Attachment - B24 Security Upgrade Floor Plan.pdf

PDF 497 KB Posted

Attached to
Building 24 Security Upgrades
Solicitation number
W50S7Z-22-R-0008
Issued by

View the file

Other files

File Type Posted
Solicitation Amend_R0008.pdf PDF
4. SOW - B24 Security Upgrade_05052022 Update.docx DOCX document
B24 Security Upgrade RFI Attachments FINAL.pdf PDF
Site Visit Sign In.pdf PDF
B24 Security Upgrade RFI - Answered_FINAL.docx DOCX document
Solicitation_B24 Upgrades.pdf PDF
Solicitation_B24 Upgrades.pdf PDF
4. SOW - B24 Security Upgrade.docx DOCX document
B24 Floor Plan - Security Upgrade.pptx PPTX presentation

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

LOUISIANA AIR NATIONAL GUARD

BUILDING 24 HEADQUARTERS

DRAWINGS

• Convert doors to no outside entry

• Add NEW panic ware where necessary(interior) & connect to fire alarm

Back Door

Front Door

Convert Office Door

• Replace existing door and install new bullet resistant Level 5 personnel door. Door swing shall be same as existing. Relocate Door

• Relocate office door/frame to inside of admin area and enclose wall within office

• Door swing same as existing

Windows

• Replace existing window units with Level 5 bullet resistant glass and new framing

Mech.

Room

Windows

• Replace existing window units with Level 5 bullet resistant glass

Headquarters Building 24

Doors

• Convert existing doors to fire exit doors only.

• Add panic ware and install to fire alarm system