This document contains a schedule of items for a federal solicitation seeking a contractor to develop a helipad site. The solicitation issued by the US Department of Agriculture Forest Service seeks pricing from offerors to complete various construction tasks on a lump sum basis. Required work includes earthwork, aggregate pavement, concrete sidewalk, two helipads with markings and tie downs, electrical and water distribution systems, a wellhouse, water well, wastewater system, fencing, a wind cone, seeding and options to add a second helipad, asphalt paving, and water system upgrades. Offerors must provide detailed cost breakdowns for each item. The awarded contractor will be responsible for all costs associated with the contract scope and will receive no separate reimbursement.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Amend 001.pdf | ||
| 12445521B0008.pdf | ||
| Attachment E - Davis Bacon Wage Determination.pdf | ||
| Attachment B - Specifications.pdf | ||
| Attachment C - Drawings.pdf | ||
| Attachment D - Site Map.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
B.1 - SCHEDULE OF ITEMS
ITEM
NUMBER
DESCRIPTION PRICING INSTRUCTIONS QTY UNIT OF
MEASURE
TOTAL
BASE BID (INCL. 1 HELIPAD)
01 MOBILIZATION This work consists of mobilization of personnel, equipment, materials and supplies. Other items included but not limited to: construction surveying and staking, temporary erosion control, bonding, insurance, permit fees, testing of materials, closeout procedures including record drawings, submittals, operations and maintenance manuals and material submittal and final cleaning, field office (if used) and staff, temporary utilities, site clean-up, waste disposal, field office vehicles and there operational costs, superintendent, safety and QC costs, and any other project costs not directly associated with a line item below
1 LSQ $________________
02 EARTHWORK The work consists of clearing and grubbing, disposal method removed from project, site grading, roadway excavation and embankment, subgrade preparation, dispose off-site excess materials
1 LSQ $______________
03 AGGREGATE
PAVEMENT
This work consists of purchase and placement of aggregate base and aggregate surfacing, compaction and shaping, wheel stops, accessible parking sign
04 CONCRETE
SIDEWALK
This work consists of providing and installing 4-inch thick reinforced concrete sidewalk 1 LSQ $________________
05 HELIPAD 1 –
SITE
DEVELOPMENT
This work consists of providing and installing 7-inch thick reinforced concrete helipad with painted markings, No Smoking signs, tie downs, static grounding rod, grass paver system within Helipad FATO area for Helipad 1
1 LSQ $________________
06 ELECTRICAL
SYSTEM,
DISTRIBUTION
AND SUPPLY
This work consists of the installation of the electrical system, distribution and supply system consisting of pedestals, well house feeders, conduit, feeders for helipads, all trenching and feeders, boring, power company connection, hand holes, grounding and testing, and any other materials or equipment associated with the electrical system
1 LSQ $_______________
07 WATER
DISTRIBUTION
AND SUPPLY
This work consists of providing waterlines, drains, valves, hydrants, pavement sleeves, and testing and commissioning 1 LSQ $_______________
NUMBER
DESCRIPTION PRICING INSTRUCTIONS QTY UNIT OF
OPTIONAL BID ITEM 1 (ASPHALT PAVING)
OB1-1 ASPHALT PAVING This work consists of providing and installing 3-inch thick asphalt pavement in lieu of aggregate surfacing for drives and parking area within the Helipad project limits
1 LSQ $________________
OB1-2 ASPHALT
PAVEMENT
MARKINGS
This work consists of providing and installing painted parking stall lines, universal accessible stall symbol, aisle markings, painted bars at helipads
TOTAL OPTIONAL BID ITEM 1 (ASPHALT PAVING)
08 WELLHOUSE -
COMPLETE
Provide and install CXT wellhouse including all utility equipment and amenities within building 1 LSQ $_______________
09 WATER WELL -
COMPLETE
This work consists of providing and installing new well, drilling, casing and grouting, drop pipe, well pump and drive box 1 LSQ $_______________
10 WASTEWATER
SYSTEM -
COMPLETE
This work consists of providing and installing a site wastewater system including septic tank, lift station, pumps and controls, sewer pipe, cleanouts, force main, low pressure septic absorption field with manifold, perforated laterals and trenching, testing and commissioning
1 LSQ $_______________
11 CHAIN LINK
SECURITY
FENCE AND
GATE
This work consists of providing and installing 7-foot high chain link security fencing, double swing gate, concrete post footings 1 LSQ $_______________
12 WIND CONE
ASSEMBLY
This work consists of providing and installing a L-806 Wind Cone Assembly, internally lighted, with an 8-foot fabric wind sock, concrete footing
1 LSQ $_______________
13 SITE
RESTORATION –
SEEDING AND
MULCHING
This work consists of providing and installing native short grass and forb mix seeding for site perimeter and disturbed areas, no mow fescue mix seeding around operational facilities, mulching and erosion control mat
1 LSQ $_______________
TOTAL BASE BID (INCL. 1 HELIPAD)
DESCRIPTION PRICING INSTRUCTIONS QTY UNIT OF
OPTIONAL BID ITEM 2 (HELIPAD 2)
OB2-1 HELIPAD 2 - SITE
DEVELOPMENT
This work consists of providing and installing 7-inch thick reinforced concrete helipad with painted markings, tie downs, static grounding rod, grass paver system in Final Approach & Take Off (FATO) area for Helipad 2
TOTAL OPTIONAL BID ITEM 2
DESCRIPTION PRICING INSTRUCTIONS QTY UNIT OF
OPTIONAL BID ITEM 3 (WATER SYSTEM UPGRADES)
OB3-1 WATER SYSTEM
UPGRADES
This work consists of providing and installing Well House interior plumbing including Chlorine Contact Tanks, Chlorine Solution Tank, Chlorine Pump, and associated plumbing and control work
TOTAL OPTIONAL BID ITEM 3
TOTAL BASE BID AND OPTIONAL BID ITEMS 1, 2 AND 3
B.2 SCHEDULE OF ITEMS NOTES
1. The contractor shall build all costs associated with the contract to include but not limited to; providing labor, superintendence, materials, supplies, equipment, and fees into the Schedule of Items. There will be no separate reimbursement for any costs not included within the schedule of items. The contractor must provide costs for all base and optional items to be considered for award.
2. In addition to completing the Schedule of Items Table above, the offeror shall submit a detailed cost break out for each bid item included in the Schedule of Items including each optional bid item (see Solicitation section L, paragraph 6 - Price Proposal).
The detailed cost proposal shall breakdown each of the bid items into the major individual construction tasks necessary to construct that bid item. Each of the construction tasks shall identify the labor, material, equipment and subcontractor costs associated with it. The prime contractor’s overhead (G&A) and profit rates shall be identified and applied to the total of all the direct costs for each bid item. When all the construction tasks for a bid item are totaled and the overhead and profit rates are applied this amount must equal the amount shown for the corresponding bid item in the bid schedule.
3. In accordance with FAR Clause 52.217-4 the Government will evaluate total price for the basic requirement (base bid) together with any option(s) exercised at time of the award. In accordance with FAR Clause 52.217-7 the government reserves the right to award additional option(s) up to 180 days after contract award. The award of the options may occur in any order or combination.