Attachment 6 EB 00320.pdf
PDF 423 KB Posted
- Attached to
- Fiber Optic Cable Installations - Qty 4 Federal contract opportunity
- Solicitation number
- FA671223Q0009
View the file
Other files for this federal contract opportunity
Show all 25
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
As Built 15 February 2017
Telecommunications System Installation Plan - CDRL A002 – Pittsburgh ARS, Pennsylvania Page 1 of 3 1st Floor Floor Plan
EB 320 (ITB 221)
Last Edited: 14 February, 2017
POC: Dora Leech 412-474-8045
Mech Rm
Rm 10
N
S
EW
Telecommunications System Installation Plan - CDRL A002 – Pittsburgh ARS, Pennsylvania Page 2 of 3 Mech Rm/Rm 10 Room Plan
EB 320 (ITB 221)
Last Edited: 14 February, 2017
POC: Dora Leech 412-474-8045
N
S
EW
4" diagonal core
50' 12SM FOC in pliable raceway to ITB 221
TG
B
Reuse 2' cabinet (on casters)(Relocated)
Power panel SD-320-B Ckt #8
.02ohms
1.9ohms to power panel
.37ohms to TGB
2" conc core
Dedicated power & ground
20AMP/110V/L5-20R
Panel SD-320-B, Ckt #8
20' ½” EMT to power panel SD-320-B
5' #6 AWG ground wire to EMT
.02ohms
4x4 Backboard
.02ohms
FODP
Telecommunications System Installation Plan - CDRL A002 – Pittsburgh ARS, Pennsylvania Page 3 of 3 Rm 10 Elevation
EB 320 (ITB 221)
Last Edited: 14 February, 2017
POC: Dora Leech 412-474-8045
Pre-Installation Photo
Reuse 2' Cabinet (On Casters)
UPS
12 Port FODP w/ 12SM FOC to ITB 221
SD
Cable Management
24 Port Patch Panel
Cisco WS-C2960X-48LPS-L
Load
AVR Boost
On Line
AVR Trim
Replace Battery
On Battery
Overload
Battery Charge
Test I
O ww w.apcc.c om
Smart-UPS
3 0 0 0
Surge ProtectorRESET
I MIN
R
BR
EA
K E
PR
ES
S
TO
Post Installation Photo
File details come from the government source that posted it. Updated .