIAL BOILER FIELD WIRING DIAGRAM

NOT TO SCALE. BASIS OF DESIGN: RBI DOMINATOR 1350

© Systems West Engineers, Inc. 2026. The signature in this document is encrypted. Editing this document is prohibited. (OAR 820)

EXP IRES : 12 - 3 1- 26

MA Y 21, 2014

RE

GI

STE

RED PROFESSIONALENGINEER# 80,621

OREGONM

A T

THEW B. R

E I

C H

(E) E-H1SA

(E) E-L1S SEC 1

(E) E-L1S SEC 2

(E) E-L1S SEC 3

(E) E-H1S

1 1

(E) BOILER EMERGENCY STOP 4

NORTH

KEY PLAN

NOT TO SCALE

725 A Street Springfield, OR 97477 541.342.7210 systemswestengineers.com

DATE:

DRAWN:

CHECKED:

PROJECT:

DESIGNED:

OWNER:

LOCATION:

MARK DATE DESCRIPTION

AREA OF WORK

/1

/2

:3 :2

A

M

DPSST DWH

REPLACEMENT

P L O

T T

E D

H

O

N

4190 Aumsville Hwy SE, Salem, OR 97317

Oregon Department of Public Safety Standards and Training

DEMOLITION

PLAN - LEVEL 1

06.01.2026

250024.01

E101

SJS

JSH

SJS

100%

CONSTRUCTION

DOCUMENTS

R E F E R E N C E N O T E S :

1 REMOVE CONNECTION TO PLUMBING EQUIPMENT. REFER TO PLUMBING SHEETS

FOR EQUIPMENT IDENTIFICATION. RETAIN BRANCH CIRCUIT FROM PANELBOARD E-

L1S- SEC 2 FOR REUSE WITH NEW EQUIPMENT IN SAME LOCATION.

REMOVE CONNECTION TO PLUMBING EQUIPMENT. REFER TO PLUMBING SHEETS

FOR EQUIPMENT IDENTIFICATION. REMOVE WIRING AND PATHWAY BACK TO

SOURCE.

REMOVE CONNECTION TO MECHANICAL EQUIPMENT. REFER TO MECHANICAL

SHEETS FOR EQUIPMENT IDENTIFICATION. REMOVE WIRING AND PATHWAY BACK

TO SOURCE PANELBOARD E-L1S SEC 1 AND MARK UNUSED CIRCUIT BREAKER AS

SPARE.

RETAIN EXISTING BOILER EMERGENCY STOP SWITCH FOR RECONNECTION TO NEW

EQUIPMENT.

NORTH

1/4" = 1'-0"1

LEVEL 1 - ELECTRICAL DEMOLITION PLAN

© Systems West Engineers, Inc. 2026. The signature in this document is encrypted. Editing this document is prohibited. (OAR 820)

EXP IRES : 12 - 3 1- 26

MA Y 21, 2014

RE

GI

STE

RED PROFESSIONALENGINEER# 80,621

OREGONM

A T

THEW B. R

E I

B-1

(BELOW)

B-2

(ABOVE)

HWRCP-1

1 2

BP-2

BP-1

(E) E-L1S SEC 2

(E) E-L1S SEC 3

(E) E-H1S

(E) E-L1S SEC 1

(E) E-H1SA

MMV-1

3BAS PANEL

SEF E-S11

SEF E-S12 1

(E) BOILER EMERGENCY STOP 4

NORTH

KEY PLAN

NOT TO SCALE

725 A Street Springfield, OR 97477 541.342.7210 systemswestengineers.com

DATE:

DRAWN:

CHECKED:

PROJECT:

DESIGNED:

OWNER:

LOCATION:

MARK DATE DESCRIPTION

AREA OF WORK

/1

/2

:3 :2

A

M

DPSST DWH

REPLACEMENT

P L O

T T

E D

H

O

N

4190 Aumsville Hwy SE, Salem, OR 97317

Oregon Department of Public Safety Standards and Training

FLOOR PLAN -

LEVEL 1

06.01.2026

250024.01

E121

SJS

JSH

SJS

100%

CONSTRUCTION

DOCUMENTS

R E F E R E N C E N O T E S :

1 INTERCEPT AND EXTEND BRANCH CIRCUIT RETAINED DURING DEMOLITION AS

REQUIRED TO SERVE NEW EQUIPMENT. REFER TO SCHEDULES AND WIRING

DIAGRAM FOR ADDITIONAL INFORMATION.

PROVIDE DEDICATED 120V CIRCUIT AND RECEPTACLE FOR MIXING VALVE. REFER

TO SCHEDULES.

PROVIDE CONNECTION TO NEW BAS PANEL. COORDINATE EXACT LOCATION WITH

MECHANICAL PRIOR TO COMMENCING WORK.

CONNECT EXISTING BOILER EMERGENCY STOP SWITCH TO NEW BOILER

EQUIPMENT. RETAIN EXISTING FUNCTIONALITY OF SHUTTING OFF FUEL AND

POWER TO BOTH BOILERS. COORDINATE CONNECTION REQUIREMENTS WITH

DIVISION 22 AND WITH EQUIPMENT SUPPLIED PRIOR TO COMMENCING WORK.

NORTH

1/4" = 1'-0"1

LEVEL 1 - POWER DISTRIBUTION FLOOR PLAN

© Systems West Engineers, Inc. 2026. The signature in this document is encrypted. Editing this document is prohibited. (OAR 820)

EXP IRES : 12 - 3 1- 26

MA Y 21, 2014

RE

GI

STE

RED PROFESSIONALENGINEER# 80,621

OREGONM

A T

THEW B. R

E I

GENERAL SHEET
PLUMBING SET
P001_LEGEND, GENERAL NOTES, & SHEET LIST
P121_FLOOR PLAN - LEVEL 1 - PLUMBING
P401_ENLARGED PLANS - PLUMBING
P501_PLUMBING DETAILS & DIAGRAMS
P601_PLUMBING SCHEDULES
MECHANICAL SET
M001_LEGEND, GENERAL NOTES, & SHEET LIST
M401_ENLARGED PLANS - MECHANICAL

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .