This document provides details for a federal solicitation to renovate electrical and telecommunications closets. The solicitation was issued by the Department of Veterans Affairs Technology Acquisition Center Austin, with number 36C77622B0036, for work at 109 Bee Street in Charleston, South Carolina. The scope of work involves renovating electrical and telecommunication closets, as described on pages 1 through 4 of the solicitation documentation. Interested parties should respond by the specified deadline in order to be considered for award, which is expected to occur on the listed date following evaluation of submissions.
View the file
Other files
Show all 24
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
BASELINE ASBESTOS INSPECTION REPORT
LOCATION:
RALPH H. JOHNSON VA HEALTHCARE SYSTEM
CHARLESTON, SC MEDICAL CENTER
109 BEE STREET
CHARLESTON, SC 29401
CONTRACT NO.: 36C24721P1334
INSPECTION DATES:
NOVEMBER 15-17, 2021
PRIME CONTRACTOR:
CASTLE HILL ASSOCIATES, LLC
1197 FARNSWORTH RD., SUITE E
WATERVILLE, OH 43566
567-952-0212
RALPH H. JOHNSON VA HEALTHCARE SYSTEM - CHARLESTON, SC
ASBESTOS BASELINE INSPECTION REPORT
NOVEMBER 2021
TABLE OF CONTENTS
1.0 ASBESTOS INSPECTION REPORT
• Table 1 – List of Acronyms
• Table 2 - Removal Priority Protocols
2.0 APPENDICES
Appendix A – Asbestos Sampling Data
Appendix B – Asbestos Quantities, Assessments, & Abatement Cost Estimates
Appendix C – Photographs of Asbestos Materials
Appendix D – Asbestos Material Locations and Sample Location Drawings
Appendix E – Asbestos Laboratory Reports
Appendix F - Inspector Certifications
Appendix G - Lab Certifications
Appendix H – O&M Plan (Operations & Maintenance)
1.0 PROJECT OVERVIEW & SUMMARY OF WORK
From November 15-17, 2021, Castle Hill Associates, LLC was contracted by the US Department of Veterans Affairs (VA) to perform a baseline asbestos inspection of the Ralph H. Johnson VA Healthcare System, Charleston, SC Medical Center. The survey was performed as part of the VA Contract 36C24721P1334. The Performance Work Statement (PWS) issued by the VA defined the scope of work for the asbestos survey.
The inspection was conducted by Brett Brumbaugh and Sam Ansara. The South Carolina licensed asbestos inspector and project manager was Mr. Brumbaugh who has been conducting asbestos surveys, sampling, and consulting work since 1987. He is licensed to conduct asbestos surveys in 29 states. Sam Ansara has been conducting asbestos surveys, sampling, and consulting work since 1988.
There was a previous asbestos baseline reinspection and numerous reinspections conducted at the facility. In addition, many bulk sampling projects have been completed in the facility prior to minor and major renovation project. All of this data was reviewed and incorporated into this baseline inspection report. There were no limitations or exceptions to the PWS for the surveys conducted.
All accessible functional areas in the building were surveyed, with the exception of the inaccessible wall and ceiling chases which would require demolition of building components to access the suspect ACM. These areas would need to be accessed as part of future NESHAP surveys prior to renovation or demolition.
Previous sampling results and inventory spreadsheets from the previous survey and additional asbestos information provided by the current staff of the VAMC were used in this report. All additional samples that were collected during this inspection are included in this report.
2.0 FEDERAL AND STATE ASBESTOS REGULATIONS
2.1 Federal Regulations
The United States Environmental Protection Agency (EPA), the Occupational Safety and Health Administration (OSHA), and delegated states are responsible for regulating environmental exposure and protecting workers from asbestos exposure. OSHA is responsible for the health and safety of workers who may be exposed to asbestos in connection with their jobs (Occupational Exposure to Asbestos; Title 29, Code of Federal Regulations (CFR) Parts 1910.1001 and 1926.1101). The EPA and state regulators are responsible for developing and enforcing regulations necessary to protect the general public from exposure to airborne contaminants that are known to be hazardous to human health.
In 1979, EPA began an asbestos technical assistance program for building owners, environmental groups, contractors, and industry. In May 1982, EPA issued the first regulation intended to control asbestos in schools under the authority of the Toxic Substances Control Act (TSCA); this regulation is known as the Asbestos-in-Schools Rule.
Two EPA regulations govern asbestos: the Asbestos Hazard Emergency Response Act (AHERA) and the National Emission Standards for Hazardous Air Pollutants (NESHAP).
AHERA
In 1986, Congress enacted AHERA (Title 40, CFR Part 763) which mandated a regulatory program to address the asbestos hazards in schools. A part of AHERA deals with the mandatory training and accreditation of persons who perform certain types of asbestos-related work in schools.
Subsequently, in 1990 Congress amended AHERA to extend some of the training and accreditation requirements to persons performing such work in public and commercial buildings.
AHERA requires inspections of school buildings to determine the conditions of ACBM and preparation of management plans which recommend the best way to reduce the asbestos hazards. The United States Veterans Administration (VA) has adopted the requirements of AHERA by Executive Order for asbestos activities conducted at all VA facilities. In addition, the AHERA response methods mandated include removal, encapsulation, enclosure, repair, and operations and maintenance to protect human health and the environment from ACBM.
NESHAP
The Clean Air Act (CAA) of 1970 required EPA to develop and enforce regulations to protect the general public from exposure to airborne contaminants that are known to be hazardous to human health; therefore, EPA promulgated NESHAP (Title 40, CFR Part 61) on April 6, 1973.
NESHAP is intended to minimize the release of asbestos fibers during certain activities (i.e., renovations, demolition, and installations). It specifies work practices to be followed during renovations of buildings (except apartment buildings that have no more than four dwelling units) which contain a specific amount of friable asbestos. NESHAP requires that buildings be inspected for ACBM prior to renovation/demolition projects.
NESHAP also requires owners and operators subject to the asbestos rules to notify delegated state and local agencies and/or the regional EPA offices before demolition or renovation activities begin. In addition, NESHAP requires the removal of all friable ACBM prior to demolition.
OSHA
OSHA began regulating workplace asbestos exposure in 1970, adopting a permissible exposure limit (PEL) to regulate worker exposure. The original asbestos standard has been revised several times to better protect workers. On August 10, 1994, OSHA issued a revised final standard regulating asbestos exposure in all industries. The newly revised standard for the construction industry lowers the PEL. The revised standard also establishes a new classification system for asbestos construction work, which clearly spells out mandatory work practices to follow to reduce worker exposures (see Occupational Exposure to Asbestos, Title 29, CFR 1926.1101).
2.2 State and Local Regulations
South Carolina state regulations are similar to the Federal regulations, with the exception of the requirement to analyze bulk samples by TEM for all non-organically bound samples (NOB). South Carolina asbestos regulations also include requirements for licensing and certification of personnel who will perform asbestos-related work activities. All personnel who engage in asbestos-related activities must comply with the state licensing/certification requirements as well as with all Federal requirements.
3.0 SAMPLE ANALYTICAL METHODS
3.1 Asbestos Sampling Protocol
EPA and OSHA define an ACBM as any material which contains greater than 1 percent asbestos.
The ACBM inspection and bulk sampling were performed in accordance with the methods outlined in the EPA guidance document titled Guidance for Controlling Asbestos-Containing Materials in Buildings (Document No. 560/5-85/024). In addition, bulk sampling of asbestos was performed in accordance with 40 CFR Part 763, AHERA requirements for number of samples and types of ACBM to be sampled. According to these requirements, materials are classified as either surfacing (e.g., decorative plaster, spray-applied fireproofing), thermal system insulation (e.g., pipe insulation, pipe fitting insulation, boiler insulation), or miscellaneous materials (e.g., floor tile, ceiling tile, plaster, wallboard, mastics).
The number of samples collected from each material varies based on the classification of the material and increases as the potential for a non-uniform mixture of asbestos in the material increases.
Typically, regulations require a minimum number of samples to be collected from the different classifications of suspect ACBM.
A total of 235 bulk samples were collected as part of this survey and analyzed by PLM. An additional 110 samples were analyzed by TEM via gravimetric reduction for those samples which were non-friable, organically bound (NOB) in accordance with South Carolina asbestos regulations. All samples were analyzed by EMSL Analytical laboratory in Cinnaminson, NJ. EMSL is accredited by the NIST, NVLAP program (National Institute of Standards and Technology, National Voluntary Laboratory Accreditation Program) and also an American Industrial Hygiene Association (AIHA) accredited laboratory.
4.0 SUMMARY OF INSPECTION FINDINGS
4.1 Asbestos-Containing Building Materials
The tables below summarize the asbestos containing materials, locations, quantities of materials.
Homog.
Area
Asbestos Material Locations
H-01 Duct Sealant - Red/reddish-brown sealant applied directly to the metal seams and joints of HVAC ducts above ceilings
Throughout Original Blocks (A,B, & C)
H-02B Duct Insulation Mastic - Black mastic applied to foil faced fiberglass HVAC duct insulation
Crawlspace
H-09 Pipe fitting mud insulation-cloth wrapped hand shaped insulation "mud" applied over fiberglass insulation at fittings on heating water piping
D134
H-12 Pipe fitting mud insulation-cloth wrapped hand shaped insulation "mud" applied over fiberglass insulation at fittings on roof drain piping
D134
H-14 Pipe insulation-cloth wrapped calcium silicate type, pre-formed dense insulation installed in short sections at hangers
D134
H-15 Floor Tile-9"x9" floor tile (multiple colors) and associated ACM mastic
Corridor 2B9, B223, B240, B580, B554
H-16 Floor Tile-9"x9" floor tile (multiple colors) and associated non- ACM mastic
C123A, C124, A568A
H-20 Pipe Insulation- cloth wrapped, calcium silicate type, pre-formed dense insulation installed in short sections at domestic water pipe hangers
C105
H-21 Floor mastic-black mastic found below yellow mastic at the stairway landings
Stairs 1, 2, 3, 4, 5, 6
H-25 Floor tile-12"x12" tan and white marbled floor tile adhered by tan mastic over grey/tan, thin brittle tile (likely 9") and black mastic
B506, B510, B514- 517, B526, B506B, Corridor 5B5 Fire
H-27 Floor mastic-black mastic below gray leveling compound below carpet
B559, B570, B571
H-28 Sink undercoat-gray, white or lavender colored coating applied to the bottom of stainless-steel sinks
Original stainless steel sink throughout original blocks
Asbestos Material Locations
H-29 Pipe insulation mastic-black mastic applied over fiberglass insulation on pipes above ceiling on Kraft-faced piping
Throughout Original Blocks (A,B, & C)
H-32 Floor tile and mastic-12"x12" vinyl composition floor tile and tan mastic installed over white floor tile and black mastic
C322, C416, AHU11
H-36A
Floor tile and mastic-12"x12" white floor tile with small black dots and tan mastic installed over white tile and black mastic
Corridor 3A3, Corridor 3A9, A533
H-36B
Floor tile and mastic-12"x12" white vinyl composition floor tile and black mastic below carpet
A357
H-37A
Floor tile and mastic-12"x12" white vinyl composition floor tile and black mastic
A358
H-61 Pipe insulation mastic-white mastic on fiberglass insulation at fittings of domestic water piping Throughout Original A, B, C Blocks
H-63 Metal 2-hour Fire Doors Throughout
H-64
Round cementitious "transite" ACM pipe
2nd-5th Floors B wing (Extends between levels & above ceiling on 5)
H-65
Pipe fitting mud insulation- hand shaped insulation "mud" applied between cloth wrapped and fiberglass insulation on Kathbar system
Penthouse/Roof (Extends between levels)
H-66
Gray and black mastic- applied to short sections on non-ACM foam glass insulation at hangers along chilled water piping
Crawlspace
H-67
Multi-colored layered mastics-applied to open mesh wrapped, foil-kraft, rigid cellular foam insulation on water piping
H-68
Black mastic-below white non-ACM mastic applied to sections of foam glass at hangers insulated with kraft faced fiberglass
H-69 Hard gray and black mastic/coating- applied to non-
ACM black, flexible, cellular rubber foam insulation
Asbestos Material Locations
H-70 White mastic-applied to fiberglass insulation Crawlspace
H-71 Off-white mastic-applied over fiberglass insulation on HVAC piping
Corridor2BB1, throughout Block BB
H-72 Off-white/gray mastic- applied to fiberglass duct insulation Roof
H-73 White mastic-applied to fiberglass on roof drain insulation Penthouse (Extends between levels)
H-74 Brownish-black mastics/sealants- applied to non- ACM insulation on induction unit piping (some covered by newer white ACM mastic)
Throughout Original Blocks (A, B, & C)
H-75 White mastic-applied to non-ACM insulation on induction unit piping
Throughout Original Blocks (A, B, & C)
H-84 Black mastic beneath 12' blue Tile with mastic and underlying tile
A317-326, A331, A335- 342, A369
6.0 EXPLANATION OF ASSESSMENT OF ASBESTOS CONTAINING MATERIALS
The inspection protocol is based on the Asbestos Hazard Emergency Response Act (AHERA), Environmental Protection Act’s (EPA’s) revised Asbestos Model Accreditation Plan (MAP) mandated by the Asbestos School Hazard Abatement Reauthorization Act (ASHARA), and the Department of Veterans Affairs (VA) Directive 7700. The tabular listing included in this report contains Building Number, Floor, Room Number, Material Category (i.e., TSI, SM or MM), Material Type, quantity, a numerical priority ranking, condition, potential for damage, potential for human exposure, drawing number, hazard ranking, recommended response action and associated cost estimate for implementation of those response actions.
The material assessment categories of the ACM identified in the building is formatted in the following order for the summary tables enclosed in this report:
• Material Category - Surfacing Material (SUR); Thermal System Insulation (TSI); Miscellaneous (MM)
• Material Type - Friable (F); Non-Fable (NF)
• Condition of Material - Good; Fair; Poor
• Potential for Damage - Low; Medium; High
• Physical Assessment - Low; Medium; High
• Recommended Response Action - 1 through 7
Material category is the type of material such as surfacing material (SUR), thermal system insulation (TSI), and miscellaneous (MM)
• Surfacing Material (SUR) - Surfacing ACM means surfacing material that is ACM. Surfacing material means material in a school building that is sprayed-on, troweled-on, or otherwise applied to surfaces, such as acoustical plaster on ceilings and fireproofing materials on structural members, or other materials on surfaces for acoustical, fireproofing, or other purposes.
• Thermal System Insulation (TSI) - Thermal system insulation ACM means thermal system insulation that is ACM. Thermal system insulation means material in a school building applied to pipes, fittings, boilers, breeching, tanks, ducts, or other interior structural components to prevent heat loss or gain, or water condensation, or for other purposes.
• Miscellaneous (MM) - Miscellaneous ACM means miscellaneous material that is ACM Miscellaneous material means interior building material on structural components, structural members or fixtures, such as floor and ceiling tiles, and does not include surfacing material or thermal system insulation. Material type refers to the hardness of a material to be crumbled, pulverized, or reduced to powder by hand pressure as friable (F), and includes previously non-friable (NF) material after such previously non-friable material becomes damaged to the extent that when dry it may be crumbled, pulverized, or reduced to powder by hand pressure.
Seven Categories define in the AHERA regulation one of which must be assigned to each friable surfacing and miscellaneous ACBM and each asbestos-containing TSI during the inspection/re-inspection.
1. Damaged or significantly damaged TSI ACBM - Damaged or significantly damaged thermal system insulation ACM means thermal system insulation ACM on pipes, boilers, tanks, ducts, and other thermal system insulation equipment where the insulation has lost its structural integrity, or its covering, in whole or in part, is crushed, water-stained, gouged, punctured, missing, or not intact such that it is not able to contain fibers. Damage may be further illustrated by occasional punctures, gouges or other signs of physical injury to ACM; occasional water damage on the protective coverings/jackets; or exposed ACM ends or joints. Asbestos debris originating from the ACBM in question may also indicate damage.
2. Damaged friable surfacing ACBM - Damaged friable surfacing ACM means friable surfacing ACM which has deteriorated or sustained physical injury such that the internal structure (cohesion) of the material is inadequate or which has delaminated such that its bond to the substrate (adhesion) is inadequate, or which, for any other reason, lacks fiber cohesion or adhesion qualities. Such damage or deterioration may be illustrated by the separation of ACM into layers; separation of ACM from the substrate; flaking, blistering, or crumbling of the ACM surface; water damage; significant or repeated water stains, scrapes, gouges, mars or other signs of physical injury on the ACM. Asbestos debris originating from the ACBM in question may also indicate damage.
3. Significantly damaged friable surfacing ACBM - Significantly damaged friable surfacing ACM means damaged friable surfacing ACM in a functional space where the damage is extensive and severe.
4. Damaged or significantly damaged friable miscellaneous ACBM - Damaged friable miscellaneous ACM means friable miscellaneous ACM which has deteriorated or sustained physical injury such that the internal structure (cohesion) of the material is inadequate or, if applicable, which has delaminated such that its bond to the substrate (adhesion) is inadequate or which for any other reason lacks fiber cohesion or adhesion qualities. Such damage or deterioration may be illustrated by the separation of ACM into layers; separation of ACM from the substrate; flaking, blistering, or crumbling of the ACM surface; water damage; significant or repeated water stains, scrapes, gouges, mars or other signs of physical injury on the ACM. Asbestos debris originating from the ACBM in question may also indicate damage.
5. ACBM with Potential for Damage - Potential damage means circumstances in which:
(1) Friable ACBM is in an area regularly used by building occupants, including maintenance personnel, in the course of their normal activities.
(2) There are indications that there is a reasonable likelihood that the material or its covering will become damaged, deteriorated, or delaminated due to factors such as changes in building use, changes in operations and maintenance practices, changes in occupancy, or recurrent damage.
6. ACBM with potential for significant damaged - Potential significant damage means circumstances in which:
(1) Friable ACBM is in an area regularly used by building occupants, including maintenance personnel, in the course of their normal activities.
(2) There are indications that there is a reasonable likelihood that the material or its covering will become significantly damaged, deteriorated, or delaminated due to factors such as changes in building use, changes in operations and maintenance practices, changes in occupancy, or recurrent damage.
7. Any remaining friable ACBM or Friable Suspected ACBM
7.0 ASBESTOS BACKGROUND INFORMATION
The term asbestos describes six naturally occurring fibrous minerals found in certain types of rock formations. The minerals chrysotile, amosite, and crocidolite have been most commonly used in building products such as floor tile, pipe insulation, boiler insulation, asbestos cement materials, roofing materials, and plasters. The minerals anthophyllite, actinolite, and tremolite are not frequently found in ACBM.
Intact and undisturbed ACBM do not pose a health risk. They may, however, become a health hazard if they are damaged, disturbed, or deteriorate over time and release fibers into the air. If released into the air, asbestos fibers may be inhaled. After prolonged or intense exposure, inhaled asbestos fibers may cause various types of lung disease. The health risks associated with asbestos exposure are greater for those who smoke.
9.0 EXPLANATION OF REMEDIATION COST ESTIMATES
All remediation cost (removal and repair) estimates are based upon RS Means data. Since RS Means does not account for work in VA Medical Centers, all cost estimates are adjusted to reflect the VA specific requirements for abatement. In addition, the cost estimates reflect the quantity and location of the asbestos materials. For example, abatement work in crawl spaces is expected to be much costlier than work in more accessible areas of building. Also, the costs for each material in each building are intended to be for “stand alone” projects and the combination of areas for removal will reduce the costs due to an economy of scale.
11.0 CONCLUSION/RECOMMENDATIONS
An operations and maintenance (O&M) program has been developed by the VAMC specifically for the positively identified ACBM in the facilities. Any renovation/demolition work which may impact these positive materials should be conducted in accordance with the O&M program and all applicable Federal, state, and local regulations by appropriately trained and VA-approved personnel and contractors. Since demolition was not performed as part of the inspection work at the facilities, certain areas such as pipe chases and areas above fixed permanent ceilings, fire-door interiors, and vault/safe wall and door linings were not inspected or tested. Prior to renovation and alteration work which could impact these areas, Castle Hill recommends that exploratory demolition be performed and a qualified inspector be utilized to examine the areas and collect samples as needed. Castle Hill recommends sampling of roofing materials and electrical components (not specifically examined as part of this survey) if renovation activities are planned which may disturb these materials.
Inspector Signature:
Brett L. Brumbaugh, REPA, CESCO South Carolina Asbestos Inspector, License #BI002029
RALPH H. JOHNSON VA HEALTHCARE SYSTEM – CHARLESTON, SC VAMC
TABLE 1
LIST OF ACRONYMS
ACBM Asbestos Containing Building Material ACM Asbestos Containing Material AHERA Asbestos Hazard Emergency Response Act AIHA American Industrial Hygiene Association CAA Clean Air Act CFR Code of Federal Regulations EPA United States Environmental Protection Agency HazCom Hazard Communication HEPA High Efficiency Particulate Air Filter HVAC Heating, Ventilation, and Air Conditioning MISC Miscellaneous Asbestos Containing Material NESHAP National Emission Standards for Hazardous Air Pollutants NIOSH National Institute for Occupational Safety and Health NIST National Institute of Standards and Technology NOB Non-friable Organically Bound NVLAP National Voluntary Laboratory Accreditation Program OSHA Occupational Safety and Health Administration PAT AIHA Proficiency Analytical Testing Program PCM Phase Contrast Microscopy PEL Permissible Exposure Limit PLM Polarized Light Microscopy TEM Transmission Electron Microscopy TSCA Toxic Substances Control Act TSI Thermal Systems Insulation Castle Hill Castle Hill Associates, LLC VA United States Department of Veterans Affairs VAMC VA Medical Center XRD X-Ray Diffraction
TABLE 2
ASBESTOS REMOVAL PRIORITY PROTOCOLS
HAZARD
RANK
REMOVAL
PRIORITY
AHERA
CATEGORY
RESPONSE ACTION
RECOMMENDATION
7 1 Significantly Damaged
Evacuate or isolate the area.
Remove or repair if feasible.
O&M for all friable ACM.
6 2 Damaged with potential for significant damage
Evacuate or isolate the area.
Remove, encapsulate, or repair if feasible. O&M for all friable
ACM.
5 3 Damaged with potential for damage
Remove, encapsulate, or repair. O&M for all friable ACM.
4 4 Damaged Remove, encapsulate, or repair. O&M for all friable ACM.
3 5 Potential for significant damage
Take steps to reduce potential for damage. O&M for all friable
ACM.
2 6 Potential for damage O&M for all friable ACM.
1 7 No problem O&M for all friable ACM.
APPENDIX A
ASBESTOS BULK SAMPLING DATA
ASBESTOS BULK SAMPLING INFORMATION
POSITIVE MATERIALS = ACM
Facility: Ralph H. Johnson VA Healthcare System – Charleston, SC VAMC Sampling Dates: November 15-17, 2021 Analysis Dates: December 3-15, 2021 Laboratory: EMSL Analytical, Inc. – Cinnaminson, NJ Accreditation: NVLAP Asbestos Bulk Accredited Laboratory Sampler: Brett Brumbaugh Accreditation: South Carolina Asbestos Inspector, License #BI002029
Date of Sampling
HA # Material Description ACM Type & % Sample Number
Location
11/15/2021 H-09 Mud fittings on fiberglass insulated pipe Chrysotile, 45% 2021-54 C104
11/16/2021 H-32 12" brown floor tile/black mastic under 12" tan floor tile/yellow mastic Chrysotile, 3% (tile) 2021-110 C322
11/16/2021 H-15 9" gray floor tile/black mastic Chrysotile, 4% (tile) 2021-123 A568A
11/17/2021 H-32 12" brown floor tile/black mastic under 12" white floor tile/yellow mastic Chrysotile, 4% (tile) 2021-146 A312
11/17/2021 H-21 Black residual mastic under red rubber flooring Chrysotile, 5% 2021-161 SW3, 5th Floor
11/17/2021 H-21 Black residual mastic under red rubber flooring Chrysotile, 3% 2021-162 SW1, 3rd Floor
11/17/2021 H-21 Black residual mastic under red rubber flooring Chrysotile, 3% 2021-163 SW2, 5th Floor
11/17/2021 H-21 Black residual mastic under red rubber flooring Chrysotile, 2% 2021-164 SW5, 3rd Floor
11/17/2021 H-21 Black residual mastic under red rubber flooring Chrysotile, 2% 2021-165 SW4, 4th Floor
11/17/2021 H-72 White/gray mastic on fiberglass ducts on roof in Penthouse enclosure Chrysotile, 8% 2021-190 Roof above 5B Wing
• EPA Definition of an asbestos containing material: Greater than 1% asbestos
NEGATIVE MATERIALS = NON-ACM
Analysis Dates: December 3-15, 2021 Laboratory: EMSL Analytical, Inc. – Cinnaminson, NJ Accreditation: NVLAP Asbestos Bulk Accredited Laboratory
HA # Material Description Sample ID's Locations
11/15/2021 H-85 Gray Gunnite sprayed-on foundation wall coating 2021-1,2,3 Crawlspaces
11/15/2021 H-86 Spray-on fireproofing on ceiling deck 2021-
4,5,6,7,8,12,13,14,15 Crawlspaces
11/15/2021 H-87 Black tar/foil jacketing on fiberglass insulated pipe 2021-9,10,11 Crawlspaces
11/15/2021 H-87 Black tar/foil jacketing on fiberglass insulated ducts 2021-16,17,18 Crawlspaces
11/15/2021 H-87 Black foil covering on Armaflex pipe insulation 2021-19,20,21 Crawlspaces
11/15/2021 H-89 Tar under foam glass on rooftop between HVAC air handlers 2021-22,23,24 Rooftop
11/15/2021 H-89 Tar over black foam glass pipe insulation between HVAC air handlers
2021-25,26,27 Rooftop
11/15/2021 H-90 Tan duct seam mastic on metal ductwork 2021-28,29,30 BB214
11/15/2021 H-91 White duct seam mastic on metal ductwork 2021-31,32 BB214
11/15/2021 H-92 White seam mastic on fiberglass pipe insulation in crawl under boiler room 2021-33,34,35 Crawlspaces
11/15/2021 H-88 18" tan floor tile and yellow mastic 2021-36 A116
11/15/2021 H-26 Drywall, joint compound 2021-37 A116
11/15/2021 H-5 Tan Cove base and brown mastic 2021-38 A116
11/15/2021 H-17 2x2 lay-in ceiling tile 2021-39 A116
11/15/2021 H-92 White seam mastic on fiberglass pipe insulation 2021-40 A116
11/15/2021 H-6 Plaster skim coat on wall 2021-41,42,43 COR3A2,COR3B7
11/15/2021 H-93 Tan wall paneling adhesive on plaster walls 2021-44,45 COR3A7,COR3B5
11/15/2021 H-17 2x2 lay-in ceiling tile 2021-46 B135
11/15/2021 H-94 12" blue floor tile/yellow mastic 2021-47 B135
11/15/2021 H-5 Tan Cove base and brown mastic 2021-48 B135
11/15/2021 H-26 Drywall, joint compound 2021-49 B135
Analysis Dates: December 3-15, 2021 Laboratory: EMSL Analytical, Inc. – Cinnaminson, NJ Accreditation: NVLAP Asbestos Bulk Accredited Laboratory
HA # Material Description Sample ID's Locations
11/15/2021 H-6 Plaster skim coat on wall 2021-50 B135
11/15/2021 H-93 Tan wall paneling adhesive on plaster walls 2021-51,52 COR4A5, COR4B7
11/15/2021 H-17 2x2 lay-in ceiling tile 2021-53 106A
11/15/2021 H-10 Mud fittings on fiberglass insulated heating lines 2021-54,55,56 G108 Shop
11/15/2021 H-26 Drywall, joint compound 2021-57,58 DD154
11/15/2021 H-95 12" tan floor tile and yellow mastic 2021-59 DD154
11/15/2021 H-5 Tan Cove base and brown mastic 2021-60 DD154
11/16/2021 H-95 12" tan floor tile and yellow mastic 2021-61 A208
11/16/2021 H-17 2x2 lay-in ceiling tile 2021-62 A208
11/16/2021 H-5 Tan Cove base and brown mastic 2021-63 A208
11/16/2021 H-26 Drywall, joint compound 2021-64 A208
11/16/2021 H-95 12" tan floor tile and yellow mastic 2021-65 AA238
11/16/2021 H-5 Tan Cove base and brown mastic 2021-66 AA238
11/16/2021 H-17 2x2 lay-in ceiling tile 2021-67 AA238
11/16/2021 H-26 Drywall, joint compound 2021-68 AA238
11/16/2021 H-92 White seam mastic on fiberglass pipe insulation 2021-69 AA231
11/16/2021 H-26 Drywall, joint compound 2021-70 CC213
11/16/2021 H-93 Spray-on fireproofing on ceiling deck 2021-70,71,72 CC213,CC214
11/16/2021 H-17 2x2 lay-in ceiling tile 2021-73 CC213
11/16/2021 H-17 2x2 lay-in ceiling tile 2021-74 CC214
11/16/2021 H-95 12" tan floor tile and yellow mastic 2021-75 B350
11/16/2021 H-26 Drywall, joint compound 2021-76 B350
11/16/2021 H-17 2x2 lay-in ceiling tile 2021-77 B350
Analysis Dates: December 3-15, 2021 Laboratory: EMSL Analytical, Inc. – Cinnaminson, NJ Accreditation: NVLAP Asbestos Bulk Accredited Laboratory
HA # Material Description Sample ID's Locations
11/16/2021 H-5 Tan Cove base and brown mastic 2021-78 B350
11/16/2021 H-18 2x2 rough lay-in ceiling tile 2021-79 A307
11/16/2021 H-18 2x2 rough lay-in ceiling tile 2021-80 A308
11/16/2021 H-17 2x2 lay-in ceiling tile 2021-81 A307
11/16/2021 H-17 2x2 lay-in ceiling tile 2021-82 A308
11/16/2021 H-6 Plaster skim coat on wall 2021-83 COR4C1
11/16/2021 H-88 18" tan floor tile and yellow mastic 2021-84 COR4C1
11/16/2021 H-88 18" tan floor tile and yellow mastic 2021-85 HAC by SW3 on 4th Fl.
11/16/2021 H-5 Tan Cove base and brown mastic 2021-86,87 HAC by SW3 on 4th Fl.
11/16/2021 H-5 Tan Cove base and brown mastic 2021-88 A405
11/16/2021 H-17 2x2 lay-in ceiling tile 2021-89 A405
11/16/2021 H-95 12" gray floor tile & yellow mastic 2021-90 A405
11/16/2021 H-26 Drywall, joint compound 2021-91 A405
11/16/2021 H-17 2x2 lay-in ceiling tile 2021-92 B456
11/16/2021 H-17 2x2 lay-in ceiling tile 2021-93 B456A
11/16/2021 H-26 Drywall, joint compound 2021-94 B456
11/16/2021 H-26 Drywall, joint compound 2021-95 B456A
11/16/2021 H-5 Tan Cove base and brown mastic 2021-96 B553B
11/16/2021 H-26 Drywall, joint compound 2021-97 B553B
11/16/2021 H-17 2x2 lay-in ceiling tile 2021-98 B553B
11/16/2021 H-6 Plaster skim coat on wall 2021-99 B553B closet
11/16/2021 H-6 Gray cove base with tan mastic 2021-100 B150
11/16/2021 H-93 12" pink floor tile and yellow mastic 2021-101,102 B150
Facility: Ralph H. Johnson VA Healthcare System – Charleston, SC VAMC Sampling Dates: November 15-17, 2021 Analysis Dates: December 3-15, 2021 Laboratory: EMSL Analytical, Inc. – Cinnaminson, NJ Accreditation: NVLAP Asbestos Bulk Accredited Laboratory
HA # Material Description Sample ID's Locations
11/16/2021 H-18 2x2 rough lay-in ceiling tile 2021-103 B150
11/16/2021 H-26 Drywall, joint compound 2021-104 B150
11/16/2021 H-95 12" tan floor tile and yellow mastic 2021-105 B364
11/16/2021 H-5 Tan Cove base and brown mastic 2021-106 B364
11/16/2021 H-26 Drywall, joint compound 2021-107 B364
11/16/2021 H-5 Brown cove base/tan mastic 2021-108 B320
11/16/2021 H-88 Tan mastic under 18" tan floor tile 2021-109 B302
11/16/2021 H-95 12" tan floor tile and yellow mastic 2021-111 C322
11/16/2021 H-5 Tan Cove base and brown mastic 2021-112 C322
11/16/2021 H-88 18" tan floor tile and yellow mastic 2021-113 Hall by C320
11/16/2021 H-6 Plaster skim coat on wall 2021-114,115 ELVLOB3
11/16/2021 H-95 12" yellow floor tile and tan mastic 2021-116 Hall by A398
11/16/2021 H-88 Tan Cove base and brown mastic 2021-117 Hall by A382
11/16/2021 H-6 Plaster skim coat on wall 2021-118 A568b closet
11/16/2021 H-95 12" blue floor tile/yellow mastic 2021-119 A567B
11/16/2021 H-88 Tan Cove base and brown mastic 2021-120 A567B
11/16/2021 H-26 Drywall, joint compound 2021-121 A567B
11/16/2021 H-96 Red firestop caulking 2021-122 A567B
11/16/2021 H-97 Black cove base and tan mastic 2021-124 A568A
11/16/2021 H-6 Plaster skim coat on wall 2021-125 A568A
11/17/2021 H-98 Gray rubber exterior concrete wall base caulking 2021-126,127 WLKWAY1
11/17/2021 H-99 Exterior concrete textured coating 2021-128,129 WLKWAY1
NOVEMBER 2021
ASBESTOS BULK SAMPLING INFORMATION
NEGATIVE MATERIALS = NON-ACM
Facility: Ralph H. Johnson VA Healthcare System – Charleston, SC VAMC Sampling Dates: November 15-17, 2021 Analysis Dates: December 3-15, 2021 Laboratory: EMSL Analytical, Inc. – Cinnaminson, NJ Accreditation: NVLAP Asbestos Bulk Accredited Laboratory Sampler: Brett Brumbaugh Accreditation: South Carolina Asbestos Inspector, License #BI002029
Date of
Sampling HA # Material Description Sample ID's Locations
11/17/2021 H-100 Tan mastic on red side stair treads 2021-130 SW3 on 5th floor
11/17/2021 H-99 Exterior concrete textured coating 2021-131 Rooftop
11/17/2021 H-101 Black duct seam mastic on metal ducts 2021-132 Rooftop
11/17/2021 H-102 Gray duct seam mastic on metal ducts 2021-133 Rooftop
11/17/2021 H-90 Tan duct seam mastic on metal ductwork 2021-134 Rooftop
11/17/2021 H-102 Gray duct seam mastic on metal ducts 2021-135 Rooftop
11/17/2021 H-99 Exterior concrete textured coating 2021-136 Rooftop
11/17/2021 H-103 Tan battleship sheet flooring and yellow mastic 2021-137 B403A
11/17/2021 H-26 Drywall, joint compound 2021-138 B401
11/17/2021 H-103 Tan battleship sheet flooring and yellow mastic 2021-139 B302
11/17/2021 H-104 White caulking on upper wall paneling 2021-140 B451
11/17/2021 H-26 Drywall, joint compound 2021-141 B413
11/17/2021 H-26 Drywall, joint compound 2021-142 B303
11/17/2021 H-6 Plaster skim coat on wall 2021-143 3rd elevator lobby
11/17/2021 H-26 Drywall, joint compound 2021-144 A359
11/17/2021 H-95 12" white floor tile and tan mastic 2021-145 A312 closet
11/17/2021 H-95 12" tan floor tile and yellow mastic 2021-147 B371
11/17/2021 H-104 White caulking on wall wainscoting 2021-148 B371 hallway
11/17/2021 H-99 Exterior concrete textured coating 2021-149 S. side of ER dock
11/17/2021 H-99 Exterior concrete textured coating 2021-150 S. side of ER dock
11/17/2021 H-99 Exterior concrete textured coating 2021-151 N.E. of loading dock
11/17/2021 H-99 Exterior concrete textured coating 2021-152 N.E. of loading dock
11/17/2021 H-105 White caulking on crawlspace entry door frame 2021-153 LDOCK2 N. wall
Analysis Dates: December 3-15, 2021 Laboratory: EMSL Analytical, Inc. – Cinnaminson, NJ Accreditation: NVLAP Asbestos Bulk Accredited Laboratory
HA # Material Description Sample ID's Locations
11/17/2021 H-93 Tan wall paneling adhesive on plaster walls 2021-154 COR3A2
11/17/2021 H-93 Tan wall paneling adhesive on plaster walls 2021-155 COR4B-5
11/17/2021 H-93 Tan wall paneling adhesive on plaster walls 2021-156 COR5B-6
11/17/2021 H-98 Gray rubber exterior concrete wall base caulking 2021-157 MRI Building walkway
11/17/2021 H106 Exterior door frame caulking - gray 2021-158,159 N. MRI exit door
11/17/2021 H-95 12" white floor tile and tan mastic 2021-166 B456A closet
11/17/2021 H-95 12" gray floor tile & yellow mastic 2021-167 B456A closet
11/17/2021 H-18 2x2 lay-in ceiling tile 2021-168 B456A closet
11/17/2021 H-26 Drywall, joint compound 2021-169 B456A closet
11/17/2021 H-88 Tan Cove base and brown mastic 2021-170 B456A closet
11/17/2021 H-95 12" blue floor tile/yellow mastic 2021-171 Corridor 398
11/17/2021 H-95 12" blue floor tile/yellow mastic 2021-172 B384
11/17/2021 H-88 Tan Cove base and brown mastic 2021-173 Corridor 398
11/17/2021 H-18 2x2 lay-in ceiling tile 2021-174 Corridor 398
11/17/2021 H-18 2x2 lay-in ceiling tile 2021-175 Corridor 398
11/17/2021 H-26 Drywall, joint compound 2021-176 Corridor 398
11/17/2021 H-26 Drywall, joint compound 2021-177 B393
11/17/2021 H-104 White caulking on wall wainscoting 2021-178 Corridor 398
11/17/2021 H-6 Gray cove base with tan mastic 2021-179 A391
11/17/2021 H-18 2x2 lay-in ceiling tile 2021-180 A392
11/17/2021 H-26 Drywall, joint compound 2021-181 B303 waiting room
11/17/2021 H-18 2x2 lay-in ceiling tile 2021-182 B303 waiting room
11/17/2021 H-6 Plaster skim coat on wall 2021-183 B384
Analysis Dates: December 3-15, 2021 Laboratory: EMSL Analytical, Inc. – Cinnaminson, NJ Accreditation: NVLAP Asbestos Bulk Accredited Laboratory
HA # Material Description Sample ID's Locations
11/17/2021 H-92 White duct seam mastic on fiberglass duct insulation 2021-184 C209
11/17/2021 H-26 Drywall, joint compound 2021-185 C209
11/17/2021 H-102 Gray duct seam mastic on metal ducts 2021-186 C209
11/17/2021 H-99 Exterior concrete textured coating 2021-187 C209
11/17/2021 H-105 Roof flashing 2021-188 Courtyard S. of C209
11/17/2021 H-106 Door threshold caulking 2021-189 Courtyard S. of C209
• EPA Definition of an asbestos containing material: Greater than 1% asbestos
APPENDIX B
Asbestos Quantities, Assessments, & Remediation Cost Estimates
RALPH H. JOHNSON VAHC SYSTEM
CHARLESTON, SC
ASBESTOS ASSESSMENTS AND COST ESTIMATES
2021 BASELINE INSPECTION
Homog.
Area Asbestos Material Locations
Sample
Number(s) Quantity AHERA Assessment Recommendation Removal Priority
Repair Cost
Estimate
Removal
Cost
Estimate
H-01
Duct Sealant - Red/reddish-brown sealant applied directly to the metal seams and joints of HVAC ducts above ceilings
Throughout Original
Blocks (A,B, & C)
MH01
~2 square foot (SQ) per linear foot (LF) where present
1 O&M; Remove at renovation 7 n/a $4.50 / SF
H-02B Duct Insulation Mastic - Black mastic applied to foil faced fiberglass HVAC duct insulation Crawlspace MH05
~2 SQ per LF where present
O&M; Remove, enclose, or repair to correct damage 5 n/a $4.50 / SF
H-09
Pipe fitting mud insulation-cloth wrapped hand shaped insulation "mud" applied over fiberglass insulation at fittings on heating water piping
D134
MH12, MH13, MH14,
MH15
180 LF 4
O&M; Remove, enclose, or repair to correct damage 4 n/a $2,700
H-12
Pipe fitting mud insulation-cloth wrapped hand shaped insulation "mud" applied over fiberglass insulation at fittings on roof drain piping
D134 MH21 25 SF 2 O&M; Remove at renovation 6 n/a $1,800
H-14
Pipe insulation-cloth wrapped calcium silicate type, pre-formed dense insulation installed in short sections at hangers
D134 MH25 60 LF 2 O&M; Remove at renovation 6 n/a $900
H-15 Floor Tile-9"x9" floor tile (multiple colors) and associated ACM mastic
Corridor 2B9, B223, B240, B580, B554 None Provided 2,990 SF 2 O&M; Remove at renovation 6 n/a $9,870
H-16 Floor Tile-9"x9" floor tile (multiple colors) and associated Non-ACM mastic C123A, C124, A568A None Provided 5,325 SF 2 O&M; Remove at renovation 6 n/a $11,715
H-20
Pipe Insulation- cloth wrapped, calcium silicate type, pre-formed dense insulation installed in short sections at domestic water pipe hangers
C105 MH36 20 LF 1 O&M; Remove at renovation 7 n/a $750
H-21 Floor mastic-black mastic found below yellow mastic at the stairway landings Stairs 1,2,3,4,5,6 MH43, MH50 1,260 SF 2 O&M; Remove at renovation 6 n/a $12,000
H-25
Floor tile-12"x12" tan and white marbled floor tile adhered by tan mastic over grey/tan, thin brittle tile
(likely 9") and black mastic
B506, B510, B514-
517, B526, B506B, Corridor 5B5 Fire
MH47, MH52 325 SF 1 O&M; Remove at renovation 7 n/a $1,073
H-27 Floor mastic-black mastic below gray leveling compound below carpet B559, B570, B571
MH49, MH53, MH56,
MH68
320 SF 1 O&M; Remove at renovation 7 n/a $945
H-28 Sink undercoat-gray, white or lavender colored coating applied to the bottom of stainless steel sinks
Original stainless steel sink throughout original blocks
MH54, MH55, MH57
~4 SQ per stainless steel where present 1 O&M; Remove at renovation 7 n/a $4.50 / SF
H-29
Pipe insulation mastic-black mastic applied over fiberglass insulation on pipes above ceiling on Kraft-faced piping
Throughout Original
Blocks (A,B, & C)
MH59, MH62, MH63,
MH65
~2 SQ per LF where present 1 O&M; Remove at renovation 7 n/a $4.50 / SF
H-32
Floor tile and mastic-12"x12" vinyl composition floor tile and tan mastic installed over white floor tile and black mastic
C322,C416, AHU11 MH64- MH66 50 SF 1 O&M; Remove at renovation 7 n/a $750
H-36A
Floor tile and mastic-12"x12" white floor tile with small black dots and tan mastic installed over white tile and black mastic
Corridor 3A3, Corridor
3A9, A533 MH71, MH73 880 SF 2 O&M; Remove at renovation 6 n/a $7,875
H-36B Floor tile and mastic-12"x12" white vinyl composition floor tile and black mastic below carpet A357 MH72, MH75 300 SF 2 O&M; Remove at renovation 6 n/a $945
H-37A Floor tile and mastic-12"x12" white vinyl composition floor tile and black mastic A358 MH74 420 SF 2 O&M; Remove at renovation 6 n/a $1,260
H-61 Pipe insulation mastic-white mastic on fiberglass insulation at fittings of domestic water piping
Throughout Original
Blocks (A,B, & C) MH105 25 LF 1 O&M; Remove at renovation 7 n/a
$1,200
($14/LF)
H-63 Metal 2-hour Fire Doors Throughout Assumed ~15 SF Each 1 O&M; Remove at renovation 7 n/a $200 Per Door
H-64 Round cementitious "transite" ACM pipe
2nd-5th Floors B wing
(Extends between levels & above ceiling on 5)
Assumed 300 SF 1 O&M; Remove at renovation 7 n/a $8,000
RALPH H. JOHNSON VAHC SYSTEM
CHARLESTON, SC
ASBESTOS ASSESSMENTS AND COST ESTIMATES
2021 BASELINE INSPECTION
Homog.
Area Asbestos Material Locations
Sample
Number(s) Quantity AHERA Assessment Recommendation Removal Priority
Repair Cost
Estimate
Removal
Cost
Estimate
H-65
Pipe fitting mud insulation- hand shaped insulation
"mud" applied between cloth wraped and fiberglass insulation on Kathbar system
Penthouse/Roof
(Extends between levels)
None Provided 150 LF 1 O&M; Remove at renovation 7 n/a $7,500
H-66
Gray and black mastic applied to short sections on non-ACM foam glass insulation at hangers along chilled water piping
Crawlspace
CH07, CH15, CH21,
CH22
1,023 LF 2 O&M; Remove at renovation 6 n/a $14,322
H-67
Multi-colored layered mastics-applied to open mesh wrapped, foil-kraft, rigid cellular foam insulation on water piping
Crawlspace
CH08, CH14, CH19, CH23,
CH24, CH25, CH26, CH36,
CH37, CH38 CH51, CH52,
CH72
830 LF 4 O&M; Remove at renovation 4 n/a $11,620
H-68
Black mastic-below white non-ACM mastic applied to sections of foam glass at hangers insulated with kraft faced fiberglass
Crawlspace
CH12, CH18, CH45,
CH61, CH63
1,350 LF 1 O&M; Remove at renovation 7 n/a $18,900
H-69 Hard gray and black mastic/coating- applied to non-
ACM black, flexible, cellular rubber foam insulation Crawlspace CH56, CH57, CH58 214 LF 1 O&M; Remove at renovation 7 n/a $2,996
H-70 White mastic-applied to fiberglass insulation Crawlspace None Provided 25 SF 1 O&M; Remove at renovation 7 n/a $800
H-71 Off-white mastic-applied over fiberglass insulation on HVAC piping
Corridor2BB1, throughout Block BB
LB-01, LB-02, LB-20
40 SF (Likely throughout Block BB) 1 O&M; Remove at renovation 7 n/a
$126 (3.15 per square foot)
H-72 Off-white/gray mastic- applied to fiberglass duct insulation Roof None Provided 1,220 SF 1 O&M; Remove at renovation 7 n/a $2,500
H-73 White mastic-applied to fiberglass on roof drain insulation
Penthouse (Extends between levels) RP-08 150 LF 1 O&M; Remove at renovation 7 n/a $2,200
H-74
Brownish-black mastics/sealants- applied to non-
ACM insulation on induction unit piping (some covered by newer white ACM mastic)
Throughout Original
Blocks (A,B, & C) None Provided
~2 SQ per LF where present 1 O&M; Remove at renovation n/a n/a $4.50 / SF
H-75 White mastic-applied to non-ACM insulation on induction unit piping
Throughout Original
Blocks (A,B, & C) None Provided
~2 SQ per LF where present 1 O&M; Remove at renovation n/a n/a $4.50 / SF
H-84 Black mastic beneath 12' blue Tile with mastic and underlying tile
A317-326, A331, A335-
342, A369 534-16 3,650 sf 1 O&M; Remove at renovation 7 n/a $7,700
APPENDIX C
PHOTOGRAPHS OF ASBESTOS MATERIALS
Photo H-01 Duct Sealant on metal ducts
Photo H-02B Duct Insulation Mastic
Photo H-09 Pipe fitting mud insulation on heating and domestic water lines
Photo H-12 Pipe fitting mud insulation on roof drains
Photo H-14
Pipe insulation-cloth wrapped calcium silicate type; pre-formed dense insulation installed in short sections at hangers
Photo H15 & H16 9” Floor Tile – assorted colors throughout
Photo H-20 Pipe Insulation- cloth wrapped, calcium silicate type, pre-formed dense insulation installed in short sections at domestic water pipe hangers
Photo H-21
Floor mastic-black mastic found below yellow mastic at the stairway landings
Photo H-25 12” Floor tile (tan and white marbled) over 9” grey/tan, and black
Photo H-27 Black floor mastic below gray leveling compound below carpet
Photo H-28 Sink undercoat (gray, white or lavender) on bottoms of stainless-steel sinks
Photo H-29 Black mastic on fiberglass pipe insulation on pipes above ceiling
Photo H-32 12” tan floor tile and mastic over white floor tile and black mastic
Photo H-36A
12” white floor tile and mastic installed over white tile and black
Photo H-36B 12” floor tile and black mastic black mastic below carpet
Photo H-37A 12” white floor tile and black mastic
Photo H-44 12” floor tile and mastic installed over 9" floor tile and black mastic
Photo H-61 Pipe insulation white mastic on fiberglass insulation at fittings of domestic water piping
Photo H-63 Metal 2-hour Fire Doors
(assumed ACM)
Photo H-64
Transite cement ACM vent pipe in vertical pipe chase
Photo H-64 Transite cement ACM vent pipe above lay-in ceiling tile
Photo H-66 Gray and black mastic-applied to short sections on non-ACM foam glass insulation at hangers along chilled water piping in crawl space
Photo H-67
Multi-colored layered mastics-applied to open mesh wrapped, foil-kraft, rigid cellular foam insulation on water piping
Photo H-68 Black mastic-below white non-ACM mastic applied to sections of foam glass at hangers insulated with kraft faced fiberglass
Photo H-69 Hard gray and black mastic/coating- applied to non-ACM black, flexible, cellular rubber foam insulation
Photo H-70 White mastic-applied to fiberglass insulation
Photo H-71 Off-white mastic-applied over fiberglass insulation on HVAC piping
Photo H-72 Off-white/gray mastic-applied to fiberglass insulation
Photo H-74 Brownish-black mastics/sealants- applied to non-ACM insulation on induction unit piping (some covered by newer white ACM mastic)
Photo H-75 White mastic-applied to non-ACM insulation on induction unit piping
Photo H-84 Black mastic beneath 12” blue floor tile with mastic and underlying tile
APPENDIX D
ASBESTOS LOCATIONS & SAMPLE LOCATION DRAWINGS
E
N
S
N
W
S
W
N
E
S
E
W
RALPH H. JOHNSON
VAMC
109 BEE ST.
CHARLESTON,
H66
H67
H68
H69
H70
SOUTH CAROLINA
29401
2021 ASBESTOS
REINSPECTION
S
L-5
CASTLE HILL
STAIR
NO.6
26.5
K
H2B
J
STAIR
NO.5
STAIR
NO.2
P-3 & P-4
PIT
S-1
S-2
PIT
G
H.1
H.2
H
27.4
P-5
PIT
STAIR
NO.3
F
M-6
PIT
E
D
CRAWL-
SPACE
C
B.8
1 2 3 4 5 5.75
STAIR
NO.4
STAIR
NO.1
25.2
26.1
Date
Drawn By
Checked By
NOVEMBER 2021
Project Number
CD2,3
Scale
ASSOCIATES, LLC.
1197 FARNSWORTH RD. ,
WATERVILLE, OHIO 43566
TEL: (567) 952-0212
2021-2
2021-11
2021-34
2021-6
2021-5
2021-35
2021-1
2021-33
2021-4
2021-7
2021-12
2021-8
2021-13
2021-9 2021-3
2021-10
2021-18
2021-21
2021-16
2021-17
2021-19
RALPH H. JOHNSON
VAMC
109 BEE ST.
CHARLESTON,
SOUTH CAROLINA
29401
2021 ASBESTOS
REINSPECTION
CASTLE HILL
Date
Drawn By
Checked By
NOVEMBER 2021
Project Number
Scale
ASSOCIATES, LLC.
1197 FARNSWORTH RD. ,
WATERVILLE, OHIO 43566
TEL: (567) 952-0212
E
N
S
N
W
S
W
N
E
S
E
W
A
UP TO
2ND FLR
SEE MATCHLINE B-B
STAIR NO.7
UP
UP
ELEV.
E-8
A
SEE MATCHLINE A-A
SOUTH
ENTRANCE
DOWN
UP
B B
ELEV.
L-5
X
X X X X X X X X X X X
MEDICAL
CENTER
DUMPSTER
AREA
(KEEP
CLEAR FOR
REMOVAL
PROCESS)
NO. 6
STAIRS
X X X X X X X X
NO. 2
STAIRS
ELEV.
P-4
ELEV.
P-3
ELEV.
S-1
ELEV.
S-2
STAIRS
NO. 5
ENTRANCE
EMERGENCY
ELEV.
P-5
NO. 3
STAIRS
ENTRANCE
EAST
ELEV.
M-6
FLOOR 1
NO. 1
STAIRS
NO. 4
STAIRS
FRONT ENTRANCE
NORTHWEST
CD4
X
X X XX X X
X XX X
X X
S H
A F
T
109 BEE ST.
CHARLESTON,
SOUTH CAROLINA
29401
2021 ASBESTOS
REINSPECTION
CASTLE HILL
Date
Drawn By
Checked By
NOVEMBER 2021
Project Number
Scale
ASSOCIATES, LLC.
1197 FARNSWORTH RD. ,
WATERVILLE, OHIO 43566
TEL: (567) 952-0212
CD5
H1
H37A
H29
H63
H21
H15
H32
FAC
DIETITIAN
OFFICE
SOCIAL
A136C
RED TEAM
MANAGER
A136B
VEST4
STORAGE
GENERAL
FAC
FACILITY MNGT
STORAGE ROOM
A135
A139D
STORAGE
A125
EXAM
TRMT
ROOM
A126
EXAM
TRMT
ROOM
A125A A126A
CLOSET CLOSET
ENTRANCE
EAST
COR1A5
FAC
RED TEAM
PHARMACIST
A176
A173
VEST9
PHYSICIANS
WORK ROOM
SUPPLIES
WARD
PHYSICIANS
WORK ROOM
TELE.
A172
CLINICAL
PHARMACIST
A171
FAC
COR1A4
FAC
CLOSET
A121A
CLOSET
A124A
ROOM
TRMT
EXAM
A124 A123
CLOSET
A123A
CLOSET
A122A
EXAM
TRMT
ROOM
A122
ROOM
TRMT
EXAM
A121
ROOM
TRMT
EXAM
A120
ROOM
TRMT
EXAM
A119
ROOM
TRMT
EXAM
A118
RED
TEAM
PHARM ROOM
TRMT
EXAM
A117D A117C
EMERGENCY
CRASH CART
A117
STAFF
TOILET
COR1A3
A117B
A109
EENT
NURSE
OFFICE
A117A
SOILED
UTILITY
ROOM
A116
EXAM/TRMT
ROOM
A115
EXAM/TRMT
ROOM
A114A
EXAM/TRMT
ROOM
FAC
A114
SPEECH
PATHOLOGY
A113
H.A.C.
H74
H75
A111
EXAM/TRMT
ROOM
A112
EXAM/TRMT
ROOM
RALPH H. JOHNSON VA MEDICAL CENTER
KEY PLAN
A11O
EXAM/TRMT
ROOM
WARD
SUPPLIES
A109A
WARD
SUPPLIES
A109B
A108
PHARMACY
RECEIVING
AREA
PHAR. REC
CLERK
A108B
A108A
HAC
A101
ENT
WAITING
AREA
A107A
EENT AUDIO
BOOTH #2
A107
ELECT.
CLO.
A105
A104
CHIEF OF
PHARMACY
SERVICE
A103
SEC'Y
PHARMACY
SERVICE
VEST6
A102
PHARMACY
BREAK ROOM
CO-ED
H/C
TOILET
COR1A1
COR1AB1
CLOSET
A169B
COMPUTER RM
A169A
A168
EXAM/TRMT
ROOM
A169
EXAM
TRMT
ROOM
A167
EXAM
TRMT
ROOM
A166
RED TEAM
VITALS ROOM
COLLECTION
LINEN
A165
CLO.
ELEC
VITAL
SIGNS
A163A
A170
A177
EXAM
TRMT
ROOM
TOILET,
MALE
STAFF
A178
A179
A163B
A180
VITAL
SIGNS
A163
EYE CLINIC
WAITING A162
ELEC.
CLO.
A161
PHYSICIANS
OFFICE
EXAM/
TRMT
ROOM
A156
COR1A9
EENT
WARD
SUPPLIES
A154
A152
A153
EXAM/
TRMT
ROOM
AUDIO
TECH
A182
A150
H.A.C.
CHAPLAIN
STORAGE
TELEPHONES
TOILET,
FEMALE
STAFF
A163C
RED TEAM
PHARMACIST
A164
RECEPTION
EYE CLINIC
A160
A160A
EXAM/TRMT
ROOM
EXAM/
TRMT
ROOM
A159
A158
EXAM/
TRMT
ROOM
EXAM/
TRMT
ROOM
A157
EXAM/
TRMT
ROOM
A155
LAZER RM.
AND VISUAL
FIELD
EENT AUDIO
BOOTH #1
A151A
A151
AUDIOLOGY
OFFICE
TOILET,
MALE
VISITOR
A183
A127
EXAM
TRMT
ROOM
A128
EXAM
TRMT
ROOM
A127A A128A
CLOSET CLOSET
A129
EXAM
TRMT
ROOM
A130
EXAM
TRMT
ROOM
A129A A130A
CLOSET CLOSET
A131
EXAM
TRMT
ROOM
A132
EXAM
TRMT
ROOM
A133
EXAM
TRMT
ROOM
A134
RED TEAM
LABORATORY
PRIMARY CARE
WAITING AREA
A136
A137
V.I.S.T.
COORD.
A138
A143
AUD. KITCHEN
A141
TOILET,
FEMALE
VISITOR
A140
TOILET,
MALE
VISITOR
MEDITAT.
ROOM
A144
CHAPEL
A145
SECRETARY
CHAPLAIN
SERVICE
A145A
CHAPLAIN'S
OFFICE
SHAFT
ELEC
CLO
A147
BACK
STAGE
A139F
FAC
COR1A6
COR1A9
ELEV.
P-5
A136A
CLERKS
A136F
AUDITOR…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .