This set of mechanical engineering documents details the HVAC and mechanical system design for a heat pump installation project at 3202 Elk Lane in Pitkin County, Colorado, prepared by SGM Engineering. The project involves replacing the existing heating system with a new Variable Refrigerant Flow (VRF) system featuring a Lochinvar modular condensing combination boiler, Carrier-Toshiba heat pump units, fan coil units, and hydronic baseboard radiation. The mechanical plans cover three levels (garage, main, and loft) and include comprehensive specifications for equipment mounting, piping materials, insulation, zoning, and control sequences.
The mechanical system design incorporates several key components, including a single air source heat pump unit (HPU-1) with a 60 MBH nominal cooling capacity and 132 MBH heating capacity, five fan coil units serving different zones, and a chemical feed system with glycol. The system is designed for high-altitude operation at 6,700 feet, using R-410A refrigerant, and includes detailed zoning with programmable thermostats for individual space temperature control. The project specifications emphasize energy efficiency, with equipment selected to meet specific performance requirements, and include provisions for startup, verification, and comprehensive documentation of the mechanical installation.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Attachment A -.pdf | ||
| Attachment C - Sample Contract.pdf | ||
| RFP 177.24 - 3202 Elk Lane Heat Pumps - Final.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
T
M
T/P
P/T
F
MOUNTING HEIGHTS:
1. MOUNT ALL THERMOSTATS AT 54 INCHES AFF, UNLESS NOTED OTHERWISE.
CONTROL WIRING:
1. PROTECT ALL EXPOSED CONTROL AND LOW VOLTAGE WIRING BY
INSTALLING WITHIN EMT CONDUIT.
SUBMITTALS:
1. REFER TO GENERAL NOTES FOR SUBMITTAL REQUIREMENTS.
2. PROVIDE SEPARATE SUBMITTAL FOR EACH CATEGORY GROUP OR
SCHEDULE OF ITEMS.
3. AT MINIMUM, PROVIDE SUBMITTALS FOR THE FOLLOWING:
a. FANS.
b. PUMPS.
c. BOILERS.
d. HYDRONIC SPECIALTIES.
e. PACKAGED EQUIPMENT.
f. CONTROLS PACKAGES.
g. PIPE AND PIPE INSULATION MATERIALS AND METHODS.
h. TEST AND BALANCE REPORTS.
i. TERMINAL UNITS.
j. STARTUP AND VERIFICATION DATA.
k. PROJECT SPECIFIC MULTI-ZONE HEAT PUMP PIPING LAYOUT (SEE
VRF SYSTEM NOTE).
TEST AND BALANCE:
1. PERFORM TESTING, ADJUSTING AND BALANCING (TAB) BY AN AABC, NEBB,
OR TABB AGENCY WITH CURRENT CERTIFICATION.
2. TAB INCLUDES BUT IS NOT LIMITED TO (WHEN PRESENT): ADJUSTING AND
RESHEAVING FANS, AIR HANDLING EQUIPMENT, PUMPS, AIR TERMINAL UNITS
AND DEVICES, CALIBRATING THERMOSTATS, BALANCING VALVES, PRESSURE
RELATIONSHIPS, OUTSIDE AIR DAMPERS, AND MEASURING MOTOR
ELECTRICAL CHARACTERISTICS.
3. AIRSIDE TOLERANCES:
a. SUPPLY, RETURN, AND EXHAUST FANS AND EQUIPMENT WITH FANS:
MINUS 5 TO PLUS 10 PERCENT.
b. AIR OUTLETS AND INLETS: 0 TO MINUS 10 PERCENT.
4. HYDRONIC TOLERANCES: CHECK THE SUM OF BRANCH-CIRCUIT FLOWS
AGAINST APPROVED PUMP FLOW RATE.
a. HEATING-WATER FLOW RATE: 0 TO MINUS 10 PERCENT.
b. COOLING-WATER FLOW RATE: 0 TO MINUS 5 PERCENT.
5. INDICATE % DISCREPANCY BETWEEN ACTUAL AND DESIGN VALUES FOR
EACH OF THE FOLLOWING (WHEN PRESENT WITH A SPECIFIED
VALUE/SETTING), AT MINIMUM:
a. DIFFUSER/REGISTER/GRILLE/LOUVER.
b. FAN.
c. PUMP.
d. HYDRONIC BALANCING VALVE, VENTURI, OR CIRCUIT SETTER.
6. BALANCE AIR AND WATER FLOWS TO VALUE SHOWN AT THE TERMINAL
DEVICE UNLESS NOTED OTHERWISE. TERMINAL VALUES MAY DIFFER FROM
CENTRAL EQUIPMENT VALUES OR CAPACITIES.
PENETRATIONS AND RATED ASSEMBLIES:
1. INSTALL COMBINATION FIRE/SMOKE DAMPERS AT ALL REQUIRED RATED
WALL PENETRATIONS AND BE WIRED INTO THE FIRE ALARM PANEL BY THE
ELECTRICAL AND/OR FIRE ALARM PANEL CONTRACTOR. COORDINATE TO
PROVIDE MOTOR VOLTAGE TO MATCH THAT OF THE FIRE ALARM PANEL.
INSTALL PER THE MANUFACTURER'S INSTRUCTIONS AND THE ADOPTED
CODE.
2. FIRE DAMPERS AND FIRE SMOKE DAMPERS SHALL BE UL LISTED AND
INSTALLED PER THE MANUFACTURER'S INSTRUCTIONS AND THE ADOPTED
CODE.
3. PROVIDE FIRE STOP MATERIAL TO SEAL AROUND DUCT AND PIPE
PENETRATIONS THROUGH RATED PARTITIONS AND ASSEMBLIES, IN
ACCORDANCE WITH THE ADOPTED CODE.
MECHANICAL SPECIFICATIONS
VARIABLE REFRIGERANT FLOW (VRF) SYSTEMS:
1. CONSTRUCT ALL PIPING IN ACCORDANCE WITH THE MATERIALS,
FITTINGS, METHODS, AND INSULATION REQUIREMENTS, AS
INDICATED ELSEWHERE WITHIN THE PROJECT DOCUMENTS.
2. INSTALL REFRIGERATION SPECIALTIES IN ACCORDANCE WITH
MANUFACTURER'S INSTRUCTIONS.
3. PIPING INSTALLATION SHALL NOT EXCEED EQUIPMENT
MANUFACTURER MAXIMUM VERTICAL AND HORIZONTAL LENGTHS.
CONTRACTOR TO VERIFY FINAL LENGTHS ARE IN ACCORDANCE WITH
MANUFACTURER SPECIFICATIONS PRIOR TO PURCHASING AND
INSTALLATION.
4. PROVIDE FACTORY STARTUP ON COMPLETE SYSTEM.
5. REFRIGERANT PIPING AS SPECIFIED BY PROJECT SPECIFIC LAYOUT
AND COMPUTER GENERATED BILL OF MATERIALS FROM
MANUFACTURER. REFER TO PLANS AND RELATED SCHEDULES FOR
ADDITIONAL INFORMATION
ELECTRICAL ROOMS:
1. ONLY PIPING DEDICATED TO EQUIPMENT SERVING OR
CONDITIONING AN ELECTRICAL ROOM MAY BE INSTALLED IN THE
ELECTRICAL ROOM. IN SUCH CASES, PROVIDE SECONDARY
CONTAINMENT TO PREVENT LEAKS AND/OR CONDENSATION, VIA
SECONDARY CONTAINMENT BENEATH THE PIPE, WITH AUDIBLE
ALARM UPON LEAK DETECTION OR VISUAL "TELL TALE" DRAIN
TERMINATION LOCATION. REFERENCE NEC 110. IN NO CASE MAY
PIPING OR DUCTWORK BE INSTALLED DIRECTLY ABOVE ELECTRICAL
EQUIPMENT WITHIN THE SPACE.
SYSTEM REFRIGERANT BASIS OF DESIGN:
1. THE REFRIGERANT SYSTEMS AND DESIGN SPECIFIED FOR THIS
PROJECT ARE BASED ON R410A. NOTIFY ENGINEER IN WRITING OF
ANY DEVIATION FROM R410A, AND AWAIT FURTHER DIRECTION
BEFORE PROCEEDING.
KEYNOTE TAG
REVISION TAG
EQUIPMENT TAG
REFER TO EQUIPMENT SCHEDULE
REFERENCE EQUIPMENT TAG
SPECIFIED BY ANOTHER DISCIPLINE
GRILLE, REGISTER, DIFFUSER TAG
AA-#-###
AA-#-###
NEW, OR OTHER ACTION ITEMS
(Solid dark lines)
ITEMS TO BE DEMOLISHED
(Dashed dark lines on demo plans)
EXISTING ITEMS TO REMAIN
(Solid light lines and text)
CONNECT NEW TO EXISTING
Type
CFM
Size reference info
ANNOTATION SYMBOLS
LINETYPES / PHASING
MECHANICAL SYMBOL LEGEND
TEMPERATURE SENSOR
THERMOSTAT
MOTORIZED DAMPER
DEVICE SYMBOLS
SUPPLY / DRAIN
RETURN
BELOW GRADE
PIPING LINE TYPES
SYSTEM TYPE
SYSTEM TYPE
SYSTEM TYPE
C CONDENSATE
CA COMPRESSED AIR
CD GRAVITY FLOW CONDENSATE DRAIN
PCD PUMPED CONDENSATE DRAIN
CH CHILLED WATER
CW CONDENSATE WATER
HW HEATING WATER
RL/RS REFRIGERANT LINESET
RS REFRIGERANT SUCTION
RL REFRIGERANT LIQUID
SM SNOWMELT
HR HEAT RECOVERY
HPS HIGH PRESSURE STEAM
MPS MEDIUM PRESSURE STEAM
LPS LOW PRESSURE STEAM
HGBP HOT GAS BYPASS
PIPE SYSTEM TYPE ABBREVIATIONS
2-WAY VALVE
3-WAY VALVE
ISOLATION VALVE
BALANCING VALVE
TEMP. AND PRESSURE RELIEF VALVE
CHECK VALVE
VALVE SYMBOLS
FLOW SWITCH
PRESSURE GAUGE
PRESSURE AND TEMPERATURE TAP
THERMOMETER
CONTROL & INSTRUMENTATION SYMBOLS
HYDRONIC SPECIALTIES SYMBOLS
AIR VENT
STRAINER
COUPLING & CONNECTOR SYMBOLS
FLANGED CONNECTION
UNION
EQUIPMENT SYMBOLS
PUMP
DUCT SYSTEM TYPE ABBREVIATIONS
FV FLUE VENT
CA COMBUSTION AIR
OA OUTSIDE AIR (UNCONDITIONED)
FA FRESH AIR (CONDITIONED)
SA SUPPLY AIR
RA RETURN AIR
EA EXHAUST (GENERAL)
GE GREASE EXHAUST
TA TRANSFER AIR
DEFINITIONS:
1. CONTRACTOR: THE ENTITY BINDED BY THE PRIME AGREEMENT WITH
THE CLIENT TO PERFORM THE TASKS INDICATED IN THE CONTRACT
DOCUMENTS. THE TERM CONTRACTOR INCLUDES AND IMPLIES ANY
RELEVANT SUB-CONTRACTOR THAT MAY BE PERFORMING THE
ACTUAL TASK UNDER THE CONTRACTOR’S DIRECTION.
2. CONTRACT DOCUMENTS: THE COMPLIMENTARY COLLECTION OF
DRAWINGS, SPECIFICATIONS, AND PROJECT MANUAL, WHICH ARE
DIRECTED TO THE CONTRACTOR, UNDER THE PRIME AGREEMENT.
3. FURNISH: TO SUPPLY, DELIVER, UNLOAD, AND INSPECT FOR DAMAGE.
4. INSTALL: TO UNPACK, ASSEMBLE, ERECT, APPLY, PLACE, FINISH,
CURE, PROTECT, CLEAN, START UP, AND MAKE READY FOR USE.
5. PROVIDE: TO FURNISH AND INSTALL.
6. SUPPLY: SAME AS FURNISH.
7. PRODUCT: MATERIAL, MACHINERY, COMPONENTS, EQUIPMENT,
FIXTURES, AND SYSTEMS FORMING THE WORK RESULT. NOT
MATERIALS OR EQUIPMENT USED FOR PREPARATION, FABRICATION,
CONVEYING, OR ERECTION AND NOT INCORPORATED INTO THE WORK
RESULT. PRODUCTS MAY BE NEW, NEVER BEFORE USED, OR RE-USED
MATERIALS OR EQUIPMENT.
8. PROJECT MANUAL: THE BOOK-SIZED VOLUME THAT INCLUDES THE
PROCUREMENT REQUIREMENTS (IF ANY), THE CONTRACTING
REQUIREMENTS, AND THE SPECIFICATIONS.
NATURE AND USE OF CONTRACT DOCUMENTS:
1. IF ANY DISCREPANCY IS FOUND WITHIN THE CONTRACT DOCUMENTS
DURING CONSTRUCTION, SUBMIT AN RFI TO THE ENGINEER FOR
DIRECTION BEFORE PROCEEDING. IF A DISCREPANCY IS FOUND
DURING BIDDING, AND THE DESIGN TEAM DOES NOT PROVIDE A
RESOLUTION BY THE FINAL ADDENDUM, BASE THE BID ON THE MORE
COSTLY INTERPRETATION. FAILING TO DO SO WILL NOT BE
CONSIDERED A VALID BASIS FOR CHANGE ORDERS DURING
CONSTRUCTION.
2. THE CONTRACTOR IS RESPONSIBLE FOR PROVIDING COMPLETE
CONTRACT DOCUMENTS TO ALL TRADES, AND FOR COORDINATING
BETWEEN ALL TRADES TO ENSURE PROPER INSTALLATION OF
COMPLETE AND FUNCTIONAL SYSTEMS AS SHOWN ON THE CONTRACT
DOCUMENTS.
3. THE CONTRACTOR IS RESPONSIBLE FOR ALL SCOPES OF WORK,
COMPLETENESS OF BIDS, AND PRICING EXERCISES. FURTHER,
COORDINATION AND DIVISION OF SCOPE AMONGST SUB-
CONTRACTORS IS THE RESPONSIBILITY OF THE CONTRACTOR.
4. DO NOT SCALE DRAWINGS FOR ROUGH-IN MEASUREMENTS OR USE
AS SHOP DRAWINGS. WHERE DRAWINGS ARE REQUIRED FOR THESE
PURPOSES OR HAVE TO BE MADE FROM FIELD MEASUREMENTS, TAKE
THE NECESSARY MEASUREMENTS AND PREPARE THE DRAWINGS.
5. DRAWINGS ARE DIAGRAMMATIC IN NATURE AND DO NOT SHOW
EVERY SYSTEM OFFSET REQUIRED. COORDINATE WITH THE EXISTING
AND NEW STRUCTURE, ELECTRICAL, PLUMBING, FIRE PROTECTION
AND CEILING TO PROVIDE OFFSETS AS REQUIRED AND APPROPRIATE.
CODES, INSPECTIONS, AND PERMITS:
1. PERFORM ALL WORK IN ACCORDANCE WITH THE CODES,
REGULATIONS, AND LOCAL AMENDMENTS, AS CURRENTLY ADOPTED
BY THE AUTHORITY HAVING JURISDICTION (AHJ).
2. IF ANY DISCREPANCIES ARE FOUND BETWEEN CONTRACT
DOCUMENTS AND ANY APPLICABLE CODE OR LEGAL REQUIREMENT,
SUBMIT AN RFI TO ENGINEER FOR DIRECTION BEFORE PROCEEDING.
3. OBTAIN ALL PERMITS AND INSPECTIONS, AND PAY FOR ALL UTILITY
METERS AND UTILITY CONNECTIONS, REQUIRED BY THE AHJ FOR
PROJECT COMPLETION.
WARRANTY:
1. UNCONDITIONALLY GUARANTEE ALL LABOR AND MATERIAL ON ALL
WORK AGAINST DEFECTS IN WORKMANSHIP AND MATERIALS FOR A
PERIOD OF ONE YEAR, FOLLOWING FINAL ACCEPTANCE, EXCEPT AS
EXTENDED BY STANDARD MANUFACTURER WARRANTY AND/OR BY
REQUIRED EXTENSION STATED IN THE CONTRACT DOCUMENTS.
SUBMITTALS AND SUBSTITUTIONS:
1. MEET THE CRITERIA DESCRIBED HEREIN, PRIOR TO ENGINEER'S
REVIEW OF THE SUBMITTAL.
2. REFERENCE EQUIPMENT TAGS PROVIDED IN THE CONTRACT
DOCUMENTS.
3. CLEARLY INDICATE THE INTENDED PRODUCT TYPE, MODE, OPTIONS,
ACCESSORIES (FACTORY AND FIELD INSTALLED), AND ANY OTHER
OPTIONS OF ANY KIND.
4. INDICATE THE PLAN ISSUANCE AND DATE ON WHICH SUBMITTAL IS
BASED.
5. IF PROPOSING A SUBSTITUTION IN PLACE OF THE BASIS OF DESIGN
EQUIPMENT, THE CONTRACTOR IS SOLELY RESPONSIBLE FOR THE
SPATIAL REQUIREMENTS, ACOUSTICAL, THERMAL, PHOTOMETRIC, AND
ELECTRICAL PERFORMANCE CHARACTERISTICS, AND COORDINATION
OF ALL INSTALLATION REQUIREMENTS. REVIEW AND APPROVAL BY
THE DESIGN TEAM DOES NOT ALTER OR MITIGATE THIS
RESPONSIBILITY. CLEARLY MARK SUBSTITUTIONS AS SUCH.
6. DESCRIBE ANY IMPACT TO OTHER DIVISIONS CREATED BY A
PRODUCT SUBSTITUTION ON THE SUBSTITUTION REQUEST FOR
CONSIDERATION BY THE DESIGN TEAM. PROVIDE AN ESTIMATE OF
ASSOCIATED COST IMPACT TO OTHER DIVISIONS WHERE APPLICABLE.
7. INDICATE WHERE PRODUCTS REQUIRE A PERFORMANCE DE-RATE
DUE TO ALTITUDE EFFECTS.
8. RE-SUBMITTALS MUST CONTAIN MARKUPS THAT CLEARLY DELINEATE
THE CHANGED ITEMS. ENGINEER WILL NOT RE-REVIEW THE ENTIRE
SUBMITTAL PACKAGE IN ORDER TO FIND THE CHANGES.
9. ALL DATA REQUIRED FOR REVIEW MUST BE CONTAINED IN THE FILES
PROVIDED TO THE ENGINEER. LINKS TO MANUFACTURER’S WEBSITES
WILL NOT BE ACCEPTED.
10. ROOM SCHEDULES ARE ACCEPTABLE TO INDICATE QUANTITIES.
PROJECT CLOSEOUT REQUIREMENTS:
1. COMPLETE ALL REQUIRED AHJ INSPECTIONS. MAKE COPIES OF
PERMITS AND INSPECTION REPORTS AVAILABLE.
2. PROVIDE A COMPLETE SET OF AS-BUILT PLANS AT THE COMPLETION
OF THE PROJECT WITH ALL CHANGES NOTED.
3. CONDUCT A TRAINING SESSION FOR OWNER’S DESIGNATED STAFF
FOR ALL CONTROLS SYSTEMS AND MAJOR EQUIPMENT. PRODUCE A
SIGN IN SHEET FOR THIS SESSION SHOWING ATTENDEES, DATE, LIST
OF EQUIPMENT AND SYSTEMS COVERED.
