The documents are 100% Construction Documents for the Aurora Fox Theater HVAC Alterations project, involving the City of Aurora and architectural and engineering design services by Architectural Workshop in Denver, Colorado. The project involves replacing and relocating HVAC systems for the historic Fox Theater, with a base bid focusing on replacing rooftop units (RTU-1 and RTU-2) servicing the studio theater and workshop areas, and an Alternate #1 involving the removal, replacement, and relocation of RTU-3 for the lobby area. The project requires comprehensive mechanical, electrical, and structural modifications, with construction documents dated September 26, 2025, and multiple design development stages between November 2024 and September 2025.

The project includes multiple pricing alternatives, with a base bid estimated around $10,000 and Alternate #1 providing options for additional work, including ceiling infill and alternate ductwork locations. The electrical system analysis indicates sufficient capacity for the new equipment, with the existing 150 kVA transformer having approximately 449 amps of remaining space capacity. The project emphasizes preserving the historic character of the Fox Theater while updating its mechanical systems, with specific attention to acoustic performance, structural reinforcement, and maintaining the building's historic preservation requirements. The work includes comprehensive demolition, replacement of mechanical units, electrical system updates, and structural modifications to support new rooftop equipment.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

LOCATION MAP:

PROJECT LOCATION

TRUE NORTH

9900 E COLFAX AVE

AURORA, CO 80010

E COLFAX AVE

DEL MAR PKWY

E 14TH AVE

FL

OR

EN

CE

S T

DA

YT

ON

S

T

CONTACTS:

CITY OF AURORA

15151 E ALAMEDA PARKWAY

AURORA, CO 80021

303.739.1735

CONTACT: GABRIELLE TOBIN

BUILDING

OWNER:

ARCHITECT:

MECH/PLUMB:

ARCHITECTURAL WORKSHOP

2 KALAMATH ST.

DENVER, CO 80223

303-788-1717

CONTACT: MARK BOWERS

ACOUSTICAL

CONSULTANT:

RTM ENGINEERING CONSULTANTS

1626 COLE BLVD. STE. 300

LAKEWOOD, CO 80401

303-278-3820

CONTACT: JOSH CURLEY

STRUCTURAL: JCAA CONSULTING ENGINEERS

4100 WADSWORTH BLVD.

WHEAT RIDGE, CO 80033

303-985-3260

CONTACT: NICHOLAS ROHR

ELECTRICAL:

RTM ENGINEERING CONSULTANTS

1626 COLE BLVD. STE. 300

LAKEWOOD, CO 80401

983-777-6542 EX. 5407

CONTACT: WESLEY PLOOF

RTM ENGINEERING CONSULTANTS

1626 COLE BLVD. STE. 300

LAKEWOOD, CO 80401

303.278.3820 EX. 5226

CONTACT: MIKE REED PROJECT ALTERNATES:

BASE BID: REPLACEMENT OF RTU-1 AND RTU-2 WHICH SERVICE STUDIO THEATER AND

WORKSHOP AREAS. THIS SHALL INCLUDE ROOF REINFORCING, ROOF REPAIR, DUCT

CONNECTION AND ALL ASSOCIATED WORK PER CONSTRUCTION DOCUMENTS AND

SPECS TO HAVE A COMPLETE OPERATING SYSTEM.

ALTERNATE #1: THE REMOVAL, REPLACEMENT, AND RELOCATION OF RTU-3. THIS

SHALL INCLUDE ALL ASSOCIATED SCOPE FOR DEMO OF EXISTING RTU-3,

REINFORCING OF ROOF, RELOCATION RTU-3 TO ROOFTOP, ROOF REPAIR, FIELD

INVESTIGATION OF EXISTING LOBBY DUCTWORK AND REPAIR AS NECESSARY, LOBBY

CEILING REPAIR, NEW ELECTRICAL PANEL, NEW RATED CHASE AND TIE INTO EXISTING

BRANCH DUCT PER MECH DWGS. SCOPE SHALL INCLUDE COMPLETE OPERATIONAL

SYSTEMS.

ALTERNATE #1.1: IN CONJUNCTION WITH ALTERNATE #1 AS AN UPGRADE TO

CEILING INFILL AS CEMENTIOUS STUCCO. PROVIDE ADDITIONAL COST FOR

CEILING INFILL AS STUCCO PER SPECIFICATION.

ALTERNATE #1.2: IN CONJUNCTION WITH ALTERNATE #1 AS AN ALTERNATE

LOCATION OF THE SUPPLY AND RETURN DUCT RISER LOCATION FOR RTU-3.

PROVIDE AN ADDITIVE OR DEDUCTIVE COST.

PROJECT DESCRIPTION:

THE CITY OF AURORA IS RENOVATING THE HVAC SYSTEMS OF THE CITY OF AURORA

FOX THEATER. THE PROJECT INVOLVES A BASE SCOPE OF THE REPLACEMENT OF

THE TWO EXISTING MECHANICAL SYSTEMS WHICH SERVICE STUDIO THEATER AND

WORKSHOP AREAS, AS WELL AS AN ALTERNATE TO REPLACE AND RELOCATE THE

MECHANICAL SYSTEM THAT SERVICES THE LOBBY. THE WORK IS BROKEN OUT AS

BASE BID AND ALTERNATES SUCH THAT THE CITY OF AURORA MAY SELECT

ALTERNATES IN ANY ORDER DEEMED SUITABLE. AS A HISTORICALLY REGISTERED

BUILDING, ALL ALTERATIONS SHALL COMPLY WITH THE AURORA HISTORIC

PRESERVATION COMMITTEE TO PRESERVE THE PROPORTIONS AND CHARACTER OF

THE BUILDING.

PROJECT NO.: INITIAL DATE:

DRAWN BY: CHECKED BY:

ARCHITECTURAL WORKSHOP . DENVER, COLORADO

AR

CH

IT

EC

TU

RA

L W

OR

KS

HO

P, LL

C.

A

LL

R

IG

HT

S

RE

SE

RV

ED

2427ft OCT 2024

MRS MAB

AURORA FOX THEATER

HVAC ALTERATIONS

9900 E COLFAX AVE, AURORA, CO 80010

G-001

COVER SHEET

100% CONSTRUCTION DOCUMENTS - REVISION 1

SEPTEMBER 26, 2025

AURORA FOX THEATER HVAC ALTERATIONS

9900 E COLFAX AVE, AURORA, CO 80010

G-001 COVER SHEET

G-002 GENERAL NOTES, SYMBOLS & ABBREVIATIONS

G-003 PROJECT CODE INFORMATION

AS-101 ARCHITECTURAL SITE PLAN

AD-101 MAIN LEVEL DEMO PLAN

AD-103 MAIN LEVEL CEILING DEMO PLAN

AD-104 LOBBY CEILING DEMO PLAN

AD-105 ROOF DEMO PLAN

AD-106 DEMO BULDING SECTIONS

A-101 MAIN LEVEL FLOOR PLAN

A-103 MAIN LEVEL CEILING PLAN

A-104 LOBBY CEILING PLAN

A-105 ROOF PLAN

A-301 BUILDING SECTIONS

A-401 ELEVATIONS VIEWS

A-501 DETAILS

SHEET INDEX:

M-001 MECHANICAL COVER SHEET

M-002 MECHANICAL SCHEDULES

MD-101 MECHANICAL MAIN LEVEL DEMOLITION PLAN

MD-102 AUDITORIUM MECHANICAL DEMOLITION PLANS

MD-105 MECHANICAL ROOF DEMOLITION PLAN

M-101 MECHANICAL MAIN LEVEL PLAN

M-102 AUDITORIUM MECHANICAL PLANS

M-105 MECHANICAL ROOF PLAN

E-001 ELECTRICAL COVER SHEET

ED-101 ELECTRICAL MAIN LEVEL DEMOLITION PLAN

ED-102 ELECTRICAL DEMOLITION PLANS

ED-105 ELECTRICAL ROOF DEMOLITION PLAN

E-101 ELECTRICAL MAIN LEVEL PLAN

E-102 ELECTRICAL PLANS

E-105 ELECTRICAL ROOF PLAN

E-201 ELECTRICAL PANEL SCHEDULES / ONE-LINE DIAGRAM

S-001 GENERAL NOTES

S-101 ROOF FRAMING PLAN

S-201 ROOF FRAMING SECTIONS

DATE DESCRIPTION

11.01.2024 35% SCHEMATIC DESIGN

01.07.2025 65% DESIGN DEVELOPMENT

02.07.2025 95% CONSTRUCTION DOCUMENTS

04.23.2025 100% CONSTRUCTION DOCUMENTS

05.12.2025 FOR BID

09.26.2025 FOR BID REVISION 1

GENERAL CONTRACTOR NOTES:

1.

2.

3.

4.

5.

6.

7.

8.

9.

10.

11.

PERMITS:

IT IS THE RESPONSIBILITY OF THE GENERAL CONTRACTOR TO SUBMIT FOR BUILDING

PERMIT THROUGH THE APPLICABLE JURISDICTION. THE CONTRACTOR SHALL LIST THE

CITY PROJECT MANAGER AS ADDITIONAL PROJECT CONTACT. THE CITY OF AURORA

WILL PAY FOR PERMIT FEES. THE CONTRACTOR SHALL HAVE A VALID COMMERCIAL

LICENSE AND SHALL PICK UP THE PERMIT.

DOCUMENTS:

CONTRACTOR AND SUB-CONTRACTORS ARE RESPONSIBLE TO READ AND UNDERSTAND

ALL OF THE DRAWINGS AND THE CONSTRUCTION SPECIFICATION MANUAL.

SITE EXAMINATION:

GENERAL CONTRACTOR AND ALL SUBCONTRACTORS SHALL VISIT AND EXAMINE THE

SITE AND BUILDING IN EVERY DETAIL AS IT PERTAINS TO THE PROJECT PRIOR TO

SUBMITTING A BID PROPOSAL.

DISCREPANCIES:

ANY DISCREPANCIES DISCOVERED BY THE GENERAL CONTRACTOR OR BY THE

SUBCONTRACTORS, BETWEEN DIMENSIONS, OR CONFLICTS UNFORESEEN PREVIOUSLY

SHALL BE BROUGHT TO THE IMMEDIATE ATTENTION OF THE ARCHITECT FOR

CLARIFICATION.

BUILDING CODE COMPLIANCE:

PERFORM ALL WORK TO COMPLY WITH APPLICABLE BUILDING CODES AND

REGULATIONS. FOR BUILDING CONDITIONS THAT ARE NOT CONSTRUCTED TO MEET

CURRENT BUILDING CODES, THE GENERAL CONTRACTOR IS TO PROVIDE ALTERNATE

PRICING TO BRING ITEMS INTO CODE COMPLIANCE.

HOURS OF CONSTRUCTION:

GENERAL CONTRACTOR IS RESPONSIBLE TO COORDINATE WITH THE CITY PROJECT

MANAGER FOR HOURS OF OPERATION, ALLOWABLE CONSTRUCTION TIMES AND

CONSTRUCTION ACTIVITIES. THE GENERAL CONTRACTOR SHALL ASSUME ALL

RESPONSIBILITY FOR ALL SUB-CONTRACTORS.

LONG LEAD ITEMS:

THE GENERAL CONTRACTOR AND SUBCONTRACTORS SHALL BE RESPONSIBLE FOR

BEING FAMILIAR WITH THE PROJECT SCHEDULE AND DEADLINES, AND FOR ADVISING

THE ARCHITECT AND CITY PROJECT MANAGER FOR ALL LONG LEAD ITEMS. ORDER

CONFIRMATION SHALL BE SUBMITTED WITH DELIVERY DATES. PROVIDE LEAD TIME

ESTIMATES WITH ANY BID PROPOSALS. IT SHALL BE AT THE GENERAL CONTRACTORS

EXPENSE IF ANY LONG LEAD ITEMS ARE DISCOVERED AFTER THE PROJECT BEGINS.

CLEAN UP:

CLEANING OF EQUIPMENT SHALL BE LIMITED TO AREAS DESIGNATED BY THE CITY

PROJECT MANAGER. TRASH SHALL BE REMOVED AND SWEEPING\VACUUMING SHALL BE

PROVIDED ON A DAILY AND CONTINUING BASIS THROUGHOUT THE CONSTRUCTION

PROCESS. FINAL CLEANING SHALL BE PROVIDED BY THE CONTRACTOR AND INCLUDE

WINDOWS, SILLS, WINDOW COVERINGS (BLINDS), CABINETS, LIGHT FIXTURES, SUPPLY

AIR DIFFUSERS AND RETURN AIR GRILLS.

DISPOSAL:

THE GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR OBTAINING THE DUMPSTER.

THE GENERAL CONTRACTOR SHALL COORDINATE WITH THE APPLICABLE JURISDICTION

FOR LOCATION AND ALLOWABLE SIZE. THE GENERAL CONTRACTOR. SHALL DISPOSE OF

/ RECYCLE ALL WASTE IN ACCORDANCE WITH ACCEPTED STANDARDS OF THE

APPLICABLE JURISDICTION. COORDINATE DUMPSTER LOCATION WITH CITY PROJECT

MANAGER.

PROTECTION OF EXISTING ITEMS:

THE GENERAL CONTRACTOR SHALL BE RESPONSIBLE TO PROTECT ALL EXISTING

CONSTRUCTION ON AND OFF SITE, AND SHALL BE HELD RESPONSIBLE FOR THE REPAIR

OF ANY DAMAGE CAUSED BY GENERAL CONTRACTOR OR ANY OF ITS

SUBCONTRACTORS.

WORK PERFORMED UNDER SEPARATE CONTRACT:

THE GENERAL CONTRACTOR IS TO VERIFY WITH THE CITY PROJECT MANAGER IF ANY

WORK IS TO BE PERFORMED UNDER A SEPARATE CONTRACT.

ABV

A.F.F

AP

A.C.T A.C.

ADJ.

ALT

A.D.

BLK

BD

BLDG

B.O.

C.I.P.

CPT

CLK

CLG

CTR

CLR

COL

CONC

C.M.U.

CONST

CONT

CONTR

CORR.

DET/DTL

DIM

DN

D.S.

DWG

ELEC

ELEV

EQ

EQUIP

EST

EXIST, (E)

E.J.

EXT

FT

FIN

F.F.

F.E.

FL

FDN

GALV.

GEN

G.C.

GYP. BD

HT

HVAC

IN

INSUL

INT.

IBC

ABV

ABOVE FINISH FLOOR

ACCESS PANEL

ACOUSTIC CEILING TILES

AIR CONDITIONING

ADJUSTABLE

ALTERNATE

AREA DRAIN

BLOCK

BOARD

BUILDING

BOTTOM OF

CAST-IN-PLACE-CONCRETE

CARPET

CAULKING

CEILING

CENTER

CLEAR

COLUMN

CONCRETE

CONCRETE MASONRY UNIT

CONSTRUCTION

CONTINUOUS/CONTINUE

CONTRACTOR

CORRIDOR

DETAIL

DIMENSIONS

DOWN

DOWN SPOUT

DRAWING

ELECTRICAL

ELEVATION

EQUAL

EQUIPMENT

ESTIMATED

EXISTING

EXPANSION JOINT

EXTERIOR

FEET

FINISH

FINISH FLOOR

FIRE EXTINGUISHER

FLOOR/FLOOR LINE

FOUNDATION

GALVANIZED

GENERAL

GENERAL CONTRACTOR

GYPSUM BOARD

HEIGHT

HEATING, VENTILATION, AND

AIR CONDITIONING

INCH

INSULATION

INTERIOR

INTERNATIONAL BUILDING CODE

JAN

JT

KIT

LAV

LGTH

LOC

MANUF./MFR

MATL

MECH

MEP

MTL/MET

MIN

MISC

N.I.C.

N.T.S.

OFF

O.C.

PEN.

PNT

PL

PRELIN

P.L.

REF/RE

REINF

REQD

R.D.

RM

R.O.

SCH

SECT.

SIM

SF

STD

STL

STO

STR

TEL

T.O.C.

T.O.D.

T.O.M.

T.O.S.

TYP

VENT

V.I.F.

VERT

W.C.

W/ W/O

WD

JANITOR

JOINT

KITCHEN

LAVATORY

LENGTH

LOCATION

MANUFACTURER

MATERIAL

MECHANICAL

MECHANICAL, ENGINEERING, AND

PLUMBING

METAL

MINIMUM

MISCELLANEOUS

NOT IN CONTRACT

NOT TO SCALE

OFFICE

ON CENTER

PENETRATION

PAINTED/PAINT

PLASTER

PRELIMINARY

PROPERTY LINE

REFERENCE

REINFORCE/REINFORCING

REQUIRED

ROOF DRAIN

ROOM

ROUGH OPENING

SCHEDULE

SECTION

SIMILAR

SQUARE FOOT

STANDARD

STEEL

STORAGE

STRUCTURAL

TELEPHONE

TOP OF CONCRETE

TOP OF DECK

TOP OF MASONRY

TOP OF STEEL

TYPICAL

VENTILATING

VERIFY IN FIELD

VERTICAL

WATER CLOSET

WITH

WITHOUT

WOOD

ABBREVIATIONS:

COLUMN GRID

DETAIL/WALL SECTION

DETAIL 1 ON SHEET A101

EXTERIOR ELEVATION

DRAWING 1 ON SHEET A101

BUILDING SECTION

DRAWING 1 ON SHEET A101

DETAIL BUBBLE

DETAIL 1 ON SHEET A101

INTERIOR ELEVATION

DRAWING 1 ON SHEET A7.1

DRAWING TITLE AND NUMBER

NORTH ARROW

ROOM NAME AND NUMBER

ELEVATION MARKER

CENTER LINE

OBJECTS ABOVE

SOFFITS, CABINETS,

HIGH WINDOWS

HIDDEN OBJECTS

KEYNOTE

ROOM FINISHES

WALL TYPE

A101

SIM

A101

A101

1 SIM

TITLE

SCALE

ROOM NAME

D

SYMBOLS LEGEND:

A101

X-1 X-1 X-1X-1

WALL WAINSCOTING

WALL BASE FLOOR

A101

Ref

1R ef 1 R ef

Ref

1i

LIFE SAFETY NOTES:

1.

2.

3.

4.

5.

6.

THE FOLLOWING NOTES SHALL BE CONTRACTUALLY BINDING AND APPLY TO ALL

DISCIPLINES. IT IS THE CONTRACTOR'S OBLIGATION TO ENSURE ALL WORK AND ALL SUB

CONTRACTORS' WORK BE PERFORMED IN COMPLIANCE WITH THE FOLLOWING NOTES IN

ADDITION TO THE CONSTRUCTION DOCUMENTS AND PROJECT SPECIFICATIONS.

HOT WORK DURING CONSTRUCTION:

THE CONTRACTOR SHALL ENSURE THAT ANY HOT WORK ACTIVITIES DURING

CONSTRUCTION, E.G., USING HEAT GUNS, SOLDERING, BRAZING, WELDING, GRINDING,

POWDER DRIVEN STUDS, METAL CUTTING USING POWER TOOLS OR OTHER ACTIVITIES

INVOLVING FLAMES OR SPARKS ARE PRECEDED BY INDUSTRY STANDARD FIRE PREVENTION

PREPARATION.

ACCESS AND EGRESS OBSTRUCTIONS:

THE CONTRACTOR SHALL CONFIRM THAT THE PROJECT STAGING AREA AND CONSTRUCTION

ACTIVITIES DO NOT CAUSE THE OBSTRUCTION OF PATHS OF EGRESS INSIDE THE BUILDING,

BLOCK EXIT DISCHARGE FROM THE BUILDING OR IMPEDE EMERGENCY VEHICLE ACCESS TO

THE AREA.

DUST/FUME GENERATION:

IF THE CONSTRUCTION ACTIVITIES GENERATE DUST OR FUMES INSIDE THE BUILDING,

NECESSARY MEASURES ARE TO BE TAKEN TO PREVENT THE NUISANCE ACTUATION OF ANY

NEARBY SMOKE OR DUCT DETECTORS.

PENETRATIONS THROUGH FIRE RATED ASSEMBLIES:

THE CONTRACTOR SHALL ENSURE THAT ANY PENETRATIONS THROUGH FIRE RATED

ASSEMBLIES (FLOORS, PARTITIONS, WALLS, ETC.) ARE FIRESTOPPED.

PEDESTRIAN PROTECTION:

THE CONTRACTOR SHALL BE RESPONSIBLE TO PROVIDE ANY NECESSARY PEDESTRIAN

PROTECTION MEASURES DURING CONSTRUCTION.

PROJECT NOTES:

1.

2.

3.

CONTRACTOR AND SUB-CONTRACTORS ARE RESPONSIBLE TO READ AND UNDERSTAND ALL

OF THE DRAWINGS AND THE PROJECT SPECIFICATION BOOK.

GENERAL CONTRACTOR IS RESPONSIBLE TO COORDINATE WITH THE CITY PROJECT

MANAGER FOR HOURS OF OPERATION, ALLOWABLE CONSTRUCTION TIMES AND

CONSTRUCTION ACTIVITIES. THE GENERAL CONTRACTOR SHALL ASSUME ALL

RESPONSIBILITY FOR ALL SUB-CONTRACTORS.

THE GENERAL CONTRACTOR SHALL WORK TO COORDINATE WITH THE SEPARATE SEAT

REPLACEMENT PROJECT THAT WILL BE RUNNING CONCURRENTLY WITH THIS PROJECT.

ENSURE ANY WORK OVERLAP DOES NOT INTERFERE WITH CONSTRUCTION SCHEDULE.

PROJECT NO.: INITIAL DATE:

DRAWN BY: CHECKED BY:

ARCHITECTURAL WORKSHOP . DENVER, COLORADO

AR

CH

IT

EC

TU

RA

L W

OR

KS

HO

P, LL

C.

A

LL

R

IG

HT

S

RE

SE

RV

ED

2427ft OCT 2024

MRS MAB

AURORA FOX THEATER

HVAC ALTERATIONS

9900 E COLFAX AVE, AURORA, CO 80010

G-002

GENERAL NOTES, SYMBOLS &

ABBREVIATIONS

DATE DESCRIPTION

11.01.2024 35% SCHEMATIC DESIGN

01.07.2025 65% DESIGN DEVELOPMENT

02.07.2025 95% CONSTRUCTION DOCUMENTS

04.23.2025 100% CONSTRUCTION DOCUMENTS

DN

CODE DATA:

BUILDING ADDRESS: 9900 E COLFAX AVE.

AURORA, CO 80010

APPLICABLE

BUILDING CODES: 2021 INTERNATIONAL BUILDING CODE

2021 INTERNATIONAL FUEL GAS CODE

2021 INTERNATIONAL MECHANICAL CODE

2021 INTERNATIONAL PLUMBING CODE

2021 INTERNATIONAL ENERGY

CONSERVATION CODE

2023 NATIONAL ELECTRICAL CODE

BLDG CONSTRUCTION: V-B (NO CHANGE)

OCCUPANCY GROUP: A-3

B F-1

S-1 (ACCESSORY TO A-3)

BUILDING AREA: LOWER LEVEL 15,640 SF

TOTAL: 16,177 SF

ALLOWED EXISTING

CHAPTER 6: TYPES OF CONSTRUCTION

TABLE 601, FIRE RESISTANCE REQUIREMENTS FOR BUILDING

ELEMENTS: TYPE V-B CONSTRUCTION = NO RATINGS REQUIRED

TABLE 602, FIRE RESISTANCE RATING FOR EXTERIOR WALLS

TYPE V-B: 5'-0" ≤ X < 10'-0" SEPARATION = 1 HR RATING REQUIRED.

TYPE V-B: 10'-0" ≤ X < 30'-0" SEPARATION = NO RATINGS REQUIRED.

TYPE V-B: >30'-0" SEPARATION = NO RATINGS REQUIRED.

2 STORIES (A-3)

3 STORIES (F-1)

1 STORY (A-3)

1 STORY (F-1)

MEZZANINE 537 SF

BUILDING HEIGHT:

FIRE SUPPRESSION REQUIREMENTS AND ALLOWANCE:

FIRE SUPPRESSION WORK: ANY DEMOLITION, RELOCATION, OR

ADDITION OF FIRE SPRINKLERS, INCLUDING THE REMOVAL OR

RELOCATION OF MORE THAN FIVE (5) SPRINKLER HEADS, SHALL

TRIGGER THE REQUIREMENT FOR A DEFERRED SUBMITTAL TO THE

AUTHORITY HAVING JURISDICTION (AHJ) FOR FIRE SUPPRESSION

SYSTEM REVISIONS. THIS INCLUDES ALL AFFECTED AREAS WITHIN

THE SCOPE OF RENOVATION.

FIRE ALARM COORDINATION: MODIFICATIONS TO THE FIRE ALARM

SYSTEM REQUIRED DUE TO CHANGES IN FIRE SUPPRESSION,

OCCUPANCY LAYOUT, OR CODE COMPLIANCE (INCLUDING CHANGES

TO NOTIFICATION DEVICES OR SMOKE DETECTION) SHALL ALSO

REQUIRE A DEFERRED SUBMITTAL FOR FIRE ALARM REVISIONS.

CONTRACTOR RESPONSIBILITY: THE GENERAL CONTRACTOR SHALL

INCLUDE IN THEIR BID:

ALL DEMOLITION AND NEW WORK FOR FIRE SUPPRESSION AND FIRE

ALARM SYSTEMS INCLUDED IN THE DESIGN.

COORDINATION WITH A LICENSED FIRE PROTECTION

SUBCONTRACTOR AND FIRE ALARM VENDOR TO PREPARE, SUBMIT,

AND OBTAIN APPROVAL OF DEFERRED SUBMITTALS.

ALL COSTS ASSOCIATED WITH DESIGN, PERMITTING, INSPECTION,

AND FINAL ACCEPTANCE OF MODIFIED SYSTEMS.

PERMITTING: FIRE PROTECTION AND ALARM MODIFICATIONS ARE

SUBJECT TO REVIEW AND APPROVAL BY THE CITY OF AURORA FIRE

DEPARTMENT. WORK SHALL NOT PROCEED WITHOUT APPROVED

DEFERRED SUBMITTALS WHERE APPLICABLE.

B C E

537 SF

4 OCC.

B

BUSINESS OPEN TO BELOW

OPEN TO BELOW

OPEN TO BELOW

OPEN TO BELOW

OPEN TO BELOW3

D F

A

B C E G H J K L

2575 SF

A-3

AUDITORIUM

1541 SF

103 OCC.

A-3

THEATER585 SF

12 OCC.

A-3

RESTROOMS

356 SF

2 OCC.

A-3

MECHANICAL

184 SF

1 OCC.

S-1

STORAGE

1896 SF

19 OCC.

F-1

WORKSHOP

1642 SF

A-3

THEATER

225 SF

2 OCC.

A-3

GREEN ROOM

1047 SF

11 OCC.

F-1

WORKSHOP

212 OCC.

122 SF

3 OCC.

A-3

RESTROOM

89 SF

2 OCC.

A-3

RESTROOM

67 OCC.

D F I

W1

K L

220 SF

2 OCC.

B

BUSINESS

62 SF

1 OCC.

S-1

STORAGE

1007 SF

68 OCC.

A-3

ASSEMBLY

28 SF

1 OCC.

S-1

STORAGE

101 SF

3 OCC.

A-3

RESTROOM

131 SF

3 OCC.

A-3

RESTROOM

117 SF

1 OCC.

B

BUSINESS

CODE STUDY LEGEND

2 HR FIRE RATED WALL (NEW)

A-3 OCCUPANCY

B OCCUPANCY

S-1 OCCUPANCY

F-1 OCCUPANCY

AREA NOT IN SCOPE

EXISTING WALL TO REMAIN

PROJECT NO.: INITIAL DATE:

DRAWN BY: CHECKED BY:

ARCHITECTURAL WORKSHOP . DENVER, COLORADO

AR

CH

IT

EC

TU

RA

L W

OR

KS

HO

P, LL

C.

A

LL

R

IG

HT

S

RE

SE

RV

ED

2427ft OCT 2024

MRS MAB

AURORA FOX THEATER

HVAC ALTERATIONS

9900 E COLFAX AVE, AURORA, CO 80010

G-003

PROJECT CODE INFORMATION

3/32" = 1'-0"2 MEZZANINE CODE PLAN

3/32" = 1'-0"3 CODE PLAN

3/32" = 1'-0"1 LOBBY CODE PLAN

DATE DESCRIPTION

11.01.2024 35% SCHEMATIC DESIGN

01.07.2025 65% DESIGN DEVELOPMENT

02.07.2025 95% CONSTRUCTION DOCUMENTS

04.23.2025 100% CONSTRUCTION DOCUMENTS

AURORA FOX THEATER

EL

MI

RA

S

T.

FL

OR

EN

CE

S T.

CHEROKEE TRAIL

E COLFAX AVE.

ADJACENT BUILDING

ADJACENT BUILDING

ADJACENT BUILDING

ADJACENT BUILDINGADJACENT BUILDING

RTU 3

RTU 2 RTU 1

ALT #1

BASE BID

SITE PLAN LEGEND:

SITE WALL

EXISTING TREE TO REMAIN

ADJACENT BUILDINGS

SUBJECT PROPERTY

AREA IN SCOPE

DUMPSTER LOCATION /

CONTRACTOR PARKING AREA

GENERAL SITE NOTES:

1.

2.

3.

4.

CONTRACTOR TO PROTECT SITE CONDITIONS DURING ALL

CONSTRUCTION ACTIVITIES.

CONTRACTOR PARKING AND CONSTRUCTION DUMPSTER

AREA LOCATION HAS BEEN LOCATED ON SITE PLAN.

BUILDING IS A HISTORIC BUILDING AND CANNOT BE

DAMAGED. CONTRACTOR TO PROVIDE PROPER MEASURES

TO PROTECT BUILDING DURING ALL ACTIVITIES.

CONTRACTOR TO PERFORM ALL CONSTRUCTION ACTIVITIES

WITHIN CITY OF AURORA ALLOWED CONSTRUCTION HOURS.

PROJECT NO.: INITIAL DATE:

DRAWN BY: CHECKED BY:

ARCHITECTURAL WORKSHOP . DENVER, COLORADO

AR

CH

IT

EC

TU

RA

L W

OR

KS

HO

P, LL

C.

A

LL

R

IG

HT

S

RE

SE

RV

ED

2427ft OCT 2024

MRS MAB

AURORA FOX THEATER

HVAC ALTERATIONS

9900 E COLFAX AVE, AURORA, CO 80010

AS-101

ARCHITECTURAL SITE PLAN

1" = 20'-0"1 ARCHITECTURAL SITE PLAN

DATE DESCRIPTION

11.01.2024 35% SCHEMATIC DESIGN

01.07.2025 65% DESIGN DEVELOPMENT

02.07.2025 95% CONSTRUCTION DOCUMENTS

04.23.2025 100% CONSTRUCTION DOCUMENTS

GENERAL DEMO NOTES:

1.

2.

3.

4.

5.

6.

7.

8.

9.

10.

DO NOT SCALE DRAWINGS. DIMENSIONS GOVERN. ANY

DISCREPANCIES IN DRAWINGS AND/OR EXISTING CONDITIONS

SHOULD BE BROUGHT TO THE IMMEDIATE ATTENTION OF THE

CITY PROJECT MANAGER FOR CLARIFICATION.

ALL WORK SHALL BE IN COMPLIANCE WITH LOCAL AUTHORITY

HAVING JURISDICTION AND 2021 INTERNATIONAL BUILDING

CODE (IBC).

ALL WORK SHALL BE IN COMPLIANCE WITH THE

CONSTRUCTION SPECIFICATION MANUAL WHICH IS PART OF

THE CONTRACT DOCUMENTS.

ALL ABANDONED WIRING, CONDUITS OR MISC. MEP MUST BE

REMOVED IN THEIR ENTIRETY.

ALL DEMOLITION AND DISPOSAL MUST BE DONE TO MEET ALL

CODES AND LAWS FOR PROPER DISPOSAL.

ALL DEMOLITION IN OCCUPIED SPACES MUST BE

COORDINATED WITH CITY PROJECT MANAGER.

ALL DEMOLITION IN OCCUPIED SPACES SHALL BE

CONDUCTED IN A SAFE MANNER AND LEFT TO MEET CODES

FOR OCCUPANCY.

ALL RETURN AIR DUCTS MUST BE FILTERED DURING DEMO

AND CONSTRUCTION TO PREVENT DEBRIS FROM ENTERING

HVAC SYSTEM.

ALL DEMOLITION SCOPE SHALL REMOVE ALL ASSOCIATED

SYSTEMS AND COMPONENTS. CITY DOES NOT ACCEPT

ABANDONING ANY UNUSED COMPONENTS IN PLACE.

EXTENTS OF SCOPE DEPICTED INCLUDES COMBINED AREAS

OF DEMO IN ARCHITECTURAL, MECHANICAL, ELECTRICAL,

AND STRUCTURAL WORK.

A

AD-106

AD-106

MENS

WOMENS

GREEN RM

STAGING

STUDIO

THEATER

SCENERY

STUDIO

LAUNDRY

ROOM

MECHANICAL

BOILER

MENS

WOMENS

TOILET RM

TOILET RM

PLATFORM

AUDITORIUM

CONTROL

RM

B C E G H J K L

4'

- 1

7"

4'

- 8

4"

4"

1'

- 0

6' - 0" 15' - 8" 19' - 4" 41' - 0" 10' - 8" 27' - 11" 17' - 7" 35' - 7"

D1

DRESSING

RM

DRESSING

RM

D F I

D2

4'

- 4

2' - 6"

RE

: F

LO

OR

P

LA

N

D3

4'

- 4

3' - 0"

(ALT #1.2)

D1

D4D4

D4

D4

D4

D5

D4

ALT #1

D6

DEMO PLAN KEYNOTES:

D1 ALTERNATE #1: DEMO (E) SHELVING FOR NEW MECHANICAL

CHASE LOCATION. REPAIR AND REBUILD SHELVES ADJACENT

TO NEW MECH CHASE. RE: DETAILS.

D2 ALTERNATE #1: DEMO FLOOR AREA FOR NEW MECHANICAL

DUCTWORK PENETRATION.

D3 ALTERNATE #1.2: ALTERNATE FLOOR DEMO AREA FOR NEW

MECHANICAL DUCTWORK PENETRATION.

D4 EXISTING SEATING AND THEATER CURTAIN TO REMAIN.

D5 AREA ABOVE IS OPEN CEILING AND WILL HAVE MODIFICATION

PERFORMED ON ROOF. MODIFY OR PROVIDE DEMOLITION IN

WORKSHOP TO ACCOMODATE ROOF STRUCTURAL AND SPACE

MODIFICATIONS.

D6 EXISTING CONTROL ROOM WINDOW TO REMAIN, PROTECT

DURING CONSTRUCTION.

EXISTING WALL TO REMAIN

DEMOLITION LEGEND

WALL / CEILING / AREA TO BE DEMOLISHED

AREA NOT IN SCOPE

ALTERNATE DUCT LOCATION

OBJECT TO BE DEMOLISHED PROJECT NO.: INITIAL DATE:

DRAWN BY: CHECKED BY:

ARCHITECTURAL WORKSHOP . DENVER, COLORADO

AR

CH

IT

EC

TU

RA

L W

OR

KS

HO

P, LL

C.

A

LL

R

IG

HT

S

RE

SE

RV

ED

2427ft OCT 2024

MRS MAB

AURORA FOX THEATER

HVAC ALTERATIONS

9900 E COLFAX AVE, AURORA, CO 80010

AD-101

MAIN LEVEL DEMO PLAN

1/8" = 1'-0"1 MAIN LEVEL DEMO PLAN

DATE DESCRIPTION

01.07.2025 65% DESIGN DEVELOPMENT

02.07.2025 95% CONSTRUCTION DOCUMENTS

04.23.2025 100% CONSTRUCTION DOCUMENTS

GENERAL DEMO NOTES:

2.

