This is a Special Provisions document supplement for the Embarcadero West Rail Safety Project (City Project #1007091) in Oakland, California, specifically addressing bituminous materials, emulsified asphalt, reinforced concrete pipe, and related construction specifications. The document establishes detailed material requirements for the project, including specifications for bituminous pavement mixtures, crack seal applications, latex/polymer modified asphaltic emulsions for slurry treatments, and HDPE-lined reinforced concrete pipe (RCP) installations. Key technical requirements include the use of PG64-10 bituminous pavement mixtures with 15% reclaimed asphalt pavement (RAP) for both upper and lower courses, crack sealant applications to cracks measuring 1/2" to 2" wide, and polymers including SBR, SBS, SEBS, or Neoprene options for emulsion-aggregate slurry. The document specifies that HDPE liners must be manufactured to strict standards with minimum pull-out strength of 14,000 pounds per square foot, 97-98% virgin high-density polyethylene composition, and compliance with multiple ASTM testing methods including density, tensile properties, thermal expansion, brittleness, and water absorption standards.
Payment for crack sealing is established as a lump sum price bid on a linear foot basis, with compensation including all labor, materials, tools, equipment, and incidentals for complete installation. The HDPE liner manufacturer must demonstrate at least 10 years of manufacturing experience and provide certified test reports confirming material compliance with specified standards. Materials must be free of defects including holes, pinholes, bubbles, blisters, and contamination. Cap strips for HDPE welding applications must be approximately 4 inches wide or greater with sufficient elongation to bridge up to 1/4-inch settling cracks. All work for liner installation, field seaming, and joint welding must be completed in strict conformity with applicable manufacturer instructions and recommendations, with samples, datasheets, and installation instructions submitted at the Engineer's request.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Project Special Provisions 68 Bid Documents: May 28, 2026 Update
SECTION 203 – BITUMINOUS MATERIALS
The following PG asphalt mixes shall be used unless otherwise specified:
• Upper Course (Top 2” of AC) or AC OVERLAY: ½” Maximum Aggregate, Type C2 Mix from Table 203-
6.4.4 (A) Bituminous Pavement Mixture PG64-10 with 15% reclaimed asphalt pavement (RAP)
• Lower Course(s) (more than 2” below surface) or AC BASE REPAIR: 3/4” Maximum Aggregate, Type B Mix from Table 203-6.4.3 (A) - Bituminous Pavement Mixture PG64-10 with 15% reclaimed asphalt pavement (RAP)
203-3 EMULSIFIED ASPHALT
203-3.1 GENERAL
ADD SUBSECTION 203-3.1.1 TO READ AS FOLLOWS:
203-3.1.1 CRACK SEAL
The contractor shall provide the engineer with a certificate of compliance conforming to the provisions for each shipment of crack sealant. The certificate shall certify that the sealant conforms to the specifications, and shall be accompanied with storage and heating instructions and cautions for the material. The crack sealant shall be readily handled at ambient temperature, shall be capable of being stored for periods of up to 6 months, shall withstand freeze-thaw cycles and shall contain no volatile organic compounds which may contribute to air pollution. The base material shall remain ductile with aging and provide resiliency under extreme climatic conditions.
Contractor shall clean and dry all cracks prior to sealing. All vegetation shall be removed with torch or spray.
When used as part of seal or mill and overlay treatment, once seal is applied, a soft rubber, u-shaped squeegee shall be used to form a wipe zone approximately 3-4 inches wide along the crack and flush to pavement surface.
When used as a stand alone treatment contractor to use the overband method 4” in width maximum.
Crack sealing shall be applied to only cracks from 1/2” to 2” wide cracks.
ADD SUBSECTION 203-3.1.2 TO READ AS FOLLOWS:
203-3.1.2 MEASUREMENT AND PAYMENT
Payment for furnishing and applying flexible joint and crack sealant will be made as a lump sum price bid for crack seal.
The linear foot price paid for crack seal shall include full compensation for furnishing all labor, materials, tools, equipment, and incidentals and for doing all the work involved in sealing cracks, complete in place, including furnishing and applying sand and for brooming excessive sand as specified in the standard specifications and these special provisions, and as directed by the engineer.
Full compensation for cleaning and sealing cracks in adjacent paved shoulders shall be considered as included in the linear foot price paid for crack seal and no additional compensation will be allowed therefor.
203-5 Emulsion-Aggregate Slurry.
REPLACE SUBSECTION 203-5.2 WITH THE FOLLOWING:
203-5.2 Materials.
The latex/polymer shall be SBR, SBS, SEBS, or Neoprene, at the option of the Contractor.
1) Latex/Polymer Modified Asphaltic Emulsion for Emulsion Aggregate Slurry. Latex/Polymer Modified Asphaltic emulsion shall be a cationic quickset, quick traffic type conforming to the requirements of type PMCQS-1h, and shall meet all the requirements for such material as specified below. The emulsion shall be homogeneous and show no separation after thorough mixing and shall break and set on the aggregate within five minutes. The polymer modified asphalt emulsion shall conform to the requirements prescribed in Table 1.
Table 1:
LATEX/ POLYMER MODIFIED ASPHALT EMULSION PMCQS-1h REQUIREMENTS
203-3.1.1 Crack Seal removed per Addendum #1
Project Special Provisions 91 Bid Documents: May 28, 2026 Update
207-3 LINED REINFORCED CONCRETE PIPE.
REPLACE SUBSECTION 207-3 TO READ:
207-3 LINED REINFORCED CONCRETE PIPE.
207-3.1 General. These specifications apply to reinforced concrete pipe (RCP) manufactured with HDPE lining. No polyvinyl chloride lining is allowed. The material properties for HDPE shall comply with the specification for concrete embedment liner in section 207-3.2. The HDPE liner shall be lined 360 degrees inside circumference of the pipe. The interior joint of the pipe shall be welded with HDPE welding (cap) strip using electro-fusion welding. At the connection of the pipe and sewer structure (manhole) wall the interior lining shall be welded using extrusion-welding method. HDPE-lined RCP shall conform to the provision in ASTM C 76, the minimum 28-day concrete compressive strength shall be the minimum compressive strength specified in ASTM C 76 for the particular pipe design.
207-3.2 Concrete Embedment Liner. This section covers the specifications and guidelines for manufacturing high density polyethylene (HDPE) embedment liner for RCP and sewer structures. References to American Society for Testing and Materials (ASTM):
1. D 1505 Test Method for Density of Plastics by the Density-Gradient Technique.
2. D 1603 Test Method for Carbon Black in Olefin Plastics.
3. D 5199 Standard Test Method for Measuring Nominal Thickness of Geo-textiles and Geo-membrane.
4. D 5596 Standard Test Method for Microscopic Evaluation of the Dispersion of Carbon Black in
Polyolefin Geo-synthetics.
5. D 6693 Standard Test Method for Determining Tensile Properties of Nonreinforced Polyethylene and
Non-reinforced Flexible Polypropylene Geo-membranes.
6. D 1204 Standard Test Method for Linear Dimensional Changes of Non-grid Thermoplastic Sheeting or film at Elevated Temperature.
7. D 696 Standard Test Method for Coefficient of Linear Thermal Expansion of Plastics Between -30º C and 30º C With a Vitreous Silica Dilatometer.
8. D 746 Standard test Method for Brittleness Temperature of Plastics and Elastomers by Impact.
9. D 570 Standard Test Method for Water Absorption of Plastics.
10. E 96 Standard Test Method for Water Vapor Transmission of Material.
207-3.3 Post Award and Submittals.
a. All work for and in connection with the installation of the lining, field seaming and welding joints shall be completed in strict conformity with all applicable instructions and recommendations of the liner manufacture.
b. All surfaces in contact with corrosive or erosive environments or environments susceptible to mechanical damage shall be lined with an approved HDPE independent anchor embedment liner.
c. At the request of the Engineer, Pre-Caster or End User, samples, datasheets, installation instructions, etc.
will be provided. Included with the shipment of liner, submit certified test reports that the liner and material are manufactured in accordance with standards specified herein.
207-3.4 Qualifications.
a. The HDPE liner specified in this section shall be furnished by a Manufacture that is fully experienced, reputable and qualified in the manufacturing of the materials. The manufacture must have at least 10 years manufacturing experience.
b. Locking independent anchors must be of the same material as that of the liner, and shall be integrally extruded with the sheet in a one step process.
c. Liner shall demonstrate minimum pull-out strength of 14,000 pound per square foot (psf).
d. HDPE liner exposed to U.V. must be protected with 1.5- 3% carbon black and comply with ASTM D 1603, and D 5596.
e. Liner in below grade installations, not exposed to U.V. should be light in color to facilitate camera inspections, U.V. protection is not required.
207-3.5 Material Properties.
a. The material used in the embedment liner, and in all welding strips shall be made from 97-98% virgin high-density polyethylene.
b. Plasticizer shall not be added to the resin formulation.
c. Embedment sheet, and welding strips shall be free of holes, pinholes, bubbles, blisters, excessive contamination by foreign matter, and nicks and cut on roll edges.
d. The cap strips shall be made from HDPE, and have good impact resistance and have an elongation sufficient to bridge up to ¼ inch settling cracks.
e. Cap strip shall be approximately 4 inches wide or greater, and shall be equivalent to liner.
f. Material shall maintain a repairable state through its lifecycle by methods approved, and recommended by the manufacturer.
g. Embedment sheets shall have the following physical properties when tested in accordance with Table 1.
h. Raw resin shall have the following properties when tested in accordance with Table 2.