4. CLEAN JOB SITE OF ALL CONSTRUCTION DEBRIS, REPAIR ALL
DAMAGED FINISHES. REMOVE ALL EXISTING EQUIPMENT LABELS THAT
ARE NO LONGER ACCURATE, AND INSTALL NEW LABELING FOR NEW
EQUIPMENT AND SYSTEMS.
5. DELIVER EQUIPMENT MANUALS AND ANY REQUIRED SPARE PARTS TO
OWNER.
ACCESS AND CLEARANCES:
1. MAINTAIN ALL SERVICE AND ACCESS CLEARANCES REQUIRED BY
CODE OR MANUFACTURER FOR ALL EQUIPMENT.
2. PROVIDE ACCESS FOR ALL EQUIPMENT, ETC. LOCATED ABOVE NON-
ACCESSIBLE CEILINGS OR IN CONCEALED AREAS. PROVIDE
SUFFICIENT ACCESS FOR SERVICING AND MAINTENANCE.
3. UTILIZE APPROPRIATELY RATED ACCESS PANELS WHEN
PENETRATING A RATED ASSEMBLY.
PENETRATIONS AND RATED ASSEMBLIES:
1. FOR ALL PENETRATIONS OF FIRE RATED ASSEMBLIES, UTILIZE AN
ASSEMBLY UL LISTED TO MAINTAIN THE RATING AND APPROVED BY
ALL APPLICABLE CODES.
STRUCTURAL MODIFICATIONS:
1. DO NOT DRILL, NOTCH, CUT, OR ALTER STRUCTURAL MEMBERS IN
ANY MANNER EXCEPT AS PERMITTED BY THE MATERIAL SPECIFIC
SECTIONS OF THE BUILDING CODE, MANUFACTURER’S GUIDELINES
FOR ENGINEERED PRODUCTS, OR THE RECOMMENDATION OF THE
STRUCTURAL ENGINEER OF RECORD.
SUBSURFACE UTILITIES:
1. PROVIDE MEANS OF TRACING TO ALL UNDGROUND UTILITIES OUTSIDE
THE BUILDING PERIMETER, IN COMPLIANCE WITH SUBSURFACE UTILITY
ENGINEERING REGULATIONS.
2. PRIOR TO TRENCHING OR EXCAVATION, CONTACT UTILITY
COMPANIES TO IDENTIFY UNDERGROUND UTILITIES AND LOCATE
SECONDARY SERVICE FEEDERS, UNDERGROUND BRANCH CIRCUITS,
GAS LINES, SPRINKLER LINES, ETC. ANY CUT OR DAMAGED
UNDERGROUND SYSTEMS TO BE REPAIRED OR REPLACED AT
CONTRACTOR'S EXPENSE.
EXISTING CONDITIONS AND DEMOLITION:
1. VISIT THE SITE AND BECOME FAMILIAR WITH EXISTING CONDITIONS
TO THE EXTENT POSSIBLE BEFORE BEGINNING WORK. IF
DISCREPANCIES ARE FOUND BETWEEN THE CONTRACT DOCUMENTS
AND ACTUAL SITE CONDITIONS, SUBMIT AN RFI TO THE ARCHITECT OR
ENGINEER FOR DIRECTION BEFORE PROCEEDING.
2. COORDINATE IN ADVANCE ALL WORK THAT AFFECTS EXISTING
SYSTEMS OR OPERATIONS (SUCH AS SHUT DOWNS, TIE-INS, OR
DEMOLITION), WITH THE BUILDING OWNER IN ADVANCE.
3. RETURN EXISTING EQUIPMENT NOTED AS TO BE REMOVED TO
OWNER IN THE SAME CONDITION AS FOUND (EXCEPT WHERE
CONTRACT DOCUMENTS CALL FOR DISPOSAL BY CONTRACTOR).
COORDINATE DELIVERY AND STORAGE LOCATION WITH CONTRACTOR.
4. COORDINATE REPAIR OF ADJACENT CONSTRUCTION AND FINISHES
DAMAGED OR EXPOSED DURING DEMOLITION WORK. MATCH EXISTING
FINISHES, AND INCLUDE PAINT ON ENTIRE WALL OR ROOM IF
REQUIRED TO MATCH COLOR.
5. X-RAY ANY SLAB PENETRATIONS PRIOR TO CORE DRILLING.
GENERAL NOTES
W e st
S ix th S tr e e t, S u ite
G le n w o o d S p ri n g s, C
O
.9
.1 w w .s g m
-i n c.
co m
Title:
Dwg No.
Job No.
Drawn by:
Print Date:
PE:QC:
File:
P ro je c t M ile s to n e
C e n tr a l M o d e l:
C
U s e rs
\a c a m p b e ll\
D o c u m e n ts
\3 E lk L a n e M
E R a le x c H
K R
J D
.r v t
/2
/2
:1 :5
P
M
P
IT
K
IN
C O
U N
T Y
E
L K
L A
N E
2024-118.003
AC
09-20-2024
TJHBC
MECHANICAL
LEGEND AND
SPECIFICATIONS
M0.01
C O
N S
T R
U C
T
IO
N D
O C
U M
E N
T S
3202ElkLane_ME_R24
I:
\2
\2
-1
-P it C o F a c ili ti e s \0
-3
E lk L a n e \H
-D ra w in g s \2
-M
E M
O D
E L
MECHANICAL SHEET LIST
Sheet Number Sheet Name
M0.01
MECHANICAL LEGEND AND
SPECIFICATIONS
M0.02 SPECIFICATIONS
M1.01 MAIN LEVEL MECHANICAL HVAC PLAN
M1.02 LOFT LEVEL MECHANICAL HVAC PLAN
M1.11
GARAGE LEVEL MECHANICAL PIPING
PLAN
M1.12 MAIN LEVEL MECHANICAL PIPING PLAN
M1.13 LOFT LEVEL MECHANICAL PIPING PLAN
M2.01 NORTH AND EAST ELEVATIONS
M5.01 MECHANICAL DETAILS
M6.01 MECHANICAL HVAC SCHEDULES
M6.02 MECHANICAL PIPING SCHEDULES
M7.01 DIAGRAMS
M9.01 AXONOMETRICS
D e s c ri p ti o n
D a te
B y
ADOPTED CODES
LOCAL AMENDMENTS CURRENT
AHJ BASALT
NEC 2023
SBRI 2022
SBRII 2022
IECC 2021
ICC 2021
IMC 2021
SITE CONDITIONS
ELEVATION
AIR DENSITY
RATIO
CLIMATE ZONE
WINTER
DESIGN
SUMMER_DESIGN
6700' - 0" 0.776 7 -10 °F 90 °F
9/20/2024
COMBUSTION AIR AND FLUE SPECIFICATION
SYSTEM DESCRIPTION
MAX.
OPERATING GAS
TEMPERATURE
NOMINAL SIZE MANUFACTURER & MATERIAL FITTINGS
TERMINATION AND
ADAPTERS
LISTING
BOILER
HIGH EFFICEINCY
BOILER COMBUSTION
AIR INTAKE AND
VENTING
230F
PER BOILER
SCHEDULE
CENTROTHERM INNOFLUE
SINGLE-WALL RIGID
POLYPROPYLENE
SINGLE-WALL RIGID
POLYPROPYLENE
AS SPECIFIED BY THE
PIPE
MANUFACTURER.
UL 1738 LISTED
VENTING FOR CATEGORY IV GAS-
BURNING APPLIANCES.
HYDRONIC SYSTEM FLUID SPECIFICATION
SYSTEM TYPE
PROP. GLYCOL
CONCENTRATION
(% BY VOLUME)
FREEZE
POINT
(°F)
BURST
POINT (°F)
APPROXIMATE
SYSTEM
LOWEST
OPERATING
TEMP (°F)
SPECIFIC HEAT AT
SYSTEM LOWEST
OPERATING TEMP.
(Btu/lb*°F)
NOTES
HEATING WATER 20 19.2 3.3 110 0.962 ALL
NOTES:
1. PRIOR TO TEST AND BALANCE, FILL SYSTEM AND BLEED AIR, CHECK ALL STRAINERS FOR DEBRIS PRIOR, SET SYSTEM STATIC PRESSURE OF EXPANSION TANKS, FILL GLYCOL FEEDERS TO MAXIMUM LEVEL WITH PRE-MIXED GLYCOL (AT CONCENTRATION).
2. GLYCOL SHALL INCLUDE INHIBITORS.
3. AFTER TEST AND BALANCE, RECHECK CONCENTRATIONS LEVELS AND ADJUST AS NECESSARY PRIOR TO TURNOVER.
4. PROVIDE PERMANENT LABEL ON GLYCOL FEEDER INDICATING SPECIFIED CONCENTRATION.
STARTUP AND VERIFICATION REQUIREMENTS
DEVICE
SUBMITTAL REQUIREMENT
NOTES
S T
A R
T U
P R
E P
O R
T
T E
S T
B
A L A
N C
E R
E P
O R
T
S E
T P
O
IN
T V
E R
F
IC
A T
IO
N
S E
Q E
U N
C E
O F
O P
E R
A T
IO
N
FAN COIL UNIT X X X X ALL
AIR SOURCE HEAT PUMP X X ALL
ZONE THERMOSTATS X X ALL
GLYCOL FEED SYSTEM X X ALL
EXPANSION TANK X ALL
MODULAR CONDENSING BOILER X X X X ALL
PUMP X X X ALL
BASEBOARD ZONE X ALL
NOTES:
1. FOR EACH DEVICE OR ITEM LISTED, SUBMIT THE SPECIFIED INFORMATION TO THE
ENGINEER OF RECORD.
2. REFER TO MANUFACTURER'S INSTALLATION REQUIREMENTS FOR STARTUP INFORMATION
WHEN FACTORY STARTUP IS NOT PROVIDED OR SPECIFIED.
3. REFER TO TEST AND BALANCE SPECIFCATION.
4. REFER TO SEQUENCES OF OPERATION FOR LIST OF SETPOINTS AND VALUES ASSOCIATED
WITH EACH DEVICE. SUBMIT LIST OF SETPOINTS INCLUDING:
-DATE OF VERIFICATION
-INITIAL OF INDIVIDUAL RESPONSIBLE
-VALUE IF SETPOINT OF FIELD ADJUSTED OR DETERMINED
5. REFER TO SEQUENCE OF OPERATION. VERIFY OPERATION OCCURS AS SPECIFIED. SUBMIT
DEVICE LIST CONTAINING:
-DATE OF VERIFICATION
-INITIAL OF INDIVIDUAL RESPONSIBLE
MECHANICAL PIPING MATERIAL SPECIFICATION
SYSTEM DESCRIPTION
OPERATING
TEMPERATURE
MIN.
PRESSURE
RATING
(PSIG)
NOMINAL SIZE MATERIAL
JOINTS
(PIPE TO PIPE)
CONNECTIONS
(PIPE TO VALVE AND PIPE TO
EQUIPMENT)
FITTINGS ISOLATION VALVE BALANCE
INSULATION
(YES/NO)
HWS & HWR
HEATING WATER
SUPPLY AND RETURN
120F-180F 125 2" SMALLER
COPPER ASTM B TYPE
L HARD DRAWN
SOLDER, LEAD-FREE,
ASTM B32 HB ALLOY
THREADED UNION
WROUGHT COPPER
SOLDER FITTINGS
ASTM B15
FULL PORT BALL VALVE
NIBCO T-585-70 OR S-585-70 WITH
UNION
ARMSTRONG CBV
YES, PER
SCHEDULE.
CONDENSATE
DRAIN
DRAIN FROM
COOLING COILS
NA NA 3/4" MINIMUM
COPPER ASTM B TYPE
L OR DWV HARD
DRAWN
SOLDER, LEAD-FREE,
ASTM B32 HB ALLOY
MATCH EQUIPMENT
CONNECTION
WROUGHT COPPER
SOLDER FITTINGS
ASTM B15
NA NA NO
CONDENSATE
DRAIN
DRAIN FROM GAS
FIRED CONDENSING
APPLIANCE
NA NA NA
PVC OR CPVC
COMPLYING WITH
ASTM D1784 OR D2845
CEMENT AND PRIMER
COMPLING WITH ASME
D2564 OR F493
MATCH EQUIPMENT
CONNECTION
PVC OR CPVC
COMPLYING WITH
ASTM D1784 OR D2845
NA NA NA
VRF
REFRIGERANT
PIPING
ALL PIPING AND FITTINGS SHALL BE EXACTLY AS SPECIFIED BY THE MANUFACTURER, VIA PROJECT SPECIFIC LAYOUT. CONTRACTOR TO SUBMIT FINAL LAYOUT TO SELECTED MANUFACTURER TO DETERMINE FINAL SIZES, FITTINGS, AND REQUIREMENTS.
NOTES:
1. VALVES REPRESENT A MINIMUM STANDARD OF QUALITY. SUBSTITUTIONS OF EQUAL OR GREATER QUALITY ARE ALLOWED WITH ENGINEER'S APPROVAL.
2. ALL ISOLATION VALVES SHALL BE CAPABLE OF DEAD END SERVICE.
3. BALANCE VALVES AND CIRCUIT SETTER SIZES SHALL BE DETERMINED BY FLOW RATE REQUIRED IN LIEU OF LINE SIZE.
4. ALL PEX BASED PIPING SHALL USE FITTINGS, JOINTS, VALVES, AND METHODS AS REQUIRED BY THE SPECIFIC MANUFACTURER, SO AS NOT VOID ANY WARRANTY UPON INSTALLATION.
MECHANICAL PIPING INSULATION SCHEDULE
(IECC 2021) R403.4
FLUID OPERATING
TEMPERATURE RANGE
(°F)
SYSTEM
INSULATION
CONDUCTIVITY
BTU* in./(h*ft^2*°F)
REQUIRED THERMAL
RESISTANCE VALUE
(R)
INSULATION THICKNESS
PER PIPE SIZE
(in.)
≤1 1-1/4 TO ≤4
>105 HEATED WATER <0.29 3 1/2 1
<55 REFRIGERANT GAS <0.29 3 1 NA
NA REFRIGERANT LIQUID NA NA NA NA
NOTES:
1. JM MICRO-LOK FIBER GLASS INSULATION
2. COMPOSITE FHC 25/50 FLAME SPREAD AND SMOKE DEVELOPED INDEX.
W e st
S ix th S tr e e t, S u ite
G le n w o o d S p ri n g s, C
O
.9
.1 w .s g m
-i n c.
co m
Title:
Dwg No.
Job No.
Drawn by:
Print Date:
PE:QC:
File:
P ro je c t M ile s to n e
C e n tr a l M o d e l:
C
U s e rs
\a c a m p b e ll\
D o c u m e n ts
\3 E lk L a n e M
E R a le x c H
K R
J D
.r v t
/2
/2
:1 :5
P
M
P
IT
K
IN
C O
U N
T Y
E
L K
L A
N E
2024-118.003
AC
09-20-2024
TJHBC
SPECIFICATIONS
M0.02
C O
N S
T R
U C
T
IO
N D
O C
U M
E N
T S
3202ElkLane_ME_R24
I:
\2
\2
-1
-P it C o F a c ili ti e s \0
-3
E lk L a n e \H
-D ra w in g s \2
-M
E M
O D
E L
D e s c ri p ti o n
D a te
B y
T
T
A
B
D
E
F
54321
LIVING
MASTER BED
MASTER BATH
MASTER CL
106 DINING
ENTRY
ENTRY CL
STAIR 2
BED 1
CL
BATH 1
LAUNDRY
STAIR 1
KITCHEN
HP-1
FCU-3
FCU-4
FCU-5
FCU-1
ZONE 3
ZONE 4
ZONE 5
ZONE 1
W e st
S ix th S tr e e t, S u ite
G le n w o o d S p ri n g s, C
O
.9
.1 w .s g m
-i n c.
co m
Title:
Dwg No.
Job No.
Drawn by:
Print Date:
PE:QC:
File:
P ro je c t M ile s to n e
C e n tr a l M o d e l:
C
U s e rs
\a c a m p b e ll\
D o c u m e n ts
\3 E lk L a n e M
E R a le x c H
K R
J D
.r v t
/2
/2
:1 :5
P
M
P
IT
K
IN
C O
U N
T Y
E
L K
L A
N E
2024-118.003
AC
09-20-2024
TJHBC
MAIN LEVEL
MECHANICAL HVAC
PLAN
M1.01
C O
N S
T R
U C
T
IO
N D
O C
U M
E N
T S
3202ElkLane_ME_R24
I:
\2
\2
-1
-P it C o F a c ili ti e s \0
-3
E lk L a n e \H
-D ra w in g s \2
-M
E M
O D
E L
D e s c ri p ti o n
D a te
B y
SCALE: 3/8" = 1'-0"
MAIN LEVEL MECHANICAL HVAC PLAN
KEYNOTES
1 INSTALL PER MANUFACTURER'S INSTALLATION INSTRUCTIONS.
2 PROVIDE TIP-OVER PREVENTION BRACE AND OR ANCHORS.
A
B
D
E
F
54321
BED 2
BATH 2
CL 2
WC 2
STAIR 2
FCU-2
ZONE 2
W e st
S ix th S tr e e t, S u ite
G le n w o o d S p ri n g s, C
O
.9
.1 w .s g m
-i n c.
co m
Title:
Dwg No.
Job No.
Drawn by:
Print Date:
PE:QC:
File:
P ro je c t M ile s to n e
C e n tr a l M o d e l:
C
U s e rs
\a c a m p b e ll\
D o c u m e n ts
\3 E lk L a n e M
E R a le x c H
K R
J D
.r v t
/2
/2
:1 :5
P
M
P
IT
K
IN
C O
U N
T Y
E
L K
L A
N E
2024-118.003
AC
09-20-2024
TJHBC
LOFT LEVEL
MECHANICAL HVAC
PLAN
M1.02
C O
N S
T R
U C
T
IO
N D
O C
U M
E N
T S
3202ElkLane_ME_R24
I:
\2
\2
-1
-P it C o F a c ili ti e s \0
-3
E lk L a n e \H
-D ra w in g s \2
-M
E M
O D
E L
D e s c ri p ti o n
D a te
B y
SCALE: 3/8" = 1'-0"
LOFT LEVEL MECHANICAL HVAC PLAN
KEYNOTES
1 INSTALL PER MANUFACTURER'S INSTALLATION INSTRUCTIONS.
D
E
F
G
H
I
GARAGE
STAIR 1
B-1
P-1
P-2
ET-1
GF-1
M1.11
FIRE CAULK ALL PIPING
PENETRATIONS THROUGH
RATED ASSEMBLY.
G
H
B-1GF-1
ET-1
P-1
P-2
1 2 3 4 5
W e st
S ix th S tr e e t, S u ite
G le n w o o d S p ri n g s, C
O
.9
.1 w .s g m
-i n c.
co m
Title:
Dwg No.
Job No.
Drawn by:
Print Date:
PE:QC:
File:
P ro je c t M ile s to n e
C e n tr a l M o d e l:
C
U s e rs
\a c a m p b e ll\
D o c u m e n ts
\3 E lk L a n e M
E R a le x c H
K R
J D
.r v t
/2
/2
:1 :5
P
M
P
IT
K
IN
C O
U N
T Y
E
L K
L A
N E
2024-118.003
AC
09-20-2024
TJHBC
GARAGE LEVEL
MECHANICAL
PIPING PLAN
M1.11
C O
N S
T R
U C
T
IO
N D
O C
U M
E N
T S
3202ElkLane_ME_R24
I:
\2
\2
-1
-P it C o F a c ili ti e s \0
-3
E lk L a n e \H
-D ra w in g s \2
-M
E M
O D
E L
D e s c ri p ti o n
D a te
B y
NORTH
SCALE: 3/8" = 1'-0"
GARAGE LEVEL MECHANICAL PIPING PLAN
KEYNOTES
1 DEMOLISH EXISTING BOILER PLANT: BOILER, PUMPS, EXPANSION TANK, GLYCOL FEEDER, ETC.
2 PROVIDE ISOLATION VALVES IN HEATING SUPPLY AND RETURNS ON NORTH AND SOUTH
HEATING ZONES.
3 PROVIDE ISOLATION VALVES ON HOT AND COLD DOMESTIC WATER PIPING.
4 INSTALL BOILER PER MANUFACTURER'S INSTALLATION INSTRUCTIONS.
5 AREA DEDICATED FOR INSTALLATION OF THE HEATING PLANT EQUIPMENT. EQUIPMENT
LAYOUT IN THE FLOOR PLANS IS FOR INFORMATIONAL PURPOSES ONLY, FINAL EQUIPMENT
LAYOUT SHALL BE COORDINATED IN THE FIELD.
NORTH
SCALE: 1" = 1'-0"
BOILER PLANT ENLARGED PLAN
A
B
D
E
F
54321
LIVING
MASTER BED
MASTER BATH
MASTER CL
106 DINING
ENTRY
ENTRY CL
STAIR 2
BED 1
CL
BATH 1
LAUNDRY
STAIR 1
KITCHEN
HB-DB
HB-DA
HB-LB
HB-B1
HB-MB
HB-LA
NORTH HB
SOUTH HB
W e st
S ix th S tr e e t, S u ite
G le n w o o d S p ri n g s, C
O
.9
.1 w .s g m
-i n c.
co m
Title:
Dwg No.
Job No.
Drawn by:
Print Date:
PE:QC:
File:
P ro je c t M ile s to n e
C e n tr a l M o d e l:
C
U s e rs
\a c a m p b e ll\
D o c u m e n ts
\3 E lk L a n e M
E R a le x c H
K R
J D
.r v t
/2
/2
:1 :5
P
M
P
IT
K
IN
C O
U N
T Y
E
L K
L A
N E
2024-118.003
AC
09-20-2024
TJHBC
MAIN LEVEL
MECHANICAL
PIPING PLAN
M1.12
C O
N S
T R
U C
T
IO
N D
O C
U M
E N
T S
3202ElkLane_ME_R24
I:
\2
\2
-1
-P it C o F a c ili ti e s \0
-3
E lk L a n e \H
-D ra w in g s \2
-M
E M
O D
E L
D e s c ri p ti o n
D a te
B y
NORTH
SCALE: 3/8" = 1'-0"
MAIN LEVEL MECHANICAL PIPING PLAN
KEYNOTES
A
B
D
E
F
54321
BED 2
BATH 2
CL 2
WC 2
STAIR 2
HB-B2
NORTH HB
W e st
S ix th S tr e e t, S u ite
G le n w o o d S p ri n g s, C
O
.9
.1 w .s g m
-i n c.
co m
Title:
Dwg No.
Job No.
Drawn by:
Print Date:
PE:QC:
File:
P ro je c t M ile s to n e
C e n tr a l M o d e l:
C
U s e rs
\a c a m p b e ll\
D o c u m e n ts
\3 E lk L a n e M
E R a le x c H
K R
J D
.r v t
/2
/2
:1 :5
P
M
P
IT
K
IN
C O
U N
T Y
E
L K
L A
N E
2024-118.003
AC
09-20-2024
TJHBC
LOFT LEVEL
MECHANICAL
PIPING PLAN
M1.13
C O
N S
T R
U C
T
IO
N D
O C
U M
E N
T S
3202ElkLane_ME_R24
I:
\2
\2
-1
-P it C o F a c ili ti e s \0
-3
E lk L a n e \H
-D ra w in g s \2
-M
E M
O D
E L
D e s c ri p ti o n
D a te
B y
NORTH
SCALE: 3/8" = 1'-0"
LOFT LEVEL MECHANICAL PIPING PLAN
KEYNOTES
GARAGE LEVEL
0' - 0"
MAIN LEVEL
10' - 7 3/4"
LOFT LEVEL
21' - 0"
HP-1
GARAGE LEVEL
0' - 0"
MAIN LEVEL
10' - 7 3/4"
LOFT LEVEL
21' - 0"
HP-1
W e st
S ix th S tr e e t, S u ite
G le n w o o d S p ri n g s, C
O
.9
.1 w .s g m
-i n c.
co m
Title:
Dwg No.
Job No.
Drawn by:
Print Date:
PE:QC:
File:
P ro je c t M ile s to n e
C e n tr a l M o d e l:
C
U s e rs
\a c a m p b e ll\
D o c u m e n ts
\3 E lk L a n e M
E R a le x c H
K R
J D
.r v t
/2
/2
:1 :5
P
M
P
IT
K
IN
C O
U N
T Y
E
L K
L A
N E
2024-118.003
AC
09-20-2024
TJHBC
NORTH AND EAST
ELEVATIONS
M2.01
C O
N S
T R
U C
T
IO
N D
O C
U M
E N
T S
3202ElkLane_ME_R24
I:
\2
\2
-1
-P it C o F a c ili ti e s \0
-3
E lk L a n e \H
-D ra w in g s \2
-M
E M
O D
E L
D e s c ri p ti o n
D a te
B y
SCALE: 3/16" = 1'-0"
MECHANICAL NORTH ELEVATION
SCALE: 1/8" = 1'-0"
MECHANICAL EAST ELEVATION
P /T
P /T
T/P
INLINE PUMP
ISOLATION
VALVE
REFER TO PLANS OR
SCHEMATIC FOR PIPE SIZE.
CONCENTRIC REDUCER / INCREASER
TO MATCH PUMP SUCTION AND
DISCHARGE, IF REQUIRED. (TYP)
MECHANICAL JOINTS. (FLANGE,
GROVE, UNIION) REFER TO
PIPE SPECIFICATION. (TYP)
BALANCING
VALVE
BOILER
REFER TO PLANS OR SCHEMATIC FOR PIPE SIZES.
MECHANICAL JOINTS. (FLANGE,GROVE, UNIION)
REFER TO PIPE SPECIFICATION. (TYP)
ISOLATION VALVE
MATCH BOILER CONDENSATE
DRAIN CONNECTION
MIN. 3/4"
ROUTE TO FLOOR DRAIN.
CONDENSATE NEUTRALIZER
KIT.
PIPE SIZE SHALL MATCH VALVE CONNECTION SIZE.
REFER TO MECHANICAL PIPING SPECIFICATIONS.
TO INDIRECT WASTE RECEPTACLE.
DISCHARGE BY GRAVITY.
PRESSURE GAUGE
TEMPERATURE GAUGE AND TEMPERATURE WELL.
STRAP-ON TEMPERATURE SENSOR IS PROHIBITED. (TYP)
PRESSURE AND TEMPERATURE TRAP.
DOMESTIC COLD WATER CONNECTION.
DOMESTIC HOT WATER CONNECTION.
EQUIPMENT STAND, 8" HEIGHT
MIRO INDUSTRIES UNIFLEX MINI SPLIT
RAIL SUPPORT CG-MS-24x32 P10
HEAT PUMP UNIT.
REFER TO EQUIPMENT
SCHEDULE FOR INFORMATION
ATTACH TO DECK, AS REQUIRED
BY MANUFACTURER.
EXISTING WOOD
DECK.
SECURE UNIT TO STAND,
AS REQUIRED BY MANUFACTURER
PROVIDE NEOPRENE
VIBRATION ISOLATION
PADS.
W e st
S ix th S tr e e t, S u ite
G le n w o o d S p ri n g s, C
O
.9
.1 w .s g m
-i n c.
co m
Title:
Dwg No.
Job No.
Drawn by:
Print Date:
PE:QC:
File:
P ro je c t M ile s to n e
C e n tr a l M o d e l:
C
U s e rs
\a c a m p b e ll\
D o c u m e n ts
\3 E lk L a n e M
E R a le x c H
K R
J D
.r v t
/2
/2
:1 :5
P
M
P
IT
K
IN
C O
U N
T Y
E
L K
L A
N E
2024-118.003
AC
09-20-2024
TJHBC
MECHANICAL
DETAILS
M5.01
C O
N S
T R
U C
T
IO
N D
O C
U M
E N
T S
3202ElkLane_ME_R24
I:
\2
\2
-1
-P it C o F a c ili ti e s \0
-3
E lk L a n e \H
-D ra w in g s \2
-M
E M
O D
E L
D e s c ri p ti o n
D a te
B y
NO SCALE
ZONE CIRCULATOR DETAIL
NO SCALE
COMBINATION CONDENSING BOILER
NO SCALE
HEAT PUMP UNIT MOUNTING DETAIL
FAN COIL UNIT SCHEDULE - HEAT PUMP SOURCE
UNIT
TAG
MFR. MODEL CONFIGURATION SERVICE
HEAT
PUMP
UNIT
FAN
SOUND
(DBA)
FILTER
COOLING HEATING ELECTRICAL DATA DIMENSIONS
APPROX.
WEIGHT
(LBS)
REMARKSVOLUME @
PROJECT
ALTITUDE
(CFM)
FAN
SPEED
(H/M/L)
NOMINAL
CAPACITY
(MBH)
ACTUAL
TOTAL
CAPACITY
(MBH)
SENSIBLE
CAPACITY
(MBH)
EAT
DB
(˚F)
EAT
WB
(˚F)
LAT
DB
(˚F)
NOMINAL
CAPACITY
(MBH)
ACTUAL
CAPACITY
(MBH)
EAT
DB
(˚F)
LAT
DB
(˚F)
VOLTS PHASE
FLA
(PER
MOTOR)
(A)
UNIT
MCA
(A)
UNIT
MOCP
(A)
WIDTH
(IN.)
HEIGHT
(IN.)
DEPTH
(IN.)
FCU-1
CARRIER -
TOSHIBA
MMK-UP0121HP-UL HIGH WALL BEDROOM 1 HPU-1 320 HIGH 27
WASHABLE
MERV 5
12.0 7.9 6.2 75 61.6 52.1 13.5 5.8 70 88.8 208 / 230 1 0.2 0.25 15 31.5 11.625 9.125 27 ALL
FCU-2
CARRIER -
TOSHIBA
MMK-UP0091HP-UL HIGH WALL BEDROOM 2 HPU-1 300 HIGH 27
WASHABLE
MERV 5
9.5 6.2 4.9 75 61.6 55.7 10.5 4.0 70 85.6 208 / 230 1 1.78 0.23 15 31.5 11.625 9.125 27 ALL
FCU-3
CARRIER -
TOSHIBA
MMK-UP0121HP-UL HIGH WALL MASTER BEDROOM HPU-1 320 HIGH 27
WASHABLE
MERV 5
12.0 7.9 6.2 75 61.6 52.1 13.5 5.1 70 88.8 208 / 230 1 0.2 0.25 15 31.5 11.625 9.125 27 ALL
FCU-4
CARRIER -
TOSHIBA
MMK-UP0361HP-UL HIGH WALL LIVING HPU-1 970 HIGH 43
WASHABLE
MERV 5
36.0 23.6 18.5 75 61.6 52.3 40 15.1 70 88.3 208 / 230 1 1.78 0.83 15 47.25 13.75 11 46.3 ALL
FCU-5
CARRIER -
TOSHIBA
MMK-UP0091HP-UL HIGH WALL KITCHEN / DINING HPU-1 300 HIGH 27
WASHABLE
MERV 5
9.5 6.2 4.9 75 61.6 55.7 10.5 4.0 70 85.6 208 / 230 1 0.88 0.23 15 31.5 11.625 9.125 27 ALL
REMARKS:
1. PERFORMANCE VALUES ARE AT PROJECT ALTITUDE UNLESS NOTED OTHERWISE.
2. FURNISH WITH THE FOLLOWING ACCCESSORIES: FACTORY DISCONNECT, CONDENSATE OVERFLOW SWITCH, CN60 RELAY FOR BASEBOARD HEAT CONNECTION, RBC-AWSU52-UL HARD WIRED 7 DAY PROGRAMMABLE THERMOSTAT.
3. REFER TO OUTDOOR UNIT FOR ADDITIONAL CONTROLS AND ACCESSORIES.
AIR SOURCE HEAT PUMP SCHEDULE
UNIT TAG
INDOOR UNIT
TAG
MFR. MODEL
REFRIGERANT
TYPE
NOMINAL
CAPACITY
NOMINAL
SYSTEM
CONNECTED
CAPAPCITY
(% OF NOM)
AMBIENT TEMP. CORRECTED CAPACITIES
COOLING
EFFICIENCY
SEER
HEATING
HASPF2
UNIT ELECTRICAL DATA DIMENSIONS
WEIGHT
(LBS)
NOTES
COOLING
(MBH)
HEATING
(MBH)
SUMMER
(F)
WINTER
(F)
COOLING
(MBH)
HEATING
(MBH)
V PH HZ
MCA
(AMPS)
MOCP
(AMPS)
WIDTH
(IN)
HEIGHT
(IN)
DEPTH
(IN)
HPU-1
FCU-1
FCU-2
FCU-MB
FCU-4
FCU-5
CARRIER - TOSHIBA
MCY-
MAP0607HS-
UL
R-410A 60.00 66.00 132.00 90 -10 52 33 23.10 10.60 208 1 60 36.3 40 39.8 61 14.6 311 ALL
NOTES:
1. ALL PERFORMANCE VALUES AT PROJECT ALTITUDE.
2. FURNISH WITH DISCONNECT.
W e st
S ix th S tr e e t, S u ite
G le n w o o d S p ri n g s, C
O
.9
.1 w .s g m
-i n c.
co m
Title:
Dwg No.
Job No.
Drawn by:
Print Date:
PE:QC:
File:
P ro je c t M ile s to n e
C e n tr a l M o d e l:
C
U s e rs
\a c a m p b e ll\
D o c u m e n ts
\3 E lk L a n e M
E R a le x c H
K R
J D
.r v t
/2
/2
:1 :5
P
M
P
IT
K
IN
C O
U N
T Y
E
L K
L A
N E
2024-118.003
AC
09-20-2024
TJHBC
MECHANICAL HVAC
SCHEDULES
M6.01
C O
N S
T R
U C
T
IO
N D
O C
U M
E N
T S
3202ElkLane_ME_R24
I:
\2
\2
-1
-P it C o F a c ili ti e s \0
-3
E lk L a n e \H
-D ra w in g s \2
-M
E M
O D
E L
D e s c ri p ti o n
D a te
B y
CHEMICAL FEED SYSTEMS SCHEDULE
ID
MANUFACTURER &
MODEL
SERVICE LOCATION TYPE
SIZE
(GAL)
ELECTRICAL
(V / PH / HZ)
GF-1
AXIOM INDUSTRIES
MF200
HEATING
WATER
BOILER
ROOM
CHEMICAL PUMP GLYCOL FEED SYSTEM, 0.7 GPM AT FREE FLOW, SELF-
PRIMING UP TO 4 FEET. LOW LEVEL PUMP CUT-OUT FLOAT SWITCH,
MANUAL DIVERTER VALVE FOR PURGING AIR AND AGITATING CONTENTS
OF TANK, SNUBBER W/PRESSURE ADJUSTABLE CUT-OPOUT PRESSURE
SWITCH (10 - 25 PSIG). LIQUID FILLED PRESSURE GAUGE. HOA SIWTHC
FOR PUMP
115 / 1 / 60
POWER CORD
NOTES
1. FILL WITH 30% PROPYLENE GLYCOL.
EXPANSION TANK SCHEDULE
TAG MFR. MODEL TYPE SERVICE
TANK
VOLUME
(GALLONS)
ACCEPTANCE
VOLUME
(GALLONS)
OPERATING
FLUID TEMP.
(°F)
PRE-CHARGED
PRESSURE
(PSI)
MAWP
(PSI)
ASME
RATED
DIMENSIONS OPERATING
WEIGHT
(LBS)
NOTES
HEIGHT
(IN)
DIAMETER
(IN)
ET-1
WESSELS
COMPANY
N-30 DIAPHRAGM
HEATING
WATER
4.8 3.0 135 12 150 NO 14 10.6 34 1
NOTES:
1. AIR SIDE AND SYSTEM OPERATING PRESSURE SHALL BE REVISED DURING THE INSTALLATION TO SATISFY OVERALL SYSTEM REQUIREMENTS
AIR AND DIRT SEPARATOR SCHEDULE
UNIT TAG MANUFACTURER MODEL DESCRIPTION SERVICE GPM
PIPE SIZE
(IN)
CONNECTION
HEIGHT
(IN)
WIDTH
(IN)
WEIGHT
(LB)
NOTES
AS-1 SPIROTHERM VDR125
AIR / DIRT SEPARATOR
WITH MAGNET
HEATING SYSTEM 10 1 1/4 THREADED 16 6.1 11.5
NOTES:
MODULAR CONDENSING COMBINATION BOILER SCHEDULE
TAG MFR. MODEL DESCRIPTION SERVICE
MINIMUM
EFFICIENCY
AFUE
MAX
INPUT
(MBH)
OUTPUT
@PROJ.
ELEV,
(MBH)
FUEL
TYPE
GAS
PRESSURE
RANGE
(IN.WC)
MAX
WORKING
PRESSURE
(PSI)
VOL.
FLOW RATE
(GPM)
WATER
TEMPERATURE
RISE
(F)
WATER
PD
(FT.)
DOMESTIC WATER
RELIEF
VALVE
SETTING
(PSI)
COMBUSTION AND
VENT
PIPE SIZE
(IN)
VENT
CATEGORY
GAS TRAIN
(NATURAL GAS)
ELECTRICAL DIMENSIONS
UNIT
WEIGHT
(LBS)
NOTESDHW DELIVERY @
77F TEMP RISE
(GPM)
PIPE
SIZE
(IN)
MAXIMUM
WORKING
PRESSURE
(PSI)
TURN
DOWN
PILOT TYPE V / PH MCA
HEIGHT
(IN)
WIDTH
(IN)
DEPTH
(IN)
B-1 LOCHINVAR NKC199
WALL MOUNT
FORCED DRAFT
CONDENSING
COMBI
WATER
HEATING /
DHW
95% 199 165
NATURAL
GAS
4-14 50 10.6 35 4 4.29 3/4" 150 50 3 IV 10:1
DIRECT
SPARK
120 / 1 2.2 32.5 18.75 18 160 ALL
NOTES:
1. FURNISH WITH FOLLOWING OPTIONS/ACCESSORIES: CONDENSATE NEUTRALIZATION KIT, OUTDOOR TEMPERATURE SENSOR, LOW WATER CUTOFF WITH MANUAL RESET, SYSTEM WATER TEMPERATURE SENSOR, ASME RELIEF VALVE AND DOMESTIC HOT WATER PRIORITY.
2. UNIT FURNISHED WITH INTEGRAL ECM VARIABLE SPEED BOILER CIRCULATING PUMP.
3. UNIT SHALL BE HIGH ALTITUDE MODEL.
PUMP SCHEDULE
EQUIPMENT
TAG
TYPE MFR. MODEL SERVICE
FLOW
RATE
(GPM)
TOTAL DYNAMIC
HEAD
(FT. WATER
COLUMN)
FLUID TYPE
FLUID
OPERATING
TEMPERATURE
(°F)
CAPACITY
CONTROL
ELECTRICAL
NOTES
V PH HZ
MAX.
AMP
MAX.
POWER
INPUT
(W)
P-1
INLINE CARTRIDGE
CIRCULATOR
GRUNDFOS UPS 26-99FC
NORTH ZONE 1
BASEBOARD
5 19 20% P.G. 140 3-SPEED 115 1 60 1.8 197 1,2
P-2
INLINE CARTRIDGE
CIRCULATOR
GRUNDFOS UPS 26-99FC
NORTH ZONE 1
BASEBOARD
5 19 20% P.G. 140 3-SPEED 115 1 60 1.8 197 1,2
NOTES:
1. UNIT SHALL BE UL LISTED, SELF-LUBRICATING WITH REPLACEABLE CARTRIDGE, AND BUILT-IN CHECK VALVE.
2. SEALS SHALL BE COMPATIBLE WITH THE FLUID INDICATED.
HYDRONIC BASEBOARD RADIATION SCHEDULE
TAG AREA SERVED
MANUFACTURER &
MODEL
HEATING
CAPACITY PER
UNIT LENGTH
(BTUH/FT.)
ACTIVE
LENGTH
(FT.)
TOTAL
CAPACITY
(MBH)
MEAN SUPPLY
WATER
TEMPERATURE
(F)
FLOW
(GPM)
PIPE SIZE
(IN)
FINS PER FOOT
DIMENSIONS
MOUNTING FINISH CONTROL NOTES:
HEIGHT (IN) DEPTH (IN)
TOTAL LENGTH
INCLUDING ACTIVE AND
INACTIVE (FT IN)
HB-B1 BED 1
SLANT/FIN BASE/LINE
320 3.00 960 140 4 3/4 55 7 23/64 2 45/64 3' 8" WALL
NU-WHITE BACKED
ENAMEL
EXISTING
THRMOSTAT
ALL
HB-B2 BED 2
SLANT/FIN BASE/LINE
320 4.00 1280 140 4 3/4 55 7 23/64 2 45/64 4' 8" WALL
NU-WHITE BACKED
ENAMEL
EXISTING
THRMOSTAT
ALL
HB-MB MASTER BED
SLANT/FIN BASE/LINE
320 6.00 1920 140 4 3/4 55 7 23/64 2 45/64 6' 8" WALL
NU-WHITE BACKED
ENAMEL
EXISTING
THRMOSTAT
ALL
HB-LA LIVING
SLANT/FIN BASE/LINE
320 4.00 1280 140 4 3/4 55 7 23/64 2 45/64 4' 8" WALL
NU-WHITE BACKED
ENAMEL
EXISTING
THRMOSTAT
ALL
HB-LB LIVING
SLANT/FIN BASE/LINE
320 6.00 1920 140 4 3/4 55 7 23/64 2 45/64 6' 8" WALL
NU-WHITE BACKED
ENAMEL
EXISTING
THRMOSTAT
ALL
HB-DA DINING
SLANT/FIN BASE/LINE
320 8.00 2560 140 4 3/4 55 7 23/64 2 45/64 8' 8" WALL
NU-WHITE BACKED
ENAMEL
EXISTING
THRMOSTAT
ALL
HB-DB DINING
SLANT/FIN BASE/LINE
320 3.00 960 140 4 3/4 55 7 23/64 2 45/64 3' 8" WALL
NU-WHITE BACKED
ENAMEL
EXISTING
THRMOSTAT
ALL
NOTES:
1. FURNISH WITH THE FOLLOWING ACCESSORIES: BACKPLATE, HEATING ELEMENT, FRONT COVER AND 3" SPLICE, AND END CAPS.
W e st
S ix th S tr e e t, S u ite
G le n w o o d S p ri n g s, C
O
.9
.1 w .s g m
-i n c.
co m
Title:
Dwg No.
Job No.
Drawn by:
Print Date:
PE:QC:
File:
P ro je c t M ile s to n e
C e n tr a l M o d e l:
C
U s e rs
\a c a m p b e ll\
D o c u m e n ts
\3 E lk L a n e M
E R a le x c H
K R
J D
.r v t
/2
/2
:1 :5
P
M
P
IT
K
IN
C O
U N
T Y
E
L K
L A
N E
2024-118.003
AC
09-20-2024
TJHBC
MECHANICAL
PIPING SCHEDULES
M6.02
C O
N S
T R
U C
T
IO
N D
O C
U M
E N
T S
3202ElkLane_ME_R24
I:
\2
\2
-1
-P it C o F a c ili ti e s \0
-3
E lk L a n e \H
-D ra w in g s \2
-M
E M
O D
E L
D e s c ri p ti o n
D a te
B y
TT
P-1 P-2
GF-1
ET-1
DOMESTIC COLD WATER CONNECTION.
DOMESTIC HOT WATER CONNECTION.
OUTDOOR AIR
TEMPERATURE SENSOR
HEATING WATER SUPPLY
TEMPERATURE SENSOR.
IMMERSION WELL TYPE.
SOUTH BASEBOARD
ZONE.
NORTH BASEBOARD
ZONE.
B-1
AS-1
MECHANICAL ROOM
EXTENTS
1-1/4"
HWS
1-1/4"
HWR
FOUR PIPE DIAMETERS
1-1/4"
HWS
1-1/4"
HWR
1" HWS/R1" HWS/R
1/2"
PROVIDE 1/2" BLOW DOWN VALVE
WITH HOSE CONNECTION
M5.01
ZONING SCHEDULE
ZONE TAG ZONE NAME
T-STAT
TAG
HEAT
STAGE 1
HEAT
STAGE 2
COOL
ZONE 1 BEDROOM 1 / BATH 1 T1 FCU-1 SOUTH HB FCU-1
ZONE 2 BEDROOM 2 / BATH 2 T2 FCU-2 NORTH HB FCU-2
ZONE 3
MASTER BEDROOM / MASTER
BATH
T3 FCU-3 NORTH HB FCU-3
ZONE 4 LIVING ROOM T4 FCU-4 NORTH HB FCU-4
ZONE 5 KITCHEN / DINING T5 FCU-5 SOUTH HB FCU-5
NOTE:
1. OVERLAPPING OF ZONES IS PROHIBITED. SOME AREAS MAY RECEIVE ONLY HEATING OR
COOLING, WHICHEVER HAS THE GREATER EXTENTS IS INDICATED.
2. ZONE EXTENTS ARE APPROXIMATE.
3. PROVIDE EACH ZONE WITH A SINGLE 7 DAY PROGRAMMABLE THERMOSTAT AND USER
INTERFACE. WHERE MULTIPLE STAGES OR SYSTEMS SERVE A SINGLE ZONE, THE SINGLE
INTERFACE SHALL SERVE AS THE PRIMARY USER INTERFACE FOR SPACE TEMPERATURE
SETPOINTS AND STAGING OF SYSTEMS, FROM WHICH INDIVIDUAL SYSTEM (VRF AND TEKMAR)
WILL RECEIVE THEIR SETPOINTS CALLS FOR HEATING AND COOLING.
4. REFER TO THE SEQUENCES OF OPERATION FOR ADDITIONAL REQUIREMENTS.
5. LOCATE EACH THERMOSTAT AT THE LOCATION INDICATED.
CONTRACTOR SHALL SUBMIT FINAL REFRIGERANT PIPING LAYOUT,
INCLUDING LENGTHS AND NUMBER OF ELBOWS FOR FINAL SIZING
AND REFRIGERANT CHARGE PRIOR TO INSTALLATION. INFORMATION
SHOWN ON THIS SHEET IN FOR PRELIMINARY SIZING AND ROUTING
PURPOSES ONLY AND SHALL NOT BE USED FOR CONSTRUCTION.
NOTE
1. SEQUENCES OF OPERATION
1.1. PROVIDE ALL THE NECESSARY CONTROLS, WIRING, RELAYS, SENSORS, SOFTWARE, CONTROL VALVES, AND HARDWARE TO ACHIEVE
THE FOLLOWING SEQUENCES HEREIN, AND IN CONJUNCTION WITH THE PROJECT DOCUMENTS. NECESSARY COMPONENTS MAY
INCLUDE BUT ARE NOT LIMITED TO: WIRING, RELAYS, SENSORS, SOFTWARE, AND HARDWARE.
2. SETPOINTS:
2.1. ALL SETPOINTS ARE INDICATED VIA UNDERLINE. ADJUSTABLE INDICATES VALUE IS USER ADJUSTABLE VIA FACTORY INTERFACE.
2.2. SPACE AND ZONE SETPOINTS:
2.2.1. SPACE HEATING TEMPERATURE = 70F (ADJUSTABLE)
2.2.2. SPACE HEATING SECOND STAGE OFFSET TEMPERATURE = 3F BELOW SPACE HEATING TEMPERATURE
2.2.3. SPACE COOLING TEMPERATURE = 75F (ADJUSTABLE)
2.2.4. HEATING WATER SUPPLY TEMPERATURE = 140F (ADJUSTABLE)
2.2.5. DHW PRIORITY WATER SUPPLY TEMPERATURE = 180F (ADJUSTABLE)
3. HYDRONIC HEATING SYSTEM OVERVIEW:
3.1. THE HEATING SYSTEM IS COMPRISED OF A CONDENSING BOILER COUPLED TO THE HEATING WATER SYSTEM VIA TWO ZONE FLOW
THROUGH LOOPS. THE LOOPS ARE DEDICATED TO THE BASEBOARD HEATERS.
3.2. HEATING SHALL BE STAGED ON IN THE FOLLOWING ORDER WHEN SUCH SYSTEMS ARE PRESENT (REFER TO ZONE SCHEDULE).
3.2.1. 1ST STAGE HEATING: FAN COIL UNITS / HEAT PUMP SYSTEM.
3.2.2. 2ND STAGE: BASEBOARD.
4. SPLIT DX FAN COIL UNIT FCU-#
4.1. PROVIDE 7 DAY PROGRAMMABLE THERMOSTAT.
4.2. THE UNIT FUNCTIONS AS A SYSTEM IN CONJUNCTION WITH ITS DEDICATED PAIRED HEAT PUMP UNIT.
4.3. THE UNIT SHALL SHALL UTILIZE INTEGRAL FACTORY CONTROLS TO MAINTAIN SPACE COOLING TEMPERATURE SETPOINT AND
SPACE HEATING TEMPERATURE SETPOINT.
5. HEAT PUMP UNIT HPU-#
5.1. THE UNIT FUNCTIONS AS A SYSTEM IN CONJUNCTION WITH ITS DEDICATED PAIRED FAN COIL UNITS. REFER TO FAN COIL SEQUENCE.
5.2. THE UNIT SHALL HAVE INTEGRAL DEFROST CAPABILITY TO CONTINUOUSLY MAINTAIN PRIMARY HEATING CAPACITY DURING COLD
AMBIENT CONDITIONS.
6. BOILERS B-#
6.1. THE BOILER SHALL BE THE SECONDARY HEATING SOURCE.
6.2. WHEN THE HEAT PUMP SYSTEM CANNOT MAINTAIN THE SPACE HEATING TEMPERATURE THE HEATING WATER SUPPLY TEMPERATURE
SETPOINT ON THE BOILER SHALL BE ENABLED.
6.3. THE BOILER SHALL MODULATE THE FIRING RATE VIA INTEGRAL FACTORY CONTROLS TO MAINTAIN HEATING WATER SUPPLY
TEMPERATURE SETPOINT.
6.4. THE BOILER SHALL UTILIZE INTEGRAL CONFIGURABLE SETTINGS TO ENABLE AND CONTROL ON FIRING RATE TO MAINTAIN A MIN. DELTA
OF 20F TO ACROSS THE HEAT EXCHANGER AT ANY TIME THE EXISTING BOILER FIRES.
6.5. THE BOILER SHALL UTILIZE A SUPPLY WATER TEMPERATURE RESET SCHEDULE BASED ON OUTSIDE AIR TEMPERATURE, VIA FACTORY
SUPPLIED OUTSIDE AIR TEMPERATURE SENSOR AND INTEGRAL CONTROLS.
6.6. THE BOILER SHALL BE PROGRAMMED TO PROVIDE DHW PRIORITY. UPON A DW FLOW FOR DHW HEATING:
6.6.1. THE BOILER SHALL BE ENABLED AND SWITCH FROM SPACE HEATING TO DHW HEATING.
6.6.2. THE BOILER SHALL MAINTAIN DHW PRIORITY SUPPLY WATER TEMPERATURE SETPOINT UNTIL DHW PRIORITY WATER SUPPLY
TEMPERATURE SETPOINT IS SATISFIED AND SHALL SWITCH BACK FROM DHW HEATING TO SPACE HEATING.
7. PUMPS P-#:
7.1. UPON A CALL FOR HEAT BY ANY HYDRONIC ZONE, THE PUMP SHALL UTILIZE THE EXISTING THERMOSTAT TO MAINTAIN HEATING WATER
SUPPLY TEMPERATURE.
8. INDIVIDUAL HEATING AND COOLING ZONE CONTROL:
8.1. PROGRAMMABLE ZONE CONTROL:
8.1.1. FOR EACH ZONE PROVIDE A THERMOSTAT TYED TO THE FAN COIL UNIT APPLICATION WITH MULTISTAGE HEATING CAPABILITY FOR ZONES INDICATED, CAPABLE TO COMMUNICATE WITH THE BASEBOARDE EXISTING THERMOSTAT (REFER TO ZONE
SCHEDULE). IT SHALL BE POSSIBLE FOR SPACE TEMPERATURE SETPOINT.
8.2. HEATING STAGE 1 FAN COIL UNIT ZONE CONTROL:
8.2.1. UPON A CALL FOR HEAT, THE FAN COIL UNIT SHALL UTILIZE INTEGRAL FACTORY CONTROL TO MAINTAIN SPACE HEATING
TEMPERATURE SETPOINT.
8.3. HEATING STAGE 2 BASEBOARD ZONE CONTROL:
8.3.1. UPON A FURTHER CALL FOR HEAT, THE ASSOCIATED DEDICATED ZONE VALVE SHALL OPEN AND P-# SHALL BE ENERGIZED TO
MAINTAIN SPACE HEATING SECOND STAGE OFFSET TEMPERATURE.
8.4. COOLING FAN COIL UNIT ZONE CONTROL:
8.4.1. UPON A CALL FOR COOLING BY THE ZONE SENSOR, THE FAN COIL UNIT SHALL UTILIZE INTEGRAL FACTORY CONTROL TO
MAINTAIN SPACE COOLING TEMPERATURE SETPOINT.
W e st
S ix th S tr e e t, S u ite
G le n w o o d S p ri n g s, C
O
.9
.1 w .s g m
-i n c.
co m
Title:
Dwg No.
Job No.
Drawn by:
Print Date:
PE:QC:
File:
P ro je c t M ile s to n e
C e n tr a l M o d e l:
C
U s e rs
\a c a m p b e ll\
D o c u m e n ts
\3 E lk L a n e M
E R a le x c H
K R
J D
.r v t
/2
/2
:1 :5
P
M
P
IT
K
IN
C O
U N
T Y
E
L K
L A
N E
2024-118.003
AC
09-20-2024
TJHBC
DIAGRAMS
M7.01
C O
N S
T R
U C
T
IO
N D
O C
U M
E N
T S
3202ElkLane_ME_R24
I:
\2
\2
-1
-P it C o F a c ili ti e s \0
-3
E lk L a n e \H
-D ra w in g s \2
-M
E M
O D
E L
D e s c ri p ti o n
D a te
B y
NO SCALE
BOILER PIPING DIAGRAM
NO SCALE
REFRIGERANT PIPING DIAGRAM
B-1
GF-1ET-1
HB-B1
HB-DA
HB-DB
FCU-5
FCU-1
HP-1
FCU-2
HB-B2
FCU-3
FCU-4
HB-MB
HB-LA
HB-LB
HB-LA
HB-LB
HP-1
FCU-3
FCU-4
FCU-1
HB-B2
HB-B1
HB-MB
HB-DA
HB-DB
FCU-5
FCU-2
GF-1
ET-1
B-1
W e st
S ix th S tr e e t, S u ite
G le n w o o d S p ri n g s, C
O
.9
.1 w .s g m
-i n c.
co m
Title:
Dwg No.
Job No.
Drawn by:
Print Date:
PE:QC:
File:
P ro je c t M ile s to n e
C e n tr a l M o d e l:
C
U s e rs
\a c a m p b e ll\
D o c u m e n ts
\3 E lk L a n e M
E R a le x c H
K R
J D
.r v t
/2
/2
:1 :5
P
M
P
IT
K
IN
C O
U N
T Y
E
L K
L A
N E
2024-118.003
AC
09-20-2024
TJHBC
AXONOMETRICS
M9.01
C O
N S
T R
U C
T
IO
N D
O C
U M
E N
T S
3202ElkLane_ME_R24
I:
\2
\2
-1
-P it C o F a c ili ti e s \0
-3
E lk L a n e \H
-D ra w in g s \2
-M
E M
O D
E L
D e s c ri p ti o n
D a te
B y
NO SCALE
MECHANICAL AXONOMETRIC - SOUTHEAST
NO SCALE
MECHANICAL AXONOMETRIC - NORTHWEST
| Sheets |
| M0.01 - MECHANICAL LEGEND AND SPECIFICATIONS |
| M0.02 - SPECIFICATIONS |
| M1.01 - MAIN LEVEL MECHANICAL HVAC PLAN |
| M1.02 - LOFT LEVEL MECHANICAL HVAC PLAN |
| M1.11 - GARAGE LEVEL MECHANICAL PIPING PLAN |
| M1.12 - MAIN LEVEL MECHANICAL PIPING PLAN |
| M1.13 - LOFT LEVEL MECHANICAL PIPING PLAN |
| M2.01 - NORTH AND EAST ELEVATIONS |
| M5.01 - MECHANICAL DETAILS |
| M6.01 - MECHANICAL HVAC SCHEDULES |
| M6.02 - MECHANICAL PIPING SCHEDULES |
| M7.01 - DIAGRAMS |
| M9.01 - AXONOMETRICS |
| 2024-09-20T17:16:43-0600 | |
| Anthony James Haschke | |
| Reviewed document |
| 2024-09-20T17:18:38-0600 | |
| Anthony James Haschke | |
| Reviewed document |
| 2024-09-20T17:18:55-0600 | |
| Anthony James Haschke | |
| Reviewed document |
| 2024-09-20T17:19:16-0600 | |
| Anthony James Haschke | |
| Reviewed document |
| 2024-09-20T17:19:35-0600 | |
| Anthony James Haschke | |
| Reviewed document |
| 2024-09-20T17:19:54-0600 | |
| Anthony James Haschke | |
| Reviewed document |
| 2024-09-20T17:20:16-0600 | |
| Anthony James Haschke | |
| Reviewed document |
| 2024-09-20T17:20:34-0600 | |
| Anthony James Haschke | |
| Reviewed document |
| 2024-09-20T17:20:55-0600 | |
| Anthony James Haschke | |
| Reviewed document |
| 2024-09-20T17:21:15-0600 | |
| Anthony James Haschke | |
| Reviewed document |
| 2024-09-20T17:21:36-0600 | |
| Anthony James Haschke | |
| Reviewed document |
| 2024-09-20T17:21:57-0600 | |
| Anthony James Haschke | |
| Reviewed document |
| 2024-09-20T17:22:19-0600 | |
| Anthony James Haschke | |
| Reviewed document |
File details come from the government source that posted it. Updated .