36C24621R0019_1.docx
DOCX document 132 KB Posted
- Attached to
- Z2DA--590-19-101 Replace Roofs Various Bldgs Federal contract opportunity
- Solicitation number
- 36C24621R0019
About this file
This federal solicitation seeks proposals for a roof replacement project at multiple buildings on the campus of the Hampton VA Medical Center in Hampton, Virginia. The solicitation is for a total small business set-aside for Service-Disabled Veteran-Owned Small Businesses. The project scope includes the removal and replacement of roofs on various buildings, along with associated mechanical, electrical, and plumbing work, in accordance with provided drawings and specifications. The estimated construction value is between $2,000,000 to $5,000,000. Offerors must be registered in SAM.gov and VetBiz.gov to be eligible for award. Any questions are to be submitted by email to the contracting officer by a specified date. Proposals are due on another specified date.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Roofs 100.pdf | ||
| 36C24621R0019_1 0003.docx | DOCX document | |
| 36C24621R0019_1 0002.docx | DOCX document | |
| 76 - 103.pdf | ||
| 1-25.pdf | ||
| 51 - 75.pdf | ||
| 26 - 50.pdf | ||
| 36C24621R0019 0001.docx | DOCX document | |
| Attachment B - Corp Experience Form.docx | DOCX document | |
| Attachment C - Past Performance Questionnaire.docx | DOCX document | |
| Attachment C - Past Performance Questionnaire.docx | DOCX document | |
| 590-19-101 100pct Specifications.pdf | ||
| Attachment B - Corp Experience Form.docx | DOCX document | |
| Safety Handbook.pdf | ||
| Attachment A - Base Proposal Item Price Breakdown.xlsx | XLSX spreadsheet | |
| 590-19-101 100pct drawings.pdf |
Show all 16
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
1. SOLICITATION NUMBER
2. TYPE OF SOLICITATION
3. DATE ISSUED
PAGE OF PAGES
4. CONTRACT NUMBER
5.
REQUISITION/PURCHASE REQUEST NUMBER
6. PROJECT NUMBER
7. ISSUED BY
CODE
8. ADDRESS OFFER TO
a. NAME
b. TELEPHONE NUMBER (Include area code) (NO COLLECT CALLS)
10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE
DOCUMENTS (
Title, identifying number, date) 12a. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?
(If "YES," indicate within how many calendar days after award in Item 12B.)
12b. CALENDAR DAYS
13. ADDITIONAL
SOLICITATION REQUIREMENTS:
STANDARD FORM 1442 (REV. 8/2014)
STANDARD FORM 1442
Prescribed by GSA-FAR (48 CFR) 52.236-1(d)
SOLICITATION, OFFER,
AND AWARD
(Construction, Alteration, or Repair)
SOLICITATION
SOLICITATION
IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.
9. FOR INFORMATION
CALL:
NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".
SEALED BID (IFB)
NEGOTIATED (RFP)
1. The Contractor shall begin performance within ____________ calendar days and complete it within calendar days after receiving award, notice to proceed. This performance period is mandatory negotiable. (See
YES
NO
a.
Sealed offers in original and ___________________copies to perform the work required are due at the place specified in Item 8 by _____________ (hour) local time _____________________ (date). If this is a sealed bid solicitation, offers must be publicly opened at that time. Sealed envelopes containing offers shall be marked to show the offeror's name and address, the solicitation number, the date and time offers are due.
b.
An offer guarantee is, is not required.
c.
All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.
d.
Offers providing less than ____ ___________________ calendar days for Government acceptance after the date offers are due will not be considered and will be rejected.
1of79 36C24621R0019 X 12-17-2020 590-19-101 Department of Veterans Affairs Network Contracting Office 6 100 Emancipation Drive Hampton VA 23667 Department of Veterans Affairs Network Contracting Office 6 100 Emancipation Drive Hampton VA 23667 Keith Norman 757-315-3958
Request for Proposal: Project # 590-19-101 Replace Roofs Various Buildings, at Hampton VA Medical Center, 100 Emancipation Dr., Hampton, VA 23667.
See Statement of Work (SOW), Specifications and Drawings attached for details of this requirement.
VAAR 836.204| Disclosure o f the magnitude of construction project is between $2,000,000 and $5,000,000.
*This is a 100% Total Service-Disabled Veteran-Owned Small Business (SDVOSB) Set-Aside The North American Industry Classification System (NAICS) code for this action is 238 160 with a size standard of $16.5M Contractors must be registered in the Vendor Information Page (https://www.vip.vetbiz.gov/) to be eligible Bid bonds, and payment and performance bonds are required.
Offerors shall be actively registered in SAM and be verified in VetBiz at the time offers are due. Offers may be rejected if they do not comply with this requirement.
A Pre-Proposal Site Visit will be conducted.
January 6, 2021 10:00 AM EST, at 100 Emancipation Drive Bldg 27, Hamton, VA 23667.
See FAR Provision 52.236-27 for Site Visit information.
Requests for Information are due to the Co ntracting Officerno later than Tuesday, January 12, 2021 at 11:00 AM (EST) RFI's received after said date will not be guaranteed a response *Responses to RFI's will be posted at https://beta.sam.gov/through amendment (s) no later than January 16, 2021.
Deadline for proposals are no later than Tuesday, January 19, 2021 at 4:30 EST.
It is solely the responsibility of the offerors to ensure the Government receives the proposal befor e or on the exact due date and time set forth in this solicitation.
All Contractors’ personnel, including subco ntractors, shall be required to undergo a COVID-19 Screening.
Each person is required to complete the Coronavirus Screening upon entering the facility and worksite thereof and/or while on the hospital campus.
X X 52.211-10 X
4:30PM
EST
01-19-2021 X
14. NAME AND ADDRESS OF OFFEROR
15. TELEPHONE NUMBER
16. REMITTANCE ADDRESS
CODE
FACILITY CODE
17. The offeror agrees to perform the work required at the prices specified below in strict accordance with the terms of the solicitation, if this offer is accepted by the Government in writing within __________ calendar days after the date offers are due.
AMOUNTS
18. The offeror agrees to furnish any required performance and payment bonds.
19. ACKNOWLEDGMENT OF AMEN
DMENTS
AMENDMENT
NUMBER
DATE.
20a. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN OFFER 20b. SIGNATURE 20c. OFFER DATE
21. ITEMS ACCEPTED:
22. AMOUNT
23. ACCOUNTING AND APPROPRIATION DATA
24. SUBMIT INVOICES TO ADDRESS SHOWN IN
ITEM
25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO
10 U.S.C. 2304(c 41 U.S.C. 3304(a) (
26. ADMINISTERED BY
27. PAYMENT WILL BE MADE BY
PHONE:
FAX:
28. NEGOTIATED AGREEMENT
29. AWARD
Your Contractor agrees offer on this solicitation is hereby accepted as to the items listed. This to furnish and deliver all items or perform all work requirements identified award consummates the contract, which consists of (a) the Government on this form and any continuation sheets for the consideration stated in solicitation and your offer, and (b) this contract award. No further cont-this contract. The rights and obligations of the parties to this contract ractual document is necessary.
shall be governed by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certifications, and specifications incorporated by reference in or attached to this contract.
30a. NAME AND
TITLE OF CONTRACTOR OR PERSON AUTHORIZED
31a. NAME OF CONTRACTING OFFICER
TO SIGN
30b. SIGNATURE 30c. DATE 31b. UNITED STATES OF AMERICA 31c. AWARD DATE
BY
OFFER
AWARD
STANDARD FORM 1442 (REV. 8/2014) BACK
(Include ZIP Code) (Include area code) (Include only if different than Item 14.)
(Insert any number equal to or greater than the minimum requirement stated in Item 13d. Failure to insert any number means the offeror accepts the minimum in Item 13d.)
(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each) (Type or print) (4 copies unless otherwise specified) (Type or print) (Type or pr int) (Contractor is required to sign this document and return _______ copies to issuing office.)
(Contractor is not required to sign this document.)
(Must be fully completed by offeror) (To be completed by Government)
CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE
BID ITEM I $______________________________
BID ITEM II $_____________________________
Department of Veterans Affairs Network Contracting Office 6 100 Emancipation Drive Hampton VA 23667 Department of Veterans Affairs Financial Services Center
PO BOX 149971
Austin TX 78714-9971
KEITH NORMAN
STATEMENT OF WORK
Replace Roofs Various Buildings Project 590-19-101
Scope: Provide construction services for the removal and replacement, and all associated mechanical, electrical and plumbing as per attached plans and specifications at Hampton, VA Veterans Affair Center:
(a) General: The following is a brief summary of the Work:
1. REPLACE ROOFS VARIOUS BUILDINGS BASE BID: Work includes general construction, alterations, roofing demolition and new roof construction, alterations, roof drainage, overflow roof drainage, mechanical and electrical work, utility systems, construction and certain other items as indicated in the contract drawings and specifications sections for select roof areas on buildings 15,110,116,135,137D and 168 as required by drawings and specifications at Hampton, VA Veterans Affair Center.
2. ALTERNATE NO.1: All work associated with ITEM I except deduct all work on building 137D.
(b) Place of Performance: Tasks will be performed at the VA Medical Center, Hampton, VA, 23667. Work will be around an occupied healthcare facility in operation 24 hours a day.
(c) Specific requirements (see drawings for area of work):
a. General – see section 01 00 00
b. Asbestos Roofing Abatement – see section 02 82 13 21
c. Rough Carpentry – see section 06 10 00
d. Roof Deck and Insulation – see section 07 22 00
e. Roofing System and Material –see section 07 54 00
f. Flashing and Sheet Metal – see section 07 60 00
g. Roof Accessories – see section 07 72 00
(d) Period of Performance: Contractor shall commence work under this contract promptly after Notice to Proceed (NTP), execute the work diligently, and achieve final completion and acceptance including final cleanup of the premises within three-hundred sixty-five (365) calendar days including submittals.
(e) Specific site requirements: Contractor and all subcontractors shall obtain a flash badge from the Police Service, provide proof of OSHA 10 training completion, provide TB test results and shall abstain from smoking within the perimeters of the facility. All individuals that enter any VA facility are required to wear a face mask, and will be pre-screened for COVID19; To include Veterans, employees, visitors, volunteers, and contractors.
(f) Construction Safety Requirements: - see attached Hampton Construction Safety Handbook and section 01 35 26
(g) Submittals: - see sections 01 00 00, 01 33 23, and all applicable trade sections
(h) Quality Control: - see section 01 45 00
(i) Schedules: - see section 01 32 16 .15
(j) Environmental and Waste Management: - see sections 01 57 19, and 01 74 19
BID ITEMS
VA Medical Center Hampton, VA Project No. 590-19-101 Replace Roofs Various Buildings
A. BID ITEM I, GENERAL CONSTRUCTION: Work includes, but is not limited to, general construction, alterations roofing demolition and new roof construction, alterations, roof drainage, overflow roof drainage, mechanical and electrical work, utility systems, construction and certain other items. (Completion time 365 calendar days)
· BID ITEM I (BASE BID) $__________________
B. BID ITEM II, DEDUCT ALTERNATE NO. I (Completion time 335 calendar days): Perform all work described in Bid Item I above except: Remove all associated work with Building 137D, as indicated on the drawings.
· BID ITEM II (DEDUCT ALTERNATE I) $_________________
590-19-101 Replace Roofs Various Buildings 15, 110, 116, 135, 137 D , & 168 Table of Contents
| PART I - THE SCHEDULE | 1 | |
| SECTION A - SOLICITATION/CONTRACT FORM | 1 | |
| A.1 SF 1442 SOLICITATION, OFFER, AND AWARD (Construction, Alteration, or Repair) | 1 | |
| A.2 SF 1442 SOLICITATION, OFFER, AND AWARD (CONSTRUCTION, ALTERATION, OR REPAIR)– BACK | 2 | |
| Replace Roofs Various Buildings | 3 | |
| Project 590-19-101 | 3 | |
| INFORMATION REGARDING BIDDING MATERIAL, BID GUARANTEE AND BONDS | 7 | |
| INSTRUCTIONS, CONDITIONS AND OTHER STATEMENTS TO BIDDERS/OFFERORS | 8 | |
| M.1 | EVALUATION CRITERIA | 9 |
| PART I – TECHNICAL CAPABILITY | 9 | |
| A. | Sub-Factor 1 - Management Approach | 11 |
| B. | Sub-Factor 2 – Corporate Experience | 13 |
| f. | Please use the Corporate Experience Form (Solicitation Attachment B) included with the solicitation to provide the requested information for Experience. | 15 |
| C. | Sub-Factor 3 – Key Personnel Qualifications | 15 |
| D. | Sub-Factor 4 – Quality Control Plan | 17 |
| PART II – PAST PERFORMANCE | 19 | |
| PART III – PRICE PROPOSAL | 23 | |
| 2.1 52.216-1 TYPE OF CONTRACT (APR 1984) | 24 | |
| 2.2 52.222-5 CONSTRUCTION WAGE RATE REQUIREMENTS—SECONDARY SITE OF THE WORK (MAY 2014) | 24 | |
| 2.3 52.222-23 NOTICE OF REQUIREMENT FOR AFFIRMATIVE ACTION TO ENSURE EQUAL EMPLOYMENT OPPORTUNITY FOR CONSTRUCTION (FEB 1999) | 24 | |
| 2.4 52.225-10 NOTICE OF BUY AMERICAN REQUIREMENT—CONSTRUCTION MATERIALS (MAY 2014) | 25 | |
| 2.5 52.228-1 BID GUARANTEE (SEP 1996) | 26 | |
| 2.6 52.233-2 SERVICE OF PROTEST (SEP 2006) | 27 | |
| 2.7 52.236-27 SITE VISIT (CONSTRUCTION) (FEB 1995) ALTERNATE I (FEB 1995) | 27 | |
| 2.8 52.252-1 SOLICITATION PROVISIONS INCORPORATED BY REFERENCE (FEB 1998) | 28 | |
| 2.9 VAAR 852.228-72 ASSISTING SERVICE-DISABLED VETERAN-OWNED AND VETERAN-OWNED SMALL BUSINESSES IN OBTAINING BONDS (DEC 2009) | 28 | |
| 2.10 VAAR 852.233-71 ALTERNATE PROTEST PROCEDURE (OCT 2018) | 28 | |
| REPRESENTATIONS AND CERTIFICATIONS | 30 | |
| 3.1 52.204-8 ANNUAL REPRESENTATIONS AND CERTIFICATIONS (MAR 2020) | 30 | |
| 3.2 52.204-24 REPRESENTATION REGARDING CERTAIN TELECOMMUNICATIONS AND VIDEO SURVEILLANCE SERVICES OR EQUIPMENT (OCT 2020) | 34 | |
| 3.3 52.209-7 INFORMATION REGARDING RESPONSIBILITY MATTERS (OCT 2018) | 36 | |
| 3.4 52.209-13 VIOLATION OF ARMS CONTROL TREATIES OR AGREEMENTS—CERTIFICATION (JUL 2020) | 38 | |
| GENERAL CONDITIONS | 40 | |
| 4.1 52.204-19 INCORPORATION BY REFERENCE OF REPRESENTATIONS AND CERTIFICATIONS (DEC 2014) | 40 | |
| 4.2 52.204-23 PROHIBITION ON CONTRACTING FOR HARDWARE, SOFTWARE, AND SERVICES DEVELOPED OR PROVIDED BY KASPERSKY LAB AND OTHER COVERED ENTITIES (JUL 2018) | 40 | |
| 4.3 52.209-9 UPDATES OF PUBLICLY AVAILABLE INFORMATION REGARDING RESPONSIBILITY MATTERS (OCT 2018) | 41 | |
| 4.4 52.211-10 COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK (APR 1984) | 42 | |
| 4.5 52.219-28 POST-AWARD SMALL BUSINESS PROGRAM REREPRESENTATION (MAY 2020) | 42 | |
| 4.6 52.222-35 EQUAL OPPORTUNITY FOR VETERANS (JUN 2020) | 45 | |
| 4.7 52.222-40 NOTIFICATION OF EMPLOYEE RIGHTS UNDER THE NATIONAL LABOR RELATIONS ACT (DEC 2010) | 46 | |
| 4.8 52.222-42 STATEMENT OF EQUIVALENT RATES FOR FEDERAL HIRES (MAY 2014) | 47 | |
| 4.9 52.225-9 BUY AMERICAN—CONSTRUCTION MATERIALS (MAY 2014) | 48 | |
| 4.10 SUPPLEMENTAL INSURANCE REQUIREMENTS | 51 | |
| 4.11 52.244-2 SUBCONTRACTS (JUN 2020) | 51 | |
| 4.12 52.252-2 CLAUSES INCORPORATED BY REFERENCE (FEB 1998) | 54 | |
| 4.13 52.222-36 EQUAL OPPORTUNITY FOR WORKERS WITH DISABILITIES (JUN 2020) | 55 | |
| 4.14 VAAR 852.211-72 TECHNICAL INDUSTRY STANDARDS (NOV 2018) | 57 | |
| 4.15 VAAR 852.219-10 VA NOTICE OF TOTAL SERVICE-DISABLED VETERAN-OWNED SMALL BUSINESS SET-ASIDE (JUL 2019) (DEVIATION) | 57 | |
| 4.16 VAAR 852.219-74 LIMITATIONS ON SUBCONTRACTING—MONITORING AND COMPLIANCE (JUL 2018) | 59 | |
| 4.17 VAAR 852.232-72 ELECTRONIC SUBMISSION OF PAYMENT REQUESTS (NOV 2018) | 60 | |
| 4.18 VAAR 852.236-71 SPECIFICATIONS AND DRAWINGS FOR CONSTRUCTION (APR 2019) | 61 | |
| 4.19 VAAR 852.236-79 CONTRACTOR PRODUCTION REPORT (APR 2019) | 62 | |
| 4.20 VAAR 852.236-80 SUBCONTRACTS AND WORK COORDINATION (APR 2019) | 63 | |
| 4.21 VAAR 852.243-70 CONSTRUCTION CONTRACT CHANGES—SUPPLEMENT (SEP 2019) | 63 | |
| 4.22 VAAR 852.246-75 WARRANTY OF CONSTRUCTION—GUARANTEE PERIOD SERVICES (OCT 2018) | 64 | |
| 4.23 VAAR 852.270-1 REPRESENTATIVES OF CONTRACTING OFFICERS (JAN 2008) | 65 |
See attached document: 590-19-101 100pct drawings.
See attached document: 590-19-101 100pct Specifications.
See attached document: Safety Handbook.
See attached document: Attachment A - Base Proposal Item Price Breakdown.
See attached document: Attachment B - Corp Experience Form.
See attached document: Attachment C - Past Performance Questionnaire.
INFORMATION REGARDING BIDDING MATERIAL, BID GUARANTEE AND BONDS
36C24621R0019
INSTRUCTIONS, CONDITIONS AND OTHER STATEMENTS TO BIDDERS/OFFERORS
Page 1 of
Page 1 of
Section M—EVALUATION FACTORS FOR AWARD
M.1 EVALUATION CRITERIA
THIS SECTION IS FOR SOLICITATION PURPOSES ONLY. THIS SECTION WILL BE PHYSICALLY REMOVED FROM ANY RESULTANT AWARD BUT WILL BE DEEMED INCORPORATED BY REFERENCE.
(a) The Government will award a contract resulting from this solicitation to the responsible Offeror whose offer conforming to the solicitation will be most advantageous to the Government, price and other factors considered. The following factors shall be used to evaluate offers:
Part I – TECHNICAL CAPABILITY Part II – PAST PERFORMANCE Part III –PRICE
(b) BASIS FOR CONTRACT AWARD: This is a competitive Best Value Tradeoff (Tradeoff) source selection in which technically acceptable competing Offerors will be assigned a Past Performance Confidence Assessment Rating and will then be evaluated for Price fairness and reasonableness. All evaluation factors other than price, when combined, are significantly more important than price alone. The government reserves the right to award a contract to other than the lowest priced offer if the lowest priced Offeror is determined to have a performance confidence assessment of "Satisfactory Confidence" or lower. In that event, the Source Selection Authority shall make an integrated assessment best value award decision, where the perceived benefits of the higher priced proposal, and the rationale for tradeoffs, shall be documented in the contract file in accordance with FAR 15.406.
(c) By submission of its offer, the Offeror accedes to all solicitation requirements, including terms and conditions, representations and certifications, and technical requirements. Failure to meet a requirement may result in an offer being determined unacceptable. The evaluation process shall proceed as follows:
PART I – TECHNICAL CAPABILITY
Offers will first be evaluated for responsiveness to the solicitation requirements, by the Contracting Officer, without regard to evaluation of specific technical capability, past performance or price factors. Exchanges may occur to identify/confirm missing documentation and a determination will be made regarding whether the Offeror should/can be allowed to submit any missing/deficient documentation. Responsive offers will be provided to the Technical Evaluation Board (TEB) for the next evaluation stage. The technical capability of all offers will be evaluated on strengths and weaknesses. Management Approach, Corporate Experience, Key Personnel Qualifications, and Quality Control Plan sub-factors will be evaluated equally.
NOTE: Those offers not meeting the minimum standard for acceptability will not be considered for award (i.e. fail to meet minimum as defined by attached Specifications). Management Approach, Corporate Experience, Key Personnel Qualifications, and Quality Control Plan sub-factors will be weighted equally, and all areas must have SATISFACTORY rating or better. The Technical capability sub-factors ratings of SATISFACTORY or better will be required in order to be considered for award.
Evaluators shall assign a rating based on the minimum requirements stated below.
SOURCE SELECTION INFORMATION—SEE FAR 2.101 and 3.104 For Official Use Only A. Sub-Factor 1 - Management Approach
Types of Rating Methods
Rating Descriptors
Adjectival
| Excellent |
| Proposal demonstrates superior understanding of requirements and approach that exceeds performance or capability standards. Has one or more strengths that will significantly benefit the government. Risk of unsuccessful performance is low. |
| Good |
| Proposal demonstrates good understanding of requirements and approach that meets performance or capability standards. Has one or more strengths that will benefit the government. Risk is very low. |
| Satisfactory |
| Proposal demonstrates acceptable understanding of requirements and approach that meets performance or capability standards. Acceptable solutions are identified. No major strengths are identified. Risk is minimal. |
| Marginal |
| Proposal demonstrates shallow understanding of requirements and approach that only marginally meets performance or capability standards necessary for acceptable contract performance. Several moderate- range risk elements are identified. |
| Unsatisfactory |
| Proposal fails to meet performance or capability standards. Requirements can only be met with major changes to the proposal. Risk of unsuccessful performance is high. |
A description of the organization’s program management policies and procedures to include project planning approach(s) and management approach(s) for multi-discipline, phased projects.
1. MINIMUM STANDARD OF ACCEPTABILITY: The minimum standard of acceptability is met when the Offeror provides a brief narrative outlining the following:
a. The Offeror has clearly demonstrated that they have established project planning approaches, specifically the Offeror has identified the principal business concepts used and principle technologies deployed.
b. The Offeror has clearly demonstrated that they have experience with project management approaches for multidiscipline, phased projects, specifically identifying the principal business concepts used and principle technologies deployed.
B. Sub-Factor 2 – Corporate Experience
Types of Rating Methods
Adjectival
| Excellent |
| Demonstration that the Company has extensive experience, as a Prime Contractor, in Multi-phase roof replacement within the Dept of Veteran Affairs Medical Centers. Level of experience can be directly tied to strengths that will significantly benefit the Government. The |
Scope of Previous projects are nearly identical to the scope of this project. Risk of unsuccessful performance is extremely low.
| Good |
| Demonstration that the Company has some experience in the multi-phase roof replacement within the VA Medical Centers of the Federal Government (VA or DoD) or Commercial Hospitals as a Prime contractor. Level of experience can be directly tied to strengths that will benefit the |
government. Risk of unsuccessful performance is very low.
| Satisfactory |
| Demonstration that the Company has some experience in the multi -phase roof replacement of Government Buildings as a Prime Contractor. Risk of unsuccessful performance is minimal. |
| Marginal |
| Demonstration that the Company has some experience in the multi -phase roof replacement of Government Buildings operating in subcontractor capacity. |
| Unsatisfactory |
| Contractor fails to make any disclosure with regards to experience in construction whether it can be deemed relevant or irrelevant and fails to provide any references for works previously performed. |
1. CRITERIA: Offerors must provide a minimum of three (3) and a maximum of five (5) references of their choice of completed projects, similar in size and scope (minimum threshold: Projects where the principle objective was multi-phase roof replacement within the United States, with a total contract value exceeding $1,000,000) to the requirement being solicited. Experience of subcontractors may be used to fulfill this requirement, but future unavailability of the subcontractor to perform work may result in contract termination.
2. MINIMUM STANDARD OF ACCEPTABILITY: The minimum standard of acceptability is met when the Offeror provides a minimum of three (3) and a maximum of five (5) examples of their choice of completed projects or in progress of similar contracts in size and scope (minimum threshold: Projects where the principle objective was mechanical, electrical and plumbing upgrade multi-phase roof replacement of hospitals within the United States, with a total contract value exceeding $1,000,000). In describing the Multi-phase roof replacement, provide the following information:
a. Project title, location and brief description of the project and contracting method (design build, design bid construct, CM at risk, Turnkey, etc).
b. Project owner and name and telephone number of owner’s contact person.
c. Indicate your firm’s role as a prime contractor or subcontractor, etc.
d. Project Prime Contractor and Major Subcontractors and name and telephone number of contact person(s).
e. Project Statistics including start and completion dates (original vs. actual) for design and construction; cost (with brief explanation of what is included in the cost); square footage; and any awards (prizes) received.
f. Please use the Corporate Experience Form (Solicitation Attachment B) included with the solicitation to provide the requested information for Experience.
g. Confirmation that the prime contractor and subcontractors are licensed for the work being performed in the state where the project is located, where specified, or otherwise in the state from which the contractor or subcontractor originates. Work requiring license in the State of Virginia includes all Contractors, HVAC, Plumbing, Electrical work and Asbestos/lead Project Monitoring.
C. Sub-Factor 3 – Key Personnel Qualifications
Types of Rating Methods
Adjectival
| Excellent |
| Proposal demonstrates superior understanding of key personnel requirements regarding relevant experience and education/certification requirements. Intended Personnel have a vast background in performance of exact works of this project for a Dept of Veteran Affairs Medical Center. Strengths of Personnel have been clearly articulated how experiences to bring significant benefit to the success |
of this project. Risk of unsuccessful performance is extremely low.
| Good |
| Proposal demonstrates understanding of key personnel requirements regarding relevant experience and education/certification requirements. Intended Personnel have some background in performance of similar works of this project at the Dept of Veteran Affairs Medical Center, DoD Medical Center or Commercial Medical Center. Strengths of Personnel articulate benefit to the success of this project. Risk is very |
low.
| Satisfactory |
| Proposal demonstrates understanding of key personnel requirements regarding relevant experience and personnel meet the education/certification requirements. Articulation of the experience of Personnel bring benefit to the success of this project. |
| Marginal |
| Contractor addresses Key Personnel Requirements by only providing information that demonstrates minimum acceptability and fails to address relevancy of experiences and fails to articulate how the personnel aid in the successful and timely completion of the project. |
| Unsatisfactory |
| Contractor fails to fully address Key Personnel Requirements by failing to proffer evidence of understanding of the Key Personnel Requirements, fails to proffer evidence of minimum education and certifications of proposed Key Personnel and fails to articulate how the personnel aid in the successful and timely completion of the |
project.
1. CRITERIA: Offeror must provide an organizational chart identifying key on-site personnel with a description of their work experience relating to projects similar in size and scope (multidiscipline construction projects with a minimum threshold value of $1,000,000) to the requirement being solicited. The key personnel required for this contract are identified in Attachment I Statement of Requirements.
2. MINIMUM STANDARD OF ACCEPTABILITY: The minimum standard of acceptability is met when the Offeror provides:
a. An organizational block identifying on-site key personnel associated with this requirement to include:
i. Each individual’s name, title, duty, years of experience and experience level relating to similar contracts in size and scope (multidiscipline construction projects with a minimum threshold value of $1,000,000).
ii. Narratives for the key personnel identified in the SOR experience for projects of similar size and scope (multidiscipline construction projects with a minimum threshold value of $1,000,000), showing project history with these key personnel in relations to the project’s description. The Quality Control Manager and the Safety Manager may be the same individual if they meet both specifications requirements.
D. Sub-Factor 4 – Quality Control Plan
Types of Rating Methods
Adjectival
| Excellent |
| Proposal demonstrates superior understanding of requirements and approach that exceeds performance or capability standards. Has one or more strengths that will significantly benefit the government. Risk of unsuccessful performance is low. |
| Good |
| Proposal demonstrates good understanding of requirements and approach that meets performance or capability standards. Has one or more strengths that will benefit the government. Risk is very low. |
| Satisfactory |
| Proposal demonstrates acceptable understanding of requirements and approach that meets performance or capability standards. Acceptable solutions are identified. No major strengths are identified. Risk is minimal. |
| Marginal |
| Proposal demonstrates shallow understanding of requirements and approach that only marginally meets performance or capability standards necessary for acceptable contract performance. Several moderate- range risk elements are identified. |
| Unsatisfactory |
| Proposal fails to meet performance or capability standards. Requirements can only be met with major changes to the proposal. Such failure in demonstration of understand of requirements is that it can be assumed that the intent of the contractor is for Government Personnel to perform quality control for the contractor in lieu of Quality Assurance. |
1. CRITERIA: Offeror must provide a plan to implement the requirements of Contract Clause entitled “Inspection of Construction” FAR 52.246-12 and section 01 45 00 “Quality Control”. The plan shall identify personnel, procedures, control, and instructions. A finalized, more detailed Quality Control Plan (QCP) will be required to be submitted and approved after contract award, which include the identification of all contract submittals, tests, records, and forms.
2. MINIMUM STANDARD OF ACCEPTABILITY: The minimum standards of acceptability are met when the Offeror provides:
a. A description of the quality control system, including a chart showing lines of authority and acknowledgement that the Quality Control (QC) Manager shall implement the three-phase control system for all aspects of work specified. The QC System Manager shall report to the project manager or someone higher in the Contractor’s organization. Project Manager in this context shall mean the individual with responsibility for the overall management of the project including quality and production. The proposal provides a Quality Control approach that effectively addresses the internal processes to identify and prevent deficiencies in the quality of construction. This approach shall also show the plans for implementation ensuring the compliance of regulatory and Specification statutes are strictly adhered to. The approach shall also clearly address the QC organizational lines of authority and the Offeror’s approach to monitor corrective actions ensuring successful and timely problem resolution. The detailed QC approach shall identify how quality inspections will meet the minimum requirements of the Specifications. The QCP shall effectively address how the Offeror will correct identified discrepancies found during QC checks and the process to provide resolution to the CO/COR for any discrepancies identified in the Specifications or design. The QCP shall include the Offeror’s method for identifying subcontractors to meet the specific requirements of all trade’s specifications included in the project, see each specification section for QC details and section 01 45 00.
B. Work under this Section shall be performed by organizations which have successfully performed at least three projects of similar size and type, in a similar climate within the past five years.”
PART II – PAST PERFORMANCE
Next, the Government will evaluate the Offeror’s demonstrated past performance of recent and relevant projects, in order to determine the Offeror’s ability to perform the contract successfully and help determine responsibility. Past performance information shall include, but not limited to evaluation of past performance of the firm having experience in construction or renovation of hospitals, quality, timely performance, management effectiveness, and safety. An overall Past Performance Confidence Assessment Rating will be assigned, but each past performance reference will first be evaluated for “recency” and “relevancy”. Therefore, the following ratings tables will be used. “Recent” past performance is defined as projects completed within the last five years, from the date of issuance of solicitation. Past Performance references meeting the “minimum threshold” criteria, but not related to hospital renovations, will be rated “Somewhat Relevant”. Past Performance references meeting the “minimum threshold” criteria, which included hospital renovations will be assigned a relevancy rating based on the below rating definitions, with regard to the tasks outlined in the Specification of similar scope and complexity.
Past Performance Relevancy Rating Method
| Adjectival Rating |
| Description |
| Very Relevant |
| Present/past performance effort involved essentially the same scope and magnitude of effort and complexities this solicitation requires. |
| Relevant |
| Present/past performance effort involved similar scope and magnitude of effort and |
complexities this solicitation requires.
| Somewhat Relevant |
| Present/past performance effort involved some of the scope and magnitude of effort and complexities this solicitation requires. |
| Not Relevant |
| Present/past performance effort involved little or none of the scope and magnitude of effort and complexities this solicitation requires. |
Performance Confidence Assessment Rating Method
| Adjectival Rating |
| Description |
| Substantial Confidence |
| Based on the Offeror’s recent/relevant performance record, the Government has a high expectation that the Offeror will successfully perform the required effort. |
| Satisfactory Confidence |
| Based on the Offeror’s recent/relevant performance record, the Government has a reasonable expectation that the Offeror will successfully perform the required effort. |
| Limited Confidence |
| Based on the Offeror’s recent/relevant performance record, the Government has a low expectation that the Offeror will successfully perform the required effort. |
| No Confidence |
| Based on the Offeror’s recent/relevant performance record, the Government has no expectation that the Offeror will be able to successfully perform the required effort. |
| Unknown Confidence |
| No recent/relevant performance record is available, or the Offeror’s performance |
record is so sparse that no meaningful confidence assessment rating can be reasonably assigned.
A. CRITERIA: Offerors must provide a minimum of three (3) and a maximum of five (5) references of their choice of completed projects, similar in size and scope (minimum threshold: Projects where the principle objective was multi-phase roof replacement within the United States, with a total contract value exceeding $1,000,000). The Offeror must provide for each reference, the reference's company name, POCs, address, contact information to include phone number and e-mail address, project description, dollar value and period of performance. SEE NOTE BELOW, regarding the past performance questionnaire. Past Performance of subcontractors may be used, but future unavailability of the subcontractor to perform work may result in contract termination.
B. EVALUATION AND PERFORMANCE CONFIDENCE ASSESSMENT RATING: The Government will consider and evaluate the Offeror's past performance information, to include the references and completed surveys, which are deemed recent and relevant for the requirements of this RFP, including evaluation of the Offeror’s adherence to period of performance/time of construction and construction according to contract specifications and design without deficiencies. The Government may also use information submitted by the Offeror and other sources such as other Federal Government offices to include the Past Performance Information Retrieval System (PPIRS), and commercial sources, to assess performance. “Recent” past performance is defined as projects completed within the last five years, from the date of issuance of solicitation.
C. Relevance ratings and Performance Confidence Assessment ratings will be assigned, as defined in the above tables.
NOTE: The contractor shall send out the attached past performance questionnaires (Solicitation Attachment C) to each of their references listed under the Experience technical factor or any other references that the Offeror deems necessary. The Government will evaluate the quality and extent of Offeror’s performance deemed relevant and recent to the requirements of this solicitation.
The references must return the survey directly to the Government Contracting Officer identified on the survey, via email, by the due date for proposals.
PART III – PRICE PROPOSAL
Finally, offers that are deemed technically acceptable and assigned a Performance Confidence Assessment rating will be evaluated for fairness and reasonableness of price. The Offeror’s price proposal will be submitted in a separate volume. No price information is to be included in the technical sections of the proposal. Price will not receive a technical rating.
A. The Government will evaluate offers for award purposes by reviewing the total price offered for Proposal Item 1 (Base Proposal Item). The Government will use the committed funds amount as the control amount for price evaluation. The control amount will not be made publicly available during evaluation and selection, due to the use of FAR Part 15 procedures, as it represents both the committed funds amount and the Government Estimate. The Government Estimate is source selection sensitive information and its release during evaluation and selection would negatively affect later negotiations, if held (see FAR 36.203(c)).
B. If evaluation results and comparison with the control amount (available funds) shows that a best value award decision cannot be issued from Proposal Item 1 (Base Proposal Item) offers, pricing for Proposal Item 2 (Deduct Alternate No. 1) will be evaluated.
C. The Government intends to evaluate proposals and award a contract without discussions with offerors (Ref: FAR 52.215-1 and Except clarifications as described in FAR 15.306(a)). Therefore, the offeror’s initial proposal should contain the offeror’s best terms from a cost or price and past performance. The Government reserves the right to conduct discussions if the Contracting Officer later determines them to be necessary. If the Contracting Officer determines that the number of proposals that would otherwise be in the competitive range exceeds the number at which an efficient competition can be conducted, the Contracting Officer may limit the number of proposals in the competitive range to the greatest number that will permit an efficient competition among the most highly rated proposals.
D. Offers that are not technically acceptable cannot be selected, regardless of price.
2.1 52.216-1 TYPE OF CONTRACT (APR 1984)
The Government contemplates award of a Firm-Fixed-Price contract resulting from this solicitation.
(End of Provision)
2.2 52.222-5 CONSTRUCTION WAGE RATE REQUIREMENTS—SECONDARY SITE OF THE WORK (MAY 2014) (a)(1) The offeror shall notify the Government if the offeror intends to perform work at any secondary site of the work, as defined in paragraph (a)(1)(ii) of the FAR clause at 52.222-6, Construction Wage Rate Requirements, of this solicitation.
(2) If the offeror is unsure if a planned work site satisfies the criteria for a secondary site of the work, the offeror shall request a determination from the Contracting Officer.
(b)(1) If the wage determination provided by the Government for work at the primary site of the work is not applicable to the secondary site of the work, the offeror shall request a wage determination from the Contracting Officer.
(2) The due date for receipt of offers will not be extended as a result of an offeror's request for a wage determination for a secondary site of the work.
(End of Provision)
2.3 52.222-23 NOTICE OF REQUIREMENT FOR AFFIRMATIVE ACTION TO ENSURE EQUAL EMPLOYMENT OPPORTUNITY FOR CONSTRUCTION (FEB 1999)
(a) The offeror's attention is called to the Equal Opportunity clause and the Affirmative Action Compliance Requirements for Construction clause of this solicitation.
(b) The goals for minority and female participation, expressed in percentage terms for the Contractor's aggregate workforce in each trade on all construction work in the covered area, are as follows:
| Goals for minority participation for each trade |
| Goals for female participation for each trade |
| 27.1 % |
| 6.9 % |
These goals are applicable to all the Contractor's construction work performed in the covered area. If the Contractor performs construction work in a geographical area located outside of the covered area, the Contractor shall apply the goals established for the geographical area where the work is actually performed. Goals are published periodically in the Federal Register in notice form, and these notices may be obtained from any Office of Federal Contract Compliance Programs office.
(c) The Contractor's compliance with Executive Order 11246, as amended, and the regulations in 41 CFR 60-4 shall be based on (1) its implementation of the Equal Opportunity clause, (2) specific affirmative action obligations required by the clause entitled "Affirmative Action Compliance Requirements for Construction," and (3) its efforts to meet the goals. The hours of minority and female employment and training must be substantially uniform throughout the length of the contract, and in each trade. The Contractor shall make a good faith effort to employ minorities and women evenly on each of its projects. The transfer of minority or female employees or trainees from Contractor to Contractor, or from project to project, for the sole purpose of meeting the Contractor's goals shall be a violation of the contract, Executive Order 11246, as amended, and the regulations in 41 CFR 60-4. Compliance with the goals will be measured against the total work hours performed.
(d) The Contractor shall provide written notification to the Deputy Assistant Secretary for Federal Contract Compliance, U.S. Department of Labor, within 10 working days following award of any construction subcontract in excess of $10,000 at any tier for construction work under the contract resulting from this solicitation. The notification shall list the—
(1) Name, address, and telephone number of the subcontractor;
(2) Employer's identification number of the subcontractor;
(3) Estimated dollar amount of the subcontract;
(4) Estimated starting and completion dates of the subcontract; and
(5) Geographical area in which the subcontract is to be performed.
(e) As used in this Notice, and in any contract resulting from this solicitation, the "covered area" is
Hampton, Virginia
(End of Provision)
2.4 52.225-10 NOTICE OF BUY AMERICAN REQUIREMENT—CONSTRUCTION MATERIALS (MAY 2014)
(a) Definitions. "Commercially available off-the-shelf (COTS) item," "construction material," "domestic construction material," and "foreign construction material," as used in this provision, are defined in the clause of this solicitation entitled "Buy American—Construction Materials" (Federal Acquisition Regulation (FAR) clause 52.225-9).
(b) Requests for determinations of inapplicability. An offeror requesting a determination regarding the inapplicability of the Buy American statute should submit the request to the Contracting Officer in time to allow a determination before submission of offers. The offeror shall include the information and applicable supporting data required by paragraphs (c) and (d) of the clause at FAR 52.225-9 in the request. If an offeror has not requested a determination regarding the inapplicability of the Buy American statute before submitting its offer, or has not received a response to a previous request, the offeror shall include the information and supporting data in the offer.
(c) Evaluation of offers.
(1) The Government will evaluate an offer requesting exception to the requirements of the Buy American statute, based on claimed unreasonable cost of domestic construction material, by adding to the offered price the appropriate percentage of the cost of such foreign construction material, as specified in paragraph (b)(3)(i) of the clause at FAR 52.225-9.
(2) If evaluation results in a tie between an offeror that requested the substitution of foreign construction material based on unreasonable cost and an offeror that did not request an exception, the Contracting Officer will award to the offeror that did not request an exception based on unreasonable cost.
(d) Alternate offers.
(1) When an offer includes foreign solicitation in paragraph (b)(2) of the clause at FAR 52.225-9, the offeror also may submit an alternate offer based on use of equivalent domestic construction material.
(2) If an alternate offer is submitted, the offeror shall submit a separate Standard Form 1442 for the alternate offer, and a separate price comparison table prepared in accordance with paragraphs (c) and (d) of the clause at FAR 52.225-9 for the offer that is based on the use of any foreign construction material for which the Government has not yet determined an exception applies.
(3) If the Government determines that a particular exception requested in accordance with paragraph (c) of the clause at FAR 52.225-9 does not apply, the Government will evaluate only those offers based on use of the equivalent domestic construction material, and the offeror shall be required to furnish such domestic construction material. An offer based on use of the foreign construction material for which an exception was requested—
(i) Will be rejected as nonresponsive if this acquisition is conducted by sealed bidding; or
(ii) May be accepted if revised during negotiations.
(End of Provision)
2.5 52.228-1 BID GUARANTEE (SEP 1996)
(a) Failure to furnish a bid guarantee in the proper form and amount, by the time set for opening of bids, may be cause for rejection of the bid.
(b) The bidder shall furnish a bid guarantee in the form of a firm commitment, e.g., bid bond supported by good and sufficient surety or sureties acceptable to the Government, postal money order, certified check, cashier's check, irrevocable letter of credit, or, under Treasury Department regulations, certain bonds or notes of the United States. The Contracting Officer will return bid guarantees, other than bid bonds—
(1) To unsuccessful bidders as soon as practicable after the opening of bids; and
(2) To the successful bidder upon execution of contractual documents and bonds (including any necessary coinsurance or reinsurance agreements), as required by the bid as accepted.
(c) The amount of the bid guarantee shall be 20 percent of the bid price or , whichever is less.
(d) If the successful bidder, upon acceptance of its bid by the Government within the period specified for acceptance, fails to execute all contractual documents or furnish executed bond(s) within 10 days after receipt of the forms by the bidder, the Contracting Officer may terminate the contract for default.
(e) In the event the contract is terminated for default, the bidder is liable for any cost of acquiring the work that exceeds the amount of its bid, and the bid guarantee is available to offset the difference.
(End of Provision)
2.6 52.233-2 SERVICE OF PROTEST (SEP 2006)
Protests, as defined in section 33.101 of the Federal Acquisition Regulation, that are filed directly with an agency, and copies of any protests that are filed with the Government Accountability Office (GAO), shall be served on the Contracting Officer (addressed as follows) by obtaining written and dated acknowledgment of receipt from:
Keith Norman, Contracting Officer
Hand-Carried Address:
Department of Veterans Affairs Contracting Office Network Contracting Office 6 100 Emancipation Drive Hampton VA 23667 Mailing Address:
Department of Veterans Affairs Contracting Office Network Contracting Office 6 100 Emancipation Drive Hampton VA 23667
(b) The copy of any protest shall be received in the office designated above within one day of filing a protest with the GAO.
(End of Provision)
2.7 52.236-27 SITE VISIT (CONSTRUCTION) (FEB 1995) ALTERNATE I (FEB 1995)
(a) The clauses at 52.236-2, Differing Site Conditions, and 52.236-3, Site Investigations and Conditions Affecting the Work, will be included in any contract awarded as a result of this solicitation. Accordingly, offerors or quoters are urged and expected to inspect the site where the work will be performed.
(b) An organized site visit has been scheduled for— January 6,2021 at 10:00 AM EST
(c) Participants will meet at— Hampton VAMC:100 Emancipation Dr Hampton,VA 23667 (Bldg. 27) (End of Provision)
2.8 52.252-1 SOLICITATION PROVISIONS INCORPORATED BY REFERENCE (FEB 1998)
This solicitation incorporates one or more solicitation provisions by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. The offeror is cautioned that the listed provisions may include blocks that must be completed by the offeror and submitted with its quotation or offer. In lieu of submitting the full text of those provisions, the offeror may identify the provision by paragraph identifier and provide the appropriate information with its quotation or offer. Also, the full text of a solicitation provision may be accessed electronically at this/these address(es):
http://www.acquisition.gov/far/index.html http://www.va.gov/oal/library/vaar/
(End of Provision)
| FAR Number |
| Title |
| Date |
| 52.204-7 |
| SYSTEM FOR AWARD MANAGEMENT |
| OCT 2018 |
| 52.204-16 |
| COMMERCIAL AND GOVERNMENT ENTITY CODE REPORTING |
| AUG 2020 |
| 52.204-22 |
| ALTERNATIVE LINE ITEM PROPOSAL |
| JAN 2017 |
| 52.215-1 |
| INSTRUCTIONS TO OFFERORS—COMPETITIVE ACQUISITION |
| JAN 2017 |
| 52.236-28 |
| PREPARATION OF PROPOSALS—CONSTRUCTION |
| OCT 1997 |
2.9 VAAR 852.228-72 ASSISTING SERVICE-DISABLED VETERAN-OWNED AND VETERAN-OWNED SMALL BUSINESSES IN OBTAINING BONDS (DEC 2009) Prime contractors are encouraged to assist service-disabled veteran-owned and veteran-owned small business potential subcontractors in obtaining bonding, when required. Mentor firms are encouraged to assist protégé firms under VA's Mentor-Protégé Program in obtaining acceptable bid, payment, and performance bonds, when required, as a prime contractor under a solicitation or contract and in obtaining any required bonds under subcontracts.
(End of Clause)
| FAR Number |
| Title |
| Date |
| 852.233-70 |
| PROTEST CONTENT/ALTERNATIVE DISPUTE RESOLUTION |
| OCT 2018 |
2.10 VAAR 852.233-71 ALTERNATE PROTEST PROCEDURE (OCT 2018)
(a) As an alternative to filing a protest with the Contracting Officer, an interested party may file a protest by mail or electronically with: Executive Director, Office of Acquisition and Logistics, Risk Management and Compliance Service (003A2C), Department of Veterans Affairs, 810 Vermont Avenue NW, Washington, DC 20420 or Email: EDProtests@va.gov.
(b) The protest will not be considered if the interested party has a protest on the same or similar issue(s) pending with the Contracting Officer.
(End of Provision) PLEASE NOTE: The correct mailing information for filing alternate protests is as follows:
| Deputy Assistant Secretary for Acquisition and Logistics, |
| Risk Management Team, Department of Veterans Affairs |
| 810 Vermont Avenue, N.W. |
| Washington, DC 20420 |
Or for solicitations issued by the Office of Construction…
This is the start of the file's text. The full file is on GovTribe.