Attachment-7 AF66 PSRC.pdf

PDF 130 KB Posted

Attached to
PACAF Regional Support Center COmmand Section Federal contract opportunity
Solicitation number
FA500020Q0059
Issued by
Department of the Air Force Pacific Air Forces

About this file

This document contains an Attachment 7 AF Form 66 schedule of material submittals for the PSRC Renovation project. The schedule lists 16 required submittals including construction drawings due 10 days after notice to proceed, as-built drawings and CD due at project completion, a project specific AF Form 66 due 10 days after notice to proceed, a construction schedule due 10 days after notice to proceed, shop drawings and samples for doors and hardware, ceramic tiles and grout, gypsum wallboard, carpet and vinyl composition tile prior to procurement, and cabinetry prior to procurement. The schedule specifies the number of copies required and includes columns for submission date, date received, contracting office review dates, suspension dates, submittal numbers, contractor notification dates, and resubmittal and approval status.

View the file

Other files for this federal contract opportunity

Show all 17

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FA500020Q0059

Attachment 7

AF FORM 66 (Computer Generated) PAGE 1 of 2

PROJECT NUMBER : PROJECT TITLE: SOLICITATION/CONTRACT NO.:

SCHEDULE OF MATERIAL SUBMITTALS PSRC Renovation

TO BE COMPLETED BY PROJECT ENGINEER TO BE COMPLETED BY CONTRACT ADMINISTRATOR Attachment 7

NO. OF COPIES REQUIRED

LI

NE

N

UM

BE

R

ITEM OR DESCRIPTION OF ITEM,

CONTRACT REFERENCE, TYPE OF

SUBMITTAL

CE

RT

IF

IC

AT

IO

N

OF

C

OM

PL

IA

NC

E

SH

OP

D

RA

W

IN

GS

SA

MP

LE

S

CO

LO

R

SE

LE

CT

IO

N

MA

NU

FA

CT

UR

ER

'S

R

EC

OM

ME

ND

AT

IO

NS

MA

NU

FA

CT

UR

ER

'S W

AR

RA

NT

Y

CA

TA

LO

G

DA

TA

OP

ER

AT

IN

G

IN

ST

RU

CT

IO

NS

SA

FE

TY

D

AT

A

SH

EE

TS

OT

HE

R

RE

QU

IR

ED

S

UB

MI

SS

IO

N

DA

TE

DA

TE

R

EC

EI

VE

D

IN

C

ON

TR

AC

TI

NG

DA

TE

T O

CI

VI

L

EN

GI

NE

ER

IN

G/

EN

VI

RO

NM

EN

T

RE

TU

RN

S

US

PE

NS

E

DA

TE

SU

BM

IT

TA

L

NU

MB

ER

S

DATE CONTRACTOR

NOTIFIED

CO

NT

RA

CT

OR

R

ES

UB

MI

TT

AL

FI

NA

L

AP

PR

OV

AL

REMARKS

APPROVED DIS-

APPROVED

HAZMAT Approval, General Specs 01500, para. 5.1.3 and 5.1.5.

NLT 10 working days prior to material being brought onto installation

HAZMAT Usage Report, General Specs 01500, para. 5.1.3 and 5.1.5.

NLT 7 Working Days After Final Acceptance

3 Construction Drawings X NTP+10 days

4 As-Built Drawings X At project Completion

5 As-Bult CD X At project Completion

6 Project Specific AF66 NTP+10 days

7 Construction Schedule NTP+10 days

Door and Hardware

X X Prior to procurement

Ceramic tiles and grout

X X Prior to procurement

GWB (type x)

X Prior to procurement

FA500020Q0059

Attachment 7

AF FORM 66 (Computer Generated) PAGE 2 of 2

PROJECT NUMBER : PROJECT TITLE: SOLICITATION/CONTRACT NO.:

SCHEDULE OF MATERIAL SUBMITTALS PSRC Renovation

TO BE COMPLETED BY PROJECT ENGINEER TO BE COMPLETED BY CONTRACT ADMINISTRATOR Attachment 7

NO. OF COPIES REQUIRED

LI

NE

N

UM

BE

R

ITEM OR DESCRIPTION OF ITEM,

CONTRACT REFERENCE, TYPE OF

SUBMITTAL

CE

RT

IF

IC

AT

IO

N

OF

C

OM

PL

IA

NC

E

SH

OP

D

RA

W

IN

GS

SA

MP

LE

S

CO

LO

R

SE

LE

CT

IO

N

MA

NU

FA

CT

UR

ER

'S

R

EC

OM

ME

ND

AT

IO

NS

MA

NU

FA

CT

UR

ER

'S W

AR

RA

NT

Y

CA

TA

LO

G

DA

TA

OP

ER

AT

IN

G

IN

ST

RU

CT

IO

NS

SA

FE

TY

D

AT

A

SH

EE

TS

OT

HE

R

RE

QU

IR

ED

S

UB

MI

SS

IO

N

DA

TE

DA

TE

R

EC

EI

VE

D

IN

C

ON

TR

AC

TI

NG

DA

TE

T O

CI

VI

L

EN

GI

NE

ER

IN

G/

EN

VI

RO

NM

EN

T

RE

TU

RN

S

US

PE

NS

E

DA

TE

SU

BM

IT

TA

L

NU

MB

ER

S

DATE CONTRACTOR

NOTIFIED

CO

NT

RA

CT

OR

R

ES

UB

MI

TT

AL

FI

NA

L

AP

PR

OV

AL

REMARKS

APPROVED DIS-

APPROVED

Carpet, VCT, Cove Base

X X X Prior to procurement

ACT and Grid

Prior to procurement

Cabinets and counters

X x Prior to procurement

Wainscot finish and trim

X X Prior to procurement

AF66- Material Submittals

File details come from the government source that posted it. Updated .