Attachment 5 073013-Asphalt Shingles.docx
DOCX document 39 KB Posted
- Attached to
- GAOA CSO, Red Bluff, Pogie Point & Eel River Roof Replacement Federal contract opportunity
- Solicitation number
- 127EAW23Q0001
- Issued by
- Department of Agriculture Forest Service
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Attachment 9 Wage Determination.pdf | ||
| Attachment 10 Fire Plan.doc | DOC document | |
| Attachment 1 013000-Shop Drawings and Submittals.doc | DOC document | |
| Attachment 7 Building photos.pdf | ||
| Attachment 6 Locality Maps.pdf | ||
| Attachment 2 018000-Project Clean Up.doc | DOC document | |
| Attachment 4 071413-Preformed Metal Roof Panels.docx | DOCX document | |
| 127EAW23Q0001 Mendocino Roof Replacements.pdf | ||
| Attachment 8 Skylight Drawings.pdf | ||
| Attachment 3 019000-Mobiliztion.doc | DOC document |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
USDA fOREST sERVICE PROJECT SPECIFICATIONS
| USDA FOREST SERVICE | PROJECT SPECIFICATIONS | |
| USDA FOREST SERVICE | pROJECT SPECIFICATIONS |
SECTION 07 30 13
ASPHALT SHINGLES
Part 1 - GENERAL
SUMMARY
Chico Seed Orchard (CSO) Office and Conference Room: Work includes removing and replacing asphalt shingles, roofing felt, flashing, and drip edge. Gutter removal and re-installation (if applicable) are considered incidental to pay item 07 30 13 (b) Asphalt Shingles, CSO.
Red Bluff: Work includes removing and replacing asphalt shingles, roofing felt, flashing, drip edge, fascia, skylights and priming and painting fascia boards on three vault toilet buildings and removing and replacing a skylight on the comfort station.
Pogie Point Campground: Work includes removing and replacing asphalt shingles, roofing felt, flashing, drip edge, and skylights on four vault toilet buildings.
Eel River:
Barn: Work includes removing all layers of existing roofing and removing shed structure on the back of the barn, removing and replacing asphalt shingles, roofing felt, flashing and drip edge.
Storage: Work includes removing and replacing asphalt shingles, roofing felt, flashing, and drip edge.
RELATED SECTIONS
01 30 00 – Shop Drawings and Submittals 01 80 00 – Project Cleanup
QUALITY ASSURANCE
Follow recommendations of Asphalt Roofing Manufacturers Association (ARMA) Residential Asphalt Roofing Manual, latest edition.
Before beginning work, report to COR if any specification requirements conflict with shingle manufacturer's warranty requirements.
DELIVERY, STORAGE, AND HANDLING
Comply with manufacturer's recommendations for protection.
WARrANTy The manufacturer of the roof material shall warrant the product in writing for the Lifetime of the shingle.
Contractor shall register the shingle warranty on behalf of the Government and shall provide a copy of the warranty registration and proof that the warranty registration was submitted to the manufacturer on the Governments behalf.
Registration warranty information is site specific and shall include the following, when applicable:
Red Bluff:
First Name: Mendocino National Forest Last Name: Red Bluff Recreation Area Vault Toilets Physical Address: 1000 Sale Lane, Red Bluff CA 96080 Business Address: 825 N. Humboldt Ave., Willows CA 95988 County: Tehama Email: amy.suschnick@usda.gov
Chico Seed Orchard:
First Name: Mendocino National Forest Last Name: Chico Seed Orchard Office and Conf. Room Physical Address: 2741 Cramer Lane, Chico CA 95928 Business Address: Same as physical address County: Butte Email: amy.suschnick@usda.gov
Pogie Point:
First Name: Mendocino National Forest Last Name: Pogie Point Campground Vault Toilets Physical Address: Forest Road 18N75 Business Address: 10025 Elk Mountain Road, Upper Lake CA 95485 County: Lake Email: amy.suschnick@usda.gov
Eel River:
First Name: Mendocino National Forest Last Name: Eel River Station Barn and Storage Building Physical Address: 34950 Mendocino Pass Road, Covelo CA 95428 Business Address: Same as physical address County: Mendocino Email: amy.suschnick@usda.gov
Part 2 - PRODUCTS Materials Roofing Felt ASTM D226, 15 pound, unperforated, unless otherwise specified by shingle manufacturer.
Shingles Manufacturers and Shingle Line:
Owens Corning - Duration Architectural Laminate Shingles CertainTeed – Landmark PRO Architectural Laminate Shingles GAF – Timberline UHD Architectural Laminate Shingles Malarkey – Legacy Scotchgard Pabco – Prestige Architectural Laminate Shingles Ridge shingles shall be from the same manufacturer and shall match roof shingles.
Color shall be selected by COR.
Shingle Fasteners Fasteners installed shall meet the asphalt shingles manufacturers requirements.
Flashing and Drip Edge All flashing and drip edge shall be new and shall be at least as wide as flashing/drip edge removed.
Flashing and Drip Edge color shall match existing fascia and paint shall be factory applied (when applicable).
Skylights Red Bluff and Pogie Point Vault Toilet Buildings: ¼” Lexan Protect-A-Glaze translucent panel or approved equal.
Red Bluff Comfort Station: SunOptics, 2040 flat, white, double sided acrylic skylight or approved equal.
Fascia Kiln dried, full length, S4S, No. 2, Dry Doug Fir. Dimensions shall match existing fascia board.
Roof Sheathing CDX Plywood, 24/0, match existing thickness.
Paint Exterior, Flat, Behr Premium Plus Ultra with Primer. Color to be selected by COR.
Part 3 – EXECUTION
3.1 Construction
Felt Underlayment.
Install felt parallel to eaves, lapping each course at least 2” over the underlying course. If two or more pieces are required to continue a course, lap the ends at least 4”. End laps in succeeding course should be located at least 6’ from end laps in the preceding course. Lap the felt a minimum of 6” from both sides over all hips, ridges and valleys. Where the roof meets a vertical surface, carry the underlayment at least 4” up the surface.
Flashing/Drip Edge Install flashing as specified in the ARMA Residential Asphalt Roofing Manual. Install drip edge at eaves directly on deck. Install drip edge at rake over the underlayment.
Laying Shingles Snap horizontal and vertical chalk guide lines on underlayment, then lay shingles following manufacturer's instructions. Construct ridges as specified by manufacturer.
Skylights Red Bluff and Pogie Point Vault Toilet Buildings: Install as shown in drawings.
Comfort Station: Install skylight in accordance with manufacturer’s specifications and skylight detail shown in drawings.
Fascia Full length fascia boards shall be installed level and end cuts shall fit tightly together without gaps. Secure with an adequate number of wood screws to prevent warping and ensure fascia is firmly attached to building; screw head shall be flush with fascia surface. Each fascia board shall be painted with a minimum of 2 coats of paint and in accordance with paint manufacturer’s application specifications.
Roof Sheathing
0. Install plywood roof sheathing with the face grain at right angles to supports. Stagger end joints. Nail with 8d nails 6 inches on center at edges and 12 inches on center at intermediate supports.
0. Visible surfaces of plywood shall be painted to match surrounding surfaces. The exposed plywood shall be painted with a minimum of 2 coats of paint and in accordance with the paint manufacturer’s application specifications.
| 3.2 | INSPECTION |
| A. | Surface to which the roofing is to be applied shall be even, smooth, sound, clean, and dry. Do not begin roofing work until surface deficiencies have been corrected. |
| B. | If the Contractor should find damaged roof sheathing or fascia, the Contractor shall immediately notify the Contracting Officer and shall provide a unit cost for the replacement of the damaged items. |
| C. | The site shall be thoroughly cleaned of all materials and debris which may have resulted from the work described herein. |
| D. | Newly installed skylights shall be tested for leaks prior to final inspection. Use ¾” garden hose to wet the entire surface of each skylight for no fewer than 2 minutes to ensure water tightness. |
PART 4 - MEASUREMENT AND PAYMENT
| 4.1 | Method of Measurement |
| A. | Measurement will be lump sum. |
| 4.2 | Basis of Payment |
| A. | Payment will be made under: |
PAY ITEM DESCRIPTION _____PAY UNIT
| 07 30 13 (a) | Asphalt Shingles, CSO Lump Sum |
| 07 30 13 (b) | Asphalt Shingles, Red Bluff Lump Sum |
| 07 30 13 (c) | Asphalt Shingles, Pogie Point Lump Sum |
| 07 30 13 (d) | Asphalt Shingles, Eel River Lump Sum |
END OF SECTION