Attachment 19 EB 00419_(CEB).pdf
PDF 801 KB Posted
- Attached to
- Fiber Optic Cable Installations - Qty 4 Federal contract opportunity
- Solicitation number
- FA671223Q0009
View the file
Other files for this federal contract opportunity
Show all 25
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
As Built 15 February 2017
Telecommunications System Installation Plan - CDRL A002 – Pittsburgh ARS, Pennsylvania Page 1 of 3 Basement Floor Plan
CEB 419 (ITB 405)
Last Edited: 14 February, 2017
POC:
Mech Rm
W
E
NS
Telecommunications System Installation Plan - CDRL A002 – Pittsburgh ARS, Pennsylvania Page 2 of 3 Mech Rm Room Plan
CEB 419 (ITB 405)
Last Edited: 14 February, 2017
POC:
Power panel EMG Ckt #39,41;31,33
Reuse 6' cabinet (on casters)
.00ohms
TG
B
Dedicated power (2ea) 20AMP/110V/5-20R
Panel EMG, Ckt #29, 35
W
E
NS
(2ea) 12SM FOC to ITB’s 405 & 221 (2ea) 4" conc core
FODP
.00ohms to TGB
.00ohms to panel EMG
(2ea) Dedicated power & ground
30AMP/220V/L5-30R
Panel EMG, Ckt #31,33;39,41
40' ½” EMT to power panel
EMG
Telecommunications System Installation Plan - CDRL A002 – Pittsburgh ARS, Pennsylvania Page 3 of 3 Mech Rm Elevation
CEB 419 (ITB 405)
Last Edited: 14 February, 2017
POC:
Pre-Installation Photo
Reuse 6' Cabinet (on casters)
SMART-UPS
1 4 0 0
Test I
O www.apcc .c om
APC UPS
24 Port FODP w/ 24SM FOC w/ (12SM ea to ITB 405, 221)
FAN
STATUS
Catalyst 4510R+E
Cisco WS-C4510R+E
Battery Pack
3000 UPS
Surge ProtectorRESET
I MIN
R
BR
EA
K E
PR
ES
S
TO
Post Installation Photo
File details come from the government source that posted it. Updated .