ATTACHMENT A - Perry Point MS4 BMP Map.pdf
PDF 3 MB Posted
- Attached to
- F110--512A5-23-005 - Perry Point Shoreline Study
- Solicitation number
- 36C24524Q0224
About this file
This document includes a federal contract opportunity announcement and an associated map of best management practices at the Perry Point VA Medical Center site.
The federal contract opportunity announcement is seeking an architect-engineering firm to provide schematics, design development, construction documents, technical specifications, site visits, cost estimates and as-built documentation for Project 512A5-23-005, a shoreline study at the Perry Point VA Medical Center in Perry Point, Maryland. The estimated construction cost range is between $25,000 to $100,000. The anticipated award date for the design contract is March 15, 2024. This is a small business set-aside being procured according to the Brooks Act by the Department of Veterans Affairs Veterans Health Administration VISN5.
The associated map depicts the location of best management practices including bioretention, microbioretention, bio-swales, grass swales, non-rooftop disconnects, impervious removals and shoreline management areas at the Perry Point VA Medical Center site. It identifies the property boundary, storm sewers and outfalls.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 512A5-23-005 SOW - Shoreline Study_Rev1.pdf | ||
| ATTACHMENT B - PP Shoreline Management Analysis_2011.pdf | ||
| 36C24524Q0224.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
!H !H
!H !H
!H !H
!H !H
!H
!H
!H!H
!H
!H!H
RIVER RD
BOILER HOUSE RD
LO
CUST
ST
FRONT ST
HAW
KINS
CT
ROUNDHOUSE DR
GERRYPERRYWAY
CHERRY
ST
OTS
EGO
ST
FO
URTH
ST
FO
U
R
TH
ST
ARCH ST
FIFTH ST
FIFTH
ST
FI
FT
H
ST
SI
XT
H
ST
EL
M
ST
SMITH
LN
HARFORD ST
OWENS
LANDING CT
AVENUE D
AVENUE D
AVENUE D
MARION N TAPP PKWY
SUSQUEHANNA AVE
BRO
AD
ST
BR
OAD
ST
AVENUE B
SERVICE DR
LA
UN
DR
Y
DR
AVENUE C
SERVICE DR
SI
XT
H
ST
AVENUE E
TH
IR
D
ST
SE
COND
ST
FIR
ST
ST
COUDON BRIDGE
AVNEUE
G
AVNEUE G
AVENUE A
AVENUE A
AVENUE A
8A
WATER TANK
22102
SPORT COURT
VILLAGE
ELECTRIC
SUBSTATION
SUSQUEHANNA RIVER
12420 Milestone Center Drive, Suite 150
Germantown, MD 20876
(301) 820-3000
Map No.
Contract No.
VA 245-17-D-0131
Project No. Date
July 2020
60617886
AECOM Proj. No.GORDON Proj. No.
N
PD
ES
G en er al Pe rm it
M
S4 Pe rry Po in ta nd Lo ch R av en
Pe rry
Po in t, M ar yl an d
BM
P
Lo ca tio n
M ap
Pe rry
Po in tV A
M ed ic al
C en te r
4501 Daly Drive Suite 200
Chantilly, VA 20151
(703) 236-1900
Datum
NAD 83
512A5-19-010
3287-0301
Best Management Practices (BMPs)
Bioretention
Microbioretention
Bio-swale
Grass swale
Non-Rooftop Disconnect
Impervious Removal
Shoreline Management
Storm Sewer
!H Outfall
Property Boundary
0 400 800 1,200 1,600200 Feet
1. Service Layer Credits:
Sources: Esri, HERE, Garmin, USGS, Intermap, INCREMENT P, NRCan, Esri Japan, METI, Esri China (Hong Kong), Esri Korea, Esri (Thailand), NGCC, (c) OpenStreetMap contributors, and the GIS User Community Sources: Esri, HERE, Garmin, Intermap, increment P Corp., GEBCO, USGS, FAO, NPS, NRCAN, GeoBase, IGN, Kadaster NL, Ordnance Survey, Esri Japan, METI, Esri China (Hong Kong), (c) OpenStreetMap contributors, and the GIS User Community Source: Esri, DigitalGlobe, GeoEye, Earthstar Geographics, CNES/Airbus DS, USDA, USGS, AeroGRID, IGN, and the GIS User Community
2. Property Boundary:
The property line shown based on field survey performed by GORDON as reflected on Boundary Survey of Perry Point Medical Center (VA Project Number 512A5-19-016) Issued on December 13, 2019.
3. Best Management Practices (BMPs):
BMP locations have been obtained from multiple record drawings and confirmed by GORDON during January 2020 site visit. Please see BMP database for MDE permit numbers for each BMP.
4. Shoreline Management:
The extents of shoreline management have been obtained from Perry Point Medical Center Shoreline Repair (VA Project Number 512A5-06-305) record drawings and confirmed by reviewing as-builts dated October 31, 2011. Please see BMP database for MDE permit number.
5. Storm Sewer and Outfalls:
All storm sewer utilities are shown as reflected on Perry Point VAMC-Site Wide Utility and Topo Survey (VA Project Number 512A5-14-308) by Nurtec Design issued on February 12, 2018. See 2019 Outfall Map for a detail map of the outfalls.
FI
N
AL
!H !H
!H
!H
!H !H
!H !H
!H !H
!H
!H!H
!H!H!H
!H!H !H
BOILER HOUSE RD
EIGHTH ST
EIGHTH ST
AVNEUE
G
SIXTH ST
N
IN
TH
ST
TEN
TH
STSEVEN
TH
ST
MARION N TAPP PKWY
AVENUE F
AVENUE
F
FI
FT
H
ST
CHAPEL DR
SERVICE DR
LA
UN
DR
Y
DR
AVENUE D
AVENUE D
AVENUE D
SERVICE DR
W
AR
D C
IR
MARION N TAPP PKWY
AVENUE G
AVENUE G
AVENUE G
AV
EN
U E
G
AVENUE A AVENUE A
AVENUE A
AVENUE A
MARION N TAPP PKWY
MARION N TAPP PKWY
25H
24H
13H
22H
14H
82H
18H
15H
11H
SPORT COURT
17H
2H
1H
6H 314A
314B
32H 27H 3H
4H
5H
314C
9H
20H
23H
19H
80H
101B101
8A
MILL
CREEK
SUSQUEHANNA RIVER
SUSQUEHANNA RIVER
12420 Milestone Center Drive, Suite 150
Germantown, MD 20876
(301) 820-3000
Map No.
Contract No.
VA 245-17-D-0131
Project No. Date
July 2020
60617886
AECOM Proj. No.GORDON Proj. No.
N
PD
ES
G en er al Pe rm it
M
S4 Pe rry Po in ta nd Lo ch R av en
Pe rry
Po in t, M ar yl an d
BM
P
Lo ca tio n
M ap
Pe rry
Po in tV A
M ed ic al
C en te r
4501 Daly Drive Suite 200
Chantilly, VA 20151
(703) 236-1900
Datum
NAD 83
512A5-19-010
3287-0301
Best Management Practices (BMPs)
Bioretention
Microbioretention
Bio-swale
Grass swale
Non-Rooftop Disconnect
Impervious Removal
Shoreline Management
Storm Sewer
!H Outfall
Property Boundary
0 400 800 1,200 1,600200 Feet
1. Service Layer Credits:
Sources: Esri, HERE, Garmin, USGS, Intermap, INCREMENT P, NRCan, Esri Japan, METI, Esri China (Hong Kong), Esri Korea, Esri (Thailand), NGCC, (c) OpenStreetMap contributors, and the GIS User Community Sources: Esri, HERE, Garmin, Intermap, increment P Corp., GEBCO, USGS, FAO, NPS, NRCAN, GeoBase, IGN, Kadaster NL, Ordnance Survey, Esri Japan, METI, Esri China (Hong Kong), (c) OpenStreetMap contributors, and the GIS User Community Source: Esri, DigitalGlobe, GeoEye, Earthstar Geographics, CNES/Airbus DS, USDA, USGS, AeroGRID, IGN, and the GIS User Community
2. Property Boundary:
The property line shown based on field survey performed by GORDON as reflected on Boundary Survey of Perry Point Medical Center (VA Project Number 512A5-19-016) Issued on December 13, 2019.
3. Best Management Practices (BMPs):
BMP locations have been obtained from multiple record drawings and confirmed by GORDON during January 2020 site visit. Please see BMP database for MDE permit numbers for each BMP.
4. Shoreline Management:
The extents of shoreline management have been obtained from Perry Point Medical Center Shoreline Repair (VA Project Number 512A5-06-305) record drawings and confirmed by reviewing as-builts dated October 31, 2011. Please see BMP database for MDE permit number.
5. Storm Sewer and Outfalls:
All storm sewer utilities are shown as reflected on Perry Point VAMC-Site Wide Utility and Topo Survey (VA Project Number 512A5-14-308) by Nurtec Design issued on February 12, 2018. See 2019 Outfall Map for a detail map of the outfalls.
FI
N
AL
File details come from the government source that posted it. Updated .