Attachment 7_Caltrans SECTION 39 HMA.pdf
PDF 681 KB Posted
- Attached to
- Creek Fire Beasore Road Repairs Federal contract opportunity
- Solicitation number
- 12363N23R4018
- Issued by
- Department of Agriculture Forest Service
About this file
This federal solicitation seeks offers for repairs to Beasore Road on the Sierra National Forest in California. Work includes cleaning and reconditioning culverts, replacing 600 linear feet of 36" corrugated metal pipe, installing metal end sections and a metal spillway, 6 inches of full depth reclamation from mile post 24.14 to 29.63 with an optional geogrid, grading, compacting pulverized material, importing base rock, placing rip rap, a 4" layer of hot mix asphalt, and painting a double yellow center line. The project location is approximately 33.5 miles along Beasore Road. Offers must be emailed to Catherine Whitted at the USDA Forest Service by June 16, 2023 at 4:00 pm PDT. The magnitude of construction is estimated between $5,000,000.00 to $10,000,000.00.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Amendment 2 to Solicitation 12363N23R4018 - Creek Fire Beasore Road Repairs.pdf | ||
| Amendment 1 Solicitation 12363N23R4018 Creek Fire Beasore Road Repairs.pdf | ||
| Attachment 6_Section 834 - Drainage structure maintenance.pdf | ||
| Attachment 5_Fire Plan 2013 Creek Fire Beasore Road Repairs.pdf | ||
| Attachment 3_Drawings -Creek Fire Beasore Road Repairs_Updated 5-16-23.pdf | ||
| Attachment 2_FSSS - Creek Fire Beasore Road Repairs.pdf | ||
| Solicitation 12363N23R4018 Beasore Road Repairs.pdf | ||
| Attachment 8_Contractor Past Performance History Sheet.docx | DOCX document | |
| Attachment 4_ Wage Decision.pdf | ||
| Attachment 1_Map Beasore Road Repairs.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SECTION 39 ASPHALT CONCRETE
(Issued 06-05-09)
Replace Section 39 with:
SECTION 39 HOT MIX ASPHALT
39-1 GENERAL
39-1.01 DESCRIPTION
Section 39 includes specifications for producing and placing hot mix asphalt (HMA) by mixing aggregate and asphalt binder at a mixing plant and spreading and compacting the HMA mixture.
The special provisions specify one or more type of HMA, including:
1. Type A
2. Type B
3. Open graded friction course (OGFC). OGFC includes hot mix asphalt (open graded), rubberized hot mix asphalt (open graded) (RHMA-O) and rubberized hot mix asphalt
(open graded high binder) (RHMA-O-HB)
4. Rubberized hot mix asphalt (gap graded) (RHMA-G)
The special provisions specify the HMA construction process, including:
1. Standard
2. Method
3. Quality Control / Quality Assurance (QC / QA)
39-1.02 MATERIALS
39-1.02A Geosynthetic Pavement Interlayer
Geosynthetic pavement interlayer must comply with the specifications for pavement fabric or paving mat in Section 88-1.07, "Pavement Interlayer."
39-1.02B Tack Coat
Tack coat must comply with the specifications for asphaltic emulsion in Section 94, "Asphaltic Emulsion," or asphalt binder in Section 92, "Asphalts." Choose the type and grade.
Notify the Engineer if you dilute asphaltic emulsion with water. The weight ratio of added water to asphaltic emulsion must not exceed 1 to 1.
Measure added water either by weight or volume in compliance with the specifications for weighing, measuring, and metering devices under Section 9-1.01, "Measurement of Quantities," or you may use water meters from water districts, cities, or counties. If you measure water by volume, apply a conversion factor to determine the correct weight.
With each dilution, submit in writing:
1. The weight ratio of water to bituminous material in the original asphaltic emulsion
2. The weight of asphaltic emulsion before diluting
3. The weight of added water
4. The final dilution weight ratio of water to asphaltic emulsion
39-1.02C Asphalt Binder
Asphalt binder in HMA must comply with Section 92, "Asphalts," or Section 39-1.02D, "Asphalt Rubber Binder." The special provisions specify the grade.
Asphalt binder for geosynthetic pavement interlayer must comply with Section 92, "Asphalts." Choose from Grades PG 64-10, PG 64-16, or PG 70-10.
39-1.02D Asphalt Rubber Binder
General
Use asphalt rubber binder in RHMA-G, RHMA-O, and RHMA-O-HB. Asphalt rubber binder must be a combination of:
1. Asphalt binder
2. Asphalt modifier
3. Crumb rubber modifier (CRM)
The combined asphalt binder and asphalt modifier must be 80.0 ± 2.0 percent by weight of the asphalt rubber binder.
Asphalt Modifier
Asphalt modifier must be a resinous, high flash point, and aromatic hydrocarbon, and comply with:
Asphalt Modifier for Asphalt Rubber Binder
Quality Characteristic ASTM Specification
Viscosity, m /s (x 10
-6 ) at 100 °C D 445 X ± 3 a
Flash Point, CL.O.C., °C D 92 207 minimum
Molecular Analysis
Asphaltenes, percent by mass D 2007 0.1 maximum
Aromatics, percent by mass D 2007 55 minimum
Note:
a The symbol "X" is the proposed asphalt modifier viscosity. "X" must be between 19 and 36. A change in "X" requires a new asphalt rubber binder design.
Asphalt modifier must be from 2.0 percent to 6.0 percent by weight of the asphalt binder in the asphalt rubber binder.
Crumb Rubber Modifier
CRM consists of a ground or granulated combination of scrap tire CRM and high natural
CRM. CRM must be 75.0 ± 2.0 percent scrap tire CRM and 25.0 ± 2.0 percent high natural
CRM by total weight of CRM. Scrap tire CRM must be from any combination of automobile tires, truck tires, or tire buffings.
Sample and test scrap tire CRM and high natural CRM separately. CRM must comply with:
Crumb Rubber Modifier for Asphalt Rubber Binder
Quality Characteristic Test Method Specification
Scrap tire CRM gradation
(% passing No. 8 sieve)
LP-10 100
High natural CRM gradation
(% passing No. 10 sieve)
LP-10 100
Wire in CRM (% max.) LP-10 0.01
Fabric in CRM (% max.) LP-10 0.05
CRM particle length (inch max.)
a -- 3/16
CRM specific gravity a
CT 208 1.1 – 1.2
Natural rubber content in high natural CRM (%) a
ASTM D 297 40.0 – 48.0
Note:
Test at mix design and for Certificate of Compliance.
Only use CRM ground and granulated at ambient temperature. If steel and fiber are cryogenically separated, it must occur before grinding and granulating. Only use cryogenically produced CRM particles that can be ground or granulated and not pass through the grinder or granulator.
CRM must be dry, free-flowing particles that do not stick together. CRM must not cause foaming when combined with the asphalt binder and asphalt modifier. You may add calcium carbonate or talc up to 3 percent by weight of CRM.
Asphalt Rubber Binder Design and Profile
Submit in writing an asphalt rubber binder design and profile that complies with the asphalt rubber binder specifications. In the design, designate the asphalt, asphalt modifier, and CRM and their proportions. The profile must include the same component sources for the asphalt rubber binder used.
Design the asphalt rubber binder from testing you perform for each quality characteristic and for the reaction temperatures expected during production. The 24-hour (1,440-minute) interaction period determines the design profile. At a minimum, mix asphalt rubber binder components, take samples, and perform and record the following tests:
Asphalt Rubber Binder Reaction Design Profile
Test Minutes of Reaction a Limits
45 60 90 120 240 360 1440
Cone penetration @ 77 °F, 0.10-mm (ASTM D 217) X b X X 25 - 70
Resilience @ 77 °F, percent rebound (ASTM D 5329) X X X 18 min.
Field softening point, °F (ASTM D 36) X X X 125 - 165
Viscosity, centipoises (LP-11) X X X X X X X 1,500 - 4,000
Notes:
a Six hours (360 minutes) after CRM addition, reduce the oven temperature to 275 °F for a period of 16 hours. After the
16-hour (1320 minutes) cool-down after CRM addition, reheat the binder to the reaction temperature expected during production for sampling and testing at 24 hours (1440 minutes).
b "X" denotes required testing
Asphalt Rubber Binder
After interacting for a minimum of 45 minutes, asphalt rubber binder must comply with:
Asphalt Rubber Binder
Quality Characteristic Test for Quality
Control or Acceptance
Test Method Specification
Minimum Maximum
Cone penetration @ 77 °F, 0.10-mm Acceptance ASTM D 217 25 70
Resilience @ 77 °F, percent rebound Acceptance ASTM D 5329 18 --
Field softening point, °F Acceptance ASTM D 36 125 165
Viscosity @ 375 °F, centipoises Quality Control LP-11 1,500 4,000
39-1.02E Aggregate
Aggregate must be clean and free from deleterious substances. Aggregate:
1. Retained on the No. 4 sieve is coarse
2. Passing the No. 4 sieve is fine
3. Added and passing the No. 30 sieve is supplemental fine, including:
3.1. Hydrated lime
3.2. Portland cement
3.3. Fines from dust collectors
The special provisions specify the aggregate gradation for each HMA type.
The specified aggregate gradation is before the addition of asphalt binder and includes supplemental fines. The Engineer tests for aggregate grading under California Test 202, modified by California Test 105 if there is a difference in specific gravity of 0.2 or more between the coarse and fine parts of different aggregate blends.
Choose a sieve size target value (TV) within each target value limit presented in the aggregate gradation tables.
Aggregate Gradation
(Percentage Passing)
HMA Types A and B
3/4–inch HMA Types A and B
Sieve Sizes Target Value Limits Allowable Tolerance
1" 100 —
3/4" 90 - 100 TV ±5
1/2" 70 - 90 TV ±6
No. 4 45 - 55 TV ±7
No. 8 32 - 40 TV ±5
No. 30 12 - 21 TV ±4
No. 200 2 - 7 TV ±2
1/2–inch HMA Types A and B
Sieve Sizes Target Value Limits Allowable Tolerance
3/4" 100 —
1/2" 95 - 99 TV ±6
3/8" 75 - 95 TV ±6
No. 4 55 - 66 TV ±7
No. 8 38 - 49 TV ±5
No. 30 15 - 27 TV ±4
No. 200 2 - 8 TV ±2
3/8–inch HMA Types A and B
Sieve Sizes Target Value Limits Allowable Tolerance
1/2" 100 —
3/8" 95 - 100 TV ±6
No. 4 58 - 72 TV ±7
No. 8 34 - 48 TV ±6
No. 30 18 - 32 TV ±5
No. 200 2 - 9 TV ±2
No. 4 HMA Types A and B
Sieve Sizes Target Value Limits Allowable Tolerance
3/8" 100 —
No. 4 95 - 100 TV ±7
No. 8 72 - 77 TV ±7
No. 30 37 - 43 TV ±7
No. 200 2 - 12 TV ±4
Rubberized Hot Mix Asphalt - Gap Graded (RHMA-G)
3/4–inch RHMA-G
Sieve Sizes Target Value Limits Allowable Tolerance
1" 100 —
3/4" 95 - 100 TV ±5
1/2" 83 - 87 TV ±6
3/8" 65 - 70 TV ±6
No. 4 28 - 42 TV ±7
No. 8 14 - 22 TV ±5
No. 200 0 - 6 TV ±2
1/2–inch RHMA-G
Sieve Sizes Target Value Limits Allowable Tolerance
3/4" 100 —
1/2" 90 - 100 TV ±6
3/8" 83 - 87 TV ±6
No. 4 28 - 42 TV ±7
No. 8 14 - 22 TV ±5
No. 200 0 - 6 TV ±2
Open Graded Friction Course (OGFC)
1–inch OGFC
Sieve Sizes Target Value Limits Allowable Tolerance
1 1/2" 100 —
1" 99 - 100 TV ±5
3/4" 85 - 96 TV ±5
1/2" 55 - 71 TV ±6
No. 4 10 - 25 TV ±7
No. 8 6 - 16 TV ±5
No. 200 1 - 6 TV ±2
1/2–inch OGFC
Sieve Sizes Target Value Limits Allowable Tolerance
3/4" 100 —
1/2" 95 - 100 TV ±6
3/8" 78 - 89 TV ±6
No. 4 28 - 37 TV ±7
No. 8 7 - 18 TV ±5
No. 30 0 - 10 TV ±4
No. 200 0 - 3 TV ±2
3/8–inch OGFC
Sieve Sizes Target Value Limits Allowable Tolerance
1/2" 100 —
3/8" 90 - 100 TV ±6
No. 4 29 - 36 TV ±7
No. 8 7 - 18 TV ±6
No. 30 0 - 10 TV ±5
No. 200 0 - 3 TV ±2
Before the addition of asphalt binder and lime treatment, aggregate must comply with:
Aggregate Quality
Quality Characteristic Test Method HMA Type
A B RHMA-G OGFC
Percent of crushed particles
Coarse aggregate (% min.)
One fractured face
Two fractured faces
Fine aggregate (% min)
(Passing No. 4 sieve and retained on No. 8 sieve.)
One fractured face
CT 205
Los Angeles Rattler (% max.)
Loss at 100 Rev.
Loss at 500 Rev.
CT 211
Sand equivalent (min.)
a
CT 217 47 42 47 --
Fine aggregate angularity (% min.)
b
AASHTO T
304 Method
A
Flat and elongated particles (% max.
by weight @ 5:1)
ASTM D
Notes:
a Reported value must be the average of 3 tests from a single sample.
b The Engineer waives this specification if HMA contains less than 10 percent of nonmanufactured sand by weight of total aggregate. Manufactured sand is fine aggregate produced by crushing rock or gravel.
39-1.02F Reclaimed Asphalt Pavement
You may produce HMA using reclaimed asphalt pavement (RAP). HMA produced using
RAP must comply with the specifications for HMA except aggregate quality specifications do not apply to RAP. You may substitute RAP aggregate for a part of the virgin aggregate in HMA in a quantity not exceeding 15.0 percent of the aggregate blend. Do not use RAP in OGFC and
RHMA-G.
Assign the substitution rate of RAP aggregate for virgin aggregate with the job mix formula
(JMF) submittal. The JMF must include the percent of RAP used. If you change your assigned
RAP aggregate substitution rate by more than 5 percent (within the 15.0 percent limit), submit a new JMF.
Process RAP from asphalt concrete. You may process and stockpile RAP throughout the project's life. Prevent material contamination and segregation. Store RAP in stockpiles on smooth surfaces free of debris and organic material. Processed RAP stockpiles must consist only of homogeneous RAP.
39-1.03 HOT MIX ASPHALT MIX DESIGN REQUIREMENTS
39-1.03A General
A mix design consists of performing California Test 367 and laboratory procedures on combinations of aggregate gradations and asphalt binder contents to determine the optimum binder content (OBC) and HMA mixture qualities. If RAP is used, use Laboratory Procedure
LP-9. The result of the mix design becomes the proposed JMF.
Use Form CEM-3512 to document aggregate quality and mix design data. Use Form CEM-
3511 to present the JMF.
Laboratories testing aggregate qualities and preparing the mix design and JMF must be qualified under the Department's Independent Assurance Program. Take samples under
California Test 125.
The Engineer reviews the aggregate qualities, mix design, and JMF and verifies and accepts the JMF.
You may change the JMF during production. Do not use the changed JMF until the Engineer accepts it. Except when adjusting the JMF in compliance with Section 39-1.03E, "Job Mix
Formula Verification," perform a new mix design and submit in writing a new JMF submittal for changing any of the following:
1. Target asphalt binder percentage
2. Asphalt binder supplier
3. Asphalt rubber binder supplier
4. Component materials used in asphalt rubber binder or percentage of any component materials
5. Combined aggregate gradation
6. Aggregate sources
7. Substitution rate for RAP aggregate of more than 5 percent
8. Any material in the JMF
For OGFC, submit in writing a complete JMF submittal except asphalt binder content. The
Engineer determines the asphalt binder content under California Test 368 within 20 days of your complete JMF submittal and provides you a Form CEM-3513.
39-1.03B Hot Mix Asphalt Mix Design
Perform a mix design that produces HMA in compliance with:
Hot Mix Asphalt Mix Design Requirements
Quality Characteristic Test Method HMA Type
A B RHMA-G
Air voids content (%) CT 367 a
4.0 4.0 Special
Provisions
Voids in mineral aggregate (% min.)
No. 4 grading
3/8" grading
1/2" grading
3/4" grading
LP-2
17.0
15.0
14.0
13.0
17.0
15.0
18.0 – 23.0 b
18.0 – 23.0
Voids filled with asphalt (%)
No. 4 grading
3/8" grading
1/2" grading
3/4" grading
LP-3
76.0 – 80.0
73.0 – 76.0
65.0 – 75.0
76.0 – 80.0
73.0 – 76.0
Note d
Dust proportion
No. 4 and 3/8" gradings
1/2" and 3/4" gradings
LP-4
0.9 – 2.0
0.6 – 1.3
Note d
Stabilometer value (min.)
c
No. 4 and 3/8" gradings
1/2" and 3/4" gradings
CT 366
Notes:
a Calculate the air voids content of each specimen using California Test 309 and Lab Procedure LP-1. Modify
California Test 367, Paragraph C5, to use the exact air voids content specified in the selection of OBC.
b Voids in mineral aggregate for RHMA-G must be within this range.
c Modify California Test 304, Part 2.B.2.c: "After compaction in the compactor, cool to 140 °± 5 °F by allowing the briquettes to cool at room temperature for 0.5-hour, then place the briquettes in the oven at 140 °F for a minimum of 2 hours and not more than 3 hours."
d Report this value in the JMF submittal.
For stability and air voids content, prepare 3 briquettes at the OBC and test for compliance.
Report the average of 3 tests. Prepare new briquettes and test if the range of stability for the 3 briquettes is more than 8 points. The average air void content may vary from the specified air void content by ±0.5 percent.
You may use the briquettes used for stability testing to determine bulk specific gravity under
CT 308. If you use the same briquettes and tests using bulk specific gravity fail, you may prepare 3 new briquettes and determine a new bulk specific gravity.
39-1.03C Job Mix Formula Submittal
Each JMF submittal must consist of:
1. Proposed JMF on Form CEM-3511
2. Mix design documentation on Form CEM-3512 dated within 12 months of submittal
3. JMF verification on Form CEM-3513, if applicable
4. JMF renewal on Form CEM-3514, if applicable
5. Materials Safety Data Sheets (MSDS) for:
5.1. Asphalt binder
5.2. Base asphalt binder used in asphalt rubber binder
5.3. CRM and asphalt modifier used in asphalt rubber binder
5.4. Blended asphalt rubber binder mixture
5.5. Supplemental fine aggregate except fines from dust collectors
5.6. Antistrip additives
If the Engineer requests in writing, sample the following materials in the presence of the
Engineer and place in labeled containers weighing no more than 50 pounds each:
1. Coarse, fine, and supplemental fine aggregate from stockpiles, cold feed belts, or hot bins. Samples must include at least 120 pounds for each coarse aggregate, 80 pounds for each fine aggregate, and 10 pounds for each type of supplemental fines. The Department combines these aggregate samples to comply with the JMF target values submitted on
Form CEM-3511.
2. RAP from stockpiles or RAP system. Samples must be at least 60 pounds.
3. Asphalt binder from the binder supplier. Samples must be in two 1-quart cylindrical shaped cans with open top and friction lids.
4. Asphalt rubber binder with the components blended in the proportions to be used.
Samples must be in four 1-quart cylindrical shaped cans with open top and friction lids.
Notify the Engineer in writing at least 2 business days before sampling materials. For aggregate and RAP, split the samples into at least 4 parts. Submit 3 parts to the Engineer and use
1 part for your testing.
39-1.03D Job Mix Formula Review
The Engineer reviews each mix design and proposed JMF within 5 business days from the complete JMF submittal. The review consists of reviewing the mix design procedures and comparing the proposed JMF with the specifications.
The Engineer may verify aggregate qualities during this review period.
39-1.03E Job Mix Formula Verification
If you cannot submit a Department-verified JMF on Form CEM-3513 dated within 12 months before HMA production, the Engineer verifies the JMF.
Based on your testing and production experience, you may submit on Form CEM-3511 an adjusted JMF before the Engineer's verification testing. JMF adjustments may include a change in the:
1. Asphalt binder content target value up to ±0.6 percent from the optimum binder content value submitted on Form CEM-3512 except do not adjust the target value for asphalt rubber binder for RHMA-G below 7.0 percent
2. Aggregate gradation target values within the target value limits specified in the aggregate gradation tables
For HMA Type A, Type B, and RHMA-G, the Engineer verifies the JMF from samples taken from HMA produced by the plant to be used. Notify the Engineer in writing at least 2 business days before sampling materials.
In the Engineer's presence and from the same production run, take samples of:
1. Aggregate
2. Asphalt binder
3. RAP
4. HMA
Sample aggregate from cold feed belts or hot bins. Sample RAP from the RAP system.
Sample HMA under California Test 125 except if you request in writing and the Engineer approves, you may sample from any of the following locations:
1. The plant
2. A truck
3. A windrow
4. The paver hopper
5. The mat behind the paver
You may sample from a different project including a non-Department project if you make arrangements for the Engineer to be present during sampling.
For aggregate, RAP, and HMA, split the samples into at least 4 parts and label their containers. Submit 3 split parts to the Engineer and use 1 part for your testing.
The Engineer verifies each proposed JMF within 20 days of receiving verification samples.
If you request in writing, the Engineer verifies RHMA-G quality requirements within 3 business days of sampling. Verification is testing for compliance with the specifications for:
1. Aggregate quality
2. Aggregate gradation (JMF TV ± tolerance)
3. Asphalt binder content (JMF TV ± tolerance)
4. HMA quality specified in the table Hot Mix Asphalt Mix Design Requirements except:
4.1. Air voids content (design value ± 2.0 percent)
4.2. Voids filled with asphalt (report only if an adjustment for asphalt binder content target value is less than or equal to ± 0.3 percent from OBC)
4.3. Dust proportion (report only if an adjustment for asphalt binder content target value is less than or equal to ± 0.3 percent from OBC)
The Engineer prepares 3 briquettes from a single split sample. To verify the JMF for stability and air voids content, the Engineer tests the 3 briquettes and reports the average of 3 tests. The Engineer prepares new briquettes if the range of stability for the 3 briquettes is more than 8 points.
The Engineer may use the briquettes used for stability testing to determine bulk specific gravity under CT 308. If the Engineer uses the same briquettes and the tests using bulk specific gravity fail, the Engineer prepares 3 new briquettes and determines a new bulk specific gravity.
If the Engineer verifies the JMF, the Engineer provides you a Form CEM-3513.
If the Engineer's tests on plant-produced samples do not verify the JMF, the Engineer notifies you in writing and you must submit a new JMF submittal or submit an adjusted JMF based on your testing. JMF adjustments may include a change in the:
1. Asphalt binder content target value up to ±0.6 percent from the optimum binder content value submitted on Form CEM-3512 except do not adjust the target value for asphalt rubber binder for RHMA-G below 7.0 percent
2. Aggregate gradation target values within the target value limits specified in the aggregate gradation tables
You may adjust the JMF only once due to a failed verification test. An adjusted JMF requires a new Form CEM-3511 and verification of a plant-produced sample.
The Engineer reverifies the JMF if HMA production has stopped for longer than 30 days and the verified JMF is older than 12 months.
For each HMA type and aggregate size specified, the Engineer verifies at the State's expense up to 2 proposed JMF including a JMF adjusted after verification failure. The Engineer deducts
$3,000 from payments for each verification exceeding this limit. This deduction does not apply to verifications initiated by the Engineer or if a JMF expires while HMA production is stopped longer than 30 days.
39-1.03F Job Mix Formula Renewal
You may request a JMF renewal by submitting the following:
1. Proposed JMF on Form CEM-3511
2. A previously verified JMF documented on Form CEM-3513 dated within 12 months
3. Mix design documentation on Form CEM-3512 used for the previously verified JMF
If the Engineer requests in writing, sample the following materials in the presence of the
Engineer and place in labeled containers weighing no more than 50 pounds each:
1. Coarse, fine, and supplemental fine aggregate from stockpiles, cold feed belts, or hot bins. Samples must include at least 120 pounds for each coarse aggregate, 80 pounds for each fine aggregate, and 10 pounds for each type of supplemental fines. The Department combines these aggregate samples to comply with the JMF target values submitted on
Form CEM-3511.
2. RAP from stockpiles or RAP system. Samples must be at least 60 pounds.
3. Asphalt binder from the binder supplier. Samples must be in two 1-quart cylindrical shaped cans with open top and friction lids.
4. Asphalt rubber binder with the components blended in the proportions to be used.
Samples must be in four 1-quart cylindrical shaped cans with open top and friction lids.
Notify the Engineer in writing at least 2 business days before sampling materials. For aggregate and RAP, split samples into at least 4 parts. Submit 3 parts to the Engineer and use 1 part for your testing.
The Engineer reviews each complete JMF renewal submittal within 5 business days.
The Engineer may verify aggregate qualities during this review period.
Notify the Engineer in writing at least 2 business days before sampling materials. For aggregate, RAP, and HMA, split the samples into at least 4 parts. Submit 3 parts to the Engineer and use 1 part for your testing.
The Engineer verifies the JMF renewal submittal under Section 39-1.03E, "Job Mix Formula
Verification," except:
1. The Engineer retains samples until you provide test results for your part on Form CEM-
3514.
2. The Engineer tests samples of materials obtained from the HMA production unit after you submit test results that comply with the specifications for the quality characteristics under Section 39-1.03E, "Job Mix Formula Verification."
3. The Engineer verifies each proposed JMF within 30 days of receiving verification samples.
4. You may not adjust the JMF due to a failed verification.
5. For each HMA type and aggregate gradation specified, the Engineer verifies at the State's expense 1 proposed JMF.
If the Engineer verifies the JMF renewal, the Engineer provides you a Form CEM-3513.
39-1.03G Job Mix Formula Acceptance
You may start HMA production if:
1. The Engineer's review of the JMF shows compliance with the specifications.
2. The Department has verified the JMF within 12 months before HMA production.
3. The Engineer accepts the verified JMF.
39-1.04 CONTRACTOR QUALITY CONTROL
39-1.04A General
Establish, maintain, and change a quality control system to ensure materials and work comply with the specifications. Submit quality control test results to the Engineer within 3 days of a request except when QC / QA is specified.
You must identify the HMA sampling location in your Quality Control Plan. During production, take samples under California Test 125 except if you request in writing and the
Engineer approves, you may sample HMA from:
2. The truck
3. A windrow
39-1.04B Prepaving Conference
Meet with the Engineer at a prepaving conference at a mutually agreed time and place.
Discuss methods of performing the production and paving work.
39-1.04C Asphalt Rubber Binder
Take asphalt rubber binder samples from the feed line connecting the asphalt rubber binder tank to the HMA plant. Sample and test asphalt rubber binder under Laboratory Procedure LP-
11.
Test asphalt rubber binder for compliance with the viscosity specifications in Section 39-
1.02, "Materials." During asphalt rubber binder production and HMA production using asphalt rubber binder, measure viscosity every hour with not less than 1 reading for each asphalt rubber binder batch. Log measurements with corresponding time and asphalt rubber binder temperature. Submit the log daily in writing.
Submit a Certificate of Compliance under Section 6-1.07, "Certificates of Compliance."
With the Certificate of Compliance, submit test results in writing for CRM and asphalt modifier with each truckload delivered to the HMA plant. A Certificate of Compliance for asphalt modifier must not represent more than 5,000 pounds. Use an AASHTO-certified laboratory for testing.
Sample and test gradation and wire and fabric content of CRM once per 10,000 pounds of scrap tire CRM and once per 3,400 pounds of high natural CRM. Sample and test scrap tire
CRM and high natural CRM separately.
Submit certified weight slips in writing for the CRM and asphalt modifier furnished.
39-1.04D Aggregate
Determine the aggregate moisture content and RAP moisture content in continuous mixing plants at least twice a day during production and adjust the plant controller. Determine the RAP moisture content in batch mixing plants at least twice a day during production and adjust the plant controller.
39-1.04E Reclaimed Asphalt Pavement
Perform RAP quality control testing each day.
Sample RAP once daily and determine the RAP aggregate gradation under Laboratory
Procedure LP-9 and submit the results to the Engineer in writing with the combined aggregate gradation.
39-1.04F Density Cores
To determine density for Standard and QC / QA projects, take 4-inch or 6-inch diameter density cores at least once every 5 business days. Take 1 density core for every 250 tons of
HMA from random locations the Engineer designates. Take density cores in the Engineer's presence and backfill and compact holes with material authorized by the Engineer. Before submitting a density core to the Engineer, mark it with the density core's location and place it in a protective container.
If a density core is damaged, replace it with a density core taken within 1 foot longitudinally from the original density core. Relocate any density core located within 1 foot of a rumble strip to 1 foot transversely away from the rumble strip.
39-1.04G Briquettes
Prepare 3 briquettes for each stability and air voids content determination. Report the average of 3 tests. Prepare new briquettes and test if the range of stability for the 3 briquettes is more than 12 points.
You may use the briquettes used for stability testing to determine bulk specific gravity under
CT 308. If you use these briquettes and tests using bulk specific gravity fail, you may prepare 3 new briquettes and determine a new bulk specific gravity.
39-1.05 ENGINEER'S ACCEPTANCE
The Engineer's acceptance of HMA is specified in the sections for each HMA construction process.
The Engineer samples materials for testing under California Test 125 and the applicable test method except samples may be taken from:
1. The plant from:
1.1. A truck
1.2. An automatic sampling device
2. The mat behind the paver
Sampling must be independent of Contractor quality control, statistically-based, and random.
If you request, the Engineer splits samples and provides you with a part.
The Engineer accepts HMA based on:
1. Accepted JMF
2. Accepted QCP for Standard and QC / QA
3. Compliance with the HMA Acceptance tables
4. Acceptance of a lot for QC / QA
5. Visual inspection
The Engineer prepares 3 briquettes for each stability and air voids content determination.
The Engineer reports the average of 3 tests. The Engineer prepares new briquettes and test if the range of stability for the 3 briquettes is more than 8 points.
The Engineer may use the briquettes used for stability testing to determine bulk specific gravity under CT 308. If the Engineer uses the same briquettes and the tests using bulk specific gravity fail, the Engineer prepares 3 new briquettes and determines a new bulk specific gravity.
39-1.06 DISPUTE RESOLUTION
You and the Engineer must work together to avoid potential conflicts and to resolve disputes regarding test result discrepancies. Notify the Engineer in writing within 5 days of receiving a test result if you dispute the test result.
If you or the Engineer dispute each other's test results, submit written quality control test results and copies of paperwork including worksheets used to determine the disputed test results to the Engineer. An Independent Third Party (ITP) performs referee testing. Before the ITP participates in a dispute resolution, the ITP must be accredited under the Department's
Independent Assurance Program. The ITP must be independent of the project. By mutual agreement, the ITP is chosen from:
1. A Department laboratory
2. A Department laboratory in a district or region not in the district or region the project is located
3. The Transportation Laboratory
4. A laboratory not currently employed by you or your HMA producer
If split quality control or acceptance samples are not available, the ITP uses any available material representing the disputed HMA for evaluation.
39-1.07 PRODUCTION START-UP EVALUATION
The Engineer evaluates HMA production and placement at production start-up.
Within the first 750 tons produced on the first day of HMA production, in the Engineer's presence and from the same production run, take samples of:
3. RAP
4. HMA
Sample aggregate from cold feed belts or hot bins. Take RAP samples from the RAP system.
Sample HMA under California Test 125 except if you request in writing and the Engineer approves, you may sample HMA from:
2. The truck
3. A windrow
For aggregate, RAP, and HMA, split the samples into at least 4 parts and label their containers. Submit 3 split parts to the Engineer and keep 1 part.
For Standard and QC / QA projects, you and the Engineer must test the split samples and report test results in writing within 3 business days of sampling. If you proceed before receipt of the test results, the Engineer may consider the HMA placed to be represented by these test results.
For Standard and QC / QA projects, take 4-inch or 6-inch diameter density cores within the first 750 tons on the first day of HMA production. For each density core, the Engineer reports the bulk specific gravity determined under California Test 308, Method A in addition to the percent of maximum theoretical density. You may test for in-place density at the density core locations and include them in your production tests for percent of maximum theoretical density.
39-1.08 PRODUCTION
39-1.08A General
Produce HMA in a batch mixing plant or a continuous mixing plant. Proportion aggregate by hot or cold feed control.
HMA plants must be Department-qualified. Before production, the HMA plant must have a current qualification under the Department's Materials Plant Quality Program.
During production, you may adjust:
1. Hot or cold feed proportion controls for virgin aggregate and RAP
2. The set point for asphalt binder content
39-1.08B Mixing
Mix HMA ingredients into a homogeneous mixture of coated aggregates.
Asphalt binder must be between 275 °F and 375 °F when mixed with aggregate.
Asphalt rubber binder must be between 375 °F and 425 °F when mixed with aggregate.
When mixed with asphalt binder, aggregate must not be more than 325 °F except aggregate for OGFC with unmodified asphalt binder must be not more than 275 °F. Aggregate temperature specifications do not apply when you use RAP.
HMA with or without RAP must not be more than 325 °F.
39-1.08C Asphalt Rubber Binder
Deliver scrap tire CRM and high natural CRM in separate bags.
Either proportion and mix asphalt binder, asphalt modifier, and CRM simultaneously or premix the asphalt binder and asphalt modifier before adding CRM. If you premix asphalt binder and asphalt modifier, mix them for at least 20 minutes. When you add CRM, the asphalt binder and asphalt modifier must be between 375 °F and 440 °F.
Do not use asphalt rubber binder during the first 45 minutes of the reaction period. During this period, the asphalt rubber binder mixture must be between 350 °F and the lower of 425 °F or
25 °F below the asphalt binder's flash point indicated in the MSDS.
If any asphalt rubber binder is not used within 4 hours after the reaction period, discontinue heating. If the asphalt rubber binder drops below 375 °F, reheat before use. If you add more scrap tire CRM to the reheated asphalt rubber binder, the binder must undergo a 45-minute reaction period. The added scrap tire CRM must not exceed 10 percent of the total asphalt rubber binder weight. Reheated and reacted asphalt rubber binder must comply with the viscosity specifications for asphalt rubber binder in Section 39-1.02, "Materials." Do not reheat asphalt rubber binder more than twice.
39-1.09 SUBGRADE, TACK COAT, AND GEOSYNTHETIC PAVEMENT
INTERLAYER
39-1.09A General
Prepare subgrade or apply tack coat to surfaces receiving HMA. If specified, place geosynthetic pavement interlayer over a coat of asphalt binder.
39-1.09B Subgrade
Subgrade to receive HMA must comply with the compaction and elevation tolerance specifications in the sections for the material involved. Subgrade must be free of loose and extraneous material. If HMA is paved on existing base or pavement, remove loose paving particles, dirt, and other extraneous material by any means including flushing and sweeping.
39-1.09C Tack Coat
Apply tack coat:
1. To existing pavement including planed surfaces
2. Between HMA layers
3. To vertical surfaces of:
3.1. Curbs
3.2. Gutters
3.3. Construction joints
Before placing HMA, apply tack coat in 1 application at the minimum residual rate specified for the condition of the underlying surface:
Tack Coat Application Rates for HMA Type A, Type B, and RHMA-G
HMA over:
Minimum Residual Rates (gallons per square yard)
CSS1/CSS1h, SS1/SS1h and
QS1h/CQS1h
Asphaltic
Emulsion
CRS1/CRS2,
RS1/RS2 and
QS1/CQS1
Asphaltic
Emulsion
Asphalt Binder and
PMRS2/PMCRS2
and
PMRS2h/PMCRS2h
Asphaltic Emulsion
New HMA (between layers) 0.02 0.03 0.02
Existing AC and PCC pavement 0.03 0.04 0.03
Planed pavement 0.05 0.06 0.04
Tack Coat Application Rates for OGFC
OGFC over:
Minimum Residual Rates (gallons per square yard)
CSS1/CSS1h, SS1/SS1h and
QS1h/CQS1h
Asphaltic
Emulsion
CRS1/CRS2,
RS1/RS2 and
QS1/CQS1
Asphaltic
Emulsion
Asphalt Binder and
PMRS2/PMCRS2
and
PMRS2h/PMCRS2h
Asphaltic Emulsion
New HMA 0.03 0.04 0.03
Existing AC and PCC pavement 0.05 0.06 0.04
Planed pavement 0.06 0.07 0.05
If you dilute asphaltic emulsion, mix until homogeneous before application.
Apply to vertical surfaces with a residual tack coat rate that will thoroughly coat the vertical face without running off.
If you request in writing and the Engineer authorizes, you may:
1. Change tack coat rates
2. Omit tack coat between layers of new HMA during the same work shift if:
2.1. No dust, dirt, or extraneous material is present
2.2. The surface is at least 140 °F
Immediately in advance of placing HMA, apply additional tack coat to damaged areas or where loose or extraneous material is removed.
Close areas receiving tack coat to traffic. Do not track tack coat onto pavement surfaces beyond the job site.
Asphalt binder tack coat must be between 285 °F and 350 °F when applied.
39-1.09D Geosynthetic Pavement Interlayer
Place geosynthetic pavement interlayer in compliance with the manufacturer's recommendations.
Before placing the geosynthetic pavement interlayer and asphalt binder:
1. Repair cracks 1/4 inch and wider, spalls, and holes in the pavement. The State pays for this repair work under Section 4-1.03D, "Extra Work."
2. Clean the pavement of loose and extraneous material.
Immediately before placing the interlayer, apply 0.25 gallon ± 0.03 gallon of asphalt binder per square yard of interlayer or until the fabric is saturated. Apply asphalt binder the width of the geosynthetic pavement interlayer plus 3 inches on each side. At interlayer overlaps, apply asphalt binder on the lower interlayer the same overlap distance as the upper interlayer.
Align and place the interlayer with no overlapping wrinkles, except a wrinkle that overlaps may remain if it is less than 1/2 inch thick. If the overlapping wrinkle is more than 1/2 inch thick, cut the wrinkle out and overlap the interlayer no more than 2 inches.
The minimum HMA thickness over the interlayer must be 0.12 foot thick including conform tapers. Do not place the interlayer on a wet or frozen surface.
Overlap the interlayer borders between 2 inches and 4 inches. In the direction of paving, overlap the following roll with the preceding roll at any break.
You may use rolling equipment to correct distortions or wrinkles in the interlayer.
If asphalt binder tracked onto the interlayer or brought to the surface by construction equipment causes interlayer displacement, cover it with a small quantity of HMA.
Before placing HMA on the interlayer, do not expose the interlayer to:
1. Traffic except for crossings under traffic control and only after you place a small HMA quantity
2. Sharp turns from construction equipment
3. Damaging elements
Pave HMA on the interlayer during the same work shift.
39-1.10 SPREADING AND COMPACTING EQUIPMENT
Paving equipment for spreading must be:
1. Self-propelled
2. Mechanical
3. Equipped with a screed or strike-off assembly that can distribute HMA the full width of a traffic lane
4. Equipped with a full-width compacting device
5. Equipped with automatic screed controls and sensing devices that control the thickness, longitudinal grade, and transverse screed slope
Install and maintain grade and slope references.
The screed must produce a uniform HMA surface texture without tearing, shoving, or gouging.
The paver must not leave marks such as ridges and indentations unless you can eliminate them by rolling.
Rollers must be equipped with a system that prevents HMA from sticking to the wheels.
You may use a parting agent that does not damage the HMA or impede the bonding of layers.
In areas inaccessible to spreading and compacting equipment:
1. Spread the HMA by any means to obtain the specified lines, grades and cross sections.
2. Use a pneumatic tamper, plate compactor, or equivalent to achieve thorough compaction.
39-1.11 TRANSPORTING, SPREADING, AND COMPACTING
Do not pave HMA on a wet pavement or frozen surface.
You may deposit HMA in a windrow and load it in the paver if:
1. Paver is equipped with a hopper that automatically feeds the screed
2. Loading equipment can pick up the windrowed material and deposit it in the paver hopper without damaging base material
3. Activities for deposit, pick-up, loading, and paving are continuous
4. HMA temperature in the windrow does not fall below 260 °F
You may pave HMA in 1 or more layers on areas less than 5 feet wide and outside the traveled way including shoulders. You may use mechanical equipment other than a paver for these areas. The equipment must produce a uniform smoothness and texture.
HMA handled, spread, or windrowed must not stain the finished surface of any improvement including pavement.
Do not use petroleum products such as kerosene or diesel fuel to release HMA from trucks, spreaders, or compactors.
HMA must be free of:
1. Segregation
2. Coarse or fine aggregate pockets
3. Hardened lumps
Longitudinal joints in the top layer must match specified lane edges. Alternate longitudinal joint offsets in lower layers at least 0.5 foot from each side of the specified lane edges. You may request in writing other longitudinal joint placement patterns.
Until the adjoining through lane's top layer has been paved, do not pave the top layer of:
1. Shoulders
2. Tapers
3. Transitions
4. Road connections
5. Driveways
6. Curve widenings
7. Chain control lanes
8. Turnouts
9. Turn pockets
If the number of lanes change, pave each through lane's top layer before paving a tapering lane's top layer. Simultaneous to paving a through lane's top layer, you may pave an adjoining area's top layer including shoulders. Do not operate spreading equipment on any area's top layer until completing final compaction.
If HMA (leveling) is specified, fill and level irregularities and ruts with HMA before spreading HMA over base, existing surfaces, or bridge decks. You may use mechanical equipment other than a paver for these areas. The equipment must produce a uniform smoothness and texture. HMA used to change an existing surface's cross slope or profile is not
HMA (leveling).
If placing HMA against the edge of existing pavement, sawcut or grind the pavement straight and vertical along the joint and remove extraneous material without damaging the surface remaining in place. If placing HMA against the edge of a longitudinal or transverse construction joint and the joint is damaged or not placed to a neat line, sawcut or grind the pavement straight and vertical along the joint and remove extraneous material without damaging the surface remaining in place. Repair or remove and replace damaged pavement at your expense.
Rolling must leave the completed surface compacted and smooth without tearing, cracking, or shoving. Complete finish rolling activities before the pavement surface temperature is:
1. Below 150 °F for HMA with unmodified binder
2. Below 140 °F for HMA with modified binder
3. Below 200 °F for RHMA-G
If a vibratory roller is used as a finish roller, turn the vibrator off.
Do not use a pneumatic tired roller to compact RHMA-G.
For Standard and QC/QA, if a 3/4-inch aggregate grading is specified, you may use a 1/2-inch aggregate grading if the specified paved thickness is from 0.15 foot to 0.20 foot thick.
Spread and compact HMA under Section 39-3.03, "Spreading and Compacting Equipment," and Section 39-3.04, "Transporting, Spreading, and Compacting," for any of the following:
1. Specified paved thickness is less than 0.15 foot.
2. Specified paved thickness is less than 0.20 foot and a 3/4-inch aggregate grading is specified and used.
3. You spread and compact at:
3.1. Asphalt concrete surfacing replacement areas
3.2. Leveling courses
3.3. Areas the Engineer determines conventional compaction and compaction measurement methods are impeded
Do not allow traffic on new HMA pavement until its mid-depth temperature is below 160 °F.
If you request in writing and the Engineer authorizes, you may cool HMA Type A and Type
B with water when rolling activities are complete. Apply water under Section 17, "Watering."
Spread sand at a rate between 1 pound and 2 pounds per square yard on new RHMA-G, RHMA-O, and RHMA-O-HB pavement when finish rolling is complete. Sand must be free of clay or organic matter. Sand must comply with Section 90-3.03, "Fine Aggregate Grading."
Keep traffic off the pavement until spreading sand is complete.
39-1.12 SMOOTHNESS
39-1.12A General
Determine HMA smoothness with a profilograph and a straightedge.
Smoothness specifications do not apply to OGFC placed on existing pavement not constructed under the same project.
If portland cement concrete is placed on HMA:
1. Cold plane the HMA finished surface to within specified tolerances if it is higher than the grade specified by the Engineer.
2. Remove and replace HMA if the finished surface is lower than 0.05 foot below the grade specified by the Engineer.
39-1.12B Straightedge
The HMA pavement top layer must not vary from the lower edge of a 12-foot long straightedge:
1. More than 0.01 foot when the straight edge is laid parallel with the centerline
2. More than 0.02 foot when the straightedge is laid perpendicular to the centerline and extends from edge to edge of a traffic lane
3. More than 0.02 foot when the straightedge is laid within 24 feet of a pavement conform
39-1.12C Profilograph
Under California Test 526, determine the zero (null) blanking band Profile Index (PI0) and must-grinds on the top layer of HMA Type A, Type B, and RHMA-G pavement. Take 2 profiles within each traffic lane, 3 feet from and parallel with the edge of each lane.
A must-grind is a deviation of 0.3 inch or more in a length of 25 feet. You must correct must-grinds.
For OGFC, only determine must-grinds when placed over HMA constructed under the same project. The top layer of the underlying HMA must comply with the smoothness specifications before placing OGFC.
Profile pavement in the Engineer's presence. Choose the time of profiling.
On tangents and horizontal curves with a centerline radius of curvature 2,000 feet or more, the PI0 must be at most 3 inches per 0.1-mile section.
On horizontal curves with a centerline radius of curvature between 1,000 feet and 2,000 feet including pavement within the superelevation transitions, the PI0 must be at most 6 inches per
0.1-mile section.
Before the Engineer accepts HMA pavement for smoothness, submit written final profilograms.
Submit 1 electronic copy of profile information in Microsoft Excel and 1 electronic copy of longitudinal pavement profiles in ".erd" format or other ProVAL compatible format to the
Engineer and to:
Smoothness@dot.ca.gov
The following HMA pavement areas do not require a PI0. You must measure these areas with a 12-foot straightedge and determine must-grinds with a profilograph:
1. New HMA with a total thickness less than or equal to 0.25 foot
2. HMA sections of city or county streets and roads, turn lanes and collector lanes that are less than 1,500 feet in length
The following HMA pavement areas do not require a PI0. You must measure these areas with a 12-foot straightedge:
1. Horizontal curves with a centerline radius of curvature less than 1,000 feet including pavement within the superelevation transitions of those curves
2. Within 12 feet of a transverse joint separating the pavement from:
2.1. Existing pavement not constructed under the same project
2.2. A bridge deck or approach slab
3. Exit ramp termini, truck weigh stations, and weigh-in-motion areas
4. If steep grades and superelevation rates greater than 6 percent are present on:
4.1. Ramps
4.2. Connectors
5. Turn lanes
6. Areas within 15 feet of manholes or drainage transitions
7. Acceleration and deceleration lanes for at-grade intersections
8. Shoulders and miscellaneous areas
9. HMA pavement within 3 feet from and parallel to the construction joints formed between curbs, gutters, or existing pavement
39-1.12D Smoothness Correction
If the top layer of HMA Type A, Type B, or RHMA-G pavement does not comply with the smoothness specifications, grind the pavement to within tolerances, remove and replace it, or place a layer of HMA. The Engineer must authorize your choice of correction before the work begins.
Remove and replace the areas of OGFC not in compliance with the must-grind and straightedge specifications, except you may grind OGFC for correcting smoothness:
1. At a transverse joint separating the pavement from pavement not constructed under the same project
2. Within 12 feet of a transverse joint separating the pavement from a bridge deck or approach slab
Corrected HMA pavement areas must be uniform rectangles with edges:
1. Parallel to the nearest HMA pavement edge or lane line
2. Perpendicular to the pavement centerline
Measure the corrected HMA pavement surface with a profilograph and a 12-foot straightedge and correct the pavement to within specified tolerances. If a must-grind area or straightedged pavement cannot be corrected to within specified tolerances, remove and replace the pavement.
On ground areas not overlaid with OGFC, apply fog seal coat under Section 37-1, "Seal
Coats."
39-1.13 MISCELLANEOUS AREAS AND DIKES
Miscellaneous areas are outside the traveled way and include:
1. Median areas not including inside shoulders
2. Island areas
3. Sidewalks
4. Gutters
5. Gutter flares
6. Ditches
7. Overside drains
8. Aprons at the ends of drainage structures
Spread miscellaneous areas in 1 layer and compact to the specified lines and grades.
For miscellaneous areas and dikes:
1. Do not submit a JMF.
2. Choose the 3/8-inch or 1/2-inch HMA Type A and Type B aggregate gradations.
3. Minimum asphalt binder content must be 6.8 percent for 3/8-inch aggregate and 6.0 percent for 1/2-inch aggregate. If you request in writing and the Engineer authorizes, you may reduce the minimum asphalt binder content.
4. Choose asphalt binder Grade PG 70-10 or the same grade specified for HMA.
39-2 STANDARD
39-2.01 DESCRIPTION
If HMA is specified as Standard, construct it under Section 39-1, "General," this Section 39-
2, "Standard," and Section 39-5, "Measurement and Payment."
39-2.02 CONTRACTOR QUALITY CONTROL
39-2.02A Quality Control Plan
Establish, implement, and maintain a Quality Control Plan (QCP) for HMA. The QCP must describe the organization and procedures you will use to:
1. Control the quality characteristics
2. Determine when corrective actions are needed (action limits)
3. Implement corrective actions
When you submit the proposed JMF, submit the written QCP. You and the Engineer must discuss the QCP during the prepaving conference.
The QCP must address the elements affecting HMA quality including:
3. Additives
4. Production
5. Paving
The Engineer reviews each QCP within 5 business days from the submittal. Hold HMA production until the Engineer accepts the QCP in writing. The Engineer's QCP acceptance does not mean your compliance with the QCP will result in acceptable HMA. Section 39-1.05, "Engineer's Acceptance," specifies HMA acceptance.
39-2.02B Quality Control Testing
Perform sampling and testing at the specified frequency for the following quality characteristics:
Minimum Quality Control – Standard
Quality
Characteristic
Test
Method
Minimum
Sampling and
Testing
Frequency
HMA Type
A
B
RHMA-G
OGFC
Aggregate gradation a
CT 202
1 per 750 tons and any remaining part
JMF
Tolerance
JMF
Sand…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .