Attachment B - Scope of Work - Page 1.docx
DOCX document 32 KB Posted
- Attached to
- Limestone - DMA-MPMG Area - Addendum No. 1 - Specification Revisions & Vendor Questions and State'
- Solicitation number
- 3000025490
- Issued by
- Rapides Parish, Louisiana
About this file
This document is a Scope of Work for a road aggregate maintenance project at Camp Beauregard Range Operations in Pineville, Louisiana. The contractor will provide labor, equipment, and materials to haul and spread #57 Limestone and Gabion rock across multiple roads within the training area, totaling 5,160 tons of limestone and 2,200 tons of Gabion rock. The project focuses on repairing road conditions that have been severely degraded by military and contractor vehicle traffic, with specific road segments including Millcreek Road, Pecan Road, West Range Road, and Cedar Road.
The project addresses significant road infrastructure challenges, including substantial washouts, erosion, and loss of structural integrity that pose safety hazards to personnel and equipment. Range Control staff will closely coordinate with the contractor during aggregate application, including precise tailgate spreading operations and subsequent motor grader work to ensure even material distribution. The roadwork is specifically aimed at preparing for anticipated wet weather conditions in the fall and winter, with the goal of improving road stability and safety for military training operations. The project is associated with RFx number 3000025490 and involves maintaining access routes in the southeastern portion of the training area.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Revised Attachment A - Special Terms and Conditions - Pages 1-10.docx | DOCX document | |
| 3000025490-1.pdf | ||
| Addendum No. 1 Specification Revisions & Vendor Questions.docx | DOCX document | |
| Attachment C - Online Bidding Instructions - Pages 1-10.pdf | ||
| 3000025490.pdf | ||
| Attachment A - Special Terms and Conditions - Pages 1-10.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Facility Address: Camp Beauregard Range Operations 6090 West Range Road, Pineville, LA 71360
The Contractor will provide all equipment, labor, and materials to complete the following scope of work. The Agency will coordinate with the Contractor to ensure aggregate is dropped at the correct start/end points.
1. The Contractor will haul, and tail gate drop #57 Limestone onto the center of all identified roads below at a depth of 2 inches and 8-foot-wide strip. Total of 5,160 Tons.
2. The Contractor will bulk drop Gabion rock at one location on Cedar Road, gabion will be used for ongoing road maintenance due to heavy construction equipment traversing the training area in effort to construct the MPMG. Total of 2,200 Tons
Locations:
1. Millcreek Road, #57, Distance 4 miles, 2,450 Tons.
2. Pecan Road, 57, Distance, 1 mile, 615 Tons.
3. West Range Road, 57, Distance 1 mile, 615 Tons.
4. Stockpile #57 on Cedar for ongoing Heavy Equipment Maintenance on Millcreek, 1,480 Tons.
5. Stockpile Gabion on Cedar for ongoing Heavy Equipment Maintenance on Millcreek, 2,200 Tons.
Conditions:
Recent heavy use, including contractor and military vehicle traffic, has significantly degraded road conditions within the south-eastern portion of the training area. Specifically, roadways exhibit substantial washouts, erosion, and a loss of structural integrity – in many areas, the road surface has deteriorated to a loose, powdery consistency. This condition poses a significant safety hazard to personnel and equipment and will be exacerbated by anticipated wet weather this fall and winter.
Range Control staff will coordinate closely with the Contractor during the application of #57 aggregate material. This will include coordinating precise tailgate spreading operations and following tailgate drops with motor graders to ensure even distribution of materials.
RFx: 3000025490 Attachment B – Scope of Work
File details come from the government source that posted it. Updated .