Attachment B - Preventive Maintenance Schedule.docx
DOCX document 48 KB Posted
- Attached to
- H141--HVAC Maintenance & Repair Services
- Solicitation number
- 36C24220Q1228
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C24220Q1228.docx | DOCX document | |
| Attachment A - Equipment List.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
VA Hospital Controls Maintenance 2020
| Description |
| JAN |
| FEB |
| MAR |
| APR |
| MAY |
| JUNE |
| JULY |
| AUG |
| SEPT |
| OCT |
| NOV |
| DEC |
| Comments |
Operator Workstations
BCU'S Inspection
X
X
Software Inspection & Backup
X
X
Clean Computers & Inspection
X
X
ALC computer and front end
X
X
Tracer ES computer and server
X
X
Trane Tracer computers software hardware updates (3)
AHU-1 (A-Wing)
Critical system
| Unit Controller & Sensor Inspection |
| X |
| Damper/Valve/Humidification Inspection |
| X |
X
| Thermostat/Humidistat Inspection (132) |
| X |
| VAV Inspection (132) |
| X |
| Roof Ventilator Operation Inspection (2) |
| X |
| HX RH system |
| X |
X
AHU-2 (A-Wing)
Critical system
Unit Controller & Sensor Inspection
X
Damper/Valve/Humidification Inspection
X
X
Roof Ventilator Operation Inspection (2)
X
AHU-3 (B-Wing)
Critical system
Unit Controller & Sensor Inspection
X
Damper/Valve/Humidification Inspection
X
X
Thermostat/Humidistat Inspection (39)
X
VAV Inspection (31)
X
Roof Ventilator Operation Inspection (2)
X
HX RH system
X
X
AHU-4 (B-Wing)
Critical system
Unit Controller & Sensor Inspection
X
Damper/Valve/Humidification Inspection
X
X
Roof Ventilator Operation Inspection (2)
X
EF 10 ISOLATION FAN INSPECTION
X
ISOLATION ROOM AIR FLOW MONITORS
X
AHU-5 (C-Wing)
Critical system
Unit Controller & Sensor Inspection
X
Damper/Valve/Humidification Inspection
X
X
Thermostat/Humidistat Inspection (39)
X
VAV Inspection (39)
X
Roof Ventilator Operation Inspection (2)
X
HX RH system
X
X
AHU-6 (C-Wing)
Critical system
Unit Controller & Sensor Inspection
X
Damper/Valve/Humidification Inspection
X
X
Roof Ventilator Operation Inspection (2)
X
AHU-7 (D-Wing)
Critical system
Unit Controller & Sensor Inspection
X
| Damper/Valve/Humidification Inspection |
| X |
X
Thermostat/Humidistat Inspection (37)
X
VAV Inspection (37)
X
Roof Ventilator Operation Inspection (2)
X
| HX RH system |
| X |
X
AHU-8 (D-Wing)
Critical system
Unit Controller & Sensor Inspection
X
Damper/Valve/Humidification Inspection
X
X
Roof Ventilator Operation Inspection (2)
X
| Description |
| JAN |
| FEB |
| MAR |
| APR |
| MAY |
| JUNE |
| JULY |
| AUG |
| SEPT |
| OCT |
| NOV |
| DEC |
| Comments |
AHU-9 (1C Clinic)
Unit Controller & Sensor Inspection
X
Damper/Valve/Humidification Inspection
X
X
VAV Inspection (28)
X
HX 1and 2
X
X
AHU-9A (Cardiac Cath Lab)
Unit Controller & Sensor Inspection
X
Damper/Valve/Humidification Inspection
X
X
Thermostat inspection
X
AHU - 6A (Lab)
Unit Controller & Sensor Inspection
X
Damper/Valve/Humidification Inspection
X
X
AHU (6B Lab Area)
Unit Controller & Sensor Inspection
X
X
Damper/Valve/Humidification Inspection
X
AHU-1 (5A)
Unit Controller & Sensor Inspection
X
Damper/Valve/Humidification Inspection
X
X
AHU-2 (5A)
Unit Controller & Sensor Inspection
X
Damper/Valve/Humidification Inspection
X
X
AHU-3 (5A)
Unit Controller & Sensor Inspection
X
Damper/Valve/Humidification Inspection
X
X
AHU -1 (5B)
Unit Controller & Sensor Inspection
X
| Damper/Valve/Humidification Inspection |
| X |
X
AHU 1 AND 2 -5C (Eye Clinic)
Unit Controller & Sensor Inspection
X
Damper/Valve/Humidification Inspection
X
X
VAV Inspection (16)
X
HX RH system
X
AHU - (3B Microbiology Unit 1)
Unit Controller & Sensor Inspection
X
Damper/Valve/Humidification Inspection
X
X
HX RH system
X
AHU - (3B Microbiology Unit 2)
Unit Controller & Sensor Inspection
X
Damper/Valve/Humidification Inspection
X
X
Thermostat inspection
X
AHU - (Anatomical Lab Area)
Unit Controller & Sensor Inspection
X
Damper/Valve/Humidification Inspection
X
X
AHU-2A X-RAY
Unit Controller & Sensor Inspection
X
| Damper/Valve/Humidification Inspection |
| X |
X
AHU - 2B Laboratory Old
Unit Controller & Sensor Inspection
X
Damper/Valve/Humidification Inspection
X
X
AHU - 2B Laboratory New
Unit Controller & Sensor Inspection
X
Damper/Valve/Humidification Inspection
X
X
Thermostat/Humidistat Inspection (1)
New Angio AHU
Unit Controller & Sensor Inspection
X
X
Damper/Valve/Humidification Inspection
X
X
Thermostat/Humidistat Inspection (1)
X
X
Angio Split-System Chiller
Unit Controller & Sensor Inspection
X
Damper/Valve/Humidification Inspection
X
X
Thermostat/Humidistat Inspection (1)
X
| Description |
| JAN |
| FEB |
| MAR |
| APR |
| MAY |
| JUNE |
| JULY |
| AUG |
| SEPT |
| OCT |
| NOV |
| DEC |
| Comments |
AHU 1D (Admitting)
Critical system
Unit Controller & Sensor Inspection
X
Damper/Valve/Humidification Inspection
X
X
Thermostat/Humidistat Inspection (39)
X
X
VAV Inspection (19)
X
HX RH SYSTEM
X
AHU - ICU
Critical system
Unit Controller & Sensor Inspection
X
Damper/Valve/Humidification Inspection
X
X
Thermostat/Humidistat Inspection (27)
X
VAV Inspection (6)
X
Only 6 VAVs on this system, for 3x isolation rooms
AHU - 1 (OR Suite)
Critical system
Unit Controller & Sensor Inspection
X
Damper/Valve/Humidification Inspection
X
X
Thermostat/Humidistat Inspection (13)
X
PHEONIX VALVE AND MONITOR Inspection (13)
X
AHU - 2 (OR ADMIN AREA)
Unit Controller & Sensor Inspection
X
Damper/Valve/Humidification Inspection
X
Thermostat/Humidistat Inspection
X
PACU (OR Suite)
Critical system
Unit Controller & Sensor Inspection
X
Damper/Valve/Humidification Inspection
X
X
Thermostat/Humidistat Inspection (10)
X
VAV Inspection (7)
X
Pharmacy AHU-1
Critical system
| Unit Controller & Sensor Inspection |
| X |
| Damper/Valve/Humidification Inspection |
| X |
X
| VAV Inspection (45 Total for 1 & 2) |
| X |
| Thermostat Inspection (30 Total for 1 & 2) |
| X |
Pharmacy AHU-2
Critical system
| Unit Controller & Sensor Inspection |
| X |
| Damper/Valve/Humidification Inspection |
| X |
X
AHU - Morgue
Critical system
Unit Controller & Sensor Inspection
X
Damper/Valve/Humidification Inspection
X
X
Thermostat/Humidistat Inspection (5)
X
X
AHU - Kitchen
Critical system
Unit Controller & Sensor Inspection
X
Damper/Valve/Humidification Inspection
X
X
Thermostat/Humidistat Inspection (4)
X
AHU - (Sterile Supply & Distribution)
Critical system
Unit Controller & Sensor Inspection
X
Damper/Valve/Humidification Inspection
X
X
Thermostat inspection
X
| Ventilation Reduction Dampers (67) |
| X |
X
Animal Research Facility (ARF) AHU-1 (RTU)
Critical system
Unit Controller & Sensor Inspection
X
Damper/Valve/Humidification Inspection
X
X
Thermostat Inspection (25 Total for 1 & 2)
X
HR pumps and controls
X
ARF Efs points 22
X
Animal Research Facility AHU-2 (Penthouse)
Critical system
Unit Controller & Sensor Inspection
X
Damper/Valve/Humidification Inspection
X
X
See AHU-1 for thermostats
X
Building 26 RTU
Unit Controller & Sensor Inspection
X
X
Damper/Valve/Humidification Inspection
X
X
Building 27 RTU #2
Unit Controller & Sensor Inspection
X
X
Damper/Valve/Humidification Inspection
X
X
Main Tunnel Sensor Inspection
| O2/CO2/ temperature/RH sensor inspection |
| X |
File details come from the government source that posted it. Updated .