This document includes a federal contract opportunity announcement and an associated map of best management practices at the Perry Point VA Medical Center site.

The federal contract opportunity announcement is seeking an architect-engineering firm to provide schematics, design development, construction documents, technical specifications, site visits, cost estimates and as-built documentation for Project 512A5-23-005, a shoreline study at the Perry Point VA Medical Center in Perry Point, Maryland. The estimated construction cost range is between $25,000 to $100,000. The anticipated award date for the design contract is March 15, 2024. This is a small business set-aside being procured according to the Brooks Act by the Department of Veterans Affairs Veterans Health Administration VISN5.

The associated map depicts the location of best management practices including bioretention, microbioretention, bio-swales, grass swales, non-rooftop disconnects, impervious removals and shoreline management areas at the Perry Point VA Medical Center site. It identifies the property boundary, storm sewers and outfalls.

View the file

Other files

File Type Posted
512A5-23-005 SOW - Shoreline Study_Rev1.pdf PDF
ATTACHMENT B - PP Shoreline Management Analysis_2011.pdf PDF
36C24524Q0224.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

!H !H

!H !H

!H !H

!H !H

!H

!H

!H!H

!H

!H!H

RIVER RD

BOILER HOUSE RD

LO

CUST

ST

FRONT ST

HAW

KINS

CT

ROUNDHOUSE DR

GERRYPERRYWAY

CHERRY

ST

OTS

EGO

ST

FO

URTH

ST

FO

U

R

TH

ST

ARCH ST

FIFTH ST

FIFTH

ST

FI

FT

H

ST

SI

XT

H

ST

EL

M

ST

SMITH

LN

HARFORD ST

OWENS

LANDING CT

AVENUE D

AVENUE D

AVENUE D

MARION N TAPP PKWY

SUSQUEHANNA AVE

BRO

AD

ST

BR

OAD

ST

AVENUE B

SERVICE DR

LA

UN

DR

Y

DR

AVENUE C

SERVICE DR

SI

XT

H

ST

AVENUE E

TH

IR

D

ST

SE

COND

ST

FIR

ST

ST

COUDON BRIDGE

AVNEUE

G

AVNEUE G

AVENUE A

AVENUE A

AVENUE A

8A

WATER TANK

22102

SPORT COURT

VILLAGE

ELECTRIC

SUBSTATION

SUSQUEHANNA RIVER

12420 Milestone Center Drive, Suite 150

Germantown, MD 20876

(301) 820-3000

Map No.

Contract No.

VA 245-17-D-0131

Project No. Date

July 2020

60617886

AECOM Proj. No.GORDON Proj. No.

N

PD

ES

G en er al Pe rm it

M

S4 Pe rry Po in ta nd Lo ch R av en

Pe rry

Po in t, M ar yl an d

BM

P

Lo ca tio n

M ap

Pe rry

Po in tV A

M ed ic al

C en te r

4501 Daly Drive Suite 200

Chantilly, VA 20151

(703) 236-1900

Datum

NAD 83

512A5-19-010

3287-0301

Best Management Practices (BMPs)

Bioretention

Microbioretention

Bio-swale

Grass swale

Non-Rooftop Disconnect

Impervious Removal

Shoreline Management

Storm Sewer

!H Outfall

Property Boundary

0 400 800 1,200 1,600200 Feet

1. Service Layer Credits:

Sources: Esri, HERE, Garmin, USGS, Intermap, INCREMENT P, NRCan, Esri Japan, METI, Esri China (Hong Kong), Esri Korea, Esri (Thailand), NGCC, (c) OpenStreetMap contributors, and the GIS User Community Sources: Esri, HERE, Garmin, Intermap, increment P Corp., GEBCO, USGS, FAO, NPS, NRCAN, GeoBase, IGN, Kadaster NL, Ordnance Survey, Esri Japan, METI, Esri China (Hong Kong), (c) OpenStreetMap contributors, and the GIS User Community Source: Esri, DigitalGlobe, GeoEye, Earthstar Geographics, CNES/Airbus DS, USDA, USGS, AeroGRID, IGN, and the GIS User Community

2. Property Boundary:

The property line shown based on field survey performed by GORDON as reflected on Boundary Survey of Perry Point Medical Center (VA Project Number 512A5-19-016) Issued on December 13, 2019.

3. Best Management Practices (BMPs):

BMP locations have been obtained from multiple record drawings and confirmed by GORDON during January 2020 site visit. Please see BMP database for MDE permit numbers for each BMP.

4. Shoreline Management:

The extents of shoreline management have been obtained from Perry Point Medical Center Shoreline Repair (VA Project Number 512A5-06-305) record drawings and confirmed by reviewing as-builts dated October 31, 2011. Please see BMP database for MDE permit number.

5. Storm Sewer and Outfalls:

All storm sewer utilities are shown as reflected on Perry Point VAMC-Site Wide Utility and Topo Survey (VA Project Number 512A5-14-308) by Nurtec Design issued on February 12, 2018. See 2019 Outfall Map for a detail map of the outfalls.

FI

N

AL

!H !H

!H

!H

!H !H

!H !H

!H !H

!H

!H!H

!H!H!H

!H!H !H

BOILER HOUSE RD

EIGHTH ST

EIGHTH ST

AVNEUE

G

SIXTH ST

N

IN

TH

ST

TEN

TH

STSEVEN

TH

ST

MARION N TAPP PKWY

AVENUE F

AVENUE

F

FI

FT

H

ST

CHAPEL DR

SERVICE DR

LA

UN

DR

Y

DR

AVENUE D

AVENUE D

AVENUE D

SERVICE DR

W

AR

D C

IR

MARION N TAPP PKWY

AVENUE G

AVENUE G

AVENUE G

AV

EN

U E

G

AVENUE A AVENUE A

AVENUE A

AVENUE A

MARION N TAPP PKWY

MARION N TAPP PKWY

25H

24H

13H

22H

14H

82H

18H

15H

11H

SPORT COURT

17H

2H

1H

6H 314A

314B

32H 27H 3H

4H

5H

314C

9H

20H

23H

19H

80H

101B101

8A

MILL

CREEK

SUSQUEHANNA RIVER

SUSQUEHANNA RIVER

12420 Milestone Center Drive, Suite 150

Germantown, MD 20876

(301) 820-3000

Map No.

Contract No.

VA 245-17-D-0131

Project No. Date

July 2020

60617886

AECOM Proj. No.GORDON Proj. No.

N

PD

ES

G en er al Pe rm it

M

S4 Pe rry Po in ta nd Lo ch R av en

Pe rry

Po in t, M ar yl an d

BM

P

Lo ca tio n

M ap

Pe rry

Po in tV A

M ed ic al

C en te r

4501 Daly Drive Suite 200

Chantilly, VA 20151

(703) 236-1900

Datum

NAD 83

512A5-19-010

3287-0301

Best Management Practices (BMPs)

Bioretention

Microbioretention

Bio-swale

Grass swale

Non-Rooftop Disconnect

Impervious Removal

Shoreline Management

Storm Sewer

!H Outfall

Property Boundary

0 400 800 1,200 1,600200 Feet

1. Service Layer Credits:

Sources: Esri, HERE, Garmin, USGS, Intermap, INCREMENT P, NRCan, Esri Japan, METI, Esri China (Hong Kong), Esri Korea, Esri (Thailand), NGCC, (c) OpenStreetMap contributors, and the GIS User Community Sources: Esri, HERE, Garmin, Intermap, increment P Corp., GEBCO, USGS, FAO, NPS, NRCAN, GeoBase, IGN, Kadaster NL, Ordnance Survey, Esri Japan, METI, Esri China (Hong Kong), (c) OpenStreetMap contributors, and the GIS User Community Source: Esri, DigitalGlobe, GeoEye, Earthstar Geographics, CNES/Airbus DS, USDA, USGS, AeroGRID, IGN, and the GIS User Community

2. Property Boundary:

The property line shown based on field survey performed by GORDON as reflected on Boundary Survey of Perry Point Medical Center (VA Project Number 512A5-19-016) Issued on December 13, 2019.

3. Best Management Practices (BMPs):

BMP locations have been obtained from multiple record drawings and confirmed by GORDON during January 2020 site visit. Please see BMP database for MDE permit numbers for each BMP.

4. Shoreline Management:

The extents of shoreline management have been obtained from Perry Point Medical Center Shoreline Repair (VA Project Number 512A5-06-305) record drawings and confirmed by reviewing as-builts dated October 31, 2011. Please see BMP database for MDE permit number.

5. Storm Sewer and Outfalls:

All storm sewer utilities are shown as reflected on Perry Point VAMC-Site Wide Utility and Topo Survey (VA Project Number 512A5-14-308) by Nurtec Design issued on February 12, 2018. See 2019 Outfall Map for a detail map of the outfalls.