Attachment A Revised.pdf
PDF 2 MB Posted
- Contract number
- 26-494DOT-FINAD-P-84425
- Issued by
- Illinois
About this file
This document is a construction plan set for the Pinckneyville Office Building renovation project, issued for construction on April 16, 2025. The project is sponsored by the State of Illinois, specifically involving the Illinois Capital Development Board and the Illinois Department of Transportation. The architectural and design work appears to be for a maintenance and office facility, with detailed floor plans, demolition notes, renovation specifications, and technical drawings prepared for a comprehensive building upgrade.
The project involves a full-scale renovation of an existing office building, including partial floor plan modifications, demolition of certain areas, and comprehensive interior updates. The drawings include detailed floor plans, room finish schedules, partition schedules, and a legend of symbols. The plan covers structural changes, utility relocations, and potential upgrades to spaces including a utility room, toilet facilities, and ready room. The document provides technical specifications for contractors, including key notes for demolition and renovation work, indicating a thorough approach to the building's transformation and modernization.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| StandTermsCond25~6.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Peter.Domahoski Highlight
Peter.Domahoski Highlight
| Attachment A.pdf |
| Highlighted.pdf |
File details come from the government source that posted it. Updated .