3.

4.

5.

6.

7.

8.

9.

10.

DO NOT SCALE DRAWINGS. DIMENSIONS GOVERN. ANY

DISCREPANCIES IN DRAWINGS AND/OR EXISTING CONDITIONS

SHOULD BE BROUGHT TO THE IMMEDIATE ATTENTION OF THE

CITY PROJECT MANAGER FOR CLARIFICATION.

ALL WORK SHALL BE IN COMPLIANCE WITH LOCAL AUTHORITY

HAVING JURISDICTION AND 2021 INTERNATIONAL BUILDING

CODE (IBC).

ALL WORK SHALL BE IN COMPLIANCE WITH THE

CONSTRUCTION SPECIFICATION MANUAL WHICH IS PART OF

THE CONTRACT DOCUMENTS.

ALL ABANDONED WIRING, CONDUITS OR MISC. MEP MUST BE

REMOVED IN THEIR ENTIRETY.

ALL DEMOLITION AND DISPOSAL MUST BE DONE TO MEET ALL

CODES AND LAWS FOR PROPER DISPOSAL.

ALL DEMOLITION IN OCCUPIED SPACES MUST BE

COORDINATED WITH CITY PROJECT MANAGER.

ALL DEMOLITION IN OCCUPIED SPACES SHALL BE

CONDUCTED IN A SAFE MANNER AND LEFT TO MEET CODES

FOR OCCUPANCY.

ALL RETURN AIR DUCTS MUST BE FILTERED DURING DEMO

AND CONSTRUCTION TO PREVENT DEBRIS FROM ENTERING

HVAC SYSTEM.

ALL DEMOLITION SCOPE SHALL REMOVE ALL ASSOCIATED

SYSTEMS AND COMPONENTS. CITY DOES NOT ACCEPT

ABANDONING ANY UNUSED COMPONENTS IN PLACE.

EXTENTS OF SCOPE DEPICTED INCLUDES COMBINED AREAS

OF DEMO IN ARCHITECTURAL, MECHANICAL, ELECTRICAL,

AND STRUCTURAL WORK.

A

AD-106

AD-106

GREEN RM

STAGING

LAUNDRY

ROOM

MECHANICAL

BOILER

MENS

WOMENS

TOILET RM

TOILET RM

PLATFORM

AUDITORIUM

MENS

WOMENS

STUDIO

THEATER

SCENERY

STUDIO

CONTROL

RM

B C E G H J K L

D1

D3

D2

D4

D4 D3

DRESSING

RM

DRESSING

RM

D F I

D6

D1

D8

0" 7'

- 1 1"

13' - 8" 11' - 8"

D7 (ALT #1.2)

3'

- 3

2' - 9"

OPEN TO STRUCTURE

OPEN TO STRUCTURE

D9

ALT #1

ES

T

4" V.

I.

F.

EST 13' - 7" V.I.F.

DEMO PLAN KEYNOTES:

ALTERNATE #1: DEMO & DISPOSE OF PORTION OF PLASTER AND

LATH CEILING / SOFFIT FOR NEW DUCTWORK AND STR

REINFORCEMENT AS PER MECH AND STR DWGS. PATCH AND

REPAIR ADJACENT SURFACES AS REQUIRED. PAINT TO MATCH.

RE: MECHANICAL FOR DUCT SIZING.

D1

ALTERNATE #1: SCRAPE, CLEAN AND PREP WATER DAMAGED

CEILING AREAS FOR NEW PATCHING AND PAINT.

D7

(E) ROOF ACCESS HATCH TO REMAIN.D2

DEMO AND REMOVE (E) MECH AND DUCT COMPONENTS IN THEIR

ENTIRETY AS SHOWN ON MECH DWGS.

D3

DO NOT DEMO OR ALTER STR UNLESS NOTED ON STR DWGS.D4

NOT USED.D5

DEMO PORTION OF MASONRY WALL TO ENLARGE OPENING TO

ALLOW DUCTWORK. RE: STR DWGS.

D6

ALTERNATE #1.2: DEMO CEILING/SOFFIT AREA FOR NEW

MECHANICAL DUCTWORK PENETRATION.

D8

DASHED LINE INDICATES AREA OF ARCHITECTURAL DEMO

WORK. OPEN TO STRUCTURE. DUCTS, LIGHTS AND SPRINKLER

WORK TO BE COORDINATED BEFORE START OF DEMOLITION.

D9

EXISTING WALL TO REMAIN

DEMOLITION LEGEND

WALL / CEILING / AREA TO BE DEMOLISHED

AREA NOT IN SCOPE

ALTERNATE DUCT LOCATION

OBJECT TO BE DEMOLISHED PROJECT NO.: INITIAL DATE:

DRAWN BY: CHECKED BY:

ARCHITECTURAL WORKSHOP . DENVER, COLORADO

AR

CH

IT

EC

TU

RA

L W

OR

KS

HO

P, LL

C.

A

LL

R

IG

HT

S

RE

SE

RV

ED

2427ft OCT 2024

MRS MAB

AURORA FOX THEATER

HVAC ALTERATIONS

9900 E COLFAX AVE, AURORA, CO 80010

AD-103

MAIN LEVEL CEILING DEMO PLAN

1/8" = 1'-0"1 MAIN LEVEL CEILING DEMO PLAN

DATE DESCRIPTION

11.01.2024 35% SCHEMATIC DESIGN

01.07.2025 65% DESIGN DEVELOPMENT

02.07.2025 95% CONSTRUCTION DOCUMENTS

04.23.2025 100% CONSTRUCTION DOCUMENTS

GENERAL DEMO NOTES:

2.

3.

4.

5.

6.

7.

8.

9.

10.

DO NOT SCALE DRAWINGS. DIMENSIONS GOVERN. ANY

DISCREPANCIES IN DRAWINGS AND/OR EXISTING CONDITIONS

SHOULD BE BROUGHT TO THE IMMEDIATE ATTENTION OF THE

CITY PROJECT MANAGER FOR CLARIFICATION.

ALL WORK SHALL BE IN COMPLIANCE WITH LOCAL AUTHORITY

HAVING JURISDICTION AND 2021 INTERNATIONAL BUILDING

CODE (IBC).

ALL WORK SHALL BE IN COMPLIANCE WITH THE

CONSTRUCTION SPECIFICATION MANUAL WHICH IS PART OF

THE CONTRACT DOCUMENTS.

ALL ABANDONED WIRING, CONDUITS OR MISC. MEP MUST BE

REMOVED IN THEIR ENTIRETY.

ALL DEMOLITION AND DISPOSAL MUST BE DONE TO MEET ALL

CODES AND LAWS FOR PROPER DISPOSAL.

ALL DEMOLITION IN OCCUPIED SPACES MUST BE

COORDINATED WITH CITY PROJECT MANAGER.

ALL DEMOLITION IN OCCUPIED SPACES SHALL BE

CONDUCTED IN A SAFE MANNER AND LEFT TO MEET CODES

FOR OCCUPANCY.

ALL RETURN AIR DUCTS MUST BE FILTERED DURING DEMO

AND CONSTRUCTION TO PREVENT DEBRIS FROM ENTERING

HVAC SYSTEM.

ALL DEMOLITION SCOPE SHALL REMOVE ALL ASSOCIATED

SYSTEMS AND COMPONENTS. CITY DOES NOT ACCEPT

ABANDONING ANY UNUSED COMPONENTS IN PLACE.

EXTENTS OF SCOPE DEPICTED INCLUDES COMBINED AREAS

OF DEMO IN ARCHITECTURAL, MECHANICAL, ELECTRICAL,

AND STRUCTURAL WORK.

AD-106

AD-106

OFFICE

RECEPTION

STORAGE

WOMENS

MENS

10JAN

LOBBY

K L

D1

D2

D4

5' - 7"

D5

2' - 6" 5' - 8"

4"

D3

7"

D7

D7 D7

D7 D7

D7

D7

D7

D7

D7

D7

ALT #1

D6

D7

D7

D7

D7

D7

D7

D7

D7

D7

D7 D7

D7 D7 D7

D7

D7

D8

D8

D8

DEMO PLAN KEYNOTES:

ALTERNATE #1: DEMO & DISPOSE OF GYP. BD CEILING AND (E)

CEILING ACCESS HATCH. PATCH AND REPAIR ADJACENT

SURFACES AS NEEDED.

D1

ALTERNATE #1: DEMO & DISPOSE OF PORTION OF CEILING FOR

NEW PULL DOWN ACCESS LADDER. LOCATION OF OPENING TO

BE CENTERED BETWEEN JOISTS. HEADER OFF CENTER JOIST IF

CUT OUT. SIZE OF OPENING AS PER INSTALLATION

INSTRUCTIONS FROM LADDER MFR. OPENING LOCATION TO

AVOID STRUCTURE ABV.

D2

EXISTING CEILING DIFFUSER TO REMAIND6

D3

EXISTING LIGHT FIXTURES TO REMAIND7

ALTERNATE #1: SCRAPE, CLEAN AND PREP WATER DAMAGED

CEILING AREAS FOR NEW PATCHING AND PAINT.

D4

(E) CEILING ACCESS PANEL TO REMAIN.D5

ALTERNATE #1: EXISTING HEADER TO REMAIN.

SALVAGE EXISTING LIGHT FIXTURES FOR REINSTALLATION IN

SAME LOCATION

D8

EXISTING WALL TO REMAIN

DEMOLITION LEGEND

WALL / CEILING / AREA TO BE DEMOLISHED

AREA NOT IN SCOPE

OBJECT TO BE DEMOLISHED

PROJECT NO.: INITIAL DATE:

DRAWN BY: CHECKED BY:

ARCHITECTURAL WORKSHOP . DENVER, COLORADO

AR

CH

IT

EC

TU

RA

L W

OR

KS

HO

P, LL

C.

A

LL

R

IG

HT

S

RE

SE

RV

ED

2427ft OCT 2024

MRS MAB

AURORA FOX THEATER

HVAC ALTERATIONS

9900 E COLFAX AVE, AURORA, CO 80010

AD-104

LOBBY CEILING DEMO PLAN

1/8" = 1'-0"1 LOBBY CEILING DEMO PLAN

DATE DESCRIPTION

11.01.2024 35% SCHEMATIC DESIGN

01.07.2025 65% DESIGN DEVELOPMENT

02.07.2025 95% CONSTRUCTION DOCUMENTS

04.23.2025 100% CONSTRUCTION DOCUMENTS

A

AD-106

AD-106

B C E G H J K L

D3 D6 D7

D5

D1

D3 D3

D8

D8

D9

D9

D F I

4'

- 6

D10

A-401 1

3' - 0"

4'

- 4

D8

D8

D8

(ALT #1.2)

D4

D2

ALT #1

22' - 0" EST. EXTENTS OF DEMO IN AREA

8" E

ST

. E

XT

EN

TS

O

F

DE

MO

IN

A

RE

A

D11

D11 DEMO PLAN KEYNOTES:

(E) SLOTTED QUONSET HUT ROOF TO REMAIN, PROTECT DURING

CONSTRUCTION. NO ROOF ACCESS.

D1

ALTERNATE #1: OPEN BACK PANEL OF SIGNAGE BASE BOX.

CONFIRM (E) ROOF PENETRATION EXISTS AND IS 48"x24" TO

ALLOW NEW DUCTWORK TO GO THROUGH ROOF. MODIFY

ROOFING TO ALLOW DUCT PENETRATION PER . IF

ROOF PENETRATION DOES NOT EXIST, NOTIFY CITY PROJECT

MANAGER AND ARCHITECT.

D2

ALTERNATE #1: CREATE OPENING IN (E) SIGNAGE BASE CABINET

TO ACCOMMODATE NEW DUCT LOCATION. DEMO PORTION OF (E)

ROOF AT DUCT TURN DOWN LOCATION. RE: MECH. PATCH AND

REPAIR ROOF SURFACES AS REQUIRED. RE: DETAILS.

