This document contains a federal contract solicitation and associated proposal template. The solicitation is for roof replacement services at various buildings located at the Hampton VA Medical Center campus. The Department of Veterans Affairs is seeking a contractor to provide all labor, materials, tools and associated mechanical, electrical and plumbing work to remove and replace various roofs. The estimated construction value is between $2 million and $5 million. The NAICS code is 238160 and the size standard is $16.5 million. This is a total SDVOSB set-aside opportunity. The proposal template requires offerors to provide labor and material cost breakdowns by construction division in order to calculate overhead, profit and bond costs for the total base offer price. Any questions must be emailed to the point of contact by the specified due date.

View the file

Other files for this federal contract opportunity

Other files attached to Z2DA--590-19-101 Replace Roofs Various Bldgs, newest first.
File Type Posted
Roofs 100.pdf PDF
36C24621R0019_1 0003.docx DOCX document
36C24621R0019_1 0002.docx DOCX document
51 - 75.pdf PDF
26 - 50.pdf PDF
36C24621R0019 0001.docx DOCX document
76 - 103.pdf PDF
1-25.pdf PDF
Attachment B - Corp Experience Form.docx DOCX document
Attachment C - Past Performance Questionnaire.docx DOCX document
Attachment C - Past Performance Questionnaire.docx DOCX document
590-19-101 100pct drawings.pdf PDF
36C24621R0019_1.docx DOCX document
590-19-101 100pct Specifications.pdf PDF
Attachment B - Corp Experience Form.docx DOCX document
Safety Handbook.pdf PDF
Show all 16

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Base Offer

Base Offer Cost Breakdown

Project Number:

Edward L Roy: VA assigned project #

Date:
Project Title
Edward L Roy: VA assigned Project TitleProject Location
Offeror Name
Offeror Street
Offeror CityStateZip

Item Description Labor Cost Edward L Roy: Enter all Labor Costs by Division

Material Cost
Edward L Roy: Enter all Material Costs by DivisionTotal Cost

Edward L Roy: This Column is the sum of the Division's Labor and Material Costs

Division 1General Requirements$ - 0$ - 0$ - 0
Division 2Existing Conditions- 0- 0- 0
Division 3Concrete- 0- 0- 0
Division 4Masonry- 0- 0- 0
Division 5Metals- 0- 0- 0
Division 6Wood and Plastic- 0- 0- 0
Division 7Thermal & Moisture Protect- 0- 0- 0
Division 8Doors and Windows- 0- 0- 0
Division 9Finishes- 0- 0- 0
Division 10Specialties- 0- 0- 0
Division 11Equipment- 0- 0- 0
Division 12Furnishings- 0- 0- 0
Division 13Special Construction- 0- 0- 0
Division 14Conveying Equipment- 0- 0- 0
Division 21Fire Suppression- 0- 0- 0
Division 22Plumbing- 0- 0- 0
Division 23HVAC- 0- 0- 0
Division 26Electrical- 0- 0- 0
Division 27Communications- 0- 0- 0
Division 28Electronic Safety & Security- 0- 0- 0
Division 31Earthwork- 0- 0- 0
Division 32Exterior Improvements- 0- 0- 0
Division 33Utilities- 0- 0- 0
Division 34Transportation Subtotal- 0- 0- 0
Division Subtotals :$ - 0$ - 0$ - 0

Overhead % 0.00% Edward L Roy: Enter Overhead % here. This % will be multiplied by the Division Total Cost Subtotal (cell F36).

Edward L Roy: Date Offer Prepared/Submitted

- 0
Profit %0.00%
Edward L Roy: Enter Profit % here.This % will be multiplied by the sum of the Division Total Cost subtotal (cell F36) plus the calculated Overhead (cell F38).- 0
Bond %0.00%

Edward L Roy: Enter Bond % here. This % will be multiplied by the sum of the Division Total Cost Subtotal (cell F36), the amount of calculated Overhead (cell F38) and the amount of calculated Profit (cell F39).

Edward L Roy: Enter all Labor Costs by Division

- 0
Overhead/Profit Subtotals :$ - 0

Edward L Roy: Sum of Overhead, Profit and Bond %.