Attachment 6 EB 00320.pdf

PDF 423 KB Posted

Attached to
Fiber Optic Cable Installations - Qty 4 Federal contract opportunity
Solicitation number
FA671223Q0009
Issued by
Department of the Air Force Reserve Command

View the file

Other files for this federal contract opportunity

Other files attached to Fiber Optic Cable Installations - Qty 4, newest first.
File Type Posted
Attachment 4 SOW-FOC from B316 - 316 revision 3.docx DOCX document
Attachment 21 MH 4.pdf PDF
Attachment 22 MH 14.pdf PDF
Attachment 25 Bldg 316 Second Floor Plan.pdf PDF
Attachment 23 Bldg 316 Basement Plan.pdf PDF
Attachment 24 Bldg 316 First Floor Plan.pdf PDF
Attachment 5 Offer Pricing Template.docx DOCX document
Attachment 9 GD13014od02CG (MH213 218 221 221A HH300).pdf PDF
Attachment 13 GD12014od02CG (MH 125).pdf PDF
Attachment 16 ITB 00405.pdf PDF
Attachment 2 SOW_FOC from ITB 405 to B208.docx DOCX document
Attachment 3 SOW_FOC from ITB 405 to B419.docx DOCX document
Attachment 10 ITB 00221.pdf PDF
Attachment 17 (MH1A 2 4 5 6 HH20).pdf PDF
Attachment 19 EB 00419_(CEB).pdf PDF
Attachment 12 GD12014od01CG (HH2-6 MH 121).pdf PDF
Attachment 1 SOW_FOC from ITB 221 to B320.docx DOCX document
Attachment 4 SOW-FOC from B316 to B316.docx DOCX document
Attachment 7 GD13013od01(MH1A 2 4 5 6 HH20).pdf PDF
Attachment 8 GD13014od01 (MH14 208 208A 210 HH21 220).pdf PDF
Attachment 14 GD13013od01(MH1A 2 4 5 6 HH20).pdf PDF
Attachment 11 EB 00208_(CEB).pdf PDF
Attachment 15 GD13014od01 (MH14 208 208A 210 HH21 220).pdf PDF
Attachment 18 (MH316 316A 411 418 419A419B).pdf PDF
Attachment 20 AF1024 Confined Space Entry Permit.pdf PDF
Show all 25

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

As Built 15 February 2017

Telecommunications System Installation Plan - CDRL A002 – Pittsburgh ARS, Pennsylvania Page 1 of 3 1st Floor Floor Plan

EB 320 (ITB 221)

Last Edited: 14 February, 2017

POC: Dora Leech 412-474-8045

Mech Rm

Rm 10

N

S

EW

Telecommunications System Installation Plan - CDRL A002 – Pittsburgh ARS, Pennsylvania Page 2 of 3 Mech Rm/Rm 10 Room Plan

EB 320 (ITB 221)

Last Edited: 14 February, 2017

POC: Dora Leech 412-474-8045

N

S

EW

4" diagonal core

50' 12SM FOC in pliable raceway to ITB 221

TG

B

Reuse 2' cabinet (on casters)(Relocated)

Power panel SD-320-B Ckt #8

.02ohms

1.9ohms to power panel

.37ohms to TGB

2" conc core

Dedicated power & ground

20AMP/110V/L5-20R

Panel SD-320-B, Ckt #8

20' ½” EMT to power panel SD-320-B

5' #6 AWG ground wire to EMT

.02ohms

4x4 Backboard

.02ohms

FODP

Telecommunications System Installation Plan - CDRL A002 – Pittsburgh ARS, Pennsylvania Page 3 of 3 Rm 10 Elevation

EB 320 (ITB 221)

Last Edited: 14 February, 2017

POC: Dora Leech 412-474-8045

Pre-Installation Photo

Reuse 2' Cabinet (On Casters)

UPS

12 Port FODP w/ 12SM FOC to ITB 221

SD

Cable Management

24 Port Patch Panel

Cisco WS-C2960X-48LPS-L

Load

AVR Boost

On Line

AVR Trim

Replace Battery

On Battery

Overload

Battery Charge

Test I

O ww w.apcc.c om

Smart-UPS

3 0 0 0

Surge ProtectorRESET

I MIN

R

BR

EA

K E

PR

ES

S

TO

Post Installation Photo

File details come from the government source that posted it. Updated .