Attachment B - Drawings.pdf
PDF 6 MB Posted
- Attached to
- Fox Theater HVAC Replacement and Upgrades
- Solicitation number
- 6066AB
- Issued by
- Colorado
About this file
The documents are 100% Construction Documents for the Aurora Fox Theater HVAC Alterations project, involving the City of Aurora and architectural and engineering design services by Architectural Workshop in Denver, Colorado. The project involves replacing and relocating HVAC systems for the historic Fox Theater, with a base bid focusing on replacing rooftop units (RTU-1 and RTU-2) servicing the studio theater and workshop areas, and an Alternate #1 involving the removal, replacement, and relocation of RTU-3 for the lobby area. The project requires comprehensive mechanical, electrical, and structural modifications, with construction documents dated September 26, 2025, and multiple design development stages between November 2024 and September 2025.
The project includes multiple pricing alternatives, with a base bid estimated around $10,000 and Alternate #1 providing options for additional work, including ceiling infill and alternate ductwork locations. The electrical system analysis indicates sufficient capacity for the new equipment, with the existing 150 kVA transformer having approximately 449 amps of remaining space capacity. The project emphasizes preserving the historic character of the Fox Theater while updating its mechanical systems, with specific attention to acoustic performance, structural reinforcement, and maintaining the building's historic preservation requirements. The work includes comprehensive demolition, replacement of mechanical units, electrical system updates, and structural modifications to support new rooftop equipment.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Bid Sheet.xlsx | XLSX spreadsheet | |
| Attachment A - Bid Specifications.pdf | ||
| Attachment C - Special Conditions.pdf | ||
| Project Manual_Fox Theater - HVAC Replacement and Upgrades (6066AB).pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
LOCATION MAP:
PROJECT LOCATION
TRUE NORTH
9900 E COLFAX AVE
AURORA, CO 80010
E COLFAX AVE
DEL MAR PKWY
E 14TH AVE
FL
OR
EN
CE
S T
DA
YT
ON
S
T
CONTACTS:
CITY OF AURORA
15151 E ALAMEDA PARKWAY
AURORA, CO 80021
303.739.1735
CONTACT: GABRIELLE TOBIN
BUILDING
OWNER:
ARCHITECT:
MECH/PLUMB:
ARCHITECTURAL WORKSHOP
2 KALAMATH ST.
DENVER, CO 80223
303-788-1717
CONTACT: MARK BOWERS
ACOUSTICAL
CONSULTANT:
RTM ENGINEERING CONSULTANTS
1626 COLE BLVD. STE. 300
LAKEWOOD, CO 80401
303-278-3820
CONTACT: JOSH CURLEY
STRUCTURAL: JCAA CONSULTING ENGINEERS
4100 WADSWORTH BLVD.
WHEAT RIDGE, CO 80033
303-985-3260
CONTACT: NICHOLAS ROHR
ELECTRICAL:
RTM ENGINEERING CONSULTANTS
1626 COLE BLVD. STE. 300
LAKEWOOD, CO 80401
983-777-6542 EX. 5407
CONTACT: WESLEY PLOOF
RTM ENGINEERING CONSULTANTS
1626 COLE BLVD. STE. 300
LAKEWOOD, CO 80401
303.278.3820 EX. 5226
CONTACT: MIKE REED PROJECT ALTERNATES:
BASE BID: REPLACEMENT OF RTU-1 AND RTU-2 WHICH SERVICE STUDIO THEATER AND
WORKSHOP AREAS. THIS SHALL INCLUDE ROOF REINFORCING, ROOF REPAIR, DUCT
CONNECTION AND ALL ASSOCIATED WORK PER CONSTRUCTION DOCUMENTS AND
SPECS TO HAVE A COMPLETE OPERATING SYSTEM.
ALTERNATE #1: THE REMOVAL, REPLACEMENT, AND RELOCATION OF RTU-3. THIS
SHALL INCLUDE ALL ASSOCIATED SCOPE FOR DEMO OF EXISTING RTU-3,
REINFORCING OF ROOF, RELOCATION RTU-3 TO ROOFTOP, ROOF REPAIR, FIELD
INVESTIGATION OF EXISTING LOBBY DUCTWORK AND REPAIR AS NECESSARY, LOBBY
CEILING REPAIR, NEW ELECTRICAL PANEL, NEW RATED CHASE AND TIE INTO EXISTING
BRANCH DUCT PER MECH DWGS. SCOPE SHALL INCLUDE COMPLETE OPERATIONAL
SYSTEMS.
ALTERNATE #1.1: IN CONJUNCTION WITH ALTERNATE #1 AS AN UPGRADE TO
CEILING INFILL AS CEMENTIOUS STUCCO. PROVIDE ADDITIONAL COST FOR
CEILING INFILL AS STUCCO PER SPECIFICATION.
ALTERNATE #1.2: IN CONJUNCTION WITH ALTERNATE #1 AS AN ALTERNATE
LOCATION OF THE SUPPLY AND RETURN DUCT RISER LOCATION FOR RTU-3.
PROVIDE AN ADDITIVE OR DEDUCTIVE COST.
PROJECT DESCRIPTION:
THE CITY OF AURORA IS RENOVATING THE HVAC SYSTEMS OF THE CITY OF AURORA
FOX THEATER. THE PROJECT INVOLVES A BASE SCOPE OF THE REPLACEMENT OF
THE TWO EXISTING MECHANICAL SYSTEMS WHICH SERVICE STUDIO THEATER AND
WORKSHOP AREAS, AS WELL AS AN ALTERNATE TO REPLACE AND RELOCATE THE
MECHANICAL SYSTEM THAT SERVICES THE LOBBY. THE WORK IS BROKEN OUT AS
BASE BID AND ALTERNATES SUCH THAT THE CITY OF AURORA MAY SELECT
ALTERNATES IN ANY ORDER DEEMED SUITABLE. AS A HISTORICALLY REGISTERED
BUILDING, ALL ALTERATIONS SHALL COMPLY WITH THE AURORA HISTORIC
PRESERVATION COMMITTEE TO PRESERVE THE PROPORTIONS AND CHARACTER OF
THE BUILDING.
PROJECT NO.: INITIAL DATE:
DRAWN BY: CHECKED BY:
ARCHITECTURAL WORKSHOP . DENVER, COLORADO
AR
CH
IT
EC
TU
RA
L W
OR
KS
HO
P, LL
C.
A
LL
R
IG
HT
S
RE
SE
RV
ED
2427ft OCT 2024
MRS MAB
AURORA FOX THEATER
HVAC ALTERATIONS
9900 E COLFAX AVE, AURORA, CO 80010
G-001
COVER SHEET
100% CONSTRUCTION DOCUMENTS - REVISION 1
SEPTEMBER 26, 2025
AURORA FOX THEATER HVAC ALTERATIONS
9900 E COLFAX AVE, AURORA, CO 80010
G-001 COVER SHEET
G-002 GENERAL NOTES, SYMBOLS & ABBREVIATIONS
G-003 PROJECT CODE INFORMATION
AS-101 ARCHITECTURAL SITE PLAN
AD-101 MAIN LEVEL DEMO PLAN
AD-103 MAIN LEVEL CEILING DEMO PLAN
AD-104 LOBBY CEILING DEMO PLAN
AD-105 ROOF DEMO PLAN
AD-106 DEMO BULDING SECTIONS
A-101 MAIN LEVEL FLOOR PLAN
A-103 MAIN LEVEL CEILING PLAN
A-104 LOBBY CEILING PLAN
A-105 ROOF PLAN
A-301 BUILDING SECTIONS
A-401 ELEVATIONS VIEWS
A-501 DETAILS
SHEET INDEX:
M-001 MECHANICAL COVER SHEET
M-002 MECHANICAL SCHEDULES
MD-101 MECHANICAL MAIN LEVEL DEMOLITION PLAN
MD-102 AUDITORIUM MECHANICAL DEMOLITION PLANS
MD-105 MECHANICAL ROOF DEMOLITION PLAN
M-101 MECHANICAL MAIN LEVEL PLAN
M-102 AUDITORIUM MECHANICAL PLANS
M-105 MECHANICAL ROOF PLAN
E-001 ELECTRICAL COVER SHEET
ED-101 ELECTRICAL MAIN LEVEL DEMOLITION PLAN
ED-102 ELECTRICAL DEMOLITION PLANS
ED-105 ELECTRICAL ROOF DEMOLITION PLAN
E-101 ELECTRICAL MAIN LEVEL PLAN
E-102 ELECTRICAL PLANS
E-105 ELECTRICAL ROOF PLAN
E-201 ELECTRICAL PANEL SCHEDULES / ONE-LINE DIAGRAM
S-001 GENERAL NOTES
S-101 ROOF FRAMING PLAN
S-201 ROOF FRAMING SECTIONS
DATE DESCRIPTION
11.01.2024 35% SCHEMATIC DESIGN
01.07.2025 65% DESIGN DEVELOPMENT
02.07.2025 95% CONSTRUCTION DOCUMENTS
04.23.2025 100% CONSTRUCTION DOCUMENTS
05.12.2025 FOR BID
09.26.2025 FOR BID REVISION 1
GENERAL CONTRACTOR NOTES:
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
PERMITS:
IT IS THE RESPONSIBILITY OF THE GENERAL CONTRACTOR TO SUBMIT FOR BUILDING
PERMIT THROUGH THE APPLICABLE JURISDICTION. THE CONTRACTOR SHALL LIST THE
CITY PROJECT MANAGER AS ADDITIONAL PROJECT CONTACT. THE CITY OF AURORA
WILL PAY FOR PERMIT FEES. THE CONTRACTOR SHALL HAVE A VALID COMMERCIAL
LICENSE AND SHALL PICK UP THE PERMIT.
DOCUMENTS:
CONTRACTOR AND SUB-CONTRACTORS ARE RESPONSIBLE TO READ AND UNDERSTAND
ALL OF THE DRAWINGS AND THE CONSTRUCTION SPECIFICATION MANUAL.
SITE EXAMINATION:
GENERAL CONTRACTOR AND ALL SUBCONTRACTORS SHALL VISIT AND EXAMINE THE
SITE AND BUILDING IN EVERY DETAIL AS IT PERTAINS TO THE PROJECT PRIOR TO
SUBMITTING A BID PROPOSAL.
DISCREPANCIES:
ANY DISCREPANCIES DISCOVERED BY THE GENERAL CONTRACTOR OR BY THE
SUBCONTRACTORS, BETWEEN DIMENSIONS, OR CONFLICTS UNFORESEEN PREVIOUSLY
SHALL BE BROUGHT TO THE IMMEDIATE ATTENTION OF THE ARCHITECT FOR
CLARIFICATION.
BUILDING CODE COMPLIANCE:
PERFORM ALL WORK TO COMPLY WITH APPLICABLE BUILDING CODES AND
REGULATIONS. FOR BUILDING CONDITIONS THAT ARE NOT CONSTRUCTED TO MEET
CURRENT BUILDING CODES, THE GENERAL CONTRACTOR IS TO PROVIDE ALTERNATE
PRICING TO BRING ITEMS INTO CODE COMPLIANCE.
HOURS OF CONSTRUCTION:
GENERAL CONTRACTOR IS RESPONSIBLE TO COORDINATE WITH THE CITY PROJECT
MANAGER FOR HOURS OF OPERATION, ALLOWABLE CONSTRUCTION TIMES AND
CONSTRUCTION ACTIVITIES. THE GENERAL CONTRACTOR SHALL ASSUME ALL
RESPONSIBILITY FOR ALL SUB-CONTRACTORS.
LONG LEAD ITEMS:
THE GENERAL CONTRACTOR AND SUBCONTRACTORS SHALL BE RESPONSIBLE FOR
BEING FAMILIAR WITH THE PROJECT SCHEDULE AND DEADLINES, AND FOR ADVISING
THE ARCHITECT AND CITY PROJECT MANAGER FOR ALL LONG LEAD ITEMS. ORDER
CONFIRMATION SHALL BE SUBMITTED WITH DELIVERY DATES. PROVIDE LEAD TIME
ESTIMATES WITH ANY BID PROPOSALS. IT SHALL BE AT THE GENERAL CONTRACTORS
EXPENSE IF ANY LONG LEAD ITEMS ARE DISCOVERED AFTER THE PROJECT BEGINS.
CLEAN UP:
CLEANING OF EQUIPMENT SHALL BE LIMITED TO AREAS DESIGNATED BY THE CITY
PROJECT MANAGER. TRASH SHALL BE REMOVED AND SWEEPING\VACUUMING SHALL BE
PROVIDED ON A DAILY AND CONTINUING BASIS THROUGHOUT THE CONSTRUCTION
PROCESS. FINAL CLEANING SHALL BE PROVIDED BY THE CONTRACTOR AND INCLUDE
WINDOWS, SILLS, WINDOW COVERINGS (BLINDS), CABINETS, LIGHT FIXTURES, SUPPLY
AIR DIFFUSERS AND RETURN AIR GRILLS.
DISPOSAL:
THE GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR OBTAINING THE DUMPSTER.
THE GENERAL CONTRACTOR SHALL COORDINATE WITH THE APPLICABLE JURISDICTION
FOR LOCATION AND ALLOWABLE SIZE. THE GENERAL CONTRACTOR. SHALL DISPOSE OF
/ RECYCLE ALL WASTE IN ACCORDANCE WITH ACCEPTED STANDARDS OF THE
APPLICABLE JURISDICTION. COORDINATE DUMPSTER LOCATION WITH CITY PROJECT
MANAGER.
PROTECTION OF EXISTING ITEMS:
THE GENERAL CONTRACTOR SHALL BE RESPONSIBLE TO PROTECT ALL EXISTING
CONSTRUCTION ON AND OFF SITE, AND SHALL BE HELD RESPONSIBLE FOR THE REPAIR
OF ANY DAMAGE CAUSED BY GENERAL CONTRACTOR OR ANY OF ITS
SUBCONTRACTORS.
WORK PERFORMED UNDER SEPARATE CONTRACT:
THE GENERAL CONTRACTOR IS TO VERIFY WITH THE CITY PROJECT MANAGER IF ANY
WORK IS TO BE PERFORMED UNDER A SEPARATE CONTRACT.
ABV
A.F.F
AP
A.C.T A.C.
ADJ.
ALT
A.D.
BLK
BD
BLDG
B.O.
C.I.P.
CPT
CLK
CLG
CTR
CLR
COL
CONC
C.M.U.
CONST
CONT
CONTR
CORR.
DET/DTL
DIM
DN
D.S.
DWG
ELEC
ELEV
EQ
EQUIP
EST
EXIST, (E)
E.J.
EXT
FT
FIN
F.F.
F.E.
FL
FDN
GALV.
GEN
G.C.
GYP. BD
HT
HVAC
IN
INSUL
INT.
IBC
ABV
ABOVE FINISH FLOOR
ACCESS PANEL
ACOUSTIC CEILING TILES
AIR CONDITIONING
ADJUSTABLE
ALTERNATE
AREA DRAIN
BLOCK
BOARD
BUILDING
BOTTOM OF
CAST-IN-PLACE-CONCRETE
CARPET
CAULKING
CEILING
CENTER
CLEAR
COLUMN
CONCRETE
CONCRETE MASONRY UNIT
CONSTRUCTION
CONTINUOUS/CONTINUE
CONTRACTOR
CORRIDOR
DETAIL
DIMENSIONS
DOWN
DOWN SPOUT
DRAWING
ELECTRICAL
ELEVATION
EQUAL
EQUIPMENT
ESTIMATED
EXISTING
EXPANSION JOINT
EXTERIOR
FEET
FINISH
FINISH FLOOR
FIRE EXTINGUISHER
FLOOR/FLOOR LINE
FOUNDATION
GALVANIZED
GENERAL
GENERAL CONTRACTOR
GYPSUM BOARD
HEIGHT
HEATING, VENTILATION, AND
AIR CONDITIONING
INCH
INSULATION
INTERIOR
INTERNATIONAL BUILDING CODE
JAN
JT
KIT
LAV
LGTH
LOC
MANUF./MFR
MATL
MECH
MEP
MTL/MET
MIN
MISC
N.I.C.
N.T.S.
OFF
O.C.
PEN.
PNT
PL
PRELIN
P.L.
REF/RE
REINF
REQD
R.D.
RM
R.O.
SCH
SECT.
SIM
SF
STD
STL
STO
STR
TEL
T.O.C.
T.O.D.
T.O.M.
T.O.S.
TYP
VENT
V.I.F.
VERT
W.C.
W/ W/O
WD
JANITOR
JOINT
KITCHEN
LAVATORY
LENGTH
LOCATION
MANUFACTURER
MATERIAL
MECHANICAL
MECHANICAL, ENGINEERING, AND
PLUMBING
METAL
MINIMUM
MISCELLANEOUS
NOT IN CONTRACT
NOT TO SCALE
OFFICE
ON CENTER
PENETRATION
PAINTED/PAINT
PLASTER
PRELIMINARY
PROPERTY LINE
REFERENCE
REINFORCE/REINFORCING
REQUIRED
ROOF DRAIN
ROOM
ROUGH OPENING
SCHEDULE
SECTION
SIMILAR
SQUARE FOOT
STANDARD
STEEL
STORAGE
STRUCTURAL
TELEPHONE
TOP OF CONCRETE
TOP OF DECK
TOP OF MASONRY
TOP OF STEEL
TYPICAL
VENTILATING
VERIFY IN FIELD
VERTICAL
WATER CLOSET
WITH
WITHOUT
WOOD
ABBREVIATIONS:
COLUMN GRID
DETAIL/WALL SECTION
DETAIL 1 ON SHEET A101
EXTERIOR ELEVATION
DRAWING 1 ON SHEET A101
BUILDING SECTION
DRAWING 1 ON SHEET A101
DETAIL BUBBLE
DETAIL 1 ON SHEET A101
INTERIOR ELEVATION
DRAWING 1 ON SHEET A7.1
DRAWING TITLE AND NUMBER
NORTH ARROW
ROOM NAME AND NUMBER
ELEVATION MARKER
CENTER LINE
OBJECTS ABOVE
SOFFITS, CABINETS,
HIGH WINDOWS
HIDDEN OBJECTS
KEYNOTE
ROOM FINISHES
WALL TYPE
A101
SIM
A101
A101
1 SIM
TITLE
SCALE
ROOM NAME
D
SYMBOLS LEGEND:
A101
X-1 X-1 X-1X-1
WALL WAINSCOTING
WALL BASE FLOOR
A101
Ref
1R ef 1 R ef
Ref
1i
LIFE SAFETY NOTES:
1.
2.
3.
4.
5.
6.
THE FOLLOWING NOTES SHALL BE CONTRACTUALLY BINDING AND APPLY TO ALL
DISCIPLINES. IT IS THE CONTRACTOR'S OBLIGATION TO ENSURE ALL WORK AND ALL SUB
CONTRACTORS' WORK BE PERFORMED IN COMPLIANCE WITH THE FOLLOWING NOTES IN
ADDITION TO THE CONSTRUCTION DOCUMENTS AND PROJECT SPECIFICATIONS.
HOT WORK DURING CONSTRUCTION:
THE CONTRACTOR SHALL ENSURE THAT ANY HOT WORK ACTIVITIES DURING
CONSTRUCTION, E.G., USING HEAT GUNS, SOLDERING, BRAZING, WELDING, GRINDING,
POWDER DRIVEN STUDS, METAL CUTTING USING POWER TOOLS OR OTHER ACTIVITIES
INVOLVING FLAMES OR SPARKS ARE PRECEDED BY INDUSTRY STANDARD FIRE PREVENTION
PREPARATION.
ACCESS AND EGRESS OBSTRUCTIONS:
THE CONTRACTOR SHALL CONFIRM THAT THE PROJECT STAGING AREA AND CONSTRUCTION
ACTIVITIES DO NOT CAUSE THE OBSTRUCTION OF PATHS OF EGRESS INSIDE THE BUILDING,
BLOCK EXIT DISCHARGE FROM THE BUILDING OR IMPEDE EMERGENCY VEHICLE ACCESS TO
THE AREA.
DUST/FUME GENERATION:
IF THE CONSTRUCTION ACTIVITIES GENERATE DUST OR FUMES INSIDE THE BUILDING,
NECESSARY MEASURES ARE TO BE TAKEN TO PREVENT THE NUISANCE ACTUATION OF ANY
NEARBY SMOKE OR DUCT DETECTORS.
PENETRATIONS THROUGH FIRE RATED ASSEMBLIES:
THE CONTRACTOR SHALL ENSURE THAT ANY PENETRATIONS THROUGH FIRE RATED
ASSEMBLIES (FLOORS, PARTITIONS, WALLS, ETC.) ARE FIRESTOPPED.
PEDESTRIAN PROTECTION:
THE CONTRACTOR SHALL BE RESPONSIBLE TO PROVIDE ANY NECESSARY PEDESTRIAN
PROTECTION MEASURES DURING CONSTRUCTION.
PROJECT NOTES:
1.
2.
3.
CONTRACTOR AND SUB-CONTRACTORS ARE RESPONSIBLE TO READ AND UNDERSTAND ALL
OF THE DRAWINGS AND THE PROJECT SPECIFICATION BOOK.
GENERAL CONTRACTOR IS RESPONSIBLE TO COORDINATE WITH THE CITY PROJECT
MANAGER FOR HOURS OF OPERATION, ALLOWABLE CONSTRUCTION TIMES AND
CONSTRUCTION ACTIVITIES. THE GENERAL CONTRACTOR SHALL ASSUME ALL
RESPONSIBILITY FOR ALL SUB-CONTRACTORS.
THE GENERAL CONTRACTOR SHALL WORK TO COORDINATE WITH THE SEPARATE SEAT
REPLACEMENT PROJECT THAT WILL BE RUNNING CONCURRENTLY WITH THIS PROJECT.
ENSURE ANY WORK OVERLAP DOES NOT INTERFERE WITH CONSTRUCTION SCHEDULE.
PROJECT NO.: INITIAL DATE:
DRAWN BY: CHECKED BY:
ARCHITECTURAL WORKSHOP . DENVER, COLORADO
AR
CH
IT
EC
TU
RA
L W
OR
KS
HO
P, LL
C.
A
LL
R
IG
HT
S
RE
SE
RV
ED
2427ft OCT 2024
MRS MAB
AURORA FOX THEATER
HVAC ALTERATIONS
9900 E COLFAX AVE, AURORA, CO 80010
G-002
GENERAL NOTES, SYMBOLS &
ABBREVIATIONS
DATE DESCRIPTION
11.01.2024 35% SCHEMATIC DESIGN
01.07.2025 65% DESIGN DEVELOPMENT
02.07.2025 95% CONSTRUCTION DOCUMENTS
04.23.2025 100% CONSTRUCTION DOCUMENTS
DN
CODE DATA:
BUILDING ADDRESS: 9900 E COLFAX AVE.
AURORA, CO 80010
APPLICABLE
BUILDING CODES: 2021 INTERNATIONAL BUILDING CODE
2021 INTERNATIONAL FUEL GAS CODE
2021 INTERNATIONAL MECHANICAL CODE
2021 INTERNATIONAL PLUMBING CODE
2021 INTERNATIONAL ENERGY
CONSERVATION CODE
2023 NATIONAL ELECTRICAL CODE
BLDG CONSTRUCTION: V-B (NO CHANGE)
OCCUPANCY GROUP: A-3
B F-1
S-1 (ACCESSORY TO A-3)
BUILDING AREA: LOWER LEVEL 15,640 SF
TOTAL: 16,177 SF
ALLOWED EXISTING
CHAPTER 6: TYPES OF CONSTRUCTION
TABLE 601, FIRE RESISTANCE REQUIREMENTS FOR BUILDING
ELEMENTS: TYPE V-B CONSTRUCTION = NO RATINGS REQUIRED
TABLE 602, FIRE RESISTANCE RATING FOR EXTERIOR WALLS
TYPE V-B: 5'-0" ≤ X < 10'-0" SEPARATION = 1 HR RATING REQUIRED.
TYPE V-B: 10'-0" ≤ X < 30'-0" SEPARATION = NO RATINGS REQUIRED.
TYPE V-B: >30'-0" SEPARATION = NO RATINGS REQUIRED.
2 STORIES (A-3)
3 STORIES (F-1)
1 STORY (A-3)
1 STORY (F-1)
MEZZANINE 537 SF
BUILDING HEIGHT:
FIRE SUPPRESSION REQUIREMENTS AND ALLOWANCE:
FIRE SUPPRESSION WORK: ANY DEMOLITION, RELOCATION, OR
ADDITION OF FIRE SPRINKLERS, INCLUDING THE REMOVAL OR
RELOCATION OF MORE THAN FIVE (5) SPRINKLER HEADS, SHALL
TRIGGER THE REQUIREMENT FOR A DEFERRED SUBMITTAL TO THE
AUTHORITY HAVING JURISDICTION (AHJ) FOR FIRE SUPPRESSION
SYSTEM REVISIONS. THIS INCLUDES ALL AFFECTED AREAS WITHIN
THE SCOPE OF RENOVATION.
FIRE ALARM COORDINATION: MODIFICATIONS TO THE FIRE ALARM
SYSTEM REQUIRED DUE TO CHANGES IN FIRE SUPPRESSION,
OCCUPANCY LAYOUT, OR CODE COMPLIANCE (INCLUDING CHANGES
TO NOTIFICATION DEVICES OR SMOKE DETECTION) SHALL ALSO
REQUIRE A DEFERRED SUBMITTAL FOR FIRE ALARM REVISIONS.
CONTRACTOR RESPONSIBILITY: THE GENERAL CONTRACTOR SHALL
INCLUDE IN THEIR BID:
ALL DEMOLITION AND NEW WORK FOR FIRE SUPPRESSION AND FIRE
ALARM SYSTEMS INCLUDED IN THE DESIGN.
COORDINATION WITH A LICENSED FIRE PROTECTION
SUBCONTRACTOR AND FIRE ALARM VENDOR TO PREPARE, SUBMIT,
AND OBTAIN APPROVAL OF DEFERRED SUBMITTALS.
ALL COSTS ASSOCIATED WITH DESIGN, PERMITTING, INSPECTION,
AND FINAL ACCEPTANCE OF MODIFIED SYSTEMS.
PERMITTING: FIRE PROTECTION AND ALARM MODIFICATIONS ARE
SUBJECT TO REVIEW AND APPROVAL BY THE CITY OF AURORA FIRE
DEPARTMENT. WORK SHALL NOT PROCEED WITHOUT APPROVED
DEFERRED SUBMITTALS WHERE APPLICABLE.
B C E
537 SF
4 OCC.
B
BUSINESS OPEN TO BELOW
OPEN TO BELOW
OPEN TO BELOW
OPEN TO BELOW
OPEN TO BELOW3
D F
A
B C E G H J K L
2575 SF
A-3
AUDITORIUM
1541 SF
103 OCC.
A-3
THEATER585 SF
12 OCC.
A-3
RESTROOMS
356 SF
2 OCC.
A-3
MECHANICAL
184 SF
1 OCC.
S-1
STORAGE
1896 SF
19 OCC.
F-1
WORKSHOP
1642 SF
A-3
THEATER
225 SF
2 OCC.
A-3
GREEN ROOM
1047 SF
11 OCC.
F-1
WORKSHOP
212 OCC.
122 SF
3 OCC.
A-3
RESTROOM
89 SF
2 OCC.
A-3
RESTROOM
67 OCC.
D F I
W1
K L
220 SF
2 OCC.
B
BUSINESS
62 SF
1 OCC.
S-1
STORAGE
1007 SF
68 OCC.
A-3
ASSEMBLY
28 SF
1 OCC.
S-1
STORAGE
101 SF
3 OCC.
A-3
RESTROOM
131 SF
3 OCC.
A-3
RESTROOM
117 SF
1 OCC.
B
BUSINESS
CODE STUDY LEGEND
2 HR FIRE RATED WALL (NEW)
A-3 OCCUPANCY
B OCCUPANCY
S-1 OCCUPANCY
F-1 OCCUPANCY
AREA NOT IN SCOPE
EXISTING WALL TO REMAIN
PROJECT NO.: INITIAL DATE:
DRAWN BY: CHECKED BY:
ARCHITECTURAL WORKSHOP . DENVER, COLORADO
AR
CH
IT
EC
TU
RA
L W
OR
KS
HO
P, LL
C.
A
LL
R
IG
HT
S
RE
SE
RV
ED
2427ft OCT 2024
MRS MAB
AURORA FOX THEATER
HVAC ALTERATIONS
9900 E COLFAX AVE, AURORA, CO 80010
G-003
PROJECT CODE INFORMATION
3/32" = 1'-0"2 MEZZANINE CODE PLAN
3/32" = 1'-0"3 CODE PLAN
3/32" = 1'-0"1 LOBBY CODE PLAN
DATE DESCRIPTION
11.01.2024 35% SCHEMATIC DESIGN
01.07.2025 65% DESIGN DEVELOPMENT
02.07.2025 95% CONSTRUCTION DOCUMENTS
04.23.2025 100% CONSTRUCTION DOCUMENTS
AURORA FOX THEATER
EL
MI
RA
S
T.
FL
OR
EN
CE
S T.
CHEROKEE TRAIL
E COLFAX AVE.
ADJACENT BUILDING
ADJACENT BUILDING
ADJACENT BUILDING
ADJACENT BUILDINGADJACENT BUILDING
RTU 3
RTU 2 RTU 1
ALT #1
BASE BID
SITE PLAN LEGEND:
SITE WALL
EXISTING TREE TO REMAIN
ADJACENT BUILDINGS
SUBJECT PROPERTY
AREA IN SCOPE
DUMPSTER LOCATION /
CONTRACTOR PARKING AREA
GENERAL SITE NOTES:
1.
2.
3.
4.
CONTRACTOR TO PROTECT SITE CONDITIONS DURING ALL
CONSTRUCTION ACTIVITIES.
CONTRACTOR PARKING AND CONSTRUCTION DUMPSTER
AREA LOCATION HAS BEEN LOCATED ON SITE PLAN.
BUILDING IS A HISTORIC BUILDING AND CANNOT BE
DAMAGED. CONTRACTOR TO PROVIDE PROPER MEASURES
TO PROTECT BUILDING DURING ALL ACTIVITIES.
CONTRACTOR TO PERFORM ALL CONSTRUCTION ACTIVITIES
WITHIN CITY OF AURORA ALLOWED CONSTRUCTION HOURS.
PROJECT NO.: INITIAL DATE:
DRAWN BY: CHECKED BY:
ARCHITECTURAL WORKSHOP . DENVER, COLORADO
AR
CH
IT
EC
TU
RA
L W
OR
KS
HO
P, LL
C.
A
LL
R
IG
HT
S
RE
SE
RV
ED
2427ft OCT 2024
MRS MAB
AURORA FOX THEATER
HVAC ALTERATIONS
9900 E COLFAX AVE, AURORA, CO 80010
AS-101
ARCHITECTURAL SITE PLAN
1" = 20'-0"1 ARCHITECTURAL SITE PLAN
DATE DESCRIPTION
11.01.2024 35% SCHEMATIC DESIGN
01.07.2025 65% DESIGN DEVELOPMENT
02.07.2025 95% CONSTRUCTION DOCUMENTS
04.23.2025 100% CONSTRUCTION DOCUMENTS
GENERAL DEMO NOTES:
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
DO NOT SCALE DRAWINGS. DIMENSIONS GOVERN. ANY
DISCREPANCIES IN DRAWINGS AND/OR EXISTING CONDITIONS
SHOULD BE BROUGHT TO THE IMMEDIATE ATTENTION OF THE
CITY PROJECT MANAGER FOR CLARIFICATION.
ALL WORK SHALL BE IN COMPLIANCE WITH LOCAL AUTHORITY
HAVING JURISDICTION AND 2021 INTERNATIONAL BUILDING
CODE (IBC).
ALL WORK SHALL BE IN COMPLIANCE WITH THE
CONSTRUCTION SPECIFICATION MANUAL WHICH IS PART OF
THE CONTRACT DOCUMENTS.
ALL ABANDONED WIRING, CONDUITS OR MISC. MEP MUST BE
REMOVED IN THEIR ENTIRETY.
ALL DEMOLITION AND DISPOSAL MUST BE DONE TO MEET ALL
CODES AND LAWS FOR PROPER DISPOSAL.
ALL DEMOLITION IN OCCUPIED SPACES MUST BE
COORDINATED WITH CITY PROJECT MANAGER.
ALL DEMOLITION IN OCCUPIED SPACES SHALL BE
CONDUCTED IN A SAFE MANNER AND LEFT TO MEET CODES
FOR OCCUPANCY.
ALL RETURN AIR DUCTS MUST BE FILTERED DURING DEMO
AND CONSTRUCTION TO PREVENT DEBRIS FROM ENTERING
HVAC SYSTEM.
ALL DEMOLITION SCOPE SHALL REMOVE ALL ASSOCIATED
SYSTEMS AND COMPONENTS. CITY DOES NOT ACCEPT
ABANDONING ANY UNUSED COMPONENTS IN PLACE.
EXTENTS OF SCOPE DEPICTED INCLUDES COMBINED AREAS
OF DEMO IN ARCHITECTURAL, MECHANICAL, ELECTRICAL,
AND STRUCTURAL WORK.
A
AD-106
AD-106
MENS
WOMENS
GREEN RM
STAGING
STUDIO
THEATER
SCENERY
STUDIO
LAUNDRY
ROOM
MECHANICAL
BOILER
MENS
WOMENS
TOILET RM
TOILET RM
PLATFORM
AUDITORIUM
CONTROL
RM
B C E G H J K L
4'
- 1
7"
4'
- 8
4"
4"
1'
- 0
6' - 0" 15' - 8" 19' - 4" 41' - 0" 10' - 8" 27' - 11" 17' - 7" 35' - 7"
D1
DRESSING
RM
DRESSING
RM
D F I
D2
4'
- 4
2' - 6"
RE
: F
LO
OR
P
LA
N
D3
4'
- 4
3' - 0"
(ALT #1.2)
D1
D4D4
D4
D4
D4
D5
D4
ALT #1
D6
DEMO PLAN KEYNOTES:
D1 ALTERNATE #1: DEMO (E) SHELVING FOR NEW MECHANICAL
CHASE LOCATION. REPAIR AND REBUILD SHELVES ADJACENT
TO NEW MECH CHASE. RE: DETAILS.
D2 ALTERNATE #1: DEMO FLOOR AREA FOR NEW MECHANICAL
DUCTWORK PENETRATION.
D3 ALTERNATE #1.2: ALTERNATE FLOOR DEMO AREA FOR NEW
MECHANICAL DUCTWORK PENETRATION.
D4 EXISTING SEATING AND THEATER CURTAIN TO REMAIN.
D5 AREA ABOVE IS OPEN CEILING AND WILL HAVE MODIFICATION
PERFORMED ON ROOF. MODIFY OR PROVIDE DEMOLITION IN
WORKSHOP TO ACCOMODATE ROOF STRUCTURAL AND SPACE
MODIFICATIONS.
D6 EXISTING CONTROL ROOM WINDOW TO REMAIN, PROTECT
DURING CONSTRUCTION.
EXISTING WALL TO REMAIN
DEMOLITION LEGEND
WALL / CEILING / AREA TO BE DEMOLISHED
AREA NOT IN SCOPE
ALTERNATE DUCT LOCATION
OBJECT TO BE DEMOLISHED PROJECT NO.: INITIAL DATE:
DRAWN BY: CHECKED BY:
ARCHITECTURAL WORKSHOP . DENVER, COLORADO
AR
CH
IT
EC
TU
RA
L W
OR
KS
HO
P, LL
C.
A
LL
R
IG
HT
S
RE
SE
RV
ED
2427ft OCT 2024
MRS MAB
AURORA FOX THEATER
HVAC ALTERATIONS
9900 E COLFAX AVE, AURORA, CO 80010
AD-101
MAIN LEVEL DEMO PLAN
1/8" = 1'-0"1 MAIN LEVEL DEMO PLAN
DATE DESCRIPTION
01.07.2025 65% DESIGN DEVELOPMENT
02.07.2025 95% CONSTRUCTION DOCUMENTS
04.23.2025 100% CONSTRUCTION DOCUMENTS
GENERAL DEMO NOTES:
2.
3.
4.
5.
6.
7.
8.
9.
10.
DO NOT SCALE DRAWINGS. DIMENSIONS GOVERN. ANY
DISCREPANCIES IN DRAWINGS AND/OR EXISTING CONDITIONS
SHOULD BE BROUGHT TO THE IMMEDIATE ATTENTION OF THE
CITY PROJECT MANAGER FOR CLARIFICATION.
ALL WORK SHALL BE IN COMPLIANCE WITH LOCAL AUTHORITY
HAVING JURISDICTION AND 2021 INTERNATIONAL BUILDING
CODE (IBC).
ALL WORK SHALL BE IN COMPLIANCE WITH THE
CONSTRUCTION SPECIFICATION MANUAL WHICH IS PART OF
THE CONTRACT DOCUMENTS.
ALL ABANDONED WIRING, CONDUITS OR MISC. MEP MUST BE
REMOVED IN THEIR ENTIRETY.
ALL DEMOLITION AND DISPOSAL MUST BE DONE TO MEET ALL
CODES AND LAWS FOR PROPER DISPOSAL.
ALL DEMOLITION IN OCCUPIED SPACES MUST BE
COORDINATED WITH CITY PROJECT MANAGER.
ALL DEMOLITION IN OCCUPIED SPACES SHALL BE
CONDUCTED IN A SAFE MANNER AND LEFT TO MEET CODES
FOR OCCUPANCY.
ALL RETURN AIR DUCTS MUST BE FILTERED DURING DEMO
AND CONSTRUCTION TO PREVENT DEBRIS FROM ENTERING
HVAC SYSTEM.
ALL DEMOLITION SCOPE SHALL REMOVE ALL ASSOCIATED
SYSTEMS AND COMPONENTS. CITY DOES NOT ACCEPT
ABANDONING ANY UNUSED COMPONENTS IN PLACE.
EXTENTS OF SCOPE DEPICTED INCLUDES COMBINED AREAS
OF DEMO IN ARCHITECTURAL, MECHANICAL, ELECTRICAL,
AND STRUCTURAL WORK.
A
AD-106
AD-106
GREEN RM
STAGING
LAUNDRY
ROOM
MECHANICAL
BOILER
MENS
WOMENS
TOILET RM
TOILET RM
PLATFORM
AUDITORIUM
MENS
WOMENS
STUDIO
THEATER
SCENERY
STUDIO
CONTROL
RM
B C E G H J K L
D1
D3
D2
D4
D4 D3
DRESSING
RM
DRESSING
RM
D F I
D6
D1
D8
0" 7'
- 1 1"
13' - 8" 11' - 8"
D7 (ALT #1.2)
3'
- 3
2' - 9"
OPEN TO STRUCTURE
OPEN TO STRUCTURE
D9
ALT #1
ES
T
4" V.
I.
F.
EST 13' - 7" V.I.F.
DEMO PLAN KEYNOTES:
ALTERNATE #1: DEMO & DISPOSE OF PORTION OF PLASTER AND
LATH CEILING / SOFFIT FOR NEW DUCTWORK AND STR
REINFORCEMENT AS PER MECH AND STR DWGS. PATCH AND
REPAIR ADJACENT SURFACES AS REQUIRED. PAINT TO MATCH.
RE: MECHANICAL FOR DUCT SIZING.
D1
ALTERNATE #1: SCRAPE, CLEAN AND PREP WATER DAMAGED
CEILING AREAS FOR NEW PATCHING AND PAINT.
D7
(E) ROOF ACCESS HATCH TO REMAIN.D2
DEMO AND REMOVE (E) MECH AND DUCT COMPONENTS IN THEIR
ENTIRETY AS SHOWN ON MECH DWGS.
D3
DO NOT DEMO OR ALTER STR UNLESS NOTED ON STR DWGS.D4
NOT USED.D5
DEMO PORTION OF MASONRY WALL TO ENLARGE OPENING TO
ALLOW DUCTWORK. RE: STR DWGS.
D6
ALTERNATE #1.2: DEMO CEILING/SOFFIT AREA FOR NEW
MECHANICAL DUCTWORK PENETRATION.
D8
DASHED LINE INDICATES AREA OF ARCHITECTURAL DEMO
WORK. OPEN TO STRUCTURE. DUCTS, LIGHTS AND SPRINKLER
WORK TO BE COORDINATED BEFORE START OF DEMOLITION.
D9
EXISTING WALL TO REMAIN
DEMOLITION LEGEND
WALL / CEILING / AREA TO BE DEMOLISHED
AREA NOT IN SCOPE
ALTERNATE DUCT LOCATION
OBJECT TO BE DEMOLISHED PROJECT NO.: INITIAL DATE:
DRAWN BY: CHECKED BY:
ARCHITECTURAL WORKSHOP . DENVER, COLORADO
AR
CH
IT
EC
TU
RA
L W
OR
KS
HO
P, LL
C.
A
LL
R
IG
HT
S
RE
SE
RV
ED
2427ft OCT 2024
MRS MAB
AURORA FOX THEATER
HVAC ALTERATIONS
9900 E COLFAX AVE, AURORA, CO 80010
AD-103
MAIN LEVEL CEILING DEMO PLAN
1/8" = 1'-0"1 MAIN LEVEL CEILING DEMO PLAN
DATE DESCRIPTION
11.01.2024 35% SCHEMATIC DESIGN
01.07.2025 65% DESIGN DEVELOPMENT
02.07.2025 95% CONSTRUCTION DOCUMENTS
04.23.2025 100% CONSTRUCTION DOCUMENTS
GENERAL DEMO NOTES:
2.
3.
4.
5.
6.
7.
8.
9.
10.
DO NOT SCALE DRAWINGS. DIMENSIONS GOVERN. ANY
DISCREPANCIES IN DRAWINGS AND/OR EXISTING CONDITIONS
SHOULD BE BROUGHT TO THE IMMEDIATE ATTENTION OF THE
CITY PROJECT MANAGER FOR CLARIFICATION.
ALL WORK SHALL BE IN COMPLIANCE WITH LOCAL AUTHORITY
HAVING JURISDICTION AND 2021 INTERNATIONAL BUILDING
CODE (IBC).
ALL WORK SHALL BE IN COMPLIANCE WITH THE
CONSTRUCTION SPECIFICATION MANUAL WHICH IS PART OF
THE CONTRACT DOCUMENTS.
ALL ABANDONED WIRING, CONDUITS OR MISC. MEP MUST BE
REMOVED IN THEIR ENTIRETY.
ALL DEMOLITION AND DISPOSAL MUST BE DONE TO MEET ALL
CODES AND LAWS FOR PROPER DISPOSAL.
ALL DEMOLITION IN OCCUPIED SPACES MUST BE
COORDINATED WITH CITY PROJECT MANAGER.
ALL DEMOLITION IN OCCUPIED SPACES SHALL BE
CONDUCTED IN A SAFE MANNER AND LEFT TO MEET CODES
FOR OCCUPANCY.
ALL RETURN AIR DUCTS MUST BE FILTERED DURING DEMO
AND CONSTRUCTION TO PREVENT DEBRIS FROM ENTERING
HVAC SYSTEM.
ALL DEMOLITION SCOPE SHALL REMOVE ALL ASSOCIATED
SYSTEMS AND COMPONENTS. CITY DOES NOT ACCEPT
ABANDONING ANY UNUSED COMPONENTS IN PLACE.
EXTENTS OF SCOPE DEPICTED INCLUDES COMBINED AREAS
OF DEMO IN ARCHITECTURAL, MECHANICAL, ELECTRICAL,
AND STRUCTURAL WORK.
AD-106
AD-106
OFFICE
RECEPTION
STORAGE
WOMENS
MENS
10JAN
LOBBY
K L
D1
D2
D4
5' - 7"
D5
2' - 6" 5' - 8"
4"
D3
7"
D7
D7 D7
D7 D7
D7
D7
D7
D7
D7
D7
ALT #1
D6
D7
D7
D7
D7
D7
D7
D7
D7
D7
D7 D7
D7 D7 D7
D7
D7
D8
D8
D8
DEMO PLAN KEYNOTES:
ALTERNATE #1: DEMO & DISPOSE OF GYP. BD CEILING AND (E)
CEILING ACCESS HATCH. PATCH AND REPAIR ADJACENT
SURFACES AS NEEDED.
D1
ALTERNATE #1: DEMO & DISPOSE OF PORTION OF CEILING FOR
NEW PULL DOWN ACCESS LADDER. LOCATION OF OPENING TO
BE CENTERED BETWEEN JOISTS. HEADER OFF CENTER JOIST IF
CUT OUT. SIZE OF OPENING AS PER INSTALLATION
INSTRUCTIONS FROM LADDER MFR. OPENING LOCATION TO
AVOID STRUCTURE ABV.
D2
EXISTING CEILING DIFFUSER TO REMAIND6
D3
EXISTING LIGHT FIXTURES TO REMAIND7
ALTERNATE #1: SCRAPE, CLEAN AND PREP WATER DAMAGED
CEILING AREAS FOR NEW PATCHING AND PAINT.
D4
(E) CEILING ACCESS PANEL TO REMAIN.D5
ALTERNATE #1: EXISTING HEADER TO REMAIN.
SALVAGE EXISTING LIGHT FIXTURES FOR REINSTALLATION IN
SAME LOCATION
D8
EXISTING WALL TO REMAIN
DEMOLITION LEGEND
WALL / CEILING / AREA TO BE DEMOLISHED
AREA NOT IN SCOPE
OBJECT TO BE DEMOLISHED
PROJECT NO.: INITIAL DATE:
DRAWN BY: CHECKED BY:
ARCHITECTURAL WORKSHOP . DENVER, COLORADO
AR
CH
IT
EC
TU
RA
L W
OR
KS
HO
P, LL
C.
A
LL
R
IG
HT
S
RE
SE
RV
ED
2427ft OCT 2024
MRS MAB
AURORA FOX THEATER
HVAC ALTERATIONS
9900 E COLFAX AVE, AURORA, CO 80010
AD-104
LOBBY CEILING DEMO PLAN
1/8" = 1'-0"1 LOBBY CEILING DEMO PLAN
DATE DESCRIPTION
11.01.2024 35% SCHEMATIC DESIGN
01.07.2025 65% DESIGN DEVELOPMENT
02.07.2025 95% CONSTRUCTION DOCUMENTS
04.23.2025 100% CONSTRUCTION DOCUMENTS
A
AD-106
AD-106
B C E G H J K L
D3 D6 D7
D5
D1
D3 D3
D8
D8
D9
D9
D F I
4'
- 6
D10
A-401 1
3' - 0"
4'
- 4
D8
D8
D8
(ALT #1.2)
D4
D2
ALT #1
22' - 0" EST. EXTENTS OF DEMO IN AREA
8" E
ST
. E
XT
EN
TS
O
F
DE
MO
IN
A
RE
A
D11
D11 DEMO PLAN KEYNOTES:
(E) SLOTTED QUONSET HUT ROOF TO REMAIN, PROTECT DURING
CONSTRUCTION. NO ROOF ACCESS.
D1
ALTERNATE #1: OPEN BACK PANEL OF SIGNAGE BASE BOX.
CONFIRM (E) ROOF PENETRATION EXISTS AND IS 48"x24" TO
ALLOW NEW DUCTWORK TO GO THROUGH ROOF. MODIFY
ROOFING TO ALLOW DUCT PENETRATION PER . IF
ROOF PENETRATION DOES NOT EXIST, NOTIFY CITY PROJECT
MANAGER AND ARCHITECT.
D2
ALTERNATE #1: CREATE OPENING IN (E) SIGNAGE BASE CABINET
TO ACCOMMODATE NEW DUCT LOCATION. DEMO PORTION OF (E)
ROOF AT DUCT TURN DOWN LOCATION. RE: MECH. PATCH AND
REPAIR ROOF SURFACES AS REQUIRED. RE: DETAILS.
D4
(E) LADDER TO REMAIN.D5
ALTERNATE #1: DEMO (E) CONTROL ROOM EXHAUST DUCT IN
ITS ENTIRETY. RE: MECH DWGS.
D6
(E) "FOX THEATER" SIGN TO REMAIN, PROTECT DURING
CONSTRUCTION.
D7
ALTERNATE #1: DEMO & DISPOSE OF (E) CONDENSING UNIT,
ASSOCIATED PIPING AND ROOF CURB, RE: MEP FOR ADDITIONAL
INFORMATION. PATCH AND REPAIR ROOF SURFACES AS
REQUIRED AND INFILL WITH INSULATION.
D3
(E) ROOF MECH EXHAUST, EQUIPMENT AND PIPING TO REMAIN.D8
(E) ROOF ACCESS HATCH TO REMAIN.D9
ALTERNATE #1.2: ALTERNATE ROOF DEMO AREA FOR NEW DUCT
PENETRATION.
D10
/6 A-501
ALTERNATE #1: DEMO & DISPOSE OF (E) ROOF MECH EXHAUST
EQUIPMENT IN ITS ENTIRETY. PATCH AND REPAIR ROOF
SURFACES AS REQUIRED AND INFILL WITH INSULATION.
D11
GENERAL DEMO NOTES:
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
DO NOT SCALE DRAWINGS. DIMENSIONS GOVERN. ANY
DISCREPANCIES IN DRAWINGS AND/OR EXISTING CONDITIONS
SHOULD BE BROUGHT TO THE IMMEDIATE ATTENTION OF THE
CITY PROJECT MANAGER FOR CLARIFICATION.
ALL WORK SHALL BE IN COMPLIANCE WITH LOCAL AUTHORITY
HAVING JURISDICTION AND 2021 INTERNATIONAL BUILDING
CODE (IBC).
ALL WORK SHALL BE IN COMPLIANCE WITH THE
CONSTRUCTION SPECIFICATION MANUAL WHICH IS PART OF
THE CONTRACT DOCUMENTS.
ALL ABANDONED WIRING, CONDUITS OR MISC. MEP MUST BE
REMOVED IN THEIR ENTIRETY.
ALL DEMOLITION AND DISPOSAL MUST BE DONE TO MEET ALL
CODES AND LAWS FOR PROPER DISPOSAL.
ALL DEMOLITION IN OCCUPIED SPACES MUST BE
COORDINATED WITH CITY PROJECT MANAGER.
ALL DEMOLITION IN OCCUPIED SPACES SHALL BE
CONDUCTED IN A SAFE MANNER AND LEFT TO MEET CODES
FOR OCCUPANCY.
ALL RETURN AIR DUCTS MUST BE FILTERED DURING DEMO
AND CONSTRUCTION TO PREVENT DEBRIS FROM ENTERING
HVAC SYSTEM.
ALL DEMOLITION SCOPE SHALL REMOVE ALL ASSOCIATED
SYSTEMS AND COMPONENTS. CITY DOES NOT ACCEPT
ABANDONING ANY UNUSED COMPONENTS IN PLACE.
EXTENTS OF SCOPE DEPICTED INCLUDES COMBINED AREAS
OF DEMO IN ARCHITECTURAL, MECHANICAL, ELECTRICAL,
AND STRUCTURAL WORK.
EXISTING WALL TO REMAIN
DEMOLITION LEGEND
WALL / CEILING / AREA TO BE DEMOLISHED
AREA NOT IN SCOPE
ALTERNATE DUCT LOCATION
OBJECT TO BE DEMOLISHED PROJECT NO.: INITIAL DATE:
DRAWN BY: CHECKED BY:
ARCHITECTURAL WORKSHOP . DENVER, COLORADO
AR
CH
IT
EC
TU
RA
L W
OR
KS
HO
P, LL
C.
A
LL
R
IG
HT
S
RE
SE
RV
ED
2427ft OCT 2024
MRS MAB
AURORA FOX THEATER
HVAC ALTERATIONS
9900 E COLFAX AVE, AURORA, CO 80010
AD-105
ROOF DEMO PLAN
1/8" = 1'-0"1 ROOF DEMO PLAN
DATE DESCRIPTION
11.01.2024 35% SCHEMATIC DESIGN
01.07.2025 65% DESIGN DEVELOPMENT
02.07.2025 95% CONSTRUCTION DOCUMENTS
04.23.2025 100% CONSTRUCTION DOCUMENTS
AD-106
B C E G H J K L
D2
D3
D4
D1
D F I
D1
D5
D1
MECHANICAL
WOMENS
113 PLATFORM
AUDITORIUM
126 LOBBY
1NO WORK
NO WORK
NO WORK
LOFT
NO WORK
MECH
SPACE
CONTROL
RM
D6
D1
D8
D9
ALT #1
2 5
AD-106
CONTROL
RM
3 4 7
D6
D1
D5
D3
4' - 5"
D1
MECH
SPACE
MECH
SPACE
WOMENS
LOBBY
OFFICE
D7
NO WORK
ALT #1
1'
- 6
WALL TO REMAIN
DEMOLITION LEGEND
FLOOR / CEILING TO BE DEMOLISHED
AREA NOT IN SCOPE
DEMO PLAN KEYNOTES:
D1
D2
ALTERNATE #1: DEMO & DISPOSE OF PORTION OF CEILING /
SOFFIT FOR NEW DUCTWORK AND STR REINFORCEMENT AS PER
MECH AND STR DWG. PATCH AND REPAIR ADJACENT SURFACES
AS REQUIRED. RE: MECHANICAL TO VERIFY DUCT SIZING.
D3
D4
D5
(E) "FOX THEATER" SIGN TO REMAIN, PROTECT DURING
CONSTRUCTION.
DEMO & DISPOSE OF (E) CONDENSING UNIT, ASSOCIATED PIPING
AND ROOF CURB, RE: MEP FOR ADDITIONAL INFORMATION.
PATCH AND REPAIR ROOF SURFACES AS REQUIRED.
ALTERNATE #1: DEMO AND REMOVE (E) AHU AND STEAM COIL
FROM MECHANICAL SPACE, INCLUDING ALL ASSOCIATED
COMPONENTS, IN THEIR ENTIRETY. RE: MECH DWGS.
ALTERNATE #1: DEMO (E) SHELVING FOR NEW MECHANICAL
CHASE LOCATION. PREP AREA FOR NEW SHELVING AS PER
FLOOR PLAN AND DETAILS.
D6 ALTERNATE #1: PROVIDE OPENING IN CORRUGATED METAL
PANEL AT BASE OF (E) SIGNAGE BASE CABINET. DO NOT
DAMAGE SIGN OR SIGNAGE BASE CABINET. RE: MECH DWGS.
D7 ALTERNATE #1: DEMO PORTION OF CEILING FOR NEW MECH
SPACE ACCESS LADDER.
D8 ALTERNATE #1: PROTECT (E) SEATING DURING DEMO AND
CONSTRUCTION.
D9 ALTERNATE #1: (E) OPENING IN ROOF BELOW ROOFING
MEMBRANE. DEMO ROOF MEMBRANE TO CONFIRM ROOF
PENETRATION EXISTS AND IS 48"x24" TO ALLOW NEW DUCTWORK
TO GO THROUGH ROOF. MODIFY ROOFING TO ALLOW DUCT
PENETRATION PER . IF ROOF PENETRATION DOES
NOT EXIST, NOTIFY CITY PROJECT MANAGER AND ARCHITECT.
/6 A-501
GENERAL DEMO NOTES:
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
DO NOT SCALE DRAWINGS. DIMENSIONS GOVERN. ANY
DISCREPANCIES IN DRAWINGS AND/OR EXISTING CONDITIONS
SHOULD BE BROUGHT TO THE IMMEDIATE ATTENTION OF THE
CITY PROJECT MANAGER FOR CLARIFICATION.
ALL WORK SHALL BE IN COMPLIANCE WITH LOCAL AUTHORITY
HAVING JURISDICTION AND 2021 INTERNATIONAL BUILDING
CODE (IBC).
ALL WORK SHALL BE IN COMPLIANCE WITH THE
CONSTRUCTION SPECIFICATION MANUAL WHICH IS PART OF
THE CONTRACT DOCUMENTS.
ALL ABANDONED WIRING, CONDUITS OR MISC. MEP MUST BE
REMOVED IN THEIR ENTIRETY.
ALL DEMOLITION AND DISPOSAL MUST BE DONE TO MEET ALL
CODES AND LAWS FOR PROPER DISPOSAL.
ALL DEMOLITION IN OCCUPIED SPACES MUST BE
COORDINATED WITH CITY PROJECT MANAGER.
ALL DEMOLITION IN OCCUPIED SPACES SHALL BE
CONDUCTED IN A SAFE MANNER AND LEFT TO MEET CODES
FOR OCCUPANCY.
ALL RETURN AIR DUCTS MUST BE FILTERED DURING DEMO
AND CONSTRUCTION TO PREVENT DEBRIS FROM ENTERING
HVAC SYSTEM.
ALL DEMOLITION SCOPE SHALL REMOVE ALL ASSOCIATED
SYSTEMS AND COMPONENTS. CITY DOES NOT ACCEPT
ABANDONING ANY UNUSED COMPONENTS IN PLACE.
EXTENTS OF SCOPE DEPICTED INCLUDES COMBINED AREAS
OF DEMO IN ARCHITECTURAL, MECHANICAL, ELECTRICAL,
AND STRUCTURAL WORK.
PROJECT NO.: INITIAL DATE:
DRAWN BY: CHECKED BY:
ARCHITECTURAL WORKSHOP . DENVER, COLORADO
AR
CH
IT
EC
TU
RA
L W
OR
KS
HO
P, LL
C.
A
LL
R
IG
HT
S
RE
SE
RV
ED
2427ft OCT 2024
MRS MAB
AURORA FOX THEATER
HVAC ALTERATIONS
9900 E COLFAX AVE, AURORA, CO 80010
AD-106
DEMO BULDING SECTIONS
1/8" = 1'-0"1 AUDITORIUM DEMO SECTION
1/8" = 1'-0"2 LOBBY DEMO SECTION
DATE DESCRIPTION
11.01.2024 35% SCHEMATIC DESIGN
01.07.2025 65% DESIGN DEVELOPMENT
02.07.2025 95% CONSTRUCTION DOCUMENTS
04.23.2025 100% CONSTRUCTION DOCUMENTS
DN
DN
DN
DNDN
UP
CABINET / CASEWORK
NEW FRAMED WALL
FLOOR PLAN LEGEND
EXISTING WALL
AREA NOT IN SCOPE
ALTERNATE DUCT LOCATION
(E) DOOR TO REMAIN
GENERAL NOTES:
1.
2.
3.
4.
5.
6.
DO NOT SCALE DRAWINGS. DIMENSIONS GOVERN. ANY
DISCREPANCIES IN DRAWINGS AND/OR EXISTING CONDITIONS
SHOULD BE BROUGHT TO THE IMMEDIATE ATTENTION OF THE
ARCHITECT FOR CLARIFICATION.
PROVIDE BLOCKING IN THE WALL AS REQUIRED TO SECURE
SHELVING.
ALL DIMENSIONS ARE FROM FACE OF FINISH, ROUGH
OPENINGS OR CENTERLINE OF GRID UNLESS NOTED
OTHERWISE.
ALL INTERIOR WALLS TO BE WALL TYPE 1 UNLESS OTHERWISE
NOTED.
ALL ROUGH AND FINISH CONSTRUCTION SHALL BE IN
COMPLIANCE WITH GOVERNING CODES AND REGULATIONS AS
A MINIMUM STANDARD.
EXTENTS OF SCOPE DEPICTED INCLUDES COMBINED AREAS
OF WORK IN ARCHITECTURAL, MECHANICAL, ELECTRICAL, AND
STRUCTURAL WORK.
A
A-301
A-301
MENS
WOMENS
GREEN RM
STAGING
STUDIO
THEATER
SCENERY
STUDIO
LAUNDRY
ROOM
MECHANICAL
BOILER
MENS
WOMENS
TOILET RM
TOILET RM
PLATFORM
AUDITORIUM
A-301
CONTROL
RM
B C E G H J K L
2' - 10"
V.
I.F
-1 0'
- 4 1/
8" 4'
- 8
4"
3(ALT #1.2)
W1
DRESSING
RM
DRESSING
RM
D F I
A-501
A-401 2
3' - 0"
4'
- 4
CPT-1
ALT #1
FLOOR PLAN KEYNOTES:
ALTERNATE #1: NEW 2 HR RATED MECHANICAL CHASE FOR NEW
DUCTWORK. RE: DETAILS FOR WALL TYPE.
ALTERNATE #1: NEW DUCT WORK, RE: MECH DWGS.2
ALTERNATE #1.2: ALTERNATE LOCATION FOR DUCT
PENETRATIONS AND CHASE. RE: MECH DWGS.
ALTERNATE #1: NEW STORAGE SHELVING. DEPTH TO MEET
DEPTH OF CHASE WALL. RE: DETAILS.
INTERIOR FINISH LEGEND:
PAINT
MANUFACTURER:
COLOR:
SHEEN / FINISH:
LOCATIONS:
NOTE:
PNT-1 SHERWIN WILLIAMS (OR
APPROVED EQUAL)
COLOR TO MATCH (E)
SURROUNDING PAINT
MATCH SURROUNDING
RE: CEILING AND FLOOR PLANS
WHERE PAINTING NEWLY
PATCHED AREAS, PAINT ENTIRE
CEILING OR FLOOR FIELD.
PNT-2
PNT-3
PNT-4
MANUFACTURER:
COLOR:
LOCATIONS:
CPT-1 MATCH CARPET FROM OWNER
STOCK
COLOR TO MATCH (E)
CONTROL ROOM
FLOORING AND BASE
MANUFACTURER/#:
COLOR:
LOCATIONS:
RB-1 MATCH (E) FLOOR BASE
COLOR TO MATCH (E)
CONTROL ROOM
PNT-5
INTERIOR FINISHES TO BE USED UPON ACCEPTANCE OF ALTERNATE #1.
PROJECT NO.: INITIAL DATE:
DRAWN BY: CHECKED BY:
ARCHITECTURAL WORKSHOP . DENVER, COLORADO
AR
CH
IT
EC
TU
RA
L W
OR
KS
HO
P, LL
C.
A
LL
R
IG
HT
S
RE
SE
RV
ED
2427ft OCT 2024
MRS MAB
AURORA FOX THEATER
HVAC ALTERATIONS
9900 E COLFAX AVE, AURORA, CO 80010
A-101
MAIN LEVEL FLOOR PLAN
1/8" = 1'-0"1 MAIN LEVEL FLOOR PLAN
DATE DESCRIPTION
11.01.2024 35% SCHEMATIC DESIGN
01.07.2025 65% DESIGN DEVELOPMENT
02.07.2025 95% CONSTRUCTION DOCUMENTS
04.23.2025 100% CONSTRUCTION DOCUMENTS
GENERAL NOTES:
2.
3.
4.
5.
6.
DO NOT SCALE DRAWINGS. DIMENSIONS GOVERN. ANY
DISCREPANCIES IN DRAWINGS AND/OR EXISTING CONDITIONS
SHOULD BE BROUGHT TO THE IMMEDIATE ATTENTION OF THE
ARCHITECT FOR CLARIFICATION.
PROVIDE BLOCKING IN THE WALL AS REQUIRED TO SECURE
SHELVING.
ALL DIMENSIONS ARE FROM FACE OF FINISH, ROUGH
OPENINGS OR CENTERLINE OF GRID UNLESS NOTED
OTHERWISE.
ALL INTERIOR WALLS TO BE WALL TYPE 1 UNLESS OTHERWISE
NOTED.
ALL ROUGH AND FINISH CONSTRUCTION SHALL BE IN
COMPLIANCE WITH GOVERNING CODES AND REGULATIONS AS
A MINIMUM STANDARD.
EXTENTS OF SCOPE DEPICTED INCLUDES COMBINED AREAS
OF WORK IN ARCHITECTURAL, MECHANICAL, ELECTRICAL, AND
STRUCTURAL WORK.
A
A
A-301
A-301
GREEN RM
STAGING
MECHANICAL
BOILER
MENS
WOMENS
TOILET RM
TOILET RM
PLATFORM
AUDITORIUM
A-301
B
B
C
C
E
E
G
G
H
H
J K L
STUDIO
THEATER
SCENERY
STUDIO
MENS
WOMENS
C4 (ALT #1.2)
C3 C2 C3
D
D
F
F
I
I
3' - 0"
LAUNDRY
ROOM
DRESSING
RM
DRESSING
RM
CONTROL
RM
128PNT-2
PNT-3 PNT-4
PNT-1
C6
ALT #1
C1
C5 (ALT #1.1)
C1
C5 (ALT #1.1)
0"
13' - 8" 11' - 8"
RE
: S
TR
D
W
GS
CABINET / CASEWORK
NEW FRAMED WALL
ROOF OR STRUCTURE OVERHANG ABOVE
CEILING PLAN LEGEND
EXISTING WALL
NEW GYPSUM CEILING
RECESSED DOWNLIGHT
TRACK LIGHT
CYLINDER DOWNLIGHT
CEILING PLAN KEYNOTES:
ALTERNATE #1: NEW DRYWALL CEILING. PATCH AND REPAIR
ADJACENT SURFACES AS REQUIRED. PAINT TO MATCH. RE:
DETAILS.
C1
ALTERNATE #1.2: ALTERNATE LOCATION FOR DUCT
PENETRATIONS AND CHASE. RE: MECH DWGS.
C4
MODIFY WALL TO ALLOW FOR DUCT SOUND DAMPER AND 2 HR
RATED DAMPER.
C2
PAINT NEW DUCT AND MECH COMPONENTS TO MATCH EXISTING
CEILING. PATCH / PAINT AREAS SURROUNDING NEW DUCTWORK
AS REQUIRED.
C3
AREA OF WORK IN OPEN CEILING AREA. ALL DUCT WORK, LIGHTS
AND SPRINKLER RENOVATION SHALL BE FINISHED AND PAINTED
TO MATCH ADJACENT.
C6
ALTERNATE #1.1: NEW PLASTER AND LATH CEILING WITH SKIM
COAT FINISH TO MATCH EXISTING CEILING FOR A SEAMLESS
LOOK.
C5
INTERIOR FINISH LEGEND:
PAINT
MANUFACTURER:
COLOR:
SHEEN / FINISH:
LOCATIONS:
NOTE:
PNT-1 SHERWIN WILLIAMS (OR
APPROVED EQUAL)
COLOR TO MATCH (E)
SURROUNDING PAINT
MATCH SURROUNDING
RE: CEILING AND FLOOR PLANS
WHERE PAINTING NEWLY
PATCHED AREAS, PAINT ENTIRE
CEILING OR FLOOR FIELD.
PNT-2
PNT-3
PNT-4
MANUFACTURER:
COLOR:
LOCATIONS:
CPT-1 MATCH CARPET FROM OWNER
STOCK
COLOR TO MATCH (E)
CONTROL ROOM
FLOORING AND BASE
MANUFACTURER/#:
COLOR:
LOCATIONS:
RB-1 MATCH (E) FLOOR BASE
COLOR TO MATCH (E)
CONTROL ROOM
PNT-5
INTERIOR FINISHES TO BE USED UPON ACCEPTANCE OF ALTERNATE #1.
PROJECT NO.: INITIAL DATE:
DRAWN BY: CHECKED BY:
ARCHITECTURAL WORKSHOP . DENVER, COLORADO
AR
CH
IT
EC
TU
RA
L W
OR
KS
HO
P, LL
C.
A
LL
R
IG
HT
S
RE
SE
RV
ED
2427ft OCT 2024
MRS MAB
AURORA FOX THEATER
HVAC ALTERATIONS
9900 E COLFAX AVE, AURORA, CO 80010
A-103
MAIN LEVEL CEILING PLAN
1/8" = 1'-0"1 MAIN LEVEL CEILING PLAN
DATE DESCRIPTION
11.01.2024 35% SCHEMATIC DESIGN
01.07.2025 65% DESIGN DEVELOPMENT
02.07.2025 95% CONSTRUCTION DOCUMENTS
04.23.2025 100% CONSTRUCTION DOCUMENTS
CEILING PLAN KEYNOTES:
EXISTING CEILING DIFFUSER TO REMAINC1
ALTERNATE #1: PATCH, REPAIR AND PAINT WATER DAMAGED
AREAS OF CEILING WHERE NEEDED.
C2
EXISTING LIGHT FIXTURE TO REMAINC5
ALTERNATE #1: REINSTALL SALVAGED LIGHT FIXTURE IN
ORIGINAL LOCATION
C6
ALTERNATE #1: NEW GYPSUM CEILING OVER ENTRY. CEILING
SLOPES TO MATCH FLOOR SLOPE. PAINT TO MATCH.
C3
ALTERNATE #1: NEW PULL DOWN ALUMINUM LADDER ATTIC
ACCESS. PRODUCT SPEC TO BE WERNER AE2510 OR EQUAL.
LOCATE AS PER DEMO PLAN.
C4
GENERAL NOTES:
1.
2.
3.
4.
5.
6.
DO NOT SCALE DRAWINGS. DIMENSIONS GOVERN. ANY
DISCREPANCIES IN DRAWINGS AND/OR EXISTING CONDITIONS
SHOULD BE BROUGHT TO THE IMMEDIATE ATTENTION OF THE
ARCHITECT FOR CLARIFICATION.
PROVIDE BLOCKING IN THE WALL AS REQUIRED TO SECURE
SHELVING.
ALL DIMENSIONS ARE FROM FACE OF FINISH, ROUGH
OPENINGS OR CENTERLINE OF GRID UNLESS NOTED
OTHERWISE.
ALL INTERIOR WALLS TO BE WALL TYPE 1 UNLESS OTHERWISE
NOTED.
ALL ROUGH AND FINISH CONSTRUCTION SHALL BE IN
COMPLIANCE WITH GOVERNING CODES AND REGULATIONS AS
A MINIMUM STANDARD.
EXTENTS OF SCOPE DEPICTED INCLUDES COMBINED AREAS
OF WORK IN ARCHITECTURAL, MECHANICAL, ELECTRICAL, AND
STRUCTURAL WORK.
A-301
A-301
OFFICE
RECEPTION
STORAGE
WOMENS
MENS
JAN
LOBBY
K L
C2
C3
C4
C5
C6
C6
C6
107' - 10"
PNT-5
PNT-5
PNT-5
ALT #1
C1
C5 C5
C5
C5
C5
C5
C5
C5
C5
C5
C5
C5
C5
C5
C5
C5
C5
C5
C5
C5
C5
C5
CABINET / CASEWORK
NEW FRAMED WALL
ROOF OR STRUCTURE OVERHANG ABOVE
CEILING PLAN LEGEND
EXISTING WALL
NEW GYPSUM CEILING
RECESSED DOWNLIGHT
TRACK LIGHT
CYLINDER DOWNLIGHT
INTERIOR FINISH LEGEND:
PAINT
MANUFACTURER:
COLOR:
SHEEN / FINISH:
LOCATIONS:
NOTE:
PNT-1 SHERWIN WILLIAMS (OR
APPROVED EQUAL)
COLOR TO MATCH (E)
SURROUNDING PAINT
MATCH SURROUNDING
RE: CEILING AND FLOOR PLANS
WHERE PAINTING NEWLY
PATCHED AREAS, PAINT ENTIRE
CEILING OR FLOOR FIELD.
PNT-2
PNT-3
PNT-4
MANUFACTURER:
COLOR:
LOCATIONS:
CPT-1 MATCH CARPET FROM OWNER
STOCK
COLOR TO MATCH (E)
CONTROL ROOM
FLOORING AND BASE
MANUFACTURER/#:
COLOR:
LOCATIONS:
RB-1 MATCH (E) FLOOR BASE
COLOR TO MATCH (E)
CONTROL ROOM
PNT-5
INTERIOR FINISHES TO BE USED UPON ACCEPTANCE OF ALTERNATE #1.
PROJECT NO.: INITIAL DATE:
DRAWN BY: CHECKED BY:
ARCHITECTURAL WORKSHOP . DENVER, COLORADO
AR
CH
IT
EC
TU
RA
L W
OR
KS
HO
P, LL
C.
A
LL
R
IG
HT
S
RE
SE
RV
ED
2427ft OCT 2024
MRS MAB
AURORA FOX THEATER
HVAC ALTERATIONS
9900 E COLFAX AVE, AURORA, CO 80010
A-104
LOBBY CEILING PLAN
1/8" = 1'-0"1 LOBBY CEILING PLAN
DATE DESCRIPTION
11.01.2024 35% SCHEMATIC DESIGN
01.07.2025 65% DESIGN DEVELOPMENT
02.07.2025 95% CONSTRUCTION DOCUMENTS
04.23.2025 100% CONSTRUCTION DOCUMENTS
ROOF PLAN KEYNOTES:
EXISTING ROOF MEMBRANE & ASSEMBLY TO REMAIN, PROTECT
DURING CONSTRUCTION. PATCH & REPAIR ANY EXISTING
DAMAGED AREAS. PATCH & REPAIR ALL PENETRATIONS FROM
EXISTING ROOF TOP UNITS AND OTHER DEMOLISHED OR
RELOCATED EQUIPMENT.
R1
R2 EXISTING THEATER SIGNAGE BASE CABINET.
R3 ALTERNATE #1: NEW CONTROL ROOM VENT TO REPLACE
DEMOLISHED VENT. RE: MECH DWGS.
R4 NEW ROOFTOP MECHANICAL UNIT. RE: MECH DWGS.
R5 NEW MECHANICAL UNIT CURB. RE: DETAILS.
R6 (E) ROOF ACCESS HATCH.
R7 NEW MECHANICAL DUCTWORK. RE: MECH DWGS.
R8
ALTERNATE #1.2: ALTERNATE LOCATION FOR NEW MECHANICAL
DUCTWORK. RE: MECH DWGS.
R9 PATCH AND CLOSE UP EXISTING ROOFTOP UNIT LOCATIONS.
R10 NOT USED
R11
EXISTING ROOFTOP EQUIPMENT TO REMAIN.
ALTERNATE #1.2: ALTERNATE LOCATION FOR NEW ROOFTOP
MECHANICAL UNIT. RE: MECH DWGS.
R12
ALTERNATE #1: PROVIDE PARAPET CAP AT BACK OF ROOF
PARAPET AS SHOWN. RE:
R14
ALTERNATE #1: CONFIRM (E) ROOF PENETRATIONS EXIST AS
DESCRIBED IN DEMO DRAWINGS. CONFIRM NEW DUCTS WILL FIT
AS SHOWN IN SIGNAGE BASE CABINET. INSTALL AND SEAL AS
PER 6/A-501.
R15
ALTERNATE #1.2: ALTERNATE LOCATION FOR DUCT
PENETRATIONS AND CHASE. RE: MECH DWGS.
R13
/4 A-501
GENERAL NOTES:
1.
2.
3.
4.
5.
6.
DO NOT SCALE DRAWINGS. DIMENSIONS GOVERN. ANY
DISCREPANCIES IN DRAWINGS AND/OR EXISTING CONDITIONS
SHOULD BE BROUGHT TO THE IMMEDIATE ATTENTION OF THE
ARCHITECT FOR CLARIFICATION.
PROVIDE BLOCKING IN THE WALL AS REQUIRED TO SECURE
SHELVING.
ALL DIMENSIONS ARE FROM FACE OF FINISH, ROUGH
OPENINGS OR CENTERLINE OF GRID UNLESS NOTED
OTHERWISE.
ALL INTERIOR WALLS TO BE WALL TYPE 1 UNLESS OTHERWISE
NOTED.
ALL ROUGH AND FINISH CONSTRUCTION SHALL BE IN
COMPLIANCE WITH GOVERNING CODES AND REGULATIONS AS
A MINIMUM STANDARD.
EXTENTS OF SCOPE DEPICTED INCLUDES COMBINED AREAS
OF WORK IN ARCHITECTURAL, MECHANICAL, ELECTRICAL, AND
STRUCTURAL WORK.
A
A-301
A-301
A-301
R4
R3
R2
B C E G H J K L
R4
11' - 0"
R6
R5
R7
R1
R11(ALT #1.2)
R9
R9
R5
R6
A-501
A-501
D F I
A-401 1
3/8" / 1'-0"
R7
R7
A-501
R4 R5
A-501
10' - 10" RTU-2
RTU-1
RTU-3
R8
R8
R8
R8R8
12(ALT #1.2)
3' - 0"
4'
- 4
A-501
A-501
R14
R14
R13(ALT #1.2)
R15
R1
R1
R1
ALT #1
20' - 10" EST. AREA OF WORK
4" E
ST
. A
RE
A
OF
W
OR
K
R9
ROOF PLAN LEGEND
NEW ROOFING MATERIAL
AREA NOT IN SCOPE
ALTERNATE DUCT LOCATION
PROJECT NO.: INITIAL DATE:
DRAWN BY: CHECKED BY:
ARCHITECTURAL WORKSHOP . DENVER, COLORADO
AR
CH
IT
EC
TU
RA
L W
OR
KS
HO
P, LL
C.
A
LL
R
IG
HT
S
RE
SE
RV
ED
2427ft OCT 2024
MRS MAB
AURORA FOX THEATER
HVAC ALTERATIONS
9900 E COLFAX AVE, AURORA, CO 80010
A-105
ROOF PLAN
1/8" = 1'-0"1 ROOF PLAN
DATE DESCRIPTION
11.01.2024 35% SCHEMATIC DESIGN
01.07.2025 65% DESIGN DEVELOPMENT
02.07.2025 95% CONSTRUCTION DOCUMENTS
04.23.2025 100% CONSTRUCTION DOCUMENTS
A-301
5 61 3 4 7
LOBBY
WOMENS
OFFICE
S3
S2
S7
S1
A-501
A-501
TYP
NO WORK
S9
S9
ALT #1
A
A-301
A-301
B C E G H J K LD F I
MECHANICAL
PLATFORM
AUDITORIUM
LOBBY
CONTROL
RM
MECH
SPACE
NO WORK
NO WORK
LOFT
NO WORK
S8
S2
S6
S5
S1
S3
S2
S9
S4
A-501
A-501
A-501
7TYP
WOMENS
ALT #1
GENERAL NOTES:
1.
2.
3.
4.
5.
6.
DO NOT SCALE DRAWINGS. DIMENSIONS GOVERN. ANY
DISCREPANCIES IN DRAWINGS AND/OR EXISTING CONDITIONS
SHOULD BE BROUGHT TO THE IMMEDIATE ATTENTION OF THE
ARCHITECT FOR CLARIFICATION.
PROVIDE BLOCKING IN THE WALL AS REQUIRED TO SECURE
SHELVING.
ALL DIMENSIONS ARE FROM FACE OF FINISH, ROUGH
OPENINGS OR CENTERLINE OF GRID UNLESS NOTED
OTHERWISE.
ALL INTERIOR WALLS TO BE WALL TYPE 1 UNLESS OTHERWISE
NOTED.
ALL ROUGH AND FINISH CONSTRUCTION SHALL BE IN
COMPLIANCE WITH GOVERNING CODES AND REGULATIONS AS
A MINIMUM STANDARD.
EXTENTS OF SCOPE DEPICTED INCLUDES COMBINED AREAS
OF WORK IN ARCHITECTURAL, MECHANICAL, ELECTRICAL, AND
STRUCTURAL WORK. 2
A-301
5 61 3 4
AUDITORIUM
S1
S4
S2
ALT #1
SECTION KEYNOTES:
(E) "FOX" NEON SIGN BEYOND.S1
EXISTING BUILDING.S2
ALTERNATE #1: ROOF JOISTS TO BE REINFORCED FOR NEW
MECHANICAL UNIT. RE: STR. DWGS FOR JOISTS AND
REINFORCING DETAILS.
S5
ALTERNATE #1: CEILING REPAIR FOR NEW STRUCTURAL REINF.
WORK. RE: STR DWGS.
S6
ALTERNATE #1: NEW MECHANICAL DUCTWORK. RE: MECH DWG
FOR SIZE AND MOUNTING.
S3
ALTERNATE #1: NEW MECHANICAL UNIT AND CURB, RE: ROOF
PLAN FOR LOCATION, RE: MECH DWG FOR UNIT INFORMATION.
S4
S7
S8
ALTERNATE #1: NEW PULL DOWN LADDER, RE: LOBBY CEILING
PLAN FOR LOCATION AND DESCRIPTION.
ALTERNATE #1: NEW CONTROL ROOM FAN AND DUCT, RE: MECH.
DWG.
S9 EXISTING MECHANICAL EQUIPMENT.
PROJECT NO.: INITIAL DATE:
DRAWN BY: CHECKED BY:
ARCHITECTURAL WORKSHOP . DENVER, COLORADO
AR
CH
IT
EC
TU
RA
L W
OR
KS
HO
P, LL
C.
A
LL
R
IG
HT
S
RE
SE
RV
ED
2427ft OCT 2024
MRS MAB
AURORA FOX THEATER
HVAC ALTERATIONS
9900 E COLFAX AVE, AURORA, CO 80010
A-301
BUILDING SECTIONS
1/8" = 1'-0"2 LOBBY SECTION
1/8" = 1'-0"1 BUILDING SECTION
1/8" = 1'-0"3 AUDITORIUM SECTION
DATE DESCRIPTION
11.01.2024 35% SCHEMATIC DESIGN
01.07.2025 65% DESIGN DEVELOPMENT
02.07.2025 95% CONSTRUCTION DOCUMENTS
04.23.2025 100% CONSTRUCTION DOCUMENTS
(E) PARAPET
(E) SIGN BASE METAL UPPER CABINET
ENCLOSURE TO REMAIN
(E) SIGN BEYOND TO REMAIN
DUCTWORK PENETRATIONS IN EXISTING SIGN
BASE METAL BOTTOM CABINET ENCLOSURE
RE: MECH DWGS & ARCH DETAILS ON A-501.
CONTRACTOR TO CONFIRM SIZE AND
LOCATION FOR NEW DUCT WORK.
(E) ROOF
NEW DUCTWORK, RE: MECH DWGS
PARAPET CAP
(E) ROOF CURB & FLASHING
1'
- 6
- 6
(E) SIGN BASE METAL BOTTOM CABINET
ENCLOSURE TO REMAIN. REMOVE CORRUGATED
PANELS AND MODIFY FRAME & PANELS AS REQ'D
FOR NEW DUCT PENETRATIONS
4' - 5"
2"
VIF
+/- 2' - 7 1/2" 2" 2' - 4" 2" 2' - 4" 2' - 4" 2" 2' - 4" 2" 2' - 4" 2"
PNT-1
A-501
A-501
7' - 6"+/- 7' - 9 1/4"
VIF
5' - 1 3/4"
PNT-1
2-HR RATED CHASE; RE: FLOOR PLANS
PNT-1
RB-1
RB-1
(E) PARAPET
(E) SIGN BASE METAL UPPER CABINET
ENCLOSURE TO REMAIN
(E) SIGN BEYOND TO REMAIN
DUCTWORK PENETRATIONS IN EXISTING SIGN
BASE METAL BOTTOM CABINET ENCLOSURE
RE: MECH DWGS & ARCH DETAILS ON A-501
(E) ROOF
(E) ROOF CURB & FLASHING
(E) SIGN BASE METAL BOTTOM CABINET
ENCLOSURE TO REMAIN. REMOVE CORRUGATED
PANELS AND MODIFY FRAME & PANELS AS REQ'D
FOR NEW DUCT PENETRATIONS
(E) ROOF MECH & EQUIPMENT TO
BE DEMOLISHED; RE: MECH DWGS
PROJECT NO.: INITIAL DATE:
DRAWN BY: CHECKED BY:
ARCHITECTURAL WORKSHOP . DENVER, COLORADO
AR
CH
IT
EC
TU
RA
L W
OR
KS
HO
P, LL
C.
A
LL
R
IG
HT
S
RE
SE
RV
ED
2427ft OCT 2024
MRS MAB
AURORA FOX THEATER
HVAC ALTERATIONS
9900 E COLFAX AVE, AURORA, CO 80010
A-401
ELEVATIONS VIEWS
1/2" = 1'-0"1 ELEVATION - ROOF DUCT AT SIGNAGE CABINET
1/2" = 1'-0"2 INT ELEVATION - CONTROL ROOM SHELVING
1" = 1'-0"3 ROOFTOP DUCT AT SIGNAGE CABINET DIAGRAM
(ALTERNATE #1) (ALTERNATE #1)
DATE DESCRIPTION
02.07.2025 95% CONSTRUCTION DOCUMENTS
04.23.2025 100% CONSTRUCTION DOCUMENTS
4 INCH 22 GAUGE BRAKE
METAL PARAPET CAP
ADDITION WITH DRIP
EDGE & COUNTER
FLASHING. COLOR TO
MATCH (E) MTL SIDING TO
REMAIN
(E) ROOF MEMBRANE
(E) PARAPET WALL
4"
(E) METAL SIDING
1 1/2"
WALL TYPE 1 (CHASE WALL)
1 1/2" = 1'-0"
RATING: 2 HOUR
NO. UL : U415 SYSTEM B
(ALTERNATE RATED WALL ASSEMBLY CAN
BE USED UPON APPROVED SUBSTITUTION)
FIRE CAULK, CONT. AT BASE, BOTH SIDES
WALL BASE (MATCH EXISTING)
2 1/2" C-H STUDS @ 24" O.C., U.N.O.
3 LAYERS OF 5/8" TYPE 'X' GYP. BD. EACH
SIDE. FASTEN PER MFR. RECOMMENDATION
BOTTOM OF (E) ROOF DECK
1" TYPE 'X' GYP. BD. EACH SIDE. FASTEN PER
MFR. RECOMMENDATION
4"
W1
FIRE CAULK, CONT. AT BASE, BOTH SIDES
116' - 0" ±
ELEV
METAL SUPPORT BRACKET PAINT TO
MATCH WALL FINISH, DIRECT FASTEN
TO EXISTING WALL STUDS, 16" O.C. W/
FLUSH #12 X 2" FLAT HEAD SCREWS
3/4" PLYWOOD SHELF. PAINT.
RE: ELEVATIONS AND FINISH SCH.
1'
- 0
1 1
/2" T
YP
1'
- 2 " T
YP
1 1
/2" T
YP
6"
A-501
CURB BY MANUF.(E) RIGID ROOF INSULATION TO REMAIN
EPDM ROOFING MATERIAL BY ROOFER
CANT STRIP BY ROOFER
COUNTER FLASHING BY ROOFER
SUPPORTED ROOFTOP UNIT
CLOSED-CELL FOAM
WEATHERSTRIPPING BY MFR
FLASHING BY ROOFER
FORMED CHANNEL BY MFR
ADJUSTABLE SPRING BY MFR, RE: MECH
EPDM WEATHER SEAL BY ROOFER
MOUNTING ANGLE BY MFR
CURB BY MFR
(E) ROOF DECK & STRUCTURE TO REMAIN
ROOF C-CHANNEL; RE: STR DWGS
6" 4 3
/8" 4 3
/8"
1'
- 2
3/ 4"
3/4" GAP, TYP
EXISTING EXT WALL & SIGN
TO REMAIN, DO NOT DISTURB
EXISTING NEON SIGN TO
REMAIN, DO NOT DISTURB
3/4" GAP AROUND DUCT
PENETRATION, STUFFED W/
MINERAL WOOL & CAULKED
FOR ACOUSTIC ISOLATION
PROVIDE WOOD
REINFORCEMENT FOR NEW
DUCT OPENING ON ALL SIDES
EXISTING PLASTER CEILING
ASSEMBLY W/ WOOD FRAMING
2-HR RATED WALL; RE: WALL TYPES
FOR DETAILS
VERTICAL DUCT IN RATED CHASE;
RE: MECH DWGS FOR SIZE &
LOCATION
EXISTING ROOF OPENING IN SIGN
BASE. CONFIRM SIZE & LOCATION.
USE ALT #1.2 IF NO OPENING EXISTS
EXISTING ROOF ASSEMBLY
CONSISTING OF STL BAR JOISTS &
MTL DECK; RE: STR DWGS FOR
REINFORCEMENT
SIGN BASE METAL UPPER CABINET
TO REMAIN. DO NOT DISTURB
SIGN BASE METAL BOTTOM CABINET
ENCLOSURE. REMOVE CORRUGATED
PANELS AND MODIFY FRAME & PANELS AS
REQ'D FOR NEW DUCT PENETRATIONS,
RE: ELEVATIONS & AXONOMETRIC
MECH DUCT ON ROOF &
PENETRATING SIGN BASE & ROOF;
RE: MECH DWGS FOR SIZE &
LOCATION
MECH DUCT ROOF SUPPORT PER
MFR REQS; RE: MECH DWGS
EXISTING ROOF CURB TO REMAIN
3/4" GAP AROUND DUCT
PENETRATION, STUFFED W/
MINERAL WOOL & CAULKED
FOR ACOUSTIC ISOLATION
2-HR RATED WALL; RE: WALL TYPES
FOR DETAILS
CONFIRM BAR JOIST LOCATION PRIOR
TO DEMO WORK. DO NOT CUT BAR
JOISTS. NOTIFY THE ARCHITECT IF BAR
JOISTS ARE IN OPENING LOCATION, TYP
3/4" GAP, TYP
VERTICAL DUCT IN RATED CHASE; RE:
MECH DWGS FOR SIZE & LOCATION
EXISTING ROOF ASSEMBLY
CONSISTING OF STL BAR JOISTS &
MTL DECK; RE: STR DWGS FOR
REINFORCEMENT
(E) FLOOR FINISH TO REMAIN,
PATCH & REPAIR AS REQ'D
WALL BASE TO MATCH EXISTING
3/4" GAP AROUND DUCT PENETRATION,
STUFFED W/ MINERAL WOOL &
CAULKED FOR ACOUSTIC ISOLATION
EXISTING ROOF OPENING W/
STRUCTURAL REINFORCEMENT.
CONTRACTOR TO CONFIRM SIZE AND
LOCATION FOR NEW DUCT WORK.
EXISTING ROOF ASSEMBLY
CONSISTING OF STL BAR JOISTS &
MTL DECK; RE: STR DWGS FOR
REINFORCEMENT
MECH DUCT ON ROOF & PENETRATING
SIGN BASE & ROOF; RE: MECH DWGS
FOR SIZE & LOCATION
3/4" GAP, TYP
EXISTING ROOF INSULATION TO REMAIN
TERMINATION BAR & WEATHER SEAL AT
DUCT PER MFRS REQS. LOCATE AS
HIGH AS POSSIBLE
MECH DUCT ROOF SUPPORT PER
MFR REQS; RE: MECH DWGS
EXISTING PLASTER CEILING
ASSEMBLY W/ WOOD FRAMING
ADDITIONAL WOOD BLOCK AS REQ'D
TO MOUNT GYP. BD. CEILING
2 LAYERS OF TYPE X GYP BD.
CONFIRM THICKNESS OF (E)
PLASTER CEILING AND MATCH
VI
F
FINISH & TEXTURE OF GYB. BD.
CEILING PATCH TO MATCH (E)
PLASTER CEILING
PROJECT NO.: INITIAL DATE:
DRAWN BY: CHECKED BY:
ARCHITECTURAL WORKSHOP . DENVER, COLORADO
AR
CH
IT
EC
TU
RA
L W
OR
KS
HO
P, LL
C.
A
LL
R
IG
HT
S
RE
SE
RV
ED
2427ft OCT 2024
MRS MAB
AURORA FOX THEATER
HVAC ALTERATIONS
9900 E COLFAX AVE, AURORA, CO 80010
A-501
DETAILS
3" = 1'-0"4 PARAPET CAP DETAIL
1 1/2" = 1'-0"5 SHELVING DETAIL
6" = 1'-0"1 MECHANICAL CURB AXONOMETRIC
3" = 1'-0"2 MECHANICAL CURB DETAIL
1" = 1'-0"6 DUCT PEN. THRU SIGN CABINET SECTION
1" = 1'-0"3 DUCT PENETRATION THRU (E) FLOOR DETAIL
1" = 1'-0"8 DUCT PEN. THRU ROOF SECTION
3" = 1'-0"7 CEILING PATCH DETAIL
(ALTERNATE #1) (ALTERNATE #1)
(ALTERNATE #1)
(ALTERNATE #1)
(ALTERNATE #1)
(ALTERNATE #1)
(ALTERNATE #1)
DATE DESCRIPTION
01.07.2025 65% DESIGN DEVELOPMENT
02.07.2025 95% CONSTRUCTION DOCUMENTS
04.23.2025 100% CONSTRUCTION DOCUMENTS
PLAN SYMBOLS
CONTROL PANEL/RADIANT MANIFOLD
T
S
CO2 CARBON DIOXIDE SENSOR
THERMOSTAT
POINT OF NEW CONNECTION
REMOTE TEMPERATURE SENSOR
ACCESS PANEL
SECTION CUT LETTER/SHEET SHOWN ON
POINT OF DISCONNECTION
S
ROOF DRAIN
SAFETY RELIEF VALVE
FLOOR DRAIN
FLOOR SINK
HORIZONTAL CLEANOUT
VERTICAL CLEANOUT
PRESSURE GAUGE W/ PIG TAIL & COCK
PRESSURE - TEMP. TAP
FLEXIBLE CONNECTOR
PIPE UNION
DRAIN VALVE W/ HOSE END
PLUG VALVE IN RISER
GATE OR GLOBE VALVE IN RISER
BALL VALVE
PLUG OR BALANCING VALVE
CHECK VALVE
BUTTERFLY VALVE
90° ELBOW UP
TEE UP
TEE DOWN
PIPING SYMBOLS
90° ELBOW DN
SHUT OFF (BALL, GATE, BUTTERFLY)
TEMPERATURE CONTROLLER OR SENSOR
STEAM TRAP TEST CHAMBER
STEAM TRAP:
FT-FLOAT & THERMOSTATIC
TD-THERMODYNAMIC
IB-INVERTED BUCKET
TS-THERMOSTATIC
BP-BALANCED PRESSURE
TC
PIPING DESIGNATIONS
STEAM & CONDENSATE PIPING
PLUMBING PIPING
G NATURAL GAS
RS REFRIGERANT SUCTION
D DRAIN PIPE
RL REFRIGERANT LIQUID
DOMESTIC COLD WATER (CW)
DOMESTIC HOT WATER (HW)
HOT WATER RECIRCULATION (HWC)
FIRE LINEF
W WASTE
VENTV
STORM DRAINST
STORM DRAIN OVERFLOWST(OF)
LPS LOW PRESURE STEAM
LPR LOW PRESURE CONDENSATE RETURN
PC PUMPED CONDENSATE
DUCTWORK LEGEND
DESCRIPTIONROUND
DUCT RISER
DUCT DROP
90° ELBOW DN.
(NEGATIVE PRESSURE)
90° ELBOW DN.
(POSITIVE PRESSURE)
90° ELBOW UP
(NEGATIVE PRESSURE)
90° ELBOW UP
(POSITIVE PRESSURE)
SIZE OR SHAPE TRANSITION
PLAN3D
CW
HW
HWC
RECTANGULAR
3DPLAN
ROUND…
This is the start of the file's text. The full file is on GovTribe.