590-19-101 100pct drawings.pdf
PDF 5 MB Posted
- Attached to
- Z2DA--590-19-101 Replace Roofs Various Bldgs Federal contract opportunity
- Solicitation number
- 36C24621R0019
About this file
This federal contract opportunity solicitation is for roof replacement services at various buildings located on the Hampton, Virginia Veterans Affairs medical center campus. The solicitation seeks a contractor to provide all labor, tools, and materials to remove and replace roofs in accordance with provided drawings and specifications. The estimated construction value is between $2 million and $5 million. This opportunity is set aside for total service-disabled veteran-owned small businesses. The solicitation number is 36C24621R0019 and was issued by the Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 6. Interested parties must check the website for any amendments and ensure their SAM and VetBiz registrations are current and active to be eligible for award. Questions regarding this solicitation must be submitted by email to the identified point of contact.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Roofs 100.pdf | ||
| 36C24621R0019_1 0003.docx | DOCX document | |
| 36C24621R0019_1 0002.docx | DOCX document | |
| 51 - 75.pdf | ||
| 26 - 50.pdf | ||
| 36C24621R0019 0001.docx | DOCX document | |
| 76 - 103.pdf | ||
| 1-25.pdf | ||
| Attachment B - Corp Experience Form.docx | DOCX document | |
| Attachment C - Past Performance Questionnaire.docx | DOCX document | |
| Attachment C - Past Performance Questionnaire.docx | DOCX document | |
| 590-19-101 100pct Specifications.pdf | ||
| Attachment A - Base Proposal Item Price Breakdown.xlsx | XLSX spreadsheet | |
| 36C24621R0019_1.docx | DOCX document | |
| Attachment B - Corp Experience Form.docx | DOCX document | |
| Safety Handbook.pdf |
Show all 16
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ROOF REPLACEMENT BLDG 15, 110, 116, 135, 137, & 168
Abbreviations
Index of Drawings
Project Notes:
tpc jeh
Drawn by:
Checked by:
Project Number:
Date:
590-19-101
VA
HAMPTON, VIRGINIA 23667-0001
D E P A R T M E N T O F
V E T E R A N S A F F A I R S
T-1
JEHTPC
DEPARTMENT OF VETERAN AFFAIRS
TITLE
SHEET
ROOF REPLACEMENT
HAMPTON
DEPARTMENT OF VETERANS AFFAIRS
ROOF EVALUATION and DESIGN CONSULTANTS, INC.
PHONE: 757-869-0345
HAMPTON, VIRGINIA 23669
8 BLACKWATER LANE
AVETECH DESIGN GROUP PLC
PHONE: 757-389-5518
CHESAPEAKE, VIRGINIA 23322
123 BRUTON COURT, SUITE 100
PROJECT LOCATION:
BUILDINGS 135, 110, & 168
100% SET
NOT FOR CONSTRUCTION
PROJECT LOCATION:
BUILDINGS 137 D
PROJECT LOCATION:
BUILDING 15
th re e-ei g h th s in ch on e fo ot on e-h a lf in ch on e fo ot on e an d on e-ha lf in ch es on e fo ot o n e in ch o n e fo o t th re e-q u a rt er s in ch on e fo ot th re e in ch es on e fo ot on e-q u a rt er in ch on e fo ot on e-ei g h th in ch on e fo ot
LAYDOWN AREA
PROJECT LOCATION
PROJECT LOCATION
BLDGS 15, 110, 116, 135, 137, & 168
15, 110, 116, 135, 137, & 168
BUILDING 116 LAYDOWN AREA
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AND NOT GUARANTEED. CONTRACTOR IS RESPONSIBLE FOR
AutoCAD SHX Text
NOT TO SCALE
AutoCAD SHX Text D-4
AutoCAD SHX Text T-1
AutoCAD SHX Text
AREA MAP, HAMPTON, VA 23667-0001
AutoCAD SHX Text
NOT TO SCALE
AutoCAD SHX Text E-4
AutoCAD SHX Text T-1
AutoCAD SHX Text
VICINITY MAP
AutoCAD SHX Text
NOT TO SCALE
AutoCAD SHX Text D-1
AutoCAD SHX Text T-1
AutoCAD SHX Text
AERIAL VIEW
AutoCAD SHX Text
ROOF SQUARE FOOTAGES AND DIMENSIONS ARE APPROXIMATE
AutoCAD SHX Text
VERIFICATION OF ALL ROOF SQUARE FOOTAGES AND FIELD
AutoCAD SHX Text
MEASUREMENTS, AND EQUIPMENT, CURB AND DRAIN LOCATION
AutoCAD SHX Text
MEASUREMENTS.
AutoCAD SHX Text Revisions
AutoCAD SHX Text Date
AutoCAD SHX Text Drawing Title
AutoCAD SHX Text Location
AutoCAD SHX Text DWG. Of
AutoCAD SHX Text Building Number
AutoCAD SHX Text Project Title
AutoCAD SHX Text Checked
AutoCAD SHX Text
DRAWING #
AutoCAD SHX Text Project No.
AutoCAD SHX Text Drawn
AutoCAD SHX Text Date
AutoCAD SHX Text
HAMPTON VIRGINIA
AutoCAD SHX Text 03-15-2020
AutoCAD SHX Text 590-19-101
AutoCAD SHX Text T-1 TITLE SHEET T-2 SIGN DETAIL AND GENERAL NOTES D-1 DEMOLITION PLAN BUILDING 135 A & B D-2 DEMOLITION PLAN BUILDING 168 A, 110 B, C, D, E, & E1 D-3 DEMOLITION PLAN BUILDING 110 F, J, K, M, & O D-4 DEMOLITION PLAN BUILDING 110 R, S, & T D-5 DEMOLITION PLAN BUILDING 137 D & 15 GEN. D-6 DEMOLITION PLAN BUILDING 116 A-1 CONSTRUCTION PLAN BUILDING 135 A & B A-2 CONSTRUCTION PLAN BUILDING 168 A, 110 B, C, D, E, & E1 A-3 CONSTRUCTION PLAN BUILDING 110 F, J, K, M, & O A-4 CONSTRUCTION PLAN BUILDING 110 R, S, & T A-5 CONSTRUCTION PLAN BUILDING 137 D & 15 GEN. A-6 CONSTRUCTION PLAN BUILDING 116 A-7 DETAILS A-8 DETAILS
AutoCAD SHX Text F
AutoCAD SHX Text E
AutoCAD SHX Text D
AutoCAD SHX Text C
AutoCAD SHX Text B
AutoCAD SHX Text A
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text F
AutoCAD SHX Text E
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text D
AutoCAD SHX Text C
AutoCAD SHX Text B
AutoCAD SHX Text
AutoCAD SHX Text A
AutoCAD SHX Text
JEH
AutoCAD SHX Text
1. CONTRACTOR IS RESPONSIBLE FOR ALL TRAFFIC CONTROL AND CONTRACTOR IS RESPONSIBLE FOR ALL TRAFFIC CONTROL AND SIGNAGE. 2. PROVIDE TOILETS , DUMPSTERS, & PARKING WITHIN BUILDING 110 PROVIDE TOILETS , DUMPSTERS, & PARKING WITHIN BUILDING 110 LAYDOWN AREA. 3. CONTRACTORS SHALL FOLLOW AND OBEY ALL FEDERAL, STATE AND CONTRACTORS SHALL FOLLOW AND OBEY ALL FEDERAL, STATE AND LOCAL CODES, LAWS, SAFETY REGULATIONS AND HAZARDOUS WASTE LAWS, ECT.
AutoCAD SHX Text HVAMC Pre CONSTRUCTION Risk Assessment / Evaluation
AutoCAD SHX Text
ITEM NO.
AutoCAD SHX Text 1.
AutoCAD SHX Text 2.
AutoCAD SHX Text 3.
AutoCAD SHX Text 4.
AutoCAD SHX Text 6.
AutoCAD SHX Text 7.
AutoCAD SHX Text 8.
AutoCAD SHX Text
PROJECT NAME: BLDG. 110C MRI ADDITION
AutoCAD SHX Text
PROJECT NUMBER: 590-19-101
AutoCAD SHX Text BRIEF MECHANICAL OUTAGES MAY BE REQUIRED TO ALLOW SYSTEM MODIFICATION AS DESCRIBED IN THE PROJECT DOCUMENTS. THE EXISTING HVAC SYSTEM WILL BE MAINTAINED.
AutoCAD SHX Text ALL SYSTEM INTERRUPTIONS ARE TO BE MINIMIMIZED AND PRECEDED BY THE OWNERS WRITTEN APPROVAL A MINIMUM OF 5 DAYS IN ADVANCE AND COORDINATED WITH ALL AFFECTED USERS. BY GENERAL NOTE THE OWNER RESERVES THE RIGHT TO REQUIRE INTERUPTION OF SYSTEM TO BE PERFORMED OUTSIDE NORMAL FACILITY WORKING HOURS.
AutoCAD SHX Text
EXPECTED IMPACTS
AutoCAD SHX Text
PLANS / MEASURES TO ADDRESS IDENTIFIED IMPACTS
AutoCAD SHX Text
ITEM NAME
AutoCAD SHX Text
UTILITY / ESSENTIAL SERVICES OUTAGES
AutoCAD SHX Text HAMMER DRILLING WILL OCCUR ON BUILDINGS 110, 135, 168, AND 116 ROOF AREAS WITH STRUCTURAL CONCRETE ROOF DECKS; DRILLING AND SCREWING WILL OCCUR ON BUILDINGS 135-D, 110E, 110 E-1, AND 110-G.
AutoCAD SHX Text DISRUPTIONS (INCLUDING NOISE, VIBRATIONS AND AIR POLLUTANTS) BEYOND THE LIMITS OF CONSTRUCTION ARE REQUIRED, BY GENERAL NOTE, TO BE MINIMIZED. BY GENERAL NOTE THE OWNER RESERVES THE RIGHT TO REQUIRE INTERUPTION OF SYSTEMS TO BE PERFORMED OUTSIDE NORMAL FACILITY WORKING HOURS.
AutoCAD SHX Text
NO DUST IMPACTS EXPECTED
AutoCAD SHX Text IMMEDIATE AREAS OF DEMOLITION AND NEW WORK WILL BE ISOLATED FROM THE REST OF THE BUILDING WITH CONSTRUCTION / ICRA BARRIERS.
AutoCAD SHX Text DISRUPTIONS (INCLUDING NOISE, VIBRATIONS, AND AIR POLLUTANTS) BEYOND THE LIMITS OF CONSTRUCTION ARE REQUIRED, BY GENERAL NOTE, TO BE MINIMIZED. DEMOLITION BY LARGE MECHANIZED EQUIPMENT SHALL BE MINIMIZED.
AutoCAD SHX Text
NO IMPACT EXPECTED
AutoCAD SHX Text ALL EQUIPMENT INTERRUPTIONS ARE TO BE MINIMIZED AND PRECEDED BY THE OWNERS WRITTEN APPROVAL A MINIMUM OF 48 HOURS IN ADVANCE AND COORDINATED WITH ALL AFFECTED USERS. BY GENERAL NOTE THE OWNER RESERVES THE RIGHT TO REQUIRE INTERRUPTION OF EQUIPMENT TO BE PERFORMED OUTSIDE NORMAL FACILITY WORKING HOURS.
AutoCAD SHX Text N/A
AutoCAD SHX Text NO SIGNIFICANT IMPACTS ARE EXPECTED FOR BUILDING TRAFFIC. CONSTRUCTION IS PRIMARILY LIMITED TO THE AREA ADJACENT TO BLDG 110C. MINOR IMPACT TO PARKING IN THE VICINITY OF THE MRI BLDG.
AutoCAD SHX Text
SEE NOTE BELOW CONCERNING "LIMITS OF CONSTRUCTION"
AutoCAD SHX Text EACH ROOF WILL CONTAIN THE LIMITS OF CONSTRUCTION DURING INSTALLATION WITH HEIGHTENED AWARENESS TO SAFETY.
AutoCAD SHX Text
VIBRATIONS
AutoCAD SHX Text
DUST (INFECTION CONTROL) / AIR QUALITY
AutoCAD SHX Text
NOISE
AutoCAD SHX Text
EQUIPMENT
AutoCAD SHX Text
CREATION OR SPREAD OF CONTAMINANTS
AutoCAD SHX Text
TRAFFIC FLOW - PATIENTS, VISITORS, STAFF, CONTRACT PERSONNEL
AutoCAD SHX Text
"LIMITS OF CONSTRUCTION" BARRIER LOCATION
AutoCAD SHX Text 5.
AutoCAD SHX Text
NO IMPACT EXPECTED
AutoCAD SHX Text BUR BUILT UP ROOF SYSTEM BUILT UP ROOF SYSTEM BTWN BETWEEN BETWEEN CLG CEILING CEILING COL COLUMN COLUMN CONC. CONCRETE CONCRETE CONT. CONTINUOUS CONTINUOUS ELEC ELECTRIC(AL) ELECTRIC(AL) ETR EXISTING TO REMAIN EXISTING TO REMAIN EXIST. EXISTING EXISTING FIN FINISH(ED) FINISH(ED) HR HOUR HOUR HT HEIGHT HEIGHT L LENGTH LENGTH MAX MAXIMUM MAXIMUM MECH MECHANICAL MECHANICAL MTG MOUNTING MOUNTING MTL METAL METAL NIC. NOT IN CONTRACT OFCI OWNER FURNISHED CONTRACTOR INSTALLED OWNER FURNISHED CONTRACTOR INSTALLED OFOI OWNER FURNISHED OWNER INSTALLED OWNER FURNISHED OWNER INSTALLED CFCI CONTRACTOR FURNISHED CONTRACTOR INSTALLED CONTRACTOR FURNISHED CONTRACTOR INSTALLED CFOI CONTRACTOR FURNISHED OWNER INSTALLED CONTRACTOR FURNISHED OWNER INSTALLED O.C. ON CENTER ON CENTER OH OPPOSITE HAND OPPOSITE HAND PNT PAINT PAINT PTD PAINTED PAINTED PVC POLYVINYL CHLORIDE POLYVINYL CHLORIDE SBS STYRENE BUTADIENE SYSTEM STYRENE BUTADIENE SYSTEM SIM SIMILAR SIMILAR TYP TYPICAL TYPICAL VERT VERTICAL VERTICAL WVRS WIND VENTED ROOF SYSTEM WIND VENTED ROOF SYSTEM @ AT AT ANGLE ANGLE CENTER LINE CENTER LINE DIAMETER
AutoCAD SHX Text HAMMER DRILLING WILL OCCUR ON BUILDINGS 110, 135, 168, AND 116 ROOF AREAS WITH STRUCTURAL CONCRETE ROOF DECKS; DRILLING AND SCREWING WILL OCCUR ON BUILDINGS 135-D, 110E, 110 E-1, AND 110-G.
AutoCAD SHX Text
ALL FEDERAL AND LOCAL SAFETY REGULATIONS MUST BE FOLLOWED.
AutoCAD SHX Text
COR - ILSM AND ICRA COMPLETED:
AutoCAD SHX Text
REVIEWED: AFGE
AutoCAD SHX Text
REVIEWED: NAGE
AutoCAD SHX Text
REVIEWED: WOMEN VETERANS PROGRAM MANAGER
AutoCAD SHX Text
APPROVED: INFECTION CONTROL
AutoCAD SHX Text
APPROVED: CONSTRUCTION SAFETY MANAGER
AutoCAD SHX Text
APPROVED: SAFETY MANAGER
AutoCAD SHX Text
APPROVED: ENERGY MANAGER
AutoCAD SHX Text
APPROVED : CHIEF, POLICE SERVICE
AutoCAD SHX Text
APPROVED: CHIEF MEDICINE SERVICE
AutoCAD SHX Text
APPROVED: SUPERVISORY FACILITIES OPERATION SPECIALIST
AutoCAD SHX Text
APPROVED: SUPERVISORY PROJECT ENGINEER
AutoCAD SHX Text
APPROVED: ENGINEERING DIVISION MANAGER
AutoCAD SHX Text
APPROVED: CHIEF ENVIRONMENTAL MANAGEMENT SERVICE
AutoCAD SHX Text
APPROVED: CHIEF, FACILITIEG MANAGEMENT SERVICE
AutoCAD SHX Text
APPROVED: ASSOCIATE DIRECTOR FOR PATIENT CARE SERVICES
AutoCAD SHX Text
APPROVED: CHIEF OF STAFF
AutoCAD SHX Text
APPROVED: ASSOCIATE DIRECTOR FOR OPERATIONS
AutoCAD SHX Text
APPROVED: DIRECTOR, HAMPTON VA MEDICAL CENTER
AutoCAD SHX Text
DATE:
AutoCAD SHX Text
DATE:
AutoCAD SHX Text
DATE:
AutoCAD SHX Text
DATE:
AutoCAD SHX Text
DATE:
AutoCAD SHX Text
DATE:
AutoCAD SHX Text
DATE:
AutoCAD SHX Text
DATE:
AutoCAD SHX Text
DATE:
AutoCAD SHX Text
DATE:
AutoCAD SHX Text
APPROVED: CHIEF, OIT
AutoCAD SHX Text
DATE:
AutoCAD SHX Text
DATE:
AutoCAD SHX Text
DATE:
AutoCAD SHX Text
DATE:
AutoCAD SHX Text
DATE:
AutoCAD SHX Text
DATE:
AutoCAD SHX Text
DATE:
AutoCAD SHX Text
DATE:
AutoCAD SHX Text
DATE:
AutoCAD SHX Text
DATE:
T-2
JEHTPC
SIGN DETAIL AND GENERAL
NOTES
ROOF REPLACEMENT
HAMPTON
DEPARTMENT OF VETERANS AFFAIRS
ROOF EVALUATION and DESIGN CONSULTANTS, INC.
PHONE: 757-869-0345
HAMPTON, VIRGINIA 23669
8 BLACKWATER LANE
AVETECH DESIGN GROUP PLC
PHONE: 757-389-5518
CHESAPEAKE, VIRGINIA 23322
123 BRUTON COURT, SUITE 100
110, 135, 168, & 137 th re e-ei g h th s in ch on e fo ot on e-h a lf in ch on e fo ot on e an d on e-ha lf in ch es on e fo ot o n e in ch o n e fo o t th re e-q u a rt er s in ch on e fo ot th re e in ch es on e fo ot on e-q u a rt er in ch on e fo ot on e-ei g h th in ch on e fo ot
BLDGS 15, 110, 116, 135, 137, & 168
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text Revisions
AutoCAD SHX Text Date
AutoCAD SHX Text Drawing Title
AutoCAD SHX Text Location
AutoCAD SHX Text DWG. Of
AutoCAD SHX Text Building Number
AutoCAD SHX Text Project Title
AutoCAD SHX Text Checked
AutoCAD SHX Text
DRAWING #
AutoCAD SHX Text Project No.
AutoCAD SHX Text Drawn
AutoCAD SHX Text Date
AutoCAD SHX Text
HAMPTON VIRGINIA
AutoCAD SHX Text 03-15-2020
AutoCAD SHX Text 590-19-101
AutoCAD SHX Text F
AutoCAD SHX Text E
AutoCAD SHX Text D
AutoCAD SHX Text C
AutoCAD SHX Text B
AutoCAD SHX Text A
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text F
AutoCAD SHX Text E
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text D
AutoCAD SHX Text C
AutoCAD SHX Text B
AutoCAD SHX Text
AutoCAD SHX Text A
AutoCAD SHX Text
JEH
AutoCAD SHX Text GENERAL SAFETY NOTES 1. THE REQUIREMENTS OF THE GENERAL CONDITIONS AND SPECIFICATIONS ARE APPLICABLE TO ALL THE REQUIREMENTS OF THE GENERAL CONDITIONS AND SPECIFICATIONS ARE APPLICABLE TO ALL ASPECTS OF THE WORK. 2. THE SAFETY AND PRIVACY OF PATIENT, VISITORS AND STAFF IS ALWAYS THE PARAMOUNT SAFETY. THE SAFETY AND PRIVACY OF PATIENT, VISITORS AND STAFF IS ALWAYS THE PARAMOUNT SAFETY. 3. WORK MAY NOT PROCEED UNTIL ALL REQUIRED SAFETY PROTOCOLS ARE IN PLACE INCLUDING BUT WORK MAY NOT PROCEED UNTIL ALL REQUIRED SAFETY PROTOCOLS ARE IN PLACE INCLUDING BUT NOT LIMITED TO OVERHEAD PROTECTIONS, SAFETY WARNING SIGNS AND PROVISION OF PRIVACY. 4. ALL EQUIPMENT, INCLUDING PERSONNEL PROTECTIONS EQUIPMENT MUST COMPLY WITH ALL SAFETY ALL EQUIPMENT, INCLUDING PERSONNEL PROTECTIONS EQUIPMENT MUST COMPLY WITH ALL SAFETY STANDARDS AND CONSTRUCTION PROTOCOLS INCLUDING OSHA 5. ALL ASPECTS OF THE WORK ARE SUBJECT TO INSPECTION BY THE CO DESIGNATED SAFETY OFFICES. ALL ASPECTS OF THE WORK ARE SUBJECT TO INSPECTION BY THE CO DESIGNATED SAFETY OFFICES. INSPECTIONS MAY OCCUR WITHOUT PRIOR NOTIFICATION. 6. MAINTAIN ONSITE, AT THE AREA OF WORK, COPIES OF MSDS FOR ALL MATERIAL BEING USED AT MAINTAIN ONSITE, AT THE AREA OF WORK, COPIES OF MSDS FOR ALL MATERIAL BEING USED AT THE AREA OF THE WORK. 7. CLEARLY MARK AND PROVIDE BARRIERS FOR ALL CONTRACTOR LIFTING AREAS INCLUDING CLEARLY MARK AND PROVIDE BARRIERS FOR ALL CONTRACTOR LIFTING AREAS INCLUDING DELINEATION OF ACCESS PATHWAYS. PROVIDE PERSONNEL TO MONITOR AND WARN NON CONTRACTOR PERSONNEL WHEN ACCESS PATHWAY ARE IN USED. 8. PARK LIFTING EQUIPMENT IN DESIGNATED AREAS ONLY AS APPROVED BY THE COR. DO NOT LEAVE PARK LIFTING EQUIPMENT IN DESIGNATED AREAS ONLY AS APPROVED BY THE COR. DO NOT LEAVE EQUIPMENT/VEHICLES UNATTENDED UNLESS PARKING DESIGNATED AREAS LOCKED AND SECURE. 9. SOME OVERHEAD WORK AT EXTERIOR ENTRANCES/EXITS DIRECTLY OVERHEAD TO CONSTRUCTION MAY SOME OVERHEAD WORK AT EXTERIOR ENTRANCES/EXITS DIRECTLY OVERHEAD TO CONSTRUCTION MAY REQUIRE OFF HOURS AND WEEKEND WORK, COORDINATE WITH THE COR FOR FINAL DETERMINATION. 10. EQUIPMENT AND MATERIALS FOR OVERHEAD WORK, INCLUDING SPARE AND EXCESS SCAFFOLDING EQUIPMENT AND MATERIALS FOR OVERHEAD WORK, INCLUDING SPARE AND EXCESS SCAFFOLDING COMPONENTS MAY NOT BE STORED AT GROUND LEVEL ON SITE. 11. LOCATE NOISE GENERATING EQUIPMENT BUT NOT LIMITED TO AIR COMPRESSORS, GENERATORS, LOCATE NOISE GENERATING EQUIPMENT BUT NOT LIMITED TO AIR COMPRESSORS, GENERATORS, PUMPS IN AREAS APPROVED BY THE COR. 12. INSTALLATION OF TRASH CHUTES SHALL BE OF COVERED TYPE, PROTECTED BY GUARDRAILS, AREA INSTALLATION OF TRASH CHUTES SHALL BE OF COVERED TYPE, PROTECTED BY GUARDRAILS, AREA BELOW MUST BE SECURELY FENCED AND COMPLY WITH OSHA 1926.852 - CHUTES. GENERAL NOTES 1. PROVIDE OVERHEAD PROTECTION AT ALL BLDG. ENTRY/EXIT. PROVIDE COR WITH COVERAGE PLAN PROVIDE OVERHEAD PROTECTION AT ALL BLDG. ENTRY/EXIT. PROVIDE COR WITH COVERAGE PLAN FOR APPROVAL AND SHALL COMPLY WITH THE FOLLOWING: A. ROOF: ROOFS OF COVERED WALKWAYS SHALL CONSIST OF PLANKING NO LESS THAN THE INDUSTRY ROOF: ROOFS OF COVERED WALKWAYS SHALL CONSIST OF PLANKING NO LESS THAN THE INDUSTRY STANDARD NOMINAL THICKNESS OF TWO INCHES (2 IN), CLOSELY LAID, MADE WATERTIGHT, AND COVERED WITH EXTERIOR GRADE FIRE RESISTANT PLYWOOD. ALL SILL PLATES AND POSTS SHALL BE GROUND CONTACT RATED PRESSURE-PRESERVATIVE TREATED MATERIAL. ALL FASTENERS SHALL BE GALVANIZED STEEL.). THE ROOF SHALL BE DESIGNED TO CARRY A LIVE LOAD OF AT LEAST 150 POUNDS PER SQUARE FOOT (150 PSF). B. HEIGHT: COVERED WALKWAYS SHALL HAVE A CLEAR AND UNOBSTRUCTED CEILING HEIGHT OF NOT HEIGHT: COVERED WALKWAYS SHALL HAVE A CLEAR AND UNOBSTRUCTED CEILING HEIGHT OF NOT LESS THAN EIGHT FEET (8 FT). 6. WIDTH: COVERED WALKWAYS SHALL HAVE A CLEAR UNOBSTRUCTED WIDTH OF NOT LESS THAN SIX FEET (6 FT). C. WIDTH IS TO BE MEASURED FROM WALL TO WALL AND NOT FROM HANDRAIL TO WALL OR WIDTH IS TO BE MEASURED FROM WALL TO WALL AND NOT FROM HANDRAIL TO WALL OR HANDRAIL TO HANDRAIL. COVERED WALKWAYS SHALL NOT ALLOW UNPROTECTED PASSAGE ALONG THE SIDEWALK ON EITHER SIDE OF THE COVERED WALKWAY. D. ALTERNATE MATERIALS: STEEL OR OTHER MATERIALS HAVING EQUIVALENT STRENGTH AND ALTERNATE MATERIALS: STEEL OR OTHER MATERIALS HAVING EQUIVALENT STRENGTH AND SUITABILITY MAY BE USED IN LIEU OF WOOD TO CONSTRUCT COVERED WALKWAYS. IF ALTERNATE MATERIALS ARE SELECTED, THEN THEY MUST SATISFY THE REQUIREMENTS OF ADA IN THE APPLICATION IN WHICH THEY WILL BE USED. 2. ALL CRANE LIFT OPERATION AND PLAN LOCATION SHALL BE APPROVED BY COR AND CSM NO LATER ALL CRANE LIFT OPERATION AND PLAN LOCATION SHALL BE APPROVED BY COR AND CSM NO LATER THAN 14 DAYS IN ADVANCE. 3. SCAFFOLDING SYSTEM SHALL BE PROVIDED BY THE CONTRACTOR TO MINIMIZE ENTRANCE THROUGH SCAFFOLDING SYSTEM SHALL BE PROVIDED BY THE CONTRACTOR TO MINIMIZE ENTRANCE THROUGH THE FACILITY UNLESS OTHERWISE APPROVED BY THE CSM. 4. ALL ACCESS THROUGH THE FACILITY SHALL COMPLY WITH INFECTIOUS CONTROL CLASS III, IN ALL ACCESS THROUGH THE FACILITY SHALL COMPLY WITH INFECTIOUS CONTROL CLASS III, IN ADDITION TO SHOE COVERS AND STICKY MATS. 5. ALL STORAGE AREAS USED IN THE PROJECT SHALL ENCLOSED WITH 6' CHAIN LINK FENCE POST ALL STORAGE AREAS USED IN THE PROJECT SHALL ENCLOSED WITH 6' CHAIN LINK FENCE POST WITH FABRICS. LAYDOWN AND STAGING AREAS SHALL BE SECURED BY LOCK AND KEY. 6. DUMPSTER AND TRASH CHUTE LOCATIONS ARE TO BE COORDINATED WITH THE COR PRIOR TO ONSITE DUMPSTER AND TRASH CHUTE LOCATIONS ARE TO BE COORDINATED WITH THE COR PRIOR TO ONSITE INSTALLATION. 7. CONTRACTOR TO INSTALL AND MAINTAIN TEMPORARY GUARDS AT EDGE OF ROOF. CONTRACTOR TO INSTALL AND MAINTAIN TEMPORARY GUARDS AT EDGE OF ROOF. 8. CONTRACTOR SHALL UTILIZE APPROVED FALL PROTECTION AS REQUIRED BY OSHA. CONTRACTOR SHALL UTILIZE APPROVED FALL PROTECTION AS REQUIRED BY OSHA. 9. ANY SCAFFOLDING NOT IN A SECURED AREA MUST HAVE A 6' TALL PERIMETER FENCING INSTALLED ANY SCAFFOLDING NOT IN A SECURED AREA MUST HAVE A 6' TALL PERIMETER FENCING INSTALLED WITH ENTRANCE SECURED BY LOCK AND KEY. 10. SHOE COVERS MUST BE USED BY ALL PERSONNEL TO AND FROM THE SITE THROUGH ANY OCCUPIED SHOE COVERS MUST BE USED BY ALL PERSONNEL TO AND FROM THE SITE THROUGH ANY OCCUPIED AREAS. 11. CONTAIN CONSTRUCTION WASTE, TOOLS, AND MATERIALS BEFORE TRANSPORT IN TIGHTLY
AutoCAD SHX Text
NOT TO SCALE
AutoCAD SHX Text F-3
AutoCAD SHX Text T-2
AutoCAD SHX Text
CONSTRUCTION SIGN: TEXT ONLY
AutoCAD SHX Text
NOT TO SCALE
AutoCAD SHX Text D-3
AutoCAD SHX Text T-2
CONSTRUCTION SIGN: SAFETY
135A
135B
168A
110B
110C 110D
110M
110S
110T
110K
110J
110F
ARCH NORTH
110O
110R
110G
110E1 110E
± 229'-0"
SATELITE DISH ON
CONCRETE MASONRY
UNITS TO BE REMOVED
± 18'-6"± 44'-0"
± 229'-0"
± 44'-0" ± 104'-0"± 18'-6"
± 12'-0"
NOTE: GRAVEL SURFACED ROOF
NOTE: GRAVEL SURFACED ROOF
ADJACENT BUILDING
ROOF ACCESS
VIA FIXED
LADDER & ROOF
HATCH
ROOF ACCESS
VIA FIXED
LADDER & ROOF
HATCH
NOTE: ASBESTOS CONTAINING MATERIAL, SEE
HAZARDOUS MATERIALS REPORT: SILVER PAINT
NOTE: ASBESTOS CONTAINING MATERIAL, SEE
HAZARDOUS MATERIALS REPORT: SILVER PAINT
NOTE: ASBESTOS CONTAINING
MATERIAL, SEE HAZARDOUS
MATERIALS REPORT: SILVER PAINT
NOTE: ASBESTOS CONTAINING MATERIAL, SEE
HAZARDOUS MATERIALS REPORT: SILVER PAINT
NOTE: ASBESTOS CONTAINING MATERIAL, SEE
HAZARDOUS MATERIALS REPORT: SILVER PAINT
ROOF REPLACEMENT
HAMPTON
DEPARTMENT OF VETERANS AFFAIRS
ROOF EVALUATION and DESIGN CONSULTANTS, INC.
PHONE: 757-869-0345
HAMPTON, VIRGINIA 23669
8 BLACKWATER LANE
AVETECH DESIGN GROUP PLC
PHONE: 757-389-5518
CHESAPEAKE, VIRGINIA 23322
123 BRUTON COURT, SUITE 100
NOT FOR CONSTRUCTION
BLDGS 15, 110, 116, 135, 137D, & 168
JEHCFM
D-1
DEMOLITION PLAN -
BUILDING 135 A & B
AutoCAD SHX Text
DEMOLITION NOTES
AutoCAD SHX Text
GENERAL NOTES
AutoCAD SHX Text
KEY PLAN
AutoCAD SHX Text
SCALE: 1/8" = 1' - 0"
AutoCAD SHX Text
AutoCAD SHX Text D-1
AutoCAD SHX Text
ROOF DEMOLITION PLAN - BUILDING 135 A & B
AutoCAD SHX Text
1. DIMENSIONS ARE APPROXIMATE. CONTRACTOR IS RESPONSIBLE FOR VERIFICATION OF ALL FIELD SIZE AND LOCATION MEASUREMENTS FOR ALL EXISTING EQUIPMENT, CURBS, DECK PENETRATIONS, DRAINS, AND OTHER ITEMS. DIMENSIONS ARE APPROXIMATE. CONTRACTOR IS RESPONSIBLE FOR VERIFICATION OF ALL FIELD SIZE AND LOCATION MEASUREMENTS FOR ALL EXISTING EQUIPMENT, CURBS, DECK PENETRATIONS, DRAINS, AND OTHER ITEMS. 2. WHEN RAISING EQUIPMENT, ALL MECHANICAL, ELECTRICAL, NATURAL GAS, AND PLUMBING DISCONNECTS AND RECONNECTS SHALL BE PERFORMED BY LICENSED TRADE PROFESSIONALS AS SUPPLIED BY THE CONTRACTOR AT THE CONTRACTORS EXPENSE. WHEN RAISING EQUIPMENT, ALL MECHANICAL, ELECTRICAL, NATURAL GAS, AND PLUMBING DISCONNECTS AND RECONNECTS SHALL BE PERFORMED BY LICENSED TRADE PROFESSIONALS AS SUPPLIED BY THE CONTRACTOR AT THE CONTRACTORS EXPENSE. 3. ALL WORK TO BE PERFORMED PER SPECIFICATIONS AND DETAILS, AND IN ACCORDANCE WITH MOST CURRENT ADOPTED CODES: NFPA 101 (LIFE SAFETY CODE) AND REFERENCED STANDARDS; IBC 2018 AND REFERENCED STANDARDS; AND NFPA ALL WORK TO BE PERFORMED PER SPECIFICATIONS AND DETAILS, AND IN ACCORDANCE WITH MOST CURRENT ADOPTED CODES: NFPA 101 (LIFE SAFETY CODE) AND REFERENCED STANDARDS; IBC 2018 AND REFERENCED STANDARDS; AND NFPA NATIONAL FIRE CODES (EXCLUDING NFPA 5000 & NFPA 900); AND ASCE 7-16 4. CONTRACTOR SHALL NOT REMOVE ANY MORE ROOFING THAN CAN BE PUT BACK IN ANY GIVEN DAY. PHASE ROOFING IS NOT ACCEPTABLE FOR ANY REASON. ALL NIGHT SEALS SHALL BE PERFORMED PER NRCA AND MANUFACTURER'S REQUIREMENTS. CONTRACTOR SHALL NOT REMOVE ANY MORE ROOFING THAN CAN BE PUT BACK IN ANY GIVEN DAY. PHASE ROOFING IS NOT ACCEPTABLE FOR ANY REASON. ALL NIGHT SEALS SHALL BE PERFORMED PER NRCA AND MANUFACTURER'S REQUIREMENTS. 5. "ITEMS TO BE REMOVED" IS DEFINED AS: DETACH ITEMS FROM EXISTING CONSTRUCTION AND LEGALLY DISPOSE OF THEM OFF-SITE, UNLESS INDICATED TO BE REMOVED AND SALVAGED OR REMOVED AND REINSTALLED. "ITEMS TO BE REMOVED" IS DEFINED AS: DETACH ITEMS FROM EXISTING CONSTRUCTION AND LEGALLY DISPOSE OF THEM OFF-SITE, UNLESS INDICATED TO BE REMOVED AND SALVAGED OR REMOVED AND REINSTALLED. 6. "ITEMS TO BE REMOVED AND SALVAGED" IS DEFINED AS: DETACH ITEMS FROM EXISTING CONSTRUCTION AND DELIVER THEM TO OWNER. "ITEMS TO BE REMOVED AND SALVAGED" IS DEFINED AS: DETACH ITEMS FROM EXISTING CONSTRUCTION AND DELIVER THEM TO OWNER. 7. "ITEMS TO BE REMOVED AND REINSTALLED" IS DEFINED AS: DETACH ITEMS FROM EXISTING CONSTRUCTION, PREPARE THEM FOR REUSE, AND REINSTALL THEM WHERE INDICATED. "ITEMS TO BE REMOVED AND REINSTALLED" IS DEFINED AS: DETACH ITEMS FROM EXISTING CONSTRUCTION, PREPARE THEM FOR REUSE, AND REINSTALL THEM WHERE INDICATED. 8. "ITEMS TO REMAIN" IS DEFINED AS: EXISTING ITEMS OF CONSTRUCTION THAT ARE NOT TO BE REMOVED AND THAT ARE NOT OTHERWISE INDICATED TO BE REMOVED, REMOVED AND SALVAGED, OR REMOVED AND REINSTALLED. "ITEMS TO REMAIN" IS DEFINED AS: EXISTING ITEMS OF CONSTRUCTION THAT ARE NOT TO BE REMOVED AND THAT ARE NOT OTHERWISE INDICATED TO BE REMOVED, REMOVED AND SALVAGED, OR REMOVED AND REINSTALLED. 9. CONTRACTOR IS RESPONSIBLE FOR ALL ITEMS ON ALL ROOFS INCLUDING HVAC, SATELLITE EQUIPMENT, VTR FANS, LIGHTNING PROTECTION AND ALL NOT SPECIFICALLY INDICATED ON PLANS. CONTRACTOR IS RESPONSIBLE FOR ALL ITEMS ON ALL ROOFS INCLUDING HVAC, SATELLITE EQUIPMENT, VTR FANS, LIGHTNING PROTECTION AND ALL NOT SPECIFICALLY INDICATED ON PLANS. 10. REMOVE ALL ABANDONED EQUIPMENT, SUPPORTS, PIPES, ANTENNAS AND OTHER EQUIPMENT NOT IN USE. CONFIRM ABANDONED ITEMS WITH COR PRIOR TO REMOVAL. REMOVE ALL ABANDONED EQUIPMENT, SUPPORTS, PIPES, ANTENNAS AND OTHER EQUIPMENT NOT IN USE. CONFIRM ABANDONED ITEMS WITH COR PRIOR TO REMOVAL. 11. REMOVE FLASHING NECESSARY FOR INSTALLATION OF NEW ROOF SYSTEM.REMOVE FLASHING NECESSARY FOR INSTALLATION OF NEW ROOF SYSTEM.
AutoCAD SHX Text D1. CONTRACTOR SHALL REMOVE ALL ROOF GRAVEL, ROOF FLASHINGS, PITCH POCKETS, EDGE, FASCIA AND CAP METALS, FASTENERS, AND ASSOCIATED ROOF AND DRAIN FLASHING MATERIALS. REMOVE ALL FOREIGN PLANT MATTER AND VEGETATION AS CONTRACTOR SHALL REMOVE ALL ROOF GRAVEL, ROOF FLASHINGS, PITCH POCKETS, EDGE, FASCIA AND CAP METALS, FASTENERS, AND ASSOCIATED ROOF AND DRAIN FLASHING MATERIALS. REMOVE ALL FOREIGN PLANT MATTER AND VEGETATION AS REQUIRED FOR NEW WORK. ALL ROOFING RELATED MATERIALS SHALL BE PROPERLY DISPOSED OF DAILY. CONTRACTOR SHALL VACUUM ALL ROOF AREAS PRIOR TO ROOFING SYSTEM INSTALLATION. D2. HAZARDOUS WASTE NOT IN USE MUST BE STORED IN SECURE LOCATION IN REMOTE LAYDOWN AREA. ITEMS CANNOT BE STORED AT BUILDING. HAZARDOUS WASTE NOT IN USE MUST BE STORED IN SECURE LOCATION IN REMOTE LAYDOWN AREA. ITEMS CANNOT BE STORED AT BUILDING. D3. CONTRACTOR TO SET UP AND MAINTAIN TEMPORARY GUARDS AT EDGE OF ROOF WHERE WORK IS BEING PERFORMED AND ALL PERSONNEL WEAR PROPER SAFETY DEVICES/FALL PROTECTION PER OSHA. STANDARDS. CONTRACTOR TO SET UP AND MAINTAIN TEMPORARY GUARDS AT EDGE OF ROOF WHERE WORK IS BEING PERFORMED AND ALL PERSONNEL WEAR PROPER SAFETY DEVICES/FALL PROTECTION PER OSHA. STANDARDS. D4. DUMPSTER AND TRASH CHUTE LOCATIONS ARE TO BE COORDINATED WITH THE COR PRIOR TO LOCATION ON SITE. DUMPSTER AND TRASH CHUTE LOCATIONS ARE TO BE COORDINATED WITH THE COR PRIOR TO LOCATION ON SITE. D5. CONTRACTOR SHALL PREPARE A PLAN SHOWING LAYDOWN AREA, SECURITY FENCE, DUMPSTER LOCATION, SCAFFOLDING AND ACCESS FOR COR REVIEW AND APPROVAL. CONTRACTOR SHALL PREPARE A PLAN SHOWING LAYDOWN AREA, SECURITY FENCE, DUMPSTER LOCATION, SCAFFOLDING AND ACCESS FOR COR REVIEW AND APPROVAL. D6. CONTRACTOR SHALL INSPECT AND SECURE ALL SCAFFOLDING AND PROTECTIVE MEASURES DAILY TO ENSURE IT COMPLIES WITH ALL OSHA REQUIREMENTS. CONTRACTOR SHALL INSPECT AND SECURE ALL SCAFFOLDING AND PROTECTIVE MEASURES DAILY TO ENSURE IT COMPLIES WITH ALL OSHA REQUIREMENTS.
AutoCAD SHX Text
VENT PIPE
AutoCAD SHX Text
OVERFLOW SCUPPER
AutoCAD SHX Text
ROOF DRAIN
AutoCAD SHX Text
PLAN LEGEND:
AutoCAD SHX Text
ROOF HATCH
AutoCAD SHX Text
OBSOLETE CURB TO BE REMOVED
AutoCAD SHX Text
OBSOLETE SLEEPER TO BE REMOVED
AutoCAD SHX Text
OBSOLETE PIPE TO BE REMOVED
AutoCAD SHX Text
VENTILATOR
AutoCAD SHX Text
PITCH POCKET
AutoCAD SHX Text
HVAC ON SLEEPER CURB
AutoCAD SHX Text
EXPANSION JOINT
AutoCAD SHX Text
CONDUIT ON WOOD SLEEPERS
AutoCAD SHX Text
CHIMNEY
AutoCAD SHX Text
EXHAUST FAN ON ROOF CURB
AutoCAD SHX Text
EF
AutoCAD SHX Text
PIPE CURB
AutoCAD SHX Text
PC
AutoCAD SHX Text
AIR HANDLER
AutoCAD SHX Text
AH
AutoCAD SHX Text
DETAIL NUMBER
AutoCAD SHX Text
SHEET WHERE DRAWN
AutoCAD SHX Text
AutoCAD SHX Text A-9
AutoCAD SHX Text NOTE: ALL SYMBOLS MAY NOT BE USED ON ALL SHEETS ALL ROOF EQUIPMENT AND ACCESSORIES NOTED ARE EXISTING TO REMAIN, UNLESS NOTED OTHERWISE
AutoCAD SHX Text
AutoCAD SHX Text Revisions
AutoCAD SHX Text Date
AutoCAD SHX Text Drawing Title
AutoCAD SHX Text Location
AutoCAD SHX Text DWG. Of
AutoCAD SHX Text Building Number
AutoCAD SHX Text Project Title
AutoCAD SHX Text Checked
AutoCAD SHX Text
DRAWING #
AutoCAD SHX Text Project No.
AutoCAD SHX Text Drawn
AutoCAD SHX Text Date
AutoCAD SHX Text
HAMPTON VIRGINIA
AutoCAD SHX Text 03-15-2020
AutoCAD SHX Text 590-19-101
AutoCAD SHX Text
AutoCAD SHX Text one-quarter inch = one foot
AutoCAD SHX Text one-eighth inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text F
AutoCAD SHX Text three-eighths inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text one-half inch = one foot
AutoCAD SHX Text E
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text one and one-half inches = one foot
AutoCAD SHX Text one inch = one foot
AutoCAD SHX Text three-quarters inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text D
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text C
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text B
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text three inches = one foot
AutoCAD SHX Text
AutoCAD SHX Text A
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text F
AutoCAD SHX Text E
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text D
AutoCAD SHX Text C
AutoCAD SHX Text B
AutoCAD SHX Text
AutoCAD SHX Text A
JEH
± 20'-8" ± 43'-6"
± 25'-2" ± 39'-0"
± 38'-0" ± 39'-6"
± 19'-9"± 18'-9"
± 38'-6"
± 19'-6"± 19'-6"
± 39'-0"
± 64'-2" ± 39'-0"
± 77'-6"
135A
135B
168A
110B
110C 110D
110M
110S
110T
110K
110J
110F
ARCH NORTH
110O
110R
110G
110E1 110E
± 15'-0"
± 22'-0"
± 11'-0"
NOTE: TENSION ROD
SUPPORT STRUCTURE
TO REMAIN
NOTE: ELECTRICAL CURB
TO BE REMOVED
NOTE: GRAVEL SURFACED ROOF
CLOGGED ROOF DRAIN
NOTE: COPPER SCUPPER
TO REMAIN, TYP OF 3
CONDENSER ON LOOSE LAID CONCRETE CURB
CONDENSER ON LOOSE LAID CONCRETE CURB
NOTE: HVAC LINE SETS TO WALL
PENETRATION; SETS NOT SHOWN HERE FOR
CLARITY
ELEVATED COOLING
TOWER STRUCTURE
INSULATED
PIPE TO ROOF
ABOVE
HVAC LINE SET TO PITCH POCKET
HVAC LINE SET TO
PITCH POCKET
ROOF ACCESS POINT &
SITE BUILT PLATFORM
LANDING
CURB BELOW
CROSSOVER STAIR ON
PITCH POCKETS
EF EF
PITCH POCKET
BELOW
CONDUIT ON WALL
NOTE: HVAC LINE
SETS TO WALL
PENETRATION;
SETS NOT
SHOWN HERE
FOR CLARITY
DUCT ON WOOD
SLEEPERS
NOTE: GRAVEL SURFACED ROOF
NOTE: ELEVATION OF ROOF 110
D -2'-6" (+/-) BELOW 110 C; NO
DIRECT ACCESS
NOTE: GRAVEL SURFACED ROOF
NOTE: GRAVEL
SURFACED ROOF
NOTE: GRAVEL SURFACED ROOF
NOTE: GRAVEL SURFACED ROOF
NOTE: MINERAL SURFACE ROOF
ADJACENT BUILDING
NOTE: ACCESS
FROM DOOR ON
ADJACENT ROOF,
BUILDING 110 F
ROOF ACCESS VIA
PORTABLE LADDER
ROOF ACCESS VIA
PORTABLE LADDER
ROOF ACCESS VIA
PORTABLE LADDER
NOTE: ASBESTOS CONTAINING MATERIAL, SEE
HAZARDOUS MATERIALS REPORT: ALL WALL
FLASHING
NOTE: AREAS OF
VEGETATION TO BE
REMOVED
D-2
ROOF REPLACEMENT
HAMPTON
DEPARTMENT OF VETERANS AFFAIRS
ROOF EVALUATION and DESIGN CONSULTANTS, INC.
PHONE: 757-869-0345
HAMPTON, VIRGINIA 23669
8 BLACKWATER LANE
AVETECH DESIGN GROUP PLC
PHONE: 757-389-5518
CHESAPEAKE, VIRGINIA 23322
123 BRUTON COURT, SUITE 100
NOT FOR CONSTRUCTION
BLDGS 15, 110, 116, 135, 137D, & 168
JEHCFM
DEMOLITION PLAN -
BUILDING 168 A & 110 B
110 & 168
C, D, E, & E1
AutoCAD SHX Text
DEMOLITION NOTES
AutoCAD SHX Text
GENERAL NOTES
AutoCAD SHX Text
KEY PLAN
AutoCAD SHX Text
SCALE: 1/8" = 1' - 0"
AutoCAD SHX Text
AutoCAD SHX Text D-2
AutoCAD SHX Text
ROOF DEMOLITION PLAN - BUILDING 168 A
AutoCAD SHX Text
SCALE: 1/8" = 1' - 0"
AutoCAD SHX Text
AutoCAD SHX Text D-2
AutoCAD SHX Text
ROOF DEMOLITION PLAN - BUILDING 110 C & D
AutoCAD SHX Text
SCALE: 1/8" = 1' - 0"
AutoCAD SHX Text
AutoCAD SHX Text D-2
AutoCAD SHX Text
ROOF DEMOLITION PLAN - BUILDING 110 B
AutoCAD SHX Text P.C.
AutoCAD SHX Text P.C.
AutoCAD SHX Text
1. DIMENSIONS ARE APPROXIMATE. CONTRACTOR IS RESPONSIBLE FOR VERIFICATION OF ALL FIELD SIZE AND LOCATION MEASUREMENTS FOR ALL EXISTING EQUIPMENT, CURBS, DECK PENETRATIONS, DRAINS, AND OTHER ITEMS. DIMENSIONS ARE APPROXIMATE. CONTRACTOR IS RESPONSIBLE FOR VERIFICATION OF ALL FIELD SIZE AND LOCATION MEASUREMENTS FOR ALL EXISTING EQUIPMENT, CURBS, DECK PENETRATIONS, DRAINS, AND OTHER ITEMS. 2. WHEN RAISING EQUIPMENT, ALL MECHANICAL, ELECTRICAL, NATURAL GAS, AND PLUMBING DISCONNECTS AND RECONNECTS SHALL BE PERFORMED BY LICENSED TRADE PROFESSIONALS AS SUPPLIED BY THE CONTRACTOR AT THE CONTRACTORS EXPENSE. WHEN RAISING EQUIPMENT, ALL MECHANICAL, ELECTRICAL, NATURAL GAS, AND PLUMBING DISCONNECTS AND RECONNECTS SHALL BE PERFORMED BY LICENSED TRADE PROFESSIONALS AS SUPPLIED BY THE CONTRACTOR AT THE CONTRACTORS EXPENSE. 3. ALL WORK TO BE PERFORMED PER SPECIFICATIONS AND DETAILS, AND IN ACCORDANCE WITH MOST CURRENT ADOPTED CODES: NFPA 101 (LIFE SAFETY CODE) AND REFERENCED STANDARDS; IBC 2018 AND REFERENCED STANDARDS; AND NFPA ALL WORK TO BE PERFORMED PER SPECIFICATIONS AND DETAILS, AND IN ACCORDANCE WITH MOST CURRENT ADOPTED CODES: NFPA 101 (LIFE SAFETY CODE) AND REFERENCED STANDARDS; IBC 2018 AND REFERENCED STANDARDS; AND NFPA NATIONAL FIRE CODES (EXCLUDING NFPA 5000 & NFPA 900); AND ASCE 7-16 4. CONTRACTOR SHALL NOT REMOVE ANY MORE ROOFING THAN CAN BE PUT BACK IN ANY GIVEN DAY. PHASE ROOFING IS NOT ACCEPTABLE FOR ANY REASON. ALL NIGHT SEALS SHALL BE PERFORMED PER NRCA AND MANUFACTURER'S REQUIREMENTS. CONTRACTOR SHALL NOT REMOVE ANY MORE ROOFING THAN CAN BE PUT BACK IN ANY GIVEN DAY. PHASE ROOFING IS NOT ACCEPTABLE FOR ANY REASON. ALL NIGHT SEALS SHALL BE PERFORMED PER NRCA AND MANUFACTURER'S REQUIREMENTS. 5. "ITEMS TO BE REMOVED" IS DEFINED AS: DETACH ITEMS FROM EXISTING CONSTRUCTION AND LEGALLY DISPOSE OF THEM OFF-SITE, UNLESS INDICATED TO BE REMOVED AND SALVAGED OR REMOVED AND REINSTALLED. "ITEMS TO BE REMOVED" IS DEFINED AS: DETACH ITEMS FROM EXISTING CONSTRUCTION AND LEGALLY DISPOSE OF THEM OFF-SITE, UNLESS INDICATED TO BE REMOVED AND SALVAGED OR REMOVED AND REINSTALLED. 6. "ITEMS TO BE REMOVED AND SALVAGED" IS DEFINED AS: DETACH ITEMS FROM EXISTING CONSTRUCTION AND DELIVER THEM TO OWNER. "ITEMS TO BE REMOVED AND SALVAGED" IS DEFINED AS: DETACH ITEMS FROM EXISTING CONSTRUCTION AND DELIVER THEM TO OWNER. 7. "ITEMS TO BE REMOVED AND REINSTALLED" IS DEFINED AS: DETACH ITEMS FROM EXISTING CONSTRUCTION, PREPARE THEM FOR REUSE, AND REINSTALL THEM WHERE INDICATED. "ITEMS TO BE REMOVED AND REINSTALLED" IS DEFINED AS: DETACH ITEMS FROM EXISTING CONSTRUCTION, PREPARE THEM FOR REUSE, AND REINSTALL THEM WHERE INDICATED. 8. "ITEMS TO REMAIN" IS DEFINED AS: EXISTING ITEMS OF CONSTRUCTION THAT ARE NOT TO BE REMOVED AND THAT ARE NOT OTHERWISE INDICATED TO BE REMOVED, REMOVED AND SALVAGED, OR REMOVED AND REINSTALLED. "ITEMS TO REMAIN" IS DEFINED AS: EXISTING ITEMS OF CONSTRUCTION THAT ARE NOT TO BE REMOVED AND THAT ARE NOT OTHERWISE INDICATED TO BE REMOVED, REMOVED AND SALVAGED, OR REMOVED AND REINSTALLED. 9. CONTRACTOR IS RESPONSIBLE FOR ALL ITEMS ON ALL ROOFS INCLUDING HVAC, SATELLITE EQUIPMENT, VTR FANS, LIGHTNING PROTECTION AND ALL NOT SPECIFICALLY INDICATED ON PLANS. CONTRACTOR IS RESPONSIBLE FOR ALL ITEMS ON ALL ROOFS INCLUDING HVAC, SATELLITE EQUIPMENT, VTR FANS, LIGHTNING PROTECTION AND ALL NOT SPECIFICALLY INDICATED ON PLANS. 10. REMOVE ALL ABANDONED EQUIPMENT, SUPPORTS, PIPES, ANTENNAS AND OTHER EQUIPMENT NOT IN USE. CONFIRM ABANDONED ITEMS WITH COR PRIOR TO REMOVAL. REMOVE ALL ABANDONED EQUIPMENT, SUPPORTS, PIPES, ANTENNAS AND OTHER EQUIPMENT NOT IN USE. CONFIRM ABANDONED ITEMS WITH COR PRIOR TO REMOVAL. 11. REMOVE FLASHING NECESSARY FOR INSTALLATION OF NEW ROOF SYSTEM.REMOVE FLASHING NECESSARY FOR INSTALLATION OF NEW ROOF SYSTEM.
AutoCAD SHX Text D1. CONTRACTOR SHALL REMOVE ALL ROOF GRAVEL, ROOF FLASHINGS, PITCH POCKETS, EDGE, FASCIA AND CAP METALS, FASTENERS, AND ASSOCIATED ROOF AND DRAIN FLASHING MATERIALS. REMOVE ALL FOREIGN PLANT MATTER AND VEGETATION AS CONTRACTOR SHALL REMOVE ALL ROOF GRAVEL, ROOF FLASHINGS, PITCH POCKETS, EDGE, FASCIA AND CAP METALS, FASTENERS, AND ASSOCIATED ROOF AND DRAIN FLASHING MATERIALS. REMOVE ALL FOREIGN PLANT MATTER AND VEGETATION AS REQUIRED FOR NEW WORK. ALL ROOFING RELATED MATERIALS SHALL BE PROPERLY DISPOSED OF DAILY. CONTRACTOR SHALL VACUUM ALL ROOF AREAS PRIOR TO ROOFING SYSTEM INSTALLATION. D2. HAZARDOUS WASTE NOT IN USE MUST BE STORED IN SECURE LOCATION IN REMOTE LAYDOWN AREA. ITEMS CANNOT BE STORED AT BUILDING. HAZARDOUS WASTE NOT IN USE MUST BE STORED IN SECURE LOCATION IN REMOTE LAYDOWN AREA. ITEMS CANNOT BE STORED AT BUILDING. D3. CONTRACTOR TO SET UP AND MAINTAIN TEMPORARY GUARDS AT EDGE OF ROOF WHERE WORK IS BEING PERFORMED AND ALL PERSONNEL WEAR PROPER SAFETY DEVICES/FALL PROTECTION PER OSHA. STANDARDS. CONTRACTOR TO SET UP AND MAINTAIN TEMPORARY GUARDS AT EDGE OF ROOF WHERE WORK IS BEING PERFORMED AND ALL PERSONNEL WEAR PROPER SAFETY DEVICES/FALL PROTECTION PER OSHA. STANDARDS. D4. DUMPSTER AND TRASH CHUTE LOCATIONS ARE TO BE COORDINATED WITH THE COR PRIOR TO LOCATION ON SITE. DUMPSTER AND TRASH CHUTE LOCATIONS ARE TO BE COORDINATED WITH THE COR PRIOR TO LOCATION ON SITE. D5. CONTRACTOR SHALL PREPARE A PLAN SHOWING LAYDOWN AREA, SECURITY FENCE, DUMPSTER LOCATION, SCAFFOLDING AND ACCESS FOR COR REVIEW AND APPROVAL. CONTRACTOR SHALL PREPARE A PLAN SHOWING LAYDOWN AREA, SECURITY FENCE, DUMPSTER LOCATION, SCAFFOLDING AND ACCESS FOR COR REVIEW AND APPROVAL. D6. CONTRACTOR SHALL INSPECT AND SECURE ALL SCAFFOLDING AND PROTECTIVE MEASURES DAILY TO ENSURE IT COMPLIES WITH ALL OSHA REQUIREMENTS. CONTRACTOR SHALL INSPECT AND SECURE ALL SCAFFOLDING AND PROTECTIVE MEASURES DAILY TO ENSURE IT COMPLIES WITH ALL OSHA REQUIREMENTS.
AutoCAD SHX Text
SCALE: 1/8" = 1' - 0"
AutoCAD SHX Text
AutoCAD SHX Text D-2
AutoCAD SHX Text
ROOF DEMOLITION PLAN - BUILDING 110 E1 & E
AutoCAD SHX Text
VENT PIPE
AutoCAD SHX Text
OVERFLOW SCUPPER
AutoCAD SHX Text
ROOF DRAIN
AutoCAD SHX Text
PLAN LEGEND:
AutoCAD SHX Text
ROOF HATCH
AutoCAD SHX Text
OBSOLETE CURB TO BE REMOVED
AutoCAD SHX Text
OBSOLETE SLEEPER TO BE REMOVED
AutoCAD SHX Text
OBSOLETE PIPE TO BE REMOVED
AutoCAD SHX Text
VENTILATOR
AutoCAD SHX Text
PITCH POCKET
AutoCAD SHX Text
HVAC ON SLEEPER CURB
AutoCAD SHX Text
EXPANSION JOINT
AutoCAD SHX Text
CONDUIT ON WOOD SLEEPERS
AutoCAD SHX Text
CHIMNEY
AutoCAD SHX Text
EXHAUST FAN ON ROOF CURB
AutoCAD SHX Text
EF
AutoCAD SHX Text
PIPE CURB
AutoCAD SHX Text
PC
AutoCAD SHX Text
AIR HANDLER
AutoCAD SHX Text
AH
AutoCAD SHX Text
DETAIL NUMBER
AutoCAD SHX Text
SHEET WHERE DRAWN
AutoCAD SHX Text
AutoCAD SHX Text A-9
AutoCAD SHX Text NOTE: ALL SYMBOLS MAY NOT BE USED ON ALL SHEETS ALL ROOF EQUIPMENT AND ACCESSORIES NOTED ARE EXISTING TO REMAIN, UNLESS NOTED OTHERWISE
AutoCAD SHX Text Revisions
AutoCAD SHX Text Date
AutoCAD SHX Text Drawing Title
AutoCAD SHX Text Location
AutoCAD SHX Text DWG. Of
AutoCAD SHX Text Building Number
AutoCAD SHX Text Project Title
AutoCAD SHX Text Checked
AutoCAD SHX Text
DRAWING #
AutoCAD SHX Text Project No.
AutoCAD SHX Text Drawn
AutoCAD SHX Text Date
AutoCAD SHX Text
HAMPTON VIRGINIA
AutoCAD SHX Text 03-15-2020
AutoCAD SHX Text 590-19-101
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text one-quarter inch = one foot
AutoCAD SHX Text one-eighth inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text F
AutoCAD SHX Text three-eighths inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text one-half inch = one foot
AutoCAD SHX Text E
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text one and one-half inches = one foot
AutoCAD SHX Text one inch = one foot
AutoCAD SHX Text three-quarters inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text D
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text C
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text B
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text three inches = one foot
AutoCAD SHX Text
AutoCAD SHX Text A
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text F
AutoCAD SHX Text E
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text D
AutoCAD SHX Text C
AutoCAD SHX Text B
AutoCAD SHX Text
AutoCAD SHX Text A
± 19'-2"± 33'-9"
± 52'-11"
ABANDONED
ROOF CURB
COPPER ROOF CURB
W/ VENTILATOR
CHIMNEY; TOP
SLAB IS CRACKED
ROOF ACCESS
LADDER
± 45'-10"
HVAC UNIT ON
ROTTEN WOOD
SLEEPERS; DEMO
SLEEPERS
SATELITE DISH ON
ROTTEN WOOD
SLEEPERS
CONCRETE SLABS
ON ROOF SURFACE
FOR ANTENNA
SUPPORT
SATELITE DISH ON
CONCRETE
MASONRY UNITS
BUILDING WALL
± 45'-6"
± 19'-2" ± 33'-9"
± 52'-11"
± 26'-8" ± 7'-8"
± 42'-0"
± 7'-8"
135A
135B
168A
110B
110C 110D
110M
110S
110T
110K
110J
110F
ARCH NORTH
110O
110R
110G
110E1 110E
± 18'-10"
NOTE: GRAVEL
SURFACED ROOF
NOTE: GRAVEL
SURFACED ROOF
NOTE: GRAVEL
SURFACED ROOF
NOTE: GRAVEL
SURFACED ROOF
ROOF ACCESS POINT
ROOF ACCESS POINT
NOTE: MINERAL
SURFACED ROOF
NOTE: MINERAL
SURFACED ROOF
ROOF ACCESS VIA
PORTABLE LADDER
ROOF ACCESS VIA
ADJACENT MECHANICAL
ROOM WINDOW
ROOF ACCESS VIA
PORTABLE LADDER
NOTE: ASBESTOS
CONTAINING MATERIAL,
SEE HAZARDOUS
MATERIALS REPORT:
ROOF DRAIN NOTE: ASBESTOS
CONTAINING MATERIAL,
SEE HAZARDOUS
MATERIALS REPORT:
ROOF DRAIN
D-3
ROOF REPLACEMENT
HAMPTON
DEPARTMENT OF VETERANS AFFAIRS
ROOF EVALUATION and DESIGN CONSULTANTS, INC.
PHONE: 757-869-0345
HAMPTON, VIRGINIA 23669
8 BLACKWATER LANE
AVETECH DESIGN GROUP PLC
PHONE: 757-389-5518
CHESAPEAKE, VIRGINIA 23322
123 BRUTON COURT, SUITE 100
NOT FOR CONSTRUCTION
BLDGS 15, 110, 116, 135, 137D, & 168
JEHCFM
DEMOLITION PLAN -
BUILDING 110 F, J, K, M, & O
AutoCAD SHX Text
DEMOLITION NOTES
AutoCAD SHX Text
GENERAL NOTES
AutoCAD SHX Text
KEY PLAN
AutoCAD SHX Text A.H.
AutoCAD SHX Text
SCALE: 1/8" = 1' - 0"
AutoCAD SHX Text
AutoCAD SHX Text D-3
AutoCAD SHX Text
ROOF DEMOLITION PLAN - BUILDING 110 F
AutoCAD SHX Text
SCALE: 1/8" = 1' - 0"
AutoCAD SHX Text
AutoCAD SHX Text D-3
AutoCAD SHX Text
ROOF DEMOLITION PLAN - BUILDING 110 J
AutoCAD SHX Text
SCALE: 1/8" = 1' - 0"
AutoCAD SHX Text
AutoCAD SHX Text D-3
AutoCAD SHX Text
ROOF DEMOLITION PLAN - BUILDING 110 K
AutoCAD SHX Text
SCALE: 1/8" = 1' - 0"
AutoCAD SHX Text
AutoCAD SHX Text D-3
AutoCAD SHX Text
ROOF DEMOLITION PLAN - BUILDING 110 M
AutoCAD SHX Text
SCALE: 1/8" = 1' - 0"
AutoCAD SHX Text
AutoCAD SHX Text D-3
AutoCAD SHX Text
ROOF DEMOLITION PLAN - BUILDING 110 O
AutoCAD SHX Text
1. DIMENSIONS ARE APPROXIMATE. CONTRACTOR IS RESPONSIBLE FOR VERIFICATION OF ALL FIELD SIZE AND LOCATION MEASUREMENTS FOR ALL EXISTING EQUIPMENT, CURBS, DECK PENETRATIONS, DRAINS, AND OTHER ITEMS. DIMENSIONS ARE APPROXIMATE. CONTRACTOR IS RESPONSIBLE FOR VERIFICATION OF ALL FIELD SIZE AND LOCATION MEASUREMENTS FOR ALL EXISTING EQUIPMENT, CURBS, DECK PENETRATIONS, DRAINS, AND OTHER ITEMS. 2. WHEN RAISING EQUIPMENT, ALL MECHANICAL, ELECTRICAL, NATURAL GAS, AND PLUMBING DISCONNECTS AND RECONNECTS SHALL BE PERFORMED BY LICENSED TRADE PROFESSIONALS AS SUPPLIED BY THE CONTRACTOR AT THE CONTRACTORS EXPENSE. WHEN RAISING EQUIPMENT, ALL MECHANICAL, ELECTRICAL, NATURAL GAS, AND PLUMBING DISCONNECTS AND RECONNECTS SHALL BE PERFORMED BY LICENSED TRADE PROFESSIONALS AS SUPPLIED BY THE CONTRACTOR AT THE CONTRACTORS EXPENSE. 3. ALL WORK TO BE PERFORMED PER SPECIFICATIONS AND DETAILS, AND IN ACCORDANCE WITH MOST CURRENT ADOPTED CODES: NFPA 101 (LIFE SAFETY CODE) AND REFERENCED STANDARDS; IBC 2018 AND REFERENCED STANDARDS; AND NFPA ALL WORK TO BE PERFORMED PER SPECIFICATIONS AND DETAILS, AND IN ACCORDANCE WITH MOST CURRENT ADOPTED CODES: NFPA 101 (LIFE SAFETY CODE) AND REFERENCED STANDARDS; IBC 2018 AND REFERENCED STANDARDS; AND NFPA NATIONAL FIRE CODES (EXCLUDING NFPA 5000 & NFPA 900); AND ASCE 7-16 4. CONTRACTOR SHALL NOT REMOVE ANY MORE ROOFING THAN CAN BE PUT BACK IN ANY GIVEN DAY. PHASE ROOFING IS NOT ACCEPTABLE FOR ANY REASON. ALL NIGHT SEALS SHALL BE PERFORMED PER NRCA AND MANUFACTURER'S REQUIREMENTS. CONTRACTOR SHALL NOT REMOVE ANY MORE ROOFING THAN CAN BE PUT BACK IN ANY GIVEN DAY. PHASE ROOFING IS NOT ACCEPTABLE FOR ANY REASON. ALL NIGHT SEALS SHALL BE PERFORMED PER NRCA AND MANUFACTURER'S REQUIREMENTS. 5. "ITEMS TO BE REMOVED" IS DEFINED AS: DETACH ITEMS FROM EXISTING CONSTRUCTION AND LEGALLY DISPOSE OF THEM OFF-SITE, UNLESS INDICATED TO BE REMOVED AND SALVAGED OR REMOVED AND REINSTALLED. "ITEMS TO BE REMOVED" IS DEFINED AS: DETACH ITEMS FROM EXISTING CONSTRUCTION AND LEGALLY DISPOSE OF THEM OFF-SITE, UNLESS INDICATED TO BE REMOVED AND SALVAGED OR REMOVED AND REINSTALLED. 6. "ITEMS TO BE REMOVED AND SALVAGED" IS DEFINED AS: DETACH ITEMS FROM EXISTING CONSTRUCTION AND DELIVER THEM TO OWNER. "ITEMS TO BE REMOVED AND SALVAGED" IS DEFINED AS: DETACH ITEMS FROM EXISTING CONSTRUCTION AND DELIVER THEM TO OWNER. 7. "ITEMS TO BE REMOVED AND REINSTALLED" IS DEFINED AS: DETACH ITEMS FROM EXISTING CONSTRUCTION, PREPARE THEM FOR REUSE, AND REINSTALL THEM WHERE INDICATED. "ITEMS TO BE REMOVED AND REINSTALLED" IS DEFINED AS: DETACH ITEMS FROM EXISTING CONSTRUCTION, PREPARE THEM FOR REUSE, AND REINSTALL THEM WHERE INDICATED. 8. "ITEMS TO REMAIN" IS DEFINED AS: EXISTING ITEMS OF CONSTRUCTION THAT ARE NOT TO BE REMOVED AND THAT ARE NOT OTHERWISE INDICATED TO BE REMOVED, REMOVED AND SALVAGED, OR REMOVED AND REINSTALLED. "ITEMS TO REMAIN" IS DEFINED AS: EXISTING ITEMS OF CONSTRUCTION THAT ARE NOT TO BE REMOVED AND THAT ARE NOT OTHERWISE INDICATED TO BE REMOVED, REMOVED AND SALVAGED, OR REMOVED AND REINSTALLED. 9. CONTRACTOR IS RESPONSIBLE FOR ALL ITEMS ON ALL ROOFS INCLUDING HVAC, SATELLITE EQUIPMENT, VTR FANS, LIGHTNING PROTECTION AND ALL NOT SPECIFICALLY INDICATED ON PLANS. CONTRACTOR IS RESPONSIBLE FOR ALL ITEMS ON ALL ROOFS INCLUDING HVAC, SATELLITE EQUIPMENT, VTR FANS, LIGHTNING PROTECTION AND ALL NOT SPECIFICALLY INDICATED ON PLANS. 10. REMOVE ALL ABANDONED EQUIPMENT, SUPPORTS, PIPES, ANTENNAS AND OTHER EQUIPMENT NOT IN USE. CONFIRM ABANDONED ITEMS WITH COR PRIOR TO REMOVAL. REMOVE ALL ABANDONED EQUIPMENT, SUPPORTS, PIPES, ANTENNAS AND OTHER EQUIPMENT NOT IN USE. CONFIRM ABANDONED ITEMS WITH COR PRIOR TO REMOVAL. 11. REMOVE FLASHING NECESSARY FOR INSTALLATION OF NEW ROOF SYSTEM.REMOVE FLASHING NECESSARY FOR INSTALLATION OF NEW ROOF SYSTEM.
AutoCAD SHX Text D1. CONTRACTOR SHALL REMOVE ALL ROOF GRAVEL, ROOF FLASHINGS, PITCH POCKETS, EDGE, FASCIA AND CAP METALS, FASTENERS, AND ASSOCIATED ROOF AND DRAIN FLASHING MATERIALS. REMOVE ALL FOREIGN PLANT MATTER AND VEGETATION AS CONTRACTOR SHALL REMOVE ALL ROOF GRAVEL, ROOF FLASHINGS, PITCH POCKETS, EDGE, FASCIA AND CAP METALS, FASTENERS, AND ASSOCIATED ROOF AND DRAIN FLASHING MATERIALS. REMOVE ALL FOREIGN PLANT MATTER AND VEGETATION AS REQUIRED FOR NEW WORK. ALL ROOFING RELATED MATERIALS SHALL BE PROPERLY DISPOSED OF DAILY. CONTRACTOR SHALL VACUUM ALL ROOF AREAS PRIOR TO ROOFING SYSTEM INSTALLATION. D2. HAZARDOUS WASTE NOT IN USE MUST BE STORED IN SECURE LOCATION IN REMOTE LAYDOWN AREA. ITEMS CANNOT BE STORED AT BUILDING. HAZARDOUS WASTE NOT IN USE MUST BE STORED IN SECURE LOCATION IN REMOTE LAYDOWN AREA. ITEMS CANNOT BE STORED AT BUILDING. D3. CONTRACTOR TO SET UP AND MAINTAIN TEMPORARY GUARDS AT EDGE OF ROOF WHERE WORK IS BEING PERFORMED AND ALL PERSONNEL WEAR PROPER SAFETY DEVICES/FALL PROTECTION PER OSHA. STANDARDS. CONTRACTOR TO SET UP AND MAINTAIN TEMPORARY GUARDS AT EDGE OF ROOF WHERE WORK IS BEING PERFORMED AND ALL PERSONNEL WEAR PROPER SAFETY DEVICES/FALL PROTECTION PER OSHA. STANDARDS. D4. DUMPSTER AND TRASH CHUTE LOCATIONS ARE TO BE COORDINATED WITH THE COR PRIOR TO LOCATION ON SITE. DUMPSTER AND TRASH CHUTE LOCATIONS ARE TO BE COORDINATED WITH THE COR PRIOR TO LOCATION ON SITE. D5. CONTRACTOR SHALL PREPARE A PLAN SHOWING LAYDOWN AREA, SECURITY FENCE, DUMPSTER LOCATION, SCAFFOLDING AND ACCESS FOR COR REVIEW AND APPROVAL. CONTRACTOR SHALL PREPARE A PLAN SHOWING LAYDOWN AREA, SECURITY FENCE, DUMPSTER LOCATION, SCAFFOLDING AND ACCESS FOR COR REVIEW AND APPROVAL. D6. CONTRACTOR SHALL INSPECT AND SECURE ALL SCAFFOLDING AND PROTECTIVE MEASURES DAILY TO ENSURE IT COMPLIES WITH ALL OSHA REQUIREMENTS. CONTRACTOR SHALL INSPECT AND SECURE ALL SCAFFOLDING AND PROTECTIVE MEASURES DAILY TO ENSURE IT COMPLIES WITH ALL OSHA REQUIREMENTS.
AutoCAD SHX Text
SCALE: 1/8" = 1' - 0"
AutoCAD SHX Text
AutoCAD SHX Text D-3
AutoCAD SHX Text
ROOF DEMOLITION PLAN - BUILDING 110 G
AutoCAD SHX Text
VENT PIPE
AutoCAD SHX Text
OVERFLOW SCUPPER
AutoCAD SHX Text
ROOF DRAIN
AutoCAD SHX Text
PLAN LEGEND:
AutoCAD SHX Text
ROOF HATCH
AutoCAD SHX Text
OBSOLETE CURB TO BE REMOVED
AutoCAD SHX Text
OBSOLETE SLEEPER TO BE REMOVED
AutoCAD SHX Text
OBSOLETE PIPE TO BE REMOVED
AutoCAD SHX Text
VENTILATOR
AutoCAD SHX Text
PITCH POCKET
AutoCAD SHX Text
HVAC ON SLEEPER CURB
AutoCAD SHX Text
EXPANSION JOINT
AutoCAD SHX Text
CONDUIT ON WOOD SLEEPERS
AutoCAD SHX Text
CHIMNEY
AutoCAD SHX Text
EXHAUST FAN ON ROOF CURB
AutoCAD SHX Text
EF
AutoCAD SHX Text
PIPE CURB
AutoCAD SHX Text
PC
AutoCAD SHX Text
AIR HANDLER
AutoCAD SHX Text
AH
AutoCAD SHX Text
DETAIL NUMBER
AutoCAD SHX Text
SHEET WHERE DRAWN
AutoCAD SHX Text
AutoCAD SHX Text A-9
AutoCAD SHX Text NOTE: ALL SYMBOLS MAY NOT BE USED ON ALL SHEETS ALL ROOF EQUIPMENT AND ACCESSORIES NOTED ARE EXISTING TO REMAIN, UNLESS NOTED OTHERWISE
AutoCAD SHX Text Revisions
AutoCAD SHX Text Date
AutoCAD SHX Text Drawing Title
AutoCAD SHX Text Location
AutoCAD SHX Text DWG. Of
AutoCAD SHX Text Building Number
AutoCAD SHX Text Project Title
AutoCAD SHX Text Checked
AutoCAD SHX Text
DRAWING #
AutoCAD SHX Text Project No.
AutoCAD SHX Text Drawn
AutoCAD SHX Text Date
AutoCAD SHX Text
HAMPTON VIRGINIA
AutoCAD SHX Text 03-15-2020
AutoCAD SHX Text 590-19-101
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text one-quarter inch = one foot
AutoCAD SHX Text one-eighth inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text F
AutoCAD SHX Text three-eighths inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text one-half inch = one foot
AutoCAD SHX Text E
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text one and one-half inches = one foot
AutoCAD SHX Text one inch = one foot
AutoCAD SHX Text three-quarters inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text D
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text C
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text B
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text three inches = one foot
AutoCAD SHX Text
AutoCAD SHX Text A
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text F
AutoCAD SHX Text E
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text D
AutoCAD SHX Text C
AutoCAD SHX Text B
AutoCAD SHX Text
AutoCAD SHX Text A
168A
110B
110C 110D
110M
110S
110T
110K
110J
110F
ARCH NORTH
110O
110R
110G
110E1 110E
± 19'-6" ± 19'-6"
± 39'-0"
± 39'-7" ± 38'-0"
± 77'-7"
± 19'-9" ± 18'-9" ± 39'-1"
NOTE: OVERHEAD DUCTWORK
SHOWN DASHED, FOR REFERENCE
NOTE: GRAVEL SURFACED ROOF
NOTE: COPPER SCUPPER
TO REMAIN, TYP OF 3
COOLING
TOWER
ROOF ACCESS POINT &
LANDING
HVAC ELEVATED
MAINTENANCE WALKWAY
INSULATED PIPE TO ROOF
ABOVE (5)
PITCH POCKET & EQUIPMENT
SUPPORT STRUCTURE, TYP
NOTE: GRAVEL
SURFACED ROOF
NOTE: ELEVATION
OF ROOF -2'-6" (+/-)
BELOW 110 S; NO
DIRECT ACCESS
PITCH POCKET & EQUIPMENT
SUPPORT STRUCTURE, TYP
NOTE: GRAVEL
SURFACED ROOF
NOTE: ACCESS FROM
DOOR ON ADJACENT
ROOF, BUILDING 110 O
NOTE: AREAS OF VEGETATION
TO BE REMOVED
D-4
ROOF REPLACEMENT
HAMPTON
DEPARTMENT OF VETERANS AFFAIRS
ROOF EVALUATION and DESIGN CONSULTANTS, INC.
PHONE: 757-869-0345
HAMPTON, VIRGINIA 23669
8 BLACKWATER LANE
AVETECH DESIGN GROUP PLC
PHONE: 757-389-5518
CHESAPEAKE, VIRGINIA 23322
123 BRUTON COURT, SUITE 100
NOT FOR CONSTRUCTION
BLDGS 15, 110, 116, 135, 137D, & 168
JEHCFM
DEMOLITION PLAN -
BUILDING 110 R, S, & T
AutoCAD SHX Text
SCALE: 1/8" = 1' - 0"
AutoCAD SHX Text
AutoCAD SHX Text D-4
AutoCAD SHX Text
ROOF DEMOLITION PLAN - BUILDING 110 S & T
AutoCAD SHX Text
DEMOLITION NOTES
AutoCAD SHX Text
GENERAL NOTES
AutoCAD SHX Text
KEY PLAN
AutoCAD SHX Text
SCALE: 1/8" = 1' - 0"
AutoCAD SHX Text
AutoCAD SHX Text D-4
AutoCAD SHX Text
ROOF DEMOLITION PLAN - BUILDING 110 R
AutoCAD SHX Text
1. DIMENSIONS ARE APPROXIMATE. CONTRACTOR IS RESPONSIBLE FOR VERIFICATION OF ALL FIELD SIZE AND LOCATION MEASUREMENTS FOR ALL EXISTING EQUIPMENT, CURBS, DECK PENETRATIONS, DRAINS, AND OTHER ITEMS. DIMENSIONS ARE APPROXIMATE. CONTRACTOR IS RESPONSIBLE FOR VERIFICATION OF ALL FIELD SIZE AND LOCATION MEASUREMENTS FOR ALL EXISTING EQUIPMENT, CURBS, DECK PENETRATIONS, DRAINS, AND OTHER ITEMS. 2.