Attachment A - Quality Assurance Surveillance Plan.doc

DOC document 96 KB Posted

Attached to
Virtual Medical Specialist Consultations
Solicitation number
19AQMM22R0152
Issued by

About this file

This document contains a Quality Assurance Surveillance Plan (QASP) and related Performance Requirements Summary Table for a federal contract for Virtual Medical Specialist Consultations. The QASP outlines procedures for monitoring contractor performance against the requirements in the Performance Work Statement. Key performance standards include responding to any emergency consultation request immediately, resolving urgent requests within 24 hours, and completing non-urgent requests within 10 business days. The contractor must maintain 99.5% uptime for its telehealth platform and ensure dashboard data is 100% accurate. Consultation reports must be completed within 72 hours, with no more than three exceptions annually. Customer satisfaction surveys must average a rating of at least 4 out of 5. No more than five deliverables may be returned by the contracting officer's representative for additional work. Surveillance methods incorporate direct observation, random sampling, periodic inspection, and customer feedback.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

QUALITY ASSURANCE SURVEILLANCE PLAN

(QASP)

1 INTRODUCTION

This quality assurance surveillance plan (QASP) is pursuant to the requirements listed in the performance work statement (PWS) entitled Virtual Medical Specialist Consultations. This plan sets forth the procedures and guidelines the Bureau of Medical Services (MED) will use in ensuring the required performance standards or services levels are achieved by the Contractor.

1.1 Purpose

1.1.1 The purpose of the QASP is to describe the systematic methods used to monitor performance and to identify the required documentation and the resources to be employed. The QASP provides a means for evaluating whether the Contractor is meeting the performance standards/quality levels identified in the PWS and to ensure that the Government pays only for the level of services received.

1.1.2 This QASP defines the roles and responsibilities of all members of the integrated project team (IPT), identifies the performance objectives, defines the methodologies used to monitor and evaluate the Contractor’s performance, describes quality assurance documentation requirements, and describes the analysis of quality assurance monitoring results.

1.2 Performance Management Approach

1.2.1 The PWS structures the acquisition around “what” service or quality level is required, as opposed to “how” the Contractor should perform the work (i.e., results, not compliance). This QASP will define the performance management approach taken by MED to monitor and manage the Contractor’s performance to ensure the expected outcomes or performance objectives communicated in the PWS are achieved. Performance management rests on developing a capability to review and analyze information generated through performance assessment. The ability to make decisions based on the analysis of performance data is the cornerstone of performance management; this analysis yields information that indicates whether expected outcomes for the project are being achieved by the Contractor.

1.2.2 Performance management represents a significant shift from the more traditional quality assurance (QA) concepts in several ways. Performance management focuses on assessing whether outcomes are being achieved and to what extent. This approach migrates away from scrutiny of compliance with the processes and practices used to achieve the outcome. A performance-based approach enables the Contractor to play a large role in how the work is performed, as long as the proposed processes are within the stated constraints. The only exceptions to process reviews are those required by law (federal, state, and local) and compelling business situations, such as safety and health. A “results” focus provides the Contractor flexibility to continuously improve and innovate over the course of the contract as long as the critical outcomes expected are being achieved and/or the desired performance levels are being met.

1.3 Performance Management Strategy

1.3.1 The Contractor is responsible for the quality of all work performed. The Contractor measures that quality through the Contractor’s own quality control (QC) program. QC is work output, not workers, and therefore includes all work performed under this contract regardless of whether the work is performed by Contractor employees or by subcontractors. The Contractor shall set forth the staffing and procedures for self-inspecting the quality, timeliness, responsiveness, customer satisfaction, and other performance requirements in the PWS. The Contractor will develop and implement a performance management system with processes to assess and report its performance to the designated Government representative. This QASP enables the Government to take advantage of the Contractor’s QC program.

1.3.2 The Government representative(s) will monitor performance and review performance reports furnished by the Contractor to determine how the Contractor is performing against communicated performance objectives.

2 ROLES AND RESPONSIBILITIES

2.1 The Contracting Officer

The Contracting Officer (CO) is responsible for monitoring contract compliance, contract administration and cost control, and for resolving any differences between the observations documented by the Contracting Officer’s Representative (COR), Government Technical Monitor (GTM) and the Contractor. The CO will designate a COR as the Government authority for performance management.

2.2 The Contracting Officer’s Representative

The COR is designated in writing by the CO to act as his or her authorized representative to assist in administering the contract. COR limitations are contained in the written appointment letter. The COR is responsible for technical administration of the project and ensures proper Government surveillance of the Contractor’s performance. The COR is not empowered to make any contractual commitments or to authorize any contractual changes on the Government’s behalf. Any changes that the Contractor deems may affect contract, terms, or conditions shall be referred to the CO for action. The COR will have the responsibility for completing QA monitoring forms used to document the inspection and evaluation of the Contractor’s work performance. Government surveillance may occur under the inspection of services clause for any service relating to the contract.

3 IDENTIFICATION OF REQUIRED PERFORMANCE STANDARDS/QUALITY LEVELS

The required performance standards and quality levels are included in the PWS (Section C.9) and in Attachment 1, Performance Requirements Summary Table.

4 METHODOLOGIES TO MONITOR PERFORMANCE

4.1 Surveillance Techniques

In an effort to minimize the performance management burden, simplified surveillance methods shall be used by the Government to evaluate Contractor performance when appropriate, including conducting site visits/audits. The primary methods of surveillance are:

· Direct observation- Performance and deliverables can be observed periodically or through 100% surveillance

· Periodic inspection- Performance and deliverables are typically inspected on a weekly or monthly basis

· Customer survey- Random surveys are conducted to solicit customer satisfaction

· Random sampling- Performance and deliverables are randomly sampled to determine if the level of performance is acceptable

· 100% inspection- Performance and deliverables are inspected at each occurrence

· Management Information System- Evaluate output through management information reports

4.2 Customer Feedback

The Contractor is expected to establish and maintain professional communication between its employees and customers. The primary objective of this communication is customer satisfaction. Customer satisfaction is the most significant external indicator of the success and effectiveness of all services provided and can be measured through customer complaints.

Performance management drives the Contractor to be customer focused through initially and internally addressing customer complaints and investigating the issues and/or problems but the customer always has the option to communicate complaints to the Contracting Officer, as opposed to the Contractor.

Customer feedback may also be obtained either from the results of formal customer satisfaction surveys or from random customer complaints.

4.3 Acceptable Quality Levels

The acceptable quality levels (AQLs) included in Attachment 1, Performance Requirements Summary Table, for Contractor performance is structured to allow the Contractor to manage how the work is performed.

5 QUALITY ASSURANCE DOCUMENTATION

5.1 The Performance Management Feedback Loop

The performance management feedback loop begins with the communication of expected outcomes. Performance standards are expressed in the PWS and are assessed using the performance monitoring techniques shown in Attachment 1.

5.2 Monitoring Forms

The Government’s QA surveillance, accomplished by the COR/GTM, will be reported using the monitoring form in Attachment 2. The forms, when completed, will document the Government’s assessment of the Contractor’s performance under the contract to ensure that the required results are being achieved.

5.2.1 The COR and GTM will retain a copy of all completed QA surveillance forms.

6 ANALYSIS OF QUALITY ASSURANCE ASSESSMENT

6.1 Determining Performance

6.1.1 Government shall use the monitoring methods cited to determine whether the performance standards/service levels/AQLs have been met. If the Contractor has not met the minimum requirements, it may be asked to develop a corrective action plan to show how and by what date it intends to bring performance up to the required levels.

6.2 Reporting

6.2.1 At the end of each month, the COR/GTM will prepare a written report for the record summarizing the overall results of the quality assurance surveillance of the Contractor’s performance. This written report, which includes the Contractor’s submitted monthly report and the completed quality assurance monitoring forms (Attachment 2), will become part of the QA documentation. It will enable the Government to demonstrate whether the Contractor is meeting the stated objectives and/or performance standards.

6.3 Reviews and Resolution

6.3.1 The COR/GTM may require the Contractor’s project manager, or a designated alternate, to meet with the CO to discuss performance evaluation. The COR/GTM will define a frequency of in-depth reviews with the Contractor, including appropriate self-assessments by the Contractor; however, if the need arises, the Contractor will meet with the COR/GTM as often as required or per the Contractor’s request. The agenda of the reviews may include:

· Monthly performance assessment data and trend analysis

· Issues and concerns of both parties

· Projected outlook for upcoming months and progress against expected trends, including a corrective action plan analysis

· Recommendations for improved efficiency and/or effectiveness

6.3.2 The COR must coordinate and communicate with the Contractor to resolve issues and concerns regarding marginal or unacceptable performance.

6.3.3 The COR and Contractor should jointly formulate tactical and long-term courses of action. Decisions regarding changes to metrics, thresholds, or service levels should be clearly documented. Changes to service levels, procedures, and metrics will be incorporated as a contract modification.

ATTACHMENT 1: PERFORMANCE REQUIREMENTS SUMMARY TABLE

Required Service
Performance Standard
AQL/Deviation from Performance Standard
Surveillance Technique
Medical Specialist Consultations (C.4.1) and Ancillary Health Services (C.4.2)
Any consultation request deemed “emergency” is handled at the time contact is made with the specialist. A specialist is available 24/7 to handle emergency requests.
No deviation
Management Information System; periodic inspection
Any consultation request deemed “urgent” is resolved within 24 hours.
No deviation
Management Information System; periodic inspection
Any consultation request or ancillary health service request deemed “non-urgent” is scheduled and completed within ten business days.
No deviation
Management Information System; periodic inspection
Telehealth Platform (C.4.3)
The Contractor’s telehealth platform and all functionalities are available and accessible.
Average platform uptime 99.5%
Periodic inspection
The near real-time data provided via dashboard and/or reportability functionality is 100% accurate and reflects all services required by this PWS.
No deviation
Direct observation; random sampling
Program Management (C.4.4)
All consultation reports are completed and transmitted within 72 hours of completion of consult.
No more than three consultation reports are submitted after 72 hours per year
Periodic inspection
A high quality of care is provided to patients, measured by customer satisfaction surveys.
Average rating of at least 4 out of 5 (or adjectival/ percentage equivalent) will be considered meeting performance standard
Customer survey
Deliverables are delivered by specified deadlines and are thorough, complete, comprehensive, free from error, and comply with all templates and other guidance.
No more than five deliverables are returned by the COR to the Contractor for additional work and resubmission per year
100% inspection

ATTACHMENT 2: SAMPLE QUALITY ASSURANCE

MONITORING FORM

SERVICE or STANDARD:

SURVEY PERIOD:

SURVEILLANCE METHOD (Check):

Random Sampling 100% Inspection Periodic Inspection Customer Complaint

LEVEL OF SURVEILLANCE (Check):

Monthly Quarterly As needed

PERCENTAGE OF ITEMS SAMPLED DURING SURVEY PERIOD:

ANALYSIS OF RESULTS:

Observed Service Provider Performance Measurement Rate: ______%

Service Provider’s Performance (Check):

Meets Standards

Does Not Meet Standards

Narrative of Performance during Survey Period:

PREPARED BY: ___________________________________

DATE: _________________

File details come from the government source that posted it. Updated .