Table 1: Material Properties
207-3 removed per Addendum #1
Project Special Provisions 92 Bid Documents: May 28, 2026 Update
Property Test Method Nominal Value Testing Frequency
Thickness, mm (mil) ASTM D 5199 2.00 (80) 3.00 (120) 4.00 (160) 5.00 (200) Every 5th roll
Density, g/cm3 ASTM D 1505 0.94 0.94 0.94 0.94 One / 100,000 ft2
Tensile Properties ASTM D 6693
Strength@yield, lb/in2 Type IV, Bumbbell 2,100 2,100 2,100 2,100 One/100,000 ft2
(Mpa) G.L.=2.0 in (50 mm) (14.5) (14.5) (14.5) (14.5)
Elongation @ Break, % 500 500 500 500
Stud Pull Strength1, >14,000 >14,000 >14,000 >14,000 One / product lb/ft2 ( kN/m2) (669.89) (669.89) (669.89) (669.89)
Carbon Black Content/
Pigment Content, %
Black Liner ASTM D 1603, mod 2-3 2-3 2-3 2-3 One /100,000 ft2
Gray Liner ASTM D 5630, mod 1.5 - 2.5 1.5 - 2.5 1.5 - 2.5 1.5 - 2.5
Carbon Black Dispersion2 ASTM D 5596 Note 2 Note 2 Note 2 Note 2 One /100,000 ft2
Notched Constant Tensile ASTM 5397 400 400 400 400 One / formulation
Load, hours
Coefficient of Linear Thermal ASTM D 696 1.20E-04 1.20E-04 1.20E-04 1.20E-04 One / product
Expansion, per oC
Low Temperature Brittleness, OC ASTM D 746 -77 -77 -77 -77
One / product
Dimensional Stability, % ASTM D 1204 ±1.0 ±1.0 ±1.0 ±1.0 One / product
(each direction) One / product
Water Absorption, % ASTM D 570 0.1 0.1 0.1 0.1 One / product
Water Vapor Transmission, ASTM E 96 <0.01 <0.01 <0.01 <0.01 One / product
(g/m2/day)
1Note: Concrete must have a compressive strength of at lease 4,000 lb/in2 (27,600 Kpa).
2Note: Despersion only applies to near spherical agglomerates. 9 of 10 views shall be category 3.
Table 2: Raw Material Properties
Property Test Method Value Testing Frequency
Density. g/cm3 ASTM D 1505 0.932 1/resin lot
Melt Flow, g/10min ASTM D 1238 ≤1.0 1/resin lot
(190/2.16)
OIT, minutes ASTM D 3895 100 1/formulation
1 atm/200oC
Project Special Provisions 93 Bid Documents: May 28, 2026 Update
207-3.6 Material Supply and Handling Material Supply
a. Embedment sheets shall be supplied in roll form, pre-fabricated tubes or panels.
b. Cap strips shall be supplied in 4 inch widths or greater.
Material Handling
a. Materials are to be handled as to prevent damage.
b. The on-site storage location for geo-membrane material, provided by the contractor to protect the liner from punctures, abrasions and excessive dirt and moisture. Storage area should have the following characteristics:
1. Level (no wooden pallets).
2. Smooth
3. Dry
4. Protected from theft and vandalism
207-3.7 Welding Procedures and Testing Program Welding Procedure
a. Only welding techniques approved by the manufacture are to be used. Approved welding techniques are as follows:
1. Factory butt-welding.
2. Wedge welding
3. Extrusion welding
4. Electro-fusion welding.
b. Hot air welding is not allowed except for the purpose of temporarily tack welding sheets together.
a. Pipe joints should be welded using the Electro-Fusion process as developed by GSE Lining Technology, and
DemTec (or equivalent), whenever possible.
b. Welding contractors must be approved by the manufacture, and be able to demonstrate welding proficiency.
e. Field welded joints must be made water tight prior to the weld. Any joints leaking should be repaired using
SealGuard® 2 expanding foam grout or equivalent before weld is attempted.
Weld Testing Program
a. A suitable weld-testing program should be instituted that meets the approval of the Engineer, the Contractor, and the liner manufacture prior starting of any welding procedures. Testing methods may include both destructive, and non-destructive testing.
b. Testing on embedded material must be non-destructive.
c. Test methods may include spark testing, vacuum testing, and pull testing.
d. Holidays found in welds should be ground out re-welded and tested.
207-16 ABS OR PVC COMPOSITE PIPE.
DELETE ALL REFERENCES TO PVC PIPE OR FITTINGS.
207-17 HDPE GRAVITY PIPE.
REVISE SECTION 207-17 TO READ AS FOLLOWS:
207-17 HDPE BIORETENTION UNDERDRAIN
207-17.1 General. This subsection applies to the requirements for perforated HDPE Schedule 40 plastic pipe for bioretention facilities. HDPE) pipe for underdrains shall be of the size shown on the plans. Pipe, fittings, couplings, and joints shall to ASTM D3034 with an SDR of 35. Joints shall be a bell and spigot assembly with elastomeric sealing gaskets. Sealing gaskets shall meet the requirements of ASTM F 477. Solvent cement joints shall not be allowed.
207-17.2 Outlet and Riser. Outlet and risers for HDPE Schedule 40 underdrains must be of the same material as the underdrain and must not be perforated. Sizes for outlets and risers shall be as shown on the plans.
207-17.3 Payment: Full compensation for furnishing all labor, materials, tools, equipment, and incidentals to deliver and install to the underdrain to limits specified in the plans, Standard Specifications and these Special Provisions, or as directed by the Engineer, shall be considered as included in the price bid for the other bid items, and no additional compensation shall be allowed therefor.
207-18 SIDEWALK UNDERDRAIN
REVISE SECTION 207-17 TO READ AS FOLLOWS:
207-17 SIDEWALK UNDERDRAIN
207-17.1 General. This subsection applies to the requirements for sidewalk underdrains. Underdrains shall be 3” unless otherwise shown on the plans, Pipe, fittings, couplings, and joints shall be compression gasket, mechanical joint, or shielded no-hub couplings, conforming to ASTM A888 or ASTM A74. Rectangular pipe shall conform to ASTM A48.
Rectangular cast iron pipe joints shall be integral bell-and-spigot, flanged, or manufacturer-standard mechanical joints.
The outside surfaces of cast iron pipe and fittings shall have a factory applied bituminous coating or asphaltic exterior coating.
Project Special Provisions 125 Bid Documents: May 28, 2026 Update
l. Install Decomposed Granite at Treewells or Misc. Areas (3” Deep, Typical): Where directed by the Engineer at tree well or other miscellaneous areas, the Contractor shall replace existing top soil and/or voids with decomposed granite specified as follows:
General Summary: The Work Consist of installing and stabilizing decomposed granite at tree well or other miscellaneous areas.
Submittals: Submit the following items for approval:
1. Product Data: A copy of the manufacturer’s product sheet together with instructions for installation of solidifying emulsion 5 days before installation.
2. Samples: A five pound sample of proposed decomposed granite before delivery of materials to the site.
Materials:
Decomposed Granite: Decomposed Granite must be crushed granite rock, “Gold Pathway Fine” or equal, with screenings graded from 3/8 inch particles to dust.
Stabilizer: added at 15lbs. per cubic yard of Decomposed Granite.
The materials must comply with the following gradation:
Grading Requirements
Sieve Size Percent Passing
3/8-inch 100
No. 4 95-100
No. 8 75-80
No. 16 55-65
No. 30 40-50
No. 50 25-35
No. 100 20-25
No. 200 5-15
Note: Gradation based upon AASHTO T11-82 and T27-82
The color of decomposed granite must be uniform and approved by the Engineer.
Solidifying Emulsion: Solidifying emulsion must be either a water-based polymer, or non-toxic organic powdered binder specifically manufactured to harden decomposed granite. The solidifying emulsion must not alter the decomposed granite color.
Construction:
Clearing: Prior to beginning decomposed granite work, areas to receive the decomposed granite shall be cleared of all weeds, debris and excess soil.
Decomposed Granite Installation (Typical 3-inch depth): Do not install decomposed granite work during rainy conditions. Mix solidifying emulsion thoroughly and uniformly throughout the decomposed granite per the manufacturer’s recommendations. Mix the material in the field using portable mixing equipment, or delivered in mixer trucks from a local ready-mixed plant. Place decomposed granite uniformly in layers nor more than 1-½-inch thick. Compact each layer of decomposed granite to a relative compaction of not less than 90 percent. Apply a final application of solidifying emulsion as recommended by the manufacturer. Prevent runoff or overspray of solidifying emulsion onto adjacent paved or planting areas. When work is complete, the surface must be smooth, compacted to 90 percent and uniform; maintaining original flow lines slope gradient and contours of the project site.
m. Parking Kiosk Pay Station: 303-5.1.1.6m removed per Addendum #1
Project Special Provisions 126 Bid Documents: May 28, 2026 Update
General. Contractor shall be responsible for purchasing and delivering to the City Maintenance Service Yard the kiosk pay stations as shown on the plans. City of Oakland is responsible to relocate and install existing kiosk pay stations and install kiosk pay stations. Removal and relocation of the parking meters requires the demolition of the existing foundation to a depth of 1-foot of the surface, and restoration of all disturbed areas in the vicinity of the work.
The contractor shall furnish and install necessary items for the installation and removal of parking meters. Salvage the parking meters as directed by the Engineer.
Submittals. Certificate of compliance shall be provided for all products and materials proposed to be used under this section.
Furnish Parking Kiosk Pay Station: Contractor shall purchase and deliver to the City Maintenance Service Yard the kiosk pay stations as shown on the plans. City of Oakland is responsible to relocate and install existing kiosk pay stations and install kiosk pay stations.
Materials
General. City standard kiosk pay station, parking meter posts, and concrete footing.
City standard kiosk pay station is IPS MS3 pay station.
Construction.
The Contractor shall test and verify the kiosk pay stations are operational.
303-5.4 Joints.
303-5.4.2 Expansion Joints.
ADD NEW PARAGRAPH TO THE END OF SUBSECTION 303-5.4.2:
One-quarter inch (6.4mm) expansion joints shall be placed in the curb and gutter at each side of structures, driveways and curb returns. Expansion joints shall also be placed in the sidewalks on each side of driveways. If slipform equipment is used in curb and gutter construction, weakened plane joints 1-inch deep at 10-foot intervals may be substituted for expansion joints, if approved by the Engineer.
303-5.5 Finishing.
303-5.5.2 Curb.
ADD THE FOLLOWING TO THE END OF SUBSECTION 303-5.5.2:
Concrete curb shall be constructed or repaired where directed by the Engineer. Unless otherwise directed by the Engineer, the defective concrete shall be sawed with a concrete saw as hereinafter specified and removed in sections so as to have a vertical joint between the old and the new concrete.
At locations where sidewalk and driveways are to be constructed having unsatisfactory subbase material as determined by the Engineer, said material shall be removed to a depth of four inches (4") minimum and replaced with ATSM C 131 Test Grading B crushed miscellaneous base conforming to the Standard Specifications and no separate payment shall be made. Crushed miscellaneous base shall be compacted in accordance with the Standard Specifications. The Contractor shall remove unsuitable subbase material as part of demolition operations and no separate payment shall be made.
Areas next to new sidewalk, back of curb and driveway where forms have been removed shall be back filled with Class “A” imported topsoil as specified in Section 212-1 and 308-2 of the Standard Specifications and these Special Provisions and mechanically compacted to ninety percent (90%) relative compaction to the level of existing sidewalk, driveway and curb. Class “A” imported topsoil shall be included as part of concrete curb and gutter work and no separate payment shall be made.
Expansion joints shall be constructed in the concrete curb and gutter at each side of driveways, returns and structures. Expansion joint material shall be the same as for sidewalk expansion joint filler material. Weakened plane joints 3/4" deep and 1/4" wide shall be constructed at regular intervals not to exceed ten (10) linear feet. The exposed surfaces of the curb and gutter shall be troweled to a smooth surface and shall be scored transversely and broom finished to the Engineer’s satisfaction.
No. 4 steel rebars shall be doweled into existing curb and gutter at saw-cut locations and no separate payment shall be made.
Project Special Provisions 25 Bid Documents: May 28, 2026 Update reasonably should be known, to contain subsurface installations, the Contractor shall contact Underground Service Alert (USA) of Northern California and obtain an inquiry identification number.
Notification numbers must be updated two working days before the twenty-eight day period expires, or as required by State law.
White Markings in Paved Areas: The Contractor shall avoid excessive or oversized marking, especially if marking outside the excavation area. Limit length, height, and interval of marks per USA guidelines. Letters and numbers shall not exceed 3” to 6” in height. On concrete surfaces the Contractor shall use spray chalk paints, water-based paints or equivalent less permanent type marking.
White Markings in Non-Paved Areas: When paint is not used, use appropriate colored stakes, lath, pennants or chalk lines. Select marker types that are most compatible to the purpose and marking surface. Adhere to paved area marking suggestions to the extent practical.
Each utility that is not a member of the Regional Notification Center (RNC) must be notified individually. The City of Oakland Electrical Division (street lights, traffic signals, call boxes) is not a member of a RNC. The City of Oakland is not required to mark gravity-fed lines such as storm and sanitary sewers.
CHANGE THE FIFTH PARAGRAPH OF SUBSECTION 5-1 TO READ:
The Contractor shall be responsible for locating all the service laterals including, but not limited to, private building sewer, storm drainage, water, electrical, telephone and cable, prior to excavation in areas where service laterals could reasonably be expected to exist. Any service laterals damaged by the Contractor shall be promptly repaired with the approval of the Engineer, at no cost to the City. If no pay item is provided in the Contract for this work, full compensation for such work shall be considered as included in the prices bid for other items of work.
