Attachment 1 013000-Shop Drawings and Submittals.doc

DOC document 33 KB Posted

Attached to
GAOA CSO, Red Bluff, Pogie Point & Eel River Roof Replacement Federal contract opportunity
Solicitation number
127EAW23Q0001
Issued by
Department of Agriculture Forest Service

View the file

Other files for this federal contract opportunity

Other files attached to GAOA CSO, Red Bluff, Pogie Point & Eel River Roof Replacement, newest first.
File Type Posted
Attachment 9 Wage Determination.pdf PDF
Attachment 10 Fire Plan.doc DOC document
Attachment 8 Skylight Drawings.pdf PDF
Attachment 3 019000-Mobiliztion.doc DOC document
Attachment 7 Building photos.pdf PDF
Attachment 6 Locality Maps.pdf PDF
Attachment 2 018000-Project Clean Up.doc DOC document
Attachment 5 073013-Asphalt Shingles.docx DOCX document
Attachment 4 071413-Preformed Metal Roof Panels.docx DOCX document
127EAW23Q0001 Mendocino Roof Replacements.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

USDA FOREST SERVICE PROJECT SPECIFICATIONS

SECTION 01 30 00

SHOP DRAWINGS AND SUBMITTALS

PART 1 ‑ GENERAL

1.01

SCOPE:

A.

Perform all work necessary and required for the construction of the project as indicated. Such work includes but is not limited to the following:

1.

Shop Drawings

2.

Samples

3.

Catalog Data

1.02

SUBMITTALS

A.

Submittals shall include all pertinent data required to understand the quality of components, dimensional relationships, integration with other materials, assembly techniques, structural aspects, color, finish, texture, and other such characteristics as may be necessary to fully describe the item and its intended use.

PART 2 ‑ PRODUCTS

Not Applicable

PART 3 ‑ EXECUTION

3.01

SUBMITTALS

A.

Submittals and shop drawings shall be submitted in a timely fashion to allow 7 days for review by the Government. "No work shall begin until shops drawings and submittals are approved".

3.02

SHOP DRAWINGS

A.

Original Submittal: One copy of all shop drawings shall be submitted for approval as required under 3.01 above prior to fabrication, installation or order placement to allow for checking and coordination.

B.

Resubmittal: When a resubmittal is required, one print so indicating will be returned to the Contractor. After revision of the original, a new reproducible and one copy shall be submitted for approval.

C.

Approval: Once approved, stamped documents shall be returned to the Contractor and shall be complied with as noted. Variation from the approved documents shall be likewise submitted and approved before being carried out.

3.03

SAMPLES

A.

Original Submittal: One samples of each item for which samples are required, unless otherwise specified, shall be furnished for approval. Approval shall be obtained prior to delivery of the material to the project site. These samples shall be representative of the actual material proposed for use in the project and of sufficient size to demonstrate design, color, texture and finish as they will appear in the completed installation.

B.

Resubmittals: All rejected samples will be returned upon request and any or all resubmittals required shall consist of two new samples.

C.

Approval: Upon approval, one sample so noted will be returned and the remainder will be retained by the Contracting Officer until completion of the work. When requested, all approved samples will be returned for installation providing identity is maintained in an approved manner until final acceptance of the project.

3.04

CATALOG DATA

A.

Submittals: One copy of catalog data is required for the original submittal and each resubmittal. Catalog data shall be submitted along with shop drawings. One copy will be returned unless additional copies are requested.

B.

Data: Each submittal shall have all pertinent data contained therein that is applicable to the item submitted for approval.

3.05

IDENTIFICATION

A.

Catalog Data: Each separate catalog brochure or page submitted shall have the identification shown. Catalog of brochures submitted containing multiple items for approval need have only cover identification. In such cases the identification shall include page and catalog item numbers.

B.

In the event one or more of the multiple items are not approved in any submittal, the additional copies required will not be requested until all items are approved.

END OF SECTION

CSO, Red Bluff, Pogie Point and Eel River Roof Replacement 01 30 00‑ 1/2

Shop Drawings and Submittals