Helibase Site Development
Solicitation number
12445521B0008
Issued by

About this file

This amendment modifies solicitation number 12445521B0008 for the Helibase Site Development opportunity issued by the Department of Agriculture Forest Service. The amendment changes the period of performance to 120 days. Galvanized pipe is deemed an acceptable alternative to the aluminum gate frame specified in the drawings. The fence panel configuration detailed in the drawings indicates a bottom brace rail and top tension wire for panels between line posts, and a bottom brace rail, upper brace rail with truss rod, and top tension wire for panels adjacent to corner, terminal, and pull posts. The gate construction requires top and bottom frame rails, vertical bracing, and diagonal tension cables. No geotechnical reports are available for the site.

View the file

Other files

File Type Posted
12445521B0008.pdf PDF
Attachment E - Davis Bacon Wage Determination.pdf PDF
Attachment B - Specifications.pdf PDF
Attachment C - Drawings.pdf PDF
Attachment A - Schedule of Items.pdf PDF
Attachment D - Site Map.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing items 8 and 15, and returning or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment your desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE

2. AMENDMENT/MODIFICATION NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ. NO. 5. PROJECT NO. (If applicable)

7. ADMINISTERED BY (If other than Item 6) CODE

STANDARD FORM 30 (REV. 10-83)

Prescribed by GSA FAR (48 CFR) 53.243

FACILITY CODE

9A. AMENDMENT OF SOLICITATION

NO.

9B. DATED (SEE ITEM 11)

10A. MODIFICATION OF CONTRACT/ORDER NO.

10B. DATED (SEE ITEM 13)

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended, is not extended.

12. ACCOUNTING AND APPROPRIATION DATA (If required) copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO.

IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15C. DATE SIGNED

15A. NAME AND TITLE OF SIGNER (Type or print)

16C. DATE SIGNED

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

PAGE OF PAGES

6. ISSUED BY CODE

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code) (X)

CODE

15B. CONTRACTOR/OFFEROR

(Signature of person authorized to sign)

16B. UNITED STATES OF AMERICA

(Signature of Contracting Officer)

NSN 7540-01-152-8070

Previous edition unusable

Shawn M. Lacina, Contracting Officer

The purpose of solicitation amendment 001 is to change the performance period to 120 days and to incorporate the attached Questions and Answers.

USDA-FS CSA EAST 13

1720 PEACHTREE ST NW

STE 876S

ATLANTA GA 30309-2449

12445521B0008

1 1

09/09/2021

08/13/2021

SHAWN LACINA Digitally signed by SHAWN LACINA Date: 2021.09.09 07:44:56 -05'00'

09/09/2021

12445521B0008 – Helibase Amendment 001

Questions & Answers

Q. Drawing CS-06 shows an aluminum gate frame. We have been unable to find a supplier who will make this. Is galvanized pipe frame acceptable?

A. Yes, galvanized pipe is an acceptable alternate.

Q. Drawing CS-06 shows a bottom rail and a top tension wire. Should these be reversed (i.e. use of a top rail)?

A. Detail 4 on Sheet CS-06 indicates two typical fence panel sections, one between line posts and one adjacent to corner posts, terminal posts and pull posts. The typical fence panel between line posts would be installed with a bottom brace rail and a top tension wire, with no top rail required. The typical fence panel adjacent to corner, terminal and pull posts would be installed with a bottom brace rail and an upper brace rail with a truss rod, as well as the tension wire at the top of the fence panel. Detail 5 on Sheet CS-06 indicates requirements for the gate construction, including top and bottom frame rails with vertical bracing and diagonal tension cables to strengthen and stabilize each gate leaf.

Q. Are geotechnical reports available for the site.

A. No geotechnical reports are available at this time.

Amendment 0001
Amend 001 QA

File details come from the government source that posted it. Updated .