5-2 PROTECTION.
REPLACE THE FIRST SENTENCE OF THE SECOND PARAGRAPH WITH THE FOLLOWING:
Where protection is required to ensure support of utilities located substantially (i.e. within 3 feet) as shown on the Plans or in accordance with 5‑1, the Contractor shall, unless otherwise provided, furnish and place the necessary protection at the Contractor's expense.
ADD THE FOLLOWING TO THE END OF SUBSECTION 5-2:
The Contractor shall provide temporary and permanent supports under all existing concrete, asbestos concrete, clay, telephone, and power conduits. Cost for such supports shall be absorbed in the Contractor's bid item for the pipeline construction.
The Contractor shall not tunnel under conduits unless approved by the Engineer. All voids within the tunnel limits shall be filled with one‑sack cement/sand slurry.
5-5 DELAYS.
ADD THE FOLLOWING TO THE END OF SUBSECTION 5-5.
No payment will be made for the first two hours of each occurrence of delay related to identification and removal of an abandoned or unmarked utility.
5-6 COOPERATION.
ADD NEW SUBSECTION 5-6.1 TO READ:
5-6.1 Utility Work. The Contractor shall cooperate and coordinate with all such other forces to avoid delays or hindrances to their work, including the following known projects and agencies within the work area:
1 The following Project utility adjustment/relocation work scheduled from [START DATE] to [END DATE], concurrent with construction of this Project:
EBMUD Water for fire hydrant, water valves and water meter relocations and adjustments.
EBMUD Sewer for vaults and manholes adjustments.
AT&T for telecommunication pull box, vault and manhole frame and cover adjustments.
PG&E Electric for electric pull box, vault and manhole frame and cover adjustments PG&E Gas for gas valve and meter box and cover adjustments (included in this project).
Project Special Provisions 26 Bid Documents: May 28, 2026 Update
PG&E Fiber for fiber pull box, vault and manhole frame and cover adjustments COMCAST for telecommunication pull box and cover adjustments.
City of Oakland storm drainage and sanitary sewer manhole, cleanout, and inlet frame and cover adjustments (included in this project).
Verizon for telecommunication vault and manhole frame and cover adjustments.
The Contractor shall allow [3] working days per location for utility owner adjustment and relocation work, exclusive of the notice periods specified in Sections 5-6.5 through 5-6.11. This duration is in addition to, and is not counted against, the [5] day limitation between concrete demolition and pour back, and that limitation shall not apply at locations where utility owner adjustment or relocation work is required. The Contractor shall reflect these durations in the baseline schedule. No additional compensation or working days will be allowed for utility owner work completed within the durations stated above.
As part of the Project’s notice to owners (NTO), the utility adjustment/relocation work between [START DATE] to [END DATE], including coordination, cooperation, and project scheduling to support and facilitate overlapping, cooperative, and seamless utility adjustment/relocation work by others, is considered part of the project, and no delays, additional compensation, or working days will be allowed therefore.
ADD NEW SUBSECTION 5-6.2 TO READ:
5-6.2 Utility Work.
The Contractor shall be advised that the relocation of overhead and underground utilities may be underway by other forces within or adjacent to the limits of Work. The Contractor shall cooperate and coordinate with all such other forces to avoid delays or hindrances to their work. As part of the Project’s notice to owners (NTO), the utility adjustment/relocation work between Month Year to Month Year, including coordination, cooperation, and project scheduling to support and facilitate overlapping, cooperative, and seamless utility adjustment/relocation work by others, is considered part of the project, and no delays, additional compensation, or working days will be allowed therefore.
ADD NEW SUBSECTION 5-6.3 TO READ:
5-6.3 EBMUD Water Coordination.
Construction of new service lines and fire hydrant relocations and water meter/valves relocations by EBMUD will be scheduled after the Contractor demolishes existing sidewalks and forms new sidewalks. Contractor shall invite the Pipeline Infrastructure Manager, Vanessa Chi (vanessa.chi@ebmud.com), Assistant Construction & Maintenance Assistant Superintendent, Juan Serrano, (510-287-1690 or juan.serrano@ebmud.com), to all pre-construction meetings. EBMUD requires a 30 days notice from when new or relocation construction will be needed.
Relocation of Backflow Prevention Devices is the responsibility of the property owner, not EBMUD.
Backflow Prevention Devices shall be located at least three feet from any other utility facility. Following construction, final inspection of the Backflow Prevention Devices will be conducted by EBMUD.
Please contact Cross Connection Specialist, Jose Angel (jose.angel@ebmud.com) to coordinate inspection of the backflow preventer after relocation.
Make arrangements and pay the charges for relocation of water meters. Notify property owners of work to be performed and service disruptions at least 48 hours before local water authority begins relocation work.