D4

(E) LADDER TO REMAIN.D5

ALTERNATE #1: DEMO (E) CONTROL ROOM EXHAUST DUCT IN

ITS ENTIRETY. RE: MECH DWGS.

D6

(E) "FOX THEATER" SIGN TO REMAIN, PROTECT DURING

CONSTRUCTION.

D7

ALTERNATE #1: DEMO & DISPOSE OF (E) CONDENSING UNIT,

ASSOCIATED PIPING AND ROOF CURB, RE: MEP FOR ADDITIONAL

INFORMATION. PATCH AND REPAIR ROOF SURFACES AS

REQUIRED AND INFILL WITH INSULATION.

D3

(E) ROOF MECH EXHAUST, EQUIPMENT AND PIPING TO REMAIN.D8

(E) ROOF ACCESS HATCH TO REMAIN.D9

ALTERNATE #1.2: ALTERNATE ROOF DEMO AREA FOR NEW DUCT

PENETRATION.

D10

/6 A-501

ALTERNATE #1: DEMO & DISPOSE OF (E) ROOF MECH EXHAUST

EQUIPMENT IN ITS ENTIRETY. PATCH AND REPAIR ROOF

SURFACES AS REQUIRED AND INFILL WITH INSULATION.

D11

GENERAL DEMO NOTES:

1.

2.

3.

4.

5.

6.

7.

8.

9.

10.

DO NOT SCALE DRAWINGS. DIMENSIONS GOVERN. ANY

DISCREPANCIES IN DRAWINGS AND/OR EXISTING CONDITIONS

SHOULD BE BROUGHT TO THE IMMEDIATE ATTENTION OF THE

CITY PROJECT MANAGER FOR CLARIFICATION.

ALL WORK SHALL BE IN COMPLIANCE WITH LOCAL AUTHORITY

HAVING JURISDICTION AND 2021 INTERNATIONAL BUILDING

CODE (IBC).

ALL WORK SHALL BE IN COMPLIANCE WITH THE

CONSTRUCTION SPECIFICATION MANUAL WHICH IS PART OF

THE CONTRACT DOCUMENTS.

ALL ABANDONED WIRING, CONDUITS OR MISC. MEP MUST BE

REMOVED IN THEIR ENTIRETY.

ALL DEMOLITION AND DISPOSAL MUST BE DONE TO MEET ALL

CODES AND LAWS FOR PROPER DISPOSAL.

ALL DEMOLITION IN OCCUPIED SPACES MUST BE

COORDINATED WITH CITY PROJECT MANAGER.

ALL DEMOLITION IN OCCUPIED SPACES SHALL BE

CONDUCTED IN A SAFE MANNER AND LEFT TO MEET CODES

FOR OCCUPANCY.

ALL RETURN AIR DUCTS MUST BE FILTERED DURING DEMO

AND CONSTRUCTION TO PREVENT DEBRIS FROM ENTERING

HVAC SYSTEM.

ALL DEMOLITION SCOPE SHALL REMOVE ALL ASSOCIATED

SYSTEMS AND COMPONENTS. CITY DOES NOT ACCEPT

ABANDONING ANY UNUSED COMPONENTS IN PLACE.

EXTENTS OF SCOPE DEPICTED INCLUDES COMBINED AREAS

OF DEMO IN ARCHITECTURAL, MECHANICAL, ELECTRICAL,

AND STRUCTURAL WORK.

EXISTING WALL TO REMAIN

DEMOLITION LEGEND

WALL / CEILING / AREA TO BE DEMOLISHED

AREA NOT IN SCOPE

ALTERNATE DUCT LOCATION

OBJECT TO BE DEMOLISHED PROJECT NO.: INITIAL DATE:

DRAWN BY: CHECKED BY:

ARCHITECTURAL WORKSHOP . DENVER, COLORADO

AR

CH

IT

EC

TU

RA

L W

OR

KS

HO

P, LL

C.

A

LL

R

IG

HT

S

RE

SE

RV

ED

2427ft OCT 2024

MRS MAB

AURORA FOX THEATER

HVAC ALTERATIONS

9900 E COLFAX AVE, AURORA, CO 80010

AD-105

ROOF DEMO PLAN

1/8" = 1'-0"1 ROOF DEMO PLAN

DATE DESCRIPTION

11.01.2024 35% SCHEMATIC DESIGN

01.07.2025 65% DESIGN DEVELOPMENT

02.07.2025 95% CONSTRUCTION DOCUMENTS

04.23.2025 100% CONSTRUCTION DOCUMENTS

AD-106

B C E G H J K L

D2

D3

D4

D1

D F I

D1

D5

D1

MECHANICAL

WOMENS

113 PLATFORM

AUDITORIUM

126 LOBBY

1NO WORK

NO WORK

NO WORK

LOFT

NO WORK

MECH

SPACE

CONTROL

RM

D6

D1

D8

D9

ALT #1

2 5

AD-106

CONTROL

RM

3 4 7

D6

D1

D5

D3

4' - 5"

D1

MECH

SPACE

MECH

SPACE

WOMENS

LOBBY

OFFICE

D7

NO WORK

ALT #1

1'

- 6

WALL TO REMAIN

DEMOLITION LEGEND

FLOOR / CEILING TO BE DEMOLISHED

AREA NOT IN SCOPE

DEMO PLAN KEYNOTES:

D1

D2

ALTERNATE #1: DEMO & DISPOSE OF PORTION OF CEILING /

SOFFIT FOR NEW DUCTWORK AND STR REINFORCEMENT AS PER

MECH AND STR DWG. PATCH AND REPAIR ADJACENT SURFACES

AS REQUIRED. RE: MECHANICAL TO VERIFY DUCT SIZING.

D3

D4

D5

(E) "FOX THEATER" SIGN TO REMAIN, PROTECT DURING

CONSTRUCTION.

DEMO & DISPOSE OF (E) CONDENSING UNIT, ASSOCIATED PIPING

AND ROOF CURB, RE: MEP FOR ADDITIONAL INFORMATION.

PATCH AND REPAIR ROOF SURFACES AS REQUIRED.

ALTERNATE #1: DEMO AND REMOVE (E) AHU AND STEAM COIL

FROM MECHANICAL SPACE, INCLUDING ALL ASSOCIATED

COMPONENTS, IN THEIR ENTIRETY. RE: MECH DWGS.

ALTERNATE #1: DEMO (E) SHELVING FOR NEW MECHANICAL

CHASE LOCATION. PREP AREA FOR NEW SHELVING AS PER

FLOOR PLAN AND DETAILS.

D6 ALTERNATE #1: PROVIDE OPENING IN CORRUGATED METAL

PANEL AT BASE OF (E) SIGNAGE BASE CABINET. DO NOT

DAMAGE SIGN OR SIGNAGE BASE CABINET. RE: MECH DWGS.

D7 ALTERNATE #1: DEMO PORTION OF CEILING FOR NEW MECH

SPACE ACCESS LADDER.

D8 ALTERNATE #1: PROTECT (E) SEATING DURING DEMO AND

CONSTRUCTION.

D9 ALTERNATE #1: (E) OPENING IN ROOF BELOW ROOFING

MEMBRANE. DEMO ROOF MEMBRANE TO CONFIRM ROOF

PENETRATION EXISTS AND IS 48"x24" TO ALLOW NEW DUCTWORK

TO GO THROUGH ROOF. MODIFY ROOFING TO ALLOW DUCT

PENETRATION PER . IF ROOF PENETRATION DOES

NOT EXIST, NOTIFY CITY PROJECT MANAGER AND ARCHITECT.

/6 A-501

GENERAL DEMO NOTES:

1.

2.

3.

4.

5.

6.

7.

8.

9.

10.

DO NOT SCALE DRAWINGS. DIMENSIONS GOVERN. ANY

DISCREPANCIES IN DRAWINGS AND/OR EXISTING CONDITIONS

SHOULD BE BROUGHT TO THE IMMEDIATE ATTENTION OF THE

CITY PROJECT MANAGER FOR CLARIFICATION.

ALL WORK SHALL BE IN COMPLIANCE WITH LOCAL AUTHORITY

HAVING JURISDICTION AND 2021 INTERNATIONAL BUILDING

CODE (IBC).

ALL WORK SHALL BE IN COMPLIANCE WITH THE

CONSTRUCTION SPECIFICATION MANUAL WHICH IS PART OF

THE CONTRACT DOCUMENTS.

ALL ABANDONED WIRING, CONDUITS OR MISC. MEP MUST BE

REMOVED IN THEIR ENTIRETY.

ALL DEMOLITION AND DISPOSAL MUST BE DONE TO MEET ALL

CODES AND LAWS FOR PROPER DISPOSAL.

ALL DEMOLITION IN OCCUPIED SPACES MUST BE

COORDINATED WITH CITY PROJECT MANAGER.

ALL DEMOLITION IN OCCUPIED SPACES SHALL BE

CONDUCTED IN A SAFE MANNER AND LEFT TO MEET CODES

FOR OCCUPANCY.

ALL RETURN AIR DUCTS MUST BE FILTERED DURING DEMO

AND CONSTRUCTION TO PREVENT DEBRIS FROM ENTERING

HVAC SYSTEM.

ALL DEMOLITION SCOPE SHALL REMOVE ALL ASSOCIATED

SYSTEMS AND COMPONENTS. CITY DOES NOT ACCEPT

ABANDONING ANY UNUSED COMPONENTS IN PLACE.

EXTENTS OF SCOPE DEPICTED INCLUDES COMBINED AREAS

OF DEMO IN ARCHITECTURAL, MECHANICAL, ELECTRICAL,

AND STRUCTURAL WORK.

PROJECT NO.: INITIAL DATE:

DRAWN BY: CHECKED BY:

ARCHITECTURAL WORKSHOP . DENVER, COLORADO

AR

CH

IT

EC

TU

RA

L W

OR

KS

HO

P, LL

C.

A

LL

R

IG

HT

S

RE

SE

RV

ED

2427ft OCT 2024

MRS MAB

AURORA FOX THEATER

HVAC ALTERATIONS

9900 E COLFAX AVE, AURORA, CO 80010

AD-106

DEMO BULDING SECTIONS

1/8" = 1'-0"1 AUDITORIUM DEMO SECTION

1/8" = 1'-0"2 LOBBY DEMO SECTION

DATE DESCRIPTION

11.01.2024 35% SCHEMATIC DESIGN

01.07.2025 65% DESIGN DEVELOPMENT

02.07.2025 95% CONSTRUCTION DOCUMENTS

04.23.2025 100% CONSTRUCTION DOCUMENTS

DN

DN

DN

DNDN

UP

CABINET / CASEWORK

NEW FRAMED WALL

FLOOR PLAN LEGEND

EXISTING WALL

AREA NOT IN SCOPE

ALTERNATE DUCT LOCATION

(E) DOOR TO REMAIN

GENERAL NOTES:

1.

2.

3.

4.

5.

6.

DO NOT SCALE DRAWINGS. DIMENSIONS GOVERN. ANY

DISCREPANCIES IN DRAWINGS AND/OR EXISTING CONDITIONS

SHOULD BE BROUGHT TO THE IMMEDIATE ATTENTION OF THE

ARCHITECT FOR CLARIFICATION.

PROVIDE BLOCKING IN THE WALL AS REQUIRED TO SECURE

SHELVING.

ALL DIMENSIONS ARE FROM FACE OF FINISH, ROUGH

OPENINGS OR CENTERLINE OF GRID UNLESS NOTED

OTHERWISE.

ALL INTERIOR WALLS TO BE WALL TYPE 1 UNLESS OTHERWISE

NOTED.

ALL ROUGH AND FINISH CONSTRUCTION SHALL BE IN

COMPLIANCE WITH GOVERNING CODES AND REGULATIONS AS

A MINIMUM STANDARD.

EXTENTS OF SCOPE DEPICTED INCLUDES COMBINED AREAS

OF WORK IN ARCHITECTURAL, MECHANICAL, ELECTRICAL, AND

STRUCTURAL WORK.

A

A-301

A-301

MENS

WOMENS

GREEN RM

STAGING

STUDIO

THEATER

SCENERY

STUDIO

LAUNDRY

ROOM

MECHANICAL

BOILER

MENS

WOMENS

TOILET RM

TOILET RM

PLATFORM

AUDITORIUM

A-301

CONTROL

RM

B C E G H J K L

2' - 10"

V.

I.F

-1 0'

- 4 1/

8" 4'

- 8

4"

3(ALT #1.2)

W1

DRESSING

RM

DRESSING

RM

D F I

A-501

A-401 2

3' - 0"

4'

- 4

CPT-1

ALT #1

FLOOR PLAN KEYNOTES:

ALTERNATE #1: NEW 2 HR RATED MECHANICAL CHASE FOR NEW

DUCTWORK. RE: DETAILS FOR WALL TYPE.

ALTERNATE #1: NEW DUCT WORK, RE: MECH DWGS.2

ALTERNATE #1.2: ALTERNATE LOCATION FOR DUCT

PENETRATIONS AND CHASE. RE: MECH DWGS.

ALTERNATE #1: NEW STORAGE SHELVING. DEPTH TO MEET

DEPTH OF CHASE WALL. RE: DETAILS.

INTERIOR FINISH LEGEND:

PAINT

MANUFACTURER:

COLOR:

SHEEN / FINISH:

LOCATIONS:

NOTE:

PNT-1 SHERWIN WILLIAMS (OR

APPROVED EQUAL)

COLOR TO MATCH (E)

SURROUNDING PAINT

MATCH SURROUNDING

RE: CEILING AND FLOOR PLANS

WHERE PAINTING NEWLY

PATCHED AREAS, PAINT ENTIRE

CEILING OR FLOOR FIELD.

PNT-2

PNT-3

PNT-4

MANUFACTURER:

COLOR:

LOCATIONS:

CPT-1 MATCH CARPET FROM OWNER

STOCK

COLOR TO MATCH (E)

CONTROL ROOM

FLOORING AND BASE

MANUFACTURER/#:

COLOR:

LOCATIONS:

RB-1 MATCH (E) FLOOR BASE

COLOR TO MATCH (E)

CONTROL ROOM

PNT-5

INTERIOR FINISHES TO BE USED UPON ACCEPTANCE OF ALTERNATE #1.

PROJECT NO.: INITIAL DATE:

DRAWN BY: CHECKED BY:

ARCHITECTURAL WORKSHOP . DENVER, COLORADO

AR

CH

IT

EC

TU

RA

L W

OR

KS

HO

P, LL

C.

A

LL

R

IG

HT

S

RE

SE

RV

ED

2427ft OCT 2024

MRS MAB

AURORA FOX THEATER

HVAC ALTERATIONS

9900 E COLFAX AVE, AURORA, CO 80010

A-101

MAIN LEVEL FLOOR PLAN

1/8" = 1'-0"1 MAIN LEVEL FLOOR PLAN

DATE DESCRIPTION

11.01.2024 35% SCHEMATIC DESIGN

01.07.2025 65% DESIGN DEVELOPMENT

02.07.2025 95% CONSTRUCTION DOCUMENTS

04.23.2025 100% CONSTRUCTION DOCUMENTS

GENERAL NOTES:

2.

3.

4.

5.

6.

DO NOT SCALE DRAWINGS. DIMENSIONS GOVERN. ANY

DISCREPANCIES IN DRAWINGS AND/OR EXISTING CONDITIONS

SHOULD BE BROUGHT TO THE IMMEDIATE ATTENTION OF THE

ARCHITECT FOR CLARIFICATION.

PROVIDE BLOCKING IN THE WALL AS REQUIRED TO SECURE

SHELVING.

ALL DIMENSIONS ARE FROM FACE OF FINISH, ROUGH

OPENINGS OR CENTERLINE OF GRID UNLESS NOTED

OTHERWISE.

ALL INTERIOR WALLS TO BE WALL TYPE 1 UNLESS OTHERWISE

NOTED.

ALL ROUGH AND FINISH CONSTRUCTION SHALL BE IN

COMPLIANCE WITH GOVERNING CODES AND REGULATIONS AS

A MINIMUM STANDARD.

EXTENTS OF SCOPE DEPICTED INCLUDES COMBINED AREAS

OF WORK IN ARCHITECTURAL, MECHANICAL, ELECTRICAL, AND

STRUCTURAL WORK.

A

A

A-301

A-301

GREEN RM

STAGING

MECHANICAL

BOILER

MENS

WOMENS

TOILET RM

TOILET RM

PLATFORM

AUDITORIUM

A-301

B

B

C

C

E

E

G

G

H

H

J K L

STUDIO

THEATER

SCENERY

STUDIO

MENS

WOMENS

C4 (ALT #1.2)

C3 C2 C3

D

D

F

F

I

I

3' - 0"

LAUNDRY

ROOM

DRESSING

RM

DRESSING

RM

CONTROL

RM

128PNT-2

PNT-3 PNT-4

PNT-1

C6

ALT #1

C1

C5 (ALT #1.1)

C1

C5 (ALT #1.1)

0"

13' - 8" 11' - 8"

RE

: S

TR

D

W

GS

CABINET / CASEWORK

NEW FRAMED WALL

ROOF OR STRUCTURE OVERHANG ABOVE

CEILING PLAN LEGEND

EXISTING WALL

NEW GYPSUM CEILING

RECESSED DOWNLIGHT

TRACK LIGHT

CYLINDER DOWNLIGHT

CEILING PLAN KEYNOTES:

ALTERNATE #1: NEW DRYWALL CEILING. PATCH AND REPAIR

ADJACENT SURFACES AS REQUIRED. PAINT TO MATCH. RE:

DETAILS.

C1

ALTERNATE #1.2: ALTERNATE LOCATION FOR DUCT

PENETRATIONS AND CHASE. RE: MECH DWGS.

C4

MODIFY WALL TO ALLOW FOR DUCT SOUND DAMPER AND 2 HR

RATED DAMPER.

C2

PAINT NEW DUCT AND MECH COMPONENTS TO MATCH EXISTING

CEILING. PATCH / PAINT AREAS SURROUNDING NEW DUCTWORK

AS REQUIRED.

C3

AREA OF WORK IN OPEN CEILING AREA. ALL DUCT WORK, LIGHTS

AND SPRINKLER RENOVATION SHALL BE FINISHED AND PAINTED

TO MATCH ADJACENT.

C6

ALTERNATE #1.1: NEW PLASTER AND LATH CEILING WITH SKIM

COAT FINISH TO MATCH EXISTING CEILING FOR A SEAMLESS

LOOK.

C5

INTERIOR FINISH LEGEND:

PAINT

MANUFACTURER:

COLOR:

SHEEN / FINISH:

LOCATIONS:

NOTE:

PNT-1 SHERWIN WILLIAMS (OR

APPROVED EQUAL)

COLOR TO MATCH (E)

SURROUNDING PAINT

MATCH SURROUNDING

RE: CEILING AND FLOOR PLANS

WHERE PAINTING NEWLY

PATCHED AREAS, PAINT ENTIRE

CEILING OR FLOOR FIELD.

PNT-2

PNT-3

PNT-4

MANUFACTURER:

COLOR:

LOCATIONS:

CPT-1 MATCH CARPET FROM OWNER

STOCK

COLOR TO MATCH (E)

CONTROL ROOM

FLOORING AND BASE

MANUFACTURER/#:

COLOR:

LOCATIONS:

RB-1 MATCH (E) FLOOR BASE

COLOR TO MATCH (E)

CONTROL ROOM

PNT-5

INTERIOR FINISHES TO BE USED UPON ACCEPTANCE OF ALTERNATE #1.

PROJECT NO.: INITIAL DATE:

DRAWN BY: CHECKED BY:

ARCHITECTURAL WORKSHOP . DENVER, COLORADO

AR

CH

IT

EC

TU

RA

L W

OR

KS

HO

P, LL

C.

A

LL

R

IG

HT

S

RE

SE

RV

ED

2427ft OCT 2024

MRS MAB

AURORA FOX THEATER

HVAC ALTERATIONS

9900 E COLFAX AVE, AURORA, CO 80010

A-103

MAIN LEVEL CEILING PLAN

1/8" = 1'-0"1 MAIN LEVEL CEILING PLAN

DATE DESCRIPTION

11.01.2024 35% SCHEMATIC DESIGN

01.07.2025 65% DESIGN DEVELOPMENT

02.07.2025 95% CONSTRUCTION DOCUMENTS

04.23.2025 100% CONSTRUCTION DOCUMENTS

CEILING PLAN KEYNOTES:

EXISTING CEILING DIFFUSER TO REMAINC1

ALTERNATE #1: PATCH, REPAIR AND PAINT WATER DAMAGED

AREAS OF CEILING WHERE NEEDED.

C2

EXISTING LIGHT FIXTURE TO REMAINC5

ALTERNATE #1: REINSTALL SALVAGED LIGHT FIXTURE IN

ORIGINAL LOCATION

C6

ALTERNATE #1: NEW GYPSUM CEILING OVER ENTRY. CEILING

SLOPES TO MATCH FLOOR SLOPE. PAINT TO MATCH.

C3

ALTERNATE #1: NEW PULL DOWN ALUMINUM LADDER ATTIC

ACCESS. PRODUCT SPEC TO BE WERNER AE2510 OR EQUAL.

LOCATE AS PER DEMO PLAN.

C4

GENERAL NOTES:

1.

2.

3.

4.

5.

6.

DO NOT SCALE DRAWINGS. DIMENSIONS GOVERN. ANY

DISCREPANCIES IN DRAWINGS AND/OR EXISTING CONDITIONS

SHOULD BE BROUGHT TO THE IMMEDIATE ATTENTION OF THE

ARCHITECT FOR CLARIFICATION.

PROVIDE BLOCKING IN THE WALL AS REQUIRED TO SECURE

SHELVING.

ALL DIMENSIONS ARE FROM FACE OF FINISH, ROUGH

OPENINGS OR CENTERLINE OF GRID UNLESS NOTED

OTHERWISE.

ALL INTERIOR WALLS TO BE WALL TYPE 1 UNLESS OTHERWISE

NOTED.

ALL ROUGH AND FINISH CONSTRUCTION SHALL BE IN

COMPLIANCE WITH GOVERNING CODES AND REGULATIONS AS

A MINIMUM STANDARD.

EXTENTS OF SCOPE DEPICTED INCLUDES COMBINED AREAS

OF WORK IN ARCHITECTURAL, MECHANICAL, ELECTRICAL, AND

STRUCTURAL WORK.

A-301

A-301

OFFICE

RECEPTION

STORAGE

WOMENS

MENS

JAN

LOBBY

K L

C2

C3

C4

C5

C6

C6

C6

107' - 10"

PNT-5

PNT-5

PNT-5

ALT #1

C1

C5 C5

C5

C5

C5

C5

C5

C5

C5

C5

C5

C5

C5

C5

C5

C5

C5

C5

C5

C5

C5

C5

CABINET / CASEWORK

NEW FRAMED WALL

ROOF OR STRUCTURE OVERHANG ABOVE

CEILING PLAN LEGEND

EXISTING WALL

NEW GYPSUM CEILING

RECESSED DOWNLIGHT

TRACK LIGHT

CYLINDER DOWNLIGHT

INTERIOR FINISH LEGEND:

PAINT

MANUFACTURER:

COLOR:

SHEEN / FINISH:

LOCATIONS:

NOTE:

PNT-1 SHERWIN WILLIAMS (OR

APPROVED EQUAL)

COLOR TO MATCH (E)

SURROUNDING PAINT

MATCH SURROUNDING

RE: CEILING AND FLOOR PLANS

WHERE PAINTING NEWLY

PATCHED AREAS, PAINT ENTIRE

CEILING OR FLOOR FIELD.

PNT-2

PNT-3

PNT-4

MANUFACTURER:

COLOR:

LOCATIONS:

CPT-1 MATCH CARPET FROM OWNER

STOCK

COLOR TO MATCH (E)

CONTROL ROOM

FLOORING AND BASE

MANUFACTURER/#:

COLOR:

LOCATIONS:

RB-1 MATCH (E) FLOOR BASE

COLOR TO MATCH (E)

CONTROL ROOM

PNT-5

INTERIOR FINISHES TO BE USED UPON ACCEPTANCE OF ALTERNATE #1.

PROJECT NO.: INITIAL DATE:

DRAWN BY: CHECKED BY:

ARCHITECTURAL WORKSHOP . DENVER, COLORADO

AR

CH

IT

EC

TU

RA

L W

OR

KS

HO

P, LL

C.

A

LL

R

IG

HT

S

RE

SE

RV

ED

2427ft OCT 2024

MRS MAB

AURORA FOX THEATER

HVAC ALTERATIONS

9900 E COLFAX AVE, AURORA, CO 80010

A-104

LOBBY CEILING PLAN

1/8" = 1'-0"1 LOBBY CEILING PLAN

DATE DESCRIPTION

11.01.2024 35% SCHEMATIC DESIGN

01.07.2025 65% DESIGN DEVELOPMENT

02.07.2025 95% CONSTRUCTION DOCUMENTS

04.23.2025 100% CONSTRUCTION DOCUMENTS

ROOF PLAN KEYNOTES:

EXISTING ROOF MEMBRANE & ASSEMBLY TO REMAIN, PROTECT

DURING CONSTRUCTION. PATCH & REPAIR ANY EXISTING

DAMAGED AREAS. PATCH & REPAIR ALL PENETRATIONS FROM

EXISTING ROOF TOP UNITS AND OTHER DEMOLISHED OR

RELOCATED EQUIPMENT.

R1

R2 EXISTING THEATER SIGNAGE BASE CABINET.

R3 ALTERNATE #1: NEW CONTROL ROOM VENT TO REPLACE

DEMOLISHED VENT. RE: MECH DWGS.

R4 NEW ROOFTOP MECHANICAL UNIT. RE: MECH DWGS.

R5 NEW MECHANICAL UNIT CURB. RE: DETAILS.

R6 (E) ROOF ACCESS HATCH.

R7 NEW MECHANICAL DUCTWORK. RE: MECH DWGS.

R8

ALTERNATE #1.2: ALTERNATE LOCATION FOR NEW MECHANICAL

DUCTWORK. RE: MECH DWGS.

R9 PATCH AND CLOSE UP EXISTING ROOFTOP UNIT LOCATIONS.

R10 NOT USED

R11

EXISTING ROOFTOP EQUIPMENT TO REMAIN.

ALTERNATE #1.2: ALTERNATE LOCATION FOR NEW ROOFTOP

MECHANICAL UNIT. RE: MECH DWGS.

R12

ALTERNATE #1: PROVIDE PARAPET CAP AT BACK OF ROOF

PARAPET AS SHOWN. RE:

R14

ALTERNATE #1: CONFIRM (E) ROOF PENETRATIONS EXIST AS

DESCRIBED IN DEMO DRAWINGS. CONFIRM NEW DUCTS WILL FIT

AS SHOWN IN SIGNAGE BASE CABINET. INSTALL AND SEAL AS

PER 6/A-501.

R15

ALTERNATE #1.2: ALTERNATE LOCATION FOR DUCT

PENETRATIONS AND CHASE. RE: MECH DWGS.

R13

/4 A-501

GENERAL NOTES:

1.

2.

3.

4.

5.

6.

DO NOT SCALE DRAWINGS. DIMENSIONS GOVERN. ANY

DISCREPANCIES IN DRAWINGS AND/OR EXISTING CONDITIONS

SHOULD BE BROUGHT TO THE IMMEDIATE ATTENTION OF THE

ARCHITECT FOR CLARIFICATION.

PROVIDE BLOCKING IN THE WALL AS REQUIRED TO SECURE

SHELVING.

ALL DIMENSIONS ARE FROM FACE OF FINISH, ROUGH

OPENINGS OR CENTERLINE OF GRID UNLESS NOTED

OTHERWISE.

ALL INTERIOR WALLS TO BE WALL TYPE 1 UNLESS OTHERWISE

NOTED.

ALL ROUGH AND FINISH CONSTRUCTION SHALL BE IN

COMPLIANCE WITH GOVERNING CODES AND REGULATIONS AS

A MINIMUM STANDARD.

EXTENTS OF SCOPE DEPICTED INCLUDES COMBINED AREAS

OF WORK IN ARCHITECTURAL, MECHANICAL, ELECTRICAL, AND

STRUCTURAL WORK.

A

A-301

A-301

A-301

R4

R3

R2

B C E G H J K L

R4

11' - 0"

R6

R5

R7

R1

R11(ALT #1.2)

R9

R9

R5

R6

A-501

A-501

D F I

A-401 1

3/8" / 1'-0"

R7

R7

A-501

R4 R5

A-501

10' - 10" RTU-2

RTU-1

RTU-3

R8

R8

R8

R8R8

12(ALT #1.2)

3' - 0"

4'

- 4

A-501

A-501

R14

R14

R13(ALT #1.2)

R15

R1

R1

R1

ALT #1

20' - 10" EST. AREA OF WORK

4" E

ST

. A

RE

A

OF

W

OR

K

R9

ROOF PLAN LEGEND

NEW ROOFING MATERIAL

AREA NOT IN SCOPE

ALTERNATE DUCT LOCATION

PROJECT NO.: INITIAL DATE:

DRAWN BY: CHECKED BY:

ARCHITECTURAL WORKSHOP . DENVER, COLORADO

AR

CH

IT

EC

TU

RA

L W

OR

KS

HO

P, LL

C.

A

LL

R

IG

HT

S

RE

SE

RV

ED

2427ft OCT 2024

MRS MAB

AURORA FOX THEATER

HVAC ALTERATIONS

9900 E COLFAX AVE, AURORA, CO 80010

A-105

ROOF PLAN

1/8" = 1'-0"1 ROOF PLAN

DATE DESCRIPTION

11.01.2024 35% SCHEMATIC DESIGN

01.07.2025 65% DESIGN DEVELOPMENT

02.07.2025 95% CONSTRUCTION DOCUMENTS

04.23.2025 100% CONSTRUCTION DOCUMENTS

A-301

5 61 3 4 7

LOBBY

WOMENS

OFFICE

S3

S2

S7

S1

A-501

A-501

TYP

NO WORK

S9

S9

ALT #1

A

A-301

A-301

B C E G H J K LD F I

MECHANICAL

PLATFORM

AUDITORIUM

LOBBY

CONTROL

RM

MECH

SPACE

NO WORK

NO WORK

LOFT

NO WORK

S8

S2

S6

S5

S1

S3

S2

S9

S4

A-501

A-501

A-501

7TYP

WOMENS

ALT #1

GENERAL NOTES:

1.

2.

3.

4.

5.

6.

DO NOT SCALE DRAWINGS. DIMENSIONS GOVERN. ANY

DISCREPANCIES IN DRAWINGS AND/OR EXISTING CONDITIONS

SHOULD BE BROUGHT TO THE IMMEDIATE ATTENTION OF THE

ARCHITECT FOR CLARIFICATION.

PROVIDE BLOCKING IN THE WALL AS REQUIRED TO SECURE

SHELVING.

ALL DIMENSIONS ARE FROM FACE OF FINISH, ROUGH

OPENINGS OR CENTERLINE OF GRID UNLESS NOTED

OTHERWISE.

ALL INTERIOR WALLS TO BE WALL TYPE 1 UNLESS OTHERWISE

NOTED.

ALL ROUGH AND FINISH CONSTRUCTION SHALL BE IN

COMPLIANCE WITH GOVERNING CODES AND REGULATIONS AS

A MINIMUM STANDARD.

EXTENTS OF SCOPE DEPICTED INCLUDES COMBINED AREAS

OF WORK IN ARCHITECTURAL, MECHANICAL, ELECTRICAL, AND

STRUCTURAL WORK. 2

A-301

5 61 3 4

AUDITORIUM

S1

S4

S2

ALT #1

SECTION KEYNOTES:

(E) "FOX" NEON SIGN BEYOND.S1

EXISTING BUILDING.S2

ALTERNATE #1: ROOF JOISTS TO BE REINFORCED FOR NEW

MECHANICAL UNIT. RE: STR. DWGS FOR JOISTS AND

REINFORCING DETAILS.

S5

ALTERNATE #1: CEILING REPAIR FOR NEW STRUCTURAL REINF.

WORK. RE: STR DWGS.

S6

ALTERNATE #1: NEW MECHANICAL DUCTWORK. RE: MECH DWG

FOR SIZE AND MOUNTING.

S3

ALTERNATE #1: NEW MECHANICAL UNIT AND CURB, RE: ROOF

PLAN FOR LOCATION, RE: MECH DWG FOR UNIT INFORMATION.

S4

S7

S8

ALTERNATE #1: NEW PULL DOWN LADDER, RE: LOBBY CEILING

PLAN FOR LOCATION AND DESCRIPTION.

ALTERNATE #1: NEW CONTROL ROOM FAN AND DUCT, RE: MECH.

DWG.

S9 EXISTING MECHANICAL EQUIPMENT.

PROJECT NO.: INITIAL DATE:

DRAWN BY: CHECKED BY:

ARCHITECTURAL WORKSHOP . DENVER, COLORADO

AR

CH

IT

EC

TU

RA

L W

OR

KS

HO

P, LL

C.

A

LL

R

IG

HT

S

RE

SE

RV

ED

2427ft OCT 2024

MRS MAB

AURORA FOX THEATER

HVAC ALTERATIONS

9900 E COLFAX AVE, AURORA, CO 80010

A-301

BUILDING SECTIONS

1/8" = 1'-0"2 LOBBY SECTION

1/8" = 1'-0"1 BUILDING SECTION

1/8" = 1'-0"3 AUDITORIUM SECTION

DATE DESCRIPTION

11.01.2024 35% SCHEMATIC DESIGN

01.07.2025 65% DESIGN DEVELOPMENT

02.07.2025 95% CONSTRUCTION DOCUMENTS

04.23.2025 100% CONSTRUCTION DOCUMENTS

(E) PARAPET

(E) SIGN BASE METAL UPPER CABINET

ENCLOSURE TO REMAIN

(E) SIGN BEYOND TO REMAIN

DUCTWORK PENETRATIONS IN EXISTING SIGN

BASE METAL BOTTOM CABINET ENCLOSURE

RE: MECH DWGS & ARCH DETAILS ON A-501.

CONTRACTOR TO CONFIRM SIZE AND

LOCATION FOR NEW DUCT WORK.

(E) ROOF

NEW DUCTWORK, RE: MECH DWGS

PARAPET CAP

(E) ROOF CURB & FLASHING

1'

- 6

- 6

(E) SIGN BASE METAL BOTTOM CABINET

ENCLOSURE TO REMAIN. REMOVE CORRUGATED

PANELS AND MODIFY FRAME & PANELS AS REQ'D

FOR NEW DUCT PENETRATIONS

4' - 5"

2"

VIF

+/- 2' - 7 1/2" 2" 2' - 4" 2" 2' - 4" 2' - 4" 2" 2' - 4" 2" 2' - 4" 2"

PNT-1

A-501

A-501

7' - 6"+/- 7' - 9 1/4"

VIF

5' - 1 3/4"

PNT-1

2-HR RATED CHASE; RE: FLOOR PLANS

PNT-1

RB-1

RB-1

(E) PARAPET

(E) SIGN BASE METAL UPPER CABINET

ENCLOSURE TO REMAIN

(E) SIGN BEYOND TO REMAIN

DUCTWORK PENETRATIONS IN EXISTING SIGN

BASE METAL BOTTOM CABINET ENCLOSURE

RE: MECH DWGS & ARCH DETAILS ON A-501

(E) ROOF

(E) ROOF CURB & FLASHING

(E) SIGN BASE METAL BOTTOM CABINET

ENCLOSURE TO REMAIN. REMOVE CORRUGATED

PANELS AND MODIFY FRAME & PANELS AS REQ'D

FOR NEW DUCT PENETRATIONS

(E) ROOF MECH & EQUIPMENT TO

BE DEMOLISHED; RE: MECH DWGS

PROJECT NO.: INITIAL DATE:

DRAWN BY: CHECKED BY:

ARCHITECTURAL WORKSHOP . DENVER, COLORADO

AR

CH

IT

EC

TU

RA

L W

OR

KS

HO

P, LL

C.

A

LL

R

IG

HT

S

RE

SE

RV

ED

2427ft OCT 2024

MRS MAB

AURORA FOX THEATER

HVAC ALTERATIONS

9900 E COLFAX AVE, AURORA, CO 80010

A-401

ELEVATIONS VIEWS

1/2" = 1'-0"1 ELEVATION - ROOF DUCT AT SIGNAGE CABINET

1/2" = 1'-0"2 INT ELEVATION - CONTROL ROOM SHELVING

1" = 1'-0"3 ROOFTOP DUCT AT SIGNAGE CABINET DIAGRAM

(ALTERNATE #1) (ALTERNATE #1)

DATE DESCRIPTION

02.07.2025 95% CONSTRUCTION DOCUMENTS

04.23.2025 100% CONSTRUCTION DOCUMENTS

4 INCH 22 GAUGE BRAKE

METAL PARAPET CAP

ADDITION WITH DRIP

EDGE & COUNTER

FLASHING. COLOR TO

MATCH (E) MTL SIDING TO

REMAIN

(E) ROOF MEMBRANE

(E) PARAPET WALL

4"

(E) METAL SIDING

1 1/2"

WALL TYPE 1 (CHASE WALL)

1 1/2" = 1'-0"

RATING: 2 HOUR

NO. UL : U415 SYSTEM B

(ALTERNATE RATED WALL ASSEMBLY CAN

BE USED UPON APPROVED SUBSTITUTION)

FIRE CAULK, CONT. AT BASE, BOTH SIDES

WALL BASE (MATCH EXISTING)

2 1/2" C-H STUDS @ 24" O.C., U.N.O.

3 LAYERS OF 5/8" TYPE 'X' GYP. BD. EACH

SIDE. FASTEN PER MFR. RECOMMENDATION

BOTTOM OF (E) ROOF DECK

1" TYPE 'X' GYP. BD. EACH SIDE. FASTEN PER

MFR. RECOMMENDATION

4"

W1

FIRE CAULK, CONT. AT BASE, BOTH SIDES

116' - 0" ±

ELEV

METAL SUPPORT BRACKET PAINT TO

MATCH WALL FINISH, DIRECT FASTEN

TO EXISTING WALL STUDS, 16" O.C. W/

FLUSH #12 X 2" FLAT HEAD SCREWS

3/4" PLYWOOD SHELF. PAINT.

RE: ELEVATIONS AND FINISH SCH.

1'

- 0

1 1

/2" T

YP

1'

- 2 " T

YP

1 1

/2" T

YP

6"

A-501

CURB BY MANUF.(E) RIGID ROOF INSULATION TO REMAIN

EPDM ROOFING MATERIAL BY ROOFER

CANT STRIP BY ROOFER

COUNTER FLASHING BY ROOFER

SUPPORTED ROOFTOP UNIT

CLOSED-CELL FOAM

WEATHERSTRIPPING BY MFR

FLASHING BY ROOFER

FORMED CHANNEL BY MFR

ADJUSTABLE SPRING BY MFR, RE: MECH

EPDM WEATHER SEAL BY ROOFER

MOUNTING ANGLE BY MFR

CURB BY MFR

(E) ROOF DECK & STRUCTURE TO REMAIN

ROOF C-CHANNEL; RE: STR DWGS

6" 4 3

/8" 4 3

/8"

1'

- 2

3/ 4"

3/4" GAP, TYP

EXISTING EXT WALL & SIGN

TO REMAIN, DO NOT DISTURB

EXISTING NEON SIGN TO

REMAIN, DO NOT DISTURB

3/4" GAP AROUND DUCT

PENETRATION, STUFFED W/

MINERAL WOOL & CAULKED

FOR ACOUSTIC ISOLATION

PROVIDE WOOD

REINFORCEMENT FOR NEW

DUCT OPENING ON ALL SIDES

EXISTING PLASTER CEILING

ASSEMBLY W/ WOOD FRAMING

2-HR RATED WALL; RE: WALL TYPES

FOR DETAILS

VERTICAL DUCT IN RATED CHASE;

RE: MECH DWGS FOR SIZE &

LOCATION

EXISTING ROOF OPENING IN SIGN

BASE. CONFIRM SIZE & LOCATION.

USE ALT #1.2 IF NO OPENING EXISTS

EXISTING ROOF ASSEMBLY

CONSISTING OF STL BAR JOISTS &

MTL DECK; RE: STR DWGS FOR

REINFORCEMENT

SIGN BASE METAL UPPER CABINET

TO REMAIN. DO NOT DISTURB

SIGN BASE METAL BOTTOM CABINET

ENCLOSURE. REMOVE CORRUGATED

PANELS AND MODIFY FRAME & PANELS AS

REQ'D FOR NEW DUCT PENETRATIONS,

RE: ELEVATIONS & AXONOMETRIC

MECH DUCT ON ROOF &

PENETRATING SIGN BASE & ROOF;

RE: MECH DWGS FOR SIZE &

LOCATION

MECH DUCT ROOF SUPPORT PER

MFR REQS; RE: MECH DWGS

EXISTING ROOF CURB TO REMAIN

3/4" GAP AROUND DUCT

PENETRATION, STUFFED W/

MINERAL WOOL & CAULKED

FOR ACOUSTIC ISOLATION

2-HR RATED WALL; RE: WALL TYPES

FOR DETAILS

CONFIRM BAR JOIST LOCATION PRIOR

TO DEMO WORK. DO NOT CUT BAR

JOISTS. NOTIFY THE ARCHITECT IF BAR

JOISTS ARE IN OPENING LOCATION, TYP

3/4" GAP, TYP

VERTICAL DUCT IN RATED CHASE; RE:

MECH DWGS FOR SIZE & LOCATION

EXISTING ROOF ASSEMBLY

CONSISTING OF STL BAR JOISTS &

MTL DECK; RE: STR DWGS FOR

REINFORCEMENT

(E) FLOOR FINISH TO REMAIN,

PATCH & REPAIR AS REQ'D

WALL BASE TO MATCH EXISTING

3/4" GAP AROUND DUCT PENETRATION,

STUFFED W/ MINERAL WOOL &

CAULKED FOR ACOUSTIC ISOLATION

EXISTING ROOF OPENING W/

STRUCTURAL REINFORCEMENT.

CONTRACTOR TO CONFIRM SIZE AND

LOCATION FOR NEW DUCT WORK.

EXISTING ROOF ASSEMBLY

CONSISTING OF STL BAR JOISTS &

MTL DECK; RE: STR DWGS FOR

REINFORCEMENT

MECH DUCT ON ROOF & PENETRATING

SIGN BASE & ROOF; RE: MECH DWGS

FOR SIZE & LOCATION

3/4" GAP, TYP

EXISTING ROOF INSULATION TO REMAIN

TERMINATION BAR & WEATHER SEAL AT

DUCT PER MFRS REQS. LOCATE AS

HIGH AS POSSIBLE

MECH DUCT ROOF SUPPORT PER

MFR REQS; RE: MECH DWGS

EXISTING PLASTER CEILING

ASSEMBLY W/ WOOD FRAMING

ADDITIONAL WOOD BLOCK AS REQ'D

TO MOUNT GYP. BD. CEILING

2 LAYERS OF TYPE X GYP BD.

CONFIRM THICKNESS OF (E)

PLASTER CEILING AND MATCH

VI

F

FINISH & TEXTURE OF GYB. BD.

CEILING PATCH TO MATCH (E)

PLASTER CEILING

PROJECT NO.: INITIAL DATE:

DRAWN BY: CHECKED BY:

ARCHITECTURAL WORKSHOP . DENVER, COLORADO

AR

CH

IT

EC

TU

RA

L W

OR

KS

HO

P, LL

C.

A

LL

R

IG

HT

S

RE

SE

RV

ED

2427ft OCT 2024

MRS MAB

AURORA FOX THEATER

HVAC ALTERATIONS

9900 E COLFAX AVE, AURORA, CO 80010

A-501

DETAILS

3" = 1'-0"4 PARAPET CAP DETAIL

1 1/2" = 1'-0"5 SHELVING DETAIL

6" = 1'-0"1 MECHANICAL CURB AXONOMETRIC

3" = 1'-0"2 MECHANICAL CURB DETAIL

1" = 1'-0"6 DUCT PEN. THRU SIGN CABINET SECTION

1" = 1'-0"3 DUCT PENETRATION THRU (E) FLOOR DETAIL

1" = 1'-0"8 DUCT PEN. THRU ROOF SECTION

3" = 1'-0"7 CEILING PATCH DETAIL

(ALTERNATE #1) (ALTERNATE #1)

(ALTERNATE #1)

(ALTERNATE #1)

(ALTERNATE #1)

(ALTERNATE #1)

(ALTERNATE #1)

DATE DESCRIPTION

01.07.2025 65% DESIGN DEVELOPMENT

02.07.2025 95% CONSTRUCTION DOCUMENTS

04.23.2025 100% CONSTRUCTION DOCUMENTS

PLAN SYMBOLS

CONTROL PANEL/RADIANT MANIFOLD

T

S

CO2 CARBON DIOXIDE SENSOR

THERMOSTAT

POINT OF NEW CONNECTION

REMOTE TEMPERATURE SENSOR

ACCESS PANEL

SECTION CUT LETTER/SHEET SHOWN ON

POINT OF DISCONNECTION

S

ROOF DRAIN

SAFETY RELIEF VALVE

FLOOR DRAIN

FLOOR SINK

HORIZONTAL CLEANOUT

VERTICAL CLEANOUT

PRESSURE GAUGE W/ PIG TAIL & COCK

PRESSURE - TEMP. TAP

FLEXIBLE CONNECTOR

PIPE UNION

DRAIN VALVE W/ HOSE END

PLUG VALVE IN RISER

GATE OR GLOBE VALVE IN RISER

BALL VALVE

PLUG OR BALANCING VALVE

CHECK VALVE

BUTTERFLY VALVE

90° ELBOW UP

TEE UP

TEE DOWN

PIPING SYMBOLS

90° ELBOW DN

SHUT OFF (BALL, GATE, BUTTERFLY)

TEMPERATURE CONTROLLER OR SENSOR

STEAM TRAP TEST CHAMBER

STEAM TRAP:

FT-FLOAT & THERMOSTATIC

TD-THERMODYNAMIC

IB-INVERTED BUCKET

TS-THERMOSTATIC

BP-BALANCED PRESSURE

TC

PIPING DESIGNATIONS

STEAM & CONDENSATE PIPING

PLUMBING PIPING

G NATURAL GAS

RS REFRIGERANT SUCTION

D DRAIN PIPE

RL REFRIGERANT LIQUID

DOMESTIC COLD WATER (CW)

DOMESTIC HOT WATER (HW)

HOT WATER RECIRCULATION (HWC)

FIRE LINEF

W WASTE

VENTV

STORM DRAINST

STORM DRAIN OVERFLOWST(OF)

LPS LOW PRESURE STEAM

LPR LOW PRESURE CONDENSATE RETURN

PC PUMPED CONDENSATE

DUCTWORK LEGEND

DESCRIPTIONROUND

DUCT RISER

DUCT DROP

90° ELBOW DN.

(NEGATIVE PRESSURE)

90° ELBOW DN.

(POSITIVE PRESSURE)

90° ELBOW UP

(NEGATIVE PRESSURE)

90° ELBOW UP

(POSITIVE PRESSURE)

SIZE OR SHAPE TRANSITION

PLAN3D

CW

HW

HWC

RECTANGULAR

3DPLAN

ROUND…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .