Attachment 7 Building photos.pdf

PDF 4 MB Posted

Attached to
GAOA CSO, Red Bluff, Pogie Point & Eel River Roof Replacement Federal contract opportunity
Solicitation number
127EAW23Q0001
Issued by
Department of Agriculture Forest Service

View the file

Other files for this federal contract opportunity

Other files attached to GAOA CSO, Red Bluff, Pogie Point & Eel River Roof Replacement, newest first.
File Type Posted
Attachment 9 Wage Determination.pdf PDF
Attachment 10 Fire Plan.doc DOC document
Attachment 1 013000-Shop Drawings and Submittals.doc DOC document
Attachment 6 Locality Maps.pdf PDF
Attachment 2 018000-Project Clean Up.doc DOC document
Attachment 5 073013-Asphalt Shingles.docx DOCX document
Attachment 4 071413-Preformed Metal Roof Panels.docx DOCX document
127EAW23Q0001 Mendocino Roof Replacements.pdf PDF
Attachment 8 Skylight Drawings.pdf PDF
Attachment 3 019000-Mobiliztion.doc DOC document

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CHICO SEED ORCHARD

ASPHALT SHINGLE REPLACEMENT

Chico Seed Orchard Office:

Northern aspect of office building: Both the bathroom addition and basement access roofs, shown above, are considered part of the roofing contract. The roofs shall be replaced in accordance with Specification 07 30 13, Asphalt Shingles.

Eastern aspect of office building

Southern aspect of office building

Chico Seed Orchard Conference Room:

Southern aspect of conference room

Western aspect of conference room

RED BLUFF

Building #2156:

Replace asphalt shingles, fascia boards (all four sides) and (2) skylights

Building #2158:

Building #2159:

Sycamore Grove Comfort Station:

Replace skylight

POGIE POINT

Building #2132:

Replace asphalt shingles and (2) skylights

Building #2133:

Building #2134:

Building #2135:

EEL RIVER STATION

ASPHALT SHINGLE AND METAL ROOF REPLACEMENT

Barn:

Shed Roof shown here and in picture below; remove and dispose of shed structure. Multiple layers of roofing.

Remove all layers and replace with new asphalt shingles as stated in specifications.

Northen aspect

Western aspect

Cooler/Wood Storage:

Remove and replace metal roof as stated in contract specifications.

Shop:

Roof maintenance only. See contract

Engine Bay:

Roof maintenance only. See contract

Northeastern aspect

Southeastern aspect

Chico Seed Orchard Building Photos
Red Bluff Building Photos
Pogie Point Building Photos
Eel River Station Building Photos

File details come from the government source that posted it. Updated .