ADD NEW SUBSECTION 5-6.5 TO READ:
5-6.5 AT&T Coordination.
Construction of telecommunication adjustments and relocations by AT&T will be scheduled after the Contractor demolishes existing sidewalks. Contractor shall invite the Telecommunications Infrastructure Manager, Edward Washington (ew6091@att.com), to all pre-construction meetings.
AT&T requires a 30 days notice from when relocation or adjustment construction will be needed.
5-6.1 revised per Addendum #1
Project Special Provisions 31 Bid Documents: May 28, 2026 Update comply with 2022 California Plumbing Code (CPC).
The contract unit price paid for each Reconstruct Water Connection (Service) shall include full compensation for all labor, materials, equipment, testing, excavation, trench shoring, protecting and supporting of utilities, providing and compacting backfill, disposal of excavated materials and all debris, coordinating with EBMUD, and incidentals to complete work and no additional compensation shall be allowed therefore.
ADD NEW SUBSECTION 5-13 TO READ:
5-13 GAS APPURTENANCE ADJUSTMENTS
The Contractor shall perform all adjustments of the gas valve and meter box and cover to grade.
The contract unit price paid for each Adjust Gas Valve Frame and Cover to Grade (PG&E) shall include full compensation for all labor, materials, equipment, and incidentals for performing all the work involved in adjusting gas valve covers to grade, including excavation and backfill, survey tie-outs, lowering for pavement grinding operation, and raising to final grade and no additional compensation shall be allowed therefore.
The contract unit price paid for each Adjust Gas Meter Box and Cover to Grade (PG&E) (Service) shall include full compensation for all labor, materials, equipment, and incidentals for performing all work involved in adjusting gas meter box cover to grade, including excavation and backfill, survey tie-outs, lowering for pavement grinding operations, and raising to final grade and no additional compensation shall be allowed therefore.
ADD NEW SUBSECTION 5-14 TO READ:
5-14 WATER METER CHARGES
Make arrangements and pay the charges for relocation of the water meters with EBMUD. Notify property owners of work to be performed and service disruptions at least 48 hours before local water authority begins relocation work.
The charges are shown in the following table:
5-15 RELOCATION OF UNIDENTIFIED UTILITY
The Contractor shall relocate the unidentified utility as necessary to clear the proposed storm drain by a minimum vertical separation of 12 inches, or as directed.
Relocation shall include furnishing all labor, materials, equipment, temporary support, shoring, bypass systems if required, and incidental work necessary to complete the relocation.
Materials used for relocation shall match the existing utility unless otherwise approved by the Engineer. Backfill and compaction shall conform to Standard Specification Section 300-
EARTHWORK.
5-14 revised per Addendum #1
Project Special Provisions 32 Bid Documents: May 28, 2026 Update
SECTION 6 - PROSECUTION, PROGRESS AND ACCEPTANCE OF THE WORK
6-1 CONSTRUCTION SCHEDULE AND COMMENCEMENT OF WORK.
6-1.1 Construction Schedule.
ADD THE FOLLOWING SENTENCE TO THE END OF THE FIRST PARAGRAPH:
A schedule utilizing the critical path method is required on all projects with a bid price of $250,000 or greater.
ADD THE FOLLOWING AFTER THE FIRST PARAGRAPH:
On a monthly basis, along with the monthly payment request, the Contractor shall revise the schedule, indicating actual progress, and resubmit to the City for review and concurrence. If in the opinion of the City, the Contractor falls behind the accepted schedule, the Contractor shall take the necessary steps to improve progress and adhere to the original schedule.
6-1.2 Commencement of the Work
ADD THE FOLLOWING AT THE END OF SUBSECTION 6-1.2:
The contract time specified is the City's best estimate of the required time to complete the Work. If the Contractor elects to submit an early completion schedule for the Project, the Contractor does so at its own risk. Such a submission does not change the contract time specified in the contract documents and the contractor must show the remaining time as “float time” on the schedule.
Moreover, the City shall not be responsible for, nor be held liable for, any damages allegedly caused by the Contractor’s failure to complete the Project within the proposed early completion schedule.
The Contractor’s failure to comply with the requirements of Subsection 6-1 shall be grounds for the City to determine that the Contractor is not prosecuting the Work with sufficient diligence to ensure completion within the time specified in the contract. Upon making this determination, the City may withhold approval of progress payments until the Contractor complies with the requirements of Subsection 6-1.
Contractor shall not pave or perform base repairs within a 2 block radius of the following schools during school days. Weekend work is allowed for the 2 block radius at no additional cost to the City.
The Contractor’s failure to comply with the requirements shall require the Contractor to pay to the City or the City may deduct from monies due the Contractor, the sum of $5,000.00 per paving segment per day, unless otherwise provided in the contract documents.
Contractor shall not pave within a 2 block radius of the following schools during school days.
Refer to http://www.ousd.org/Domain/3540 for the Oakland Unified School District School Calendar.
The Contractor’s failure to comply with the requirements of Subsection 6-1 shall be grounds for the City to determine that the Contractor is not prosecuting the Work with sufficient diligence to ensure completion within the time specified in the contract. Upon making this determination, the City may withhold approval of progress payments until the Contractor complies with the requirements of Subsection 6-1.
ORDER OF WORK: The project order of work shall be as follows:
• All concrete work and related items shall be completed on a particular street before AC pavement demolition or other AC work may commence.
For work within Port of Oakland (Port) property, Contractor is required to notify the Port 60 days prior to start of work for each stage. Contractor is required to demobilize within 15 days upon acceptance of construction during this stage and return operational status back to the Port. Existing tenants within Port property must have access maintained during business operations. Nightwork requests will be considered on a case-by-case basis and require City and Port approval. All night work operations should be identified in the contractor schedule. The Contractor shall only work, store equipment, store
Project Special Provisions 33 Bid Documents: May 28, 2026 Update material and conduct construction operations within areas designated as construction area during each stage. No area outside the designated construction area shall be used or occupied by the contractor without explicit written consent from the Port. Requests for additional areas can be submitted for use and subject to Port approval.
ADD NEW SUBSECTION 6-1.3 TO READ:
6-1.3 Mandatory Pre-Construction Meeting.
A pre-construction meeting will be scheduled for within ten days of the contract award for all projects with a contract bid price of greater than $50,000. At this meeting the Contractor will meet representatives of the City's Contract Compliance, Construction and Design divisions.
The project Resident Engineer will chair the meeting. This meeting's purpose is to establish procedures for field coordination, resolve anticipated construction problems, and discuss the process for submittals, request for information, disputes, and progress payments. The Resident Engineer will also discuss the construction schedule, traffic control plans, housekeeping, storm water protection, recycling, utility coordination, notification to property owners, project sign location, office trailer location, working hours, noise control, dust control, general public relations, and other related issues.
The Contract Compliance Officer will discuss enforcement of the City's various employment and prevailing wage requirements specified by the Contract.
6-3 SUSPENSION OF THE WORK.
CHANGE SUBSECTION 6-3.1 TO READ:
6-3.1 General. The Engineer shall have the authority to suspend the work wholly or in part for such period as deemed necessary, due to unsuitable weather, or to such other conditions as are considered unfavorable for the suitable prosecution of the work, or for such time as it may deem necessary due to the Contractor’s failure to carry out orders given or to perform any work provisions.
The Contractor shall immediately obey the Engineer’s suspension orders and shall not resume work until so ordered in writing by the Engineer.
If the Engineer orders a work suspension due to the Contractor’s failure to carry out provided orders or to perform any contract provision, the days on which the suspension order is in effect shall be considered contract working days if such days are working days within the meaning of the definition set forth in these specifications.
If work is suspended through no fault of the Agency, all expenses and losses incurred by the Contractor during such suspension shall be borne by the Contractor. If the Contractor fails to properly provide for public safety, traffic, and protection of the work during suspension periods, the Agency may elect to do so, and deduct the cost thereof from monies due the Contractor. Such action will not relieve the Contractor from liability.
The Contractor’s responsibilities as defined in Section 7 of the Standard Specifications and Special Provisions shall continue in full force and effect during such suspension period.
ADD NEW SUBSECTION 6-3.3 TO READ:
6-3.3 Hazardous Material and Waste Encountered during Operations. If the Contractor encounters a substance during operations that the Contractor has reason to believe may be a hazardous material as defined by Section 25501 of the California Health and Safety Code or a hazardous waste as defined by Section 25117 of the California Health and Safety Code, and if such substance was not previously accounted for in the Scope of Work, the Contractor shall immediately so notify the Engineer in writing. Work in the immediate area of the suspected hazardous material or waste shall be suspended until the Engineer authorizes the work to resume. If such suspension delays the current controlling operation, the Contractor shall be granted a time extension as provided in Section 6-6.
If such work suspension delays the current controlling operation by more than two working days, the delay shall be considered a right of way delay and the Contractor shall be compensated for such delay as provided in Section 8-1.09 of the most recent Caltrans Standard Specifications.
The City reserves the right to use other forces for exploratory work to identify and determine the extent of such hazardous material or waste in the construction area.
| Spec_Remove 203-3.1.1 |
| Spec_Remove 207-3 |
| Spec_Remove 303-5.1.1.6m |
| Spec_Revise 5-6.1 |
| Spec_Revise 5-14 |
| Spec_Revise 6-1.2_Rev2 |