Attachment 5 Drawings (3 of 3).pdf

PDF 41 MB Posted

Attached to
Modernize Supply Chain, Bldg. 1 Basement Project No. 664-21-301 Federal contract opportunity
Solicitation number
36C26223B0013
Issued by
Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 22

About this file

This document provides details on a federal solicitation from the Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 22. The solicitation number is 36C26223B0013 and seeks proposals to modernize the supply chain in Building 1's basement for Project No. 664-21-301. An attachment is included that contains drawings related to the project scope. Proposals are due by the date specified in the solicitation to modernize the supply chain operations located in the basement of Building 1 on the VA campus. The selected contractor will be responsible for renovating and upgrading the existing supply chain facilities and systems to meet current needs and standards.

View the file

Other files for this federal contract opportunity

Show all 19

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

(E ) E

F-

2" S

LO

T

LI

N.

P

T.

0C

FM

-S

13X7

(E-1)

X1

X1

FD

X6

-S

5C

FM

-S

58X21-E

X6

400CFM-S

12X12-CD

37X20-E

260CFM-S

10X10-CD

440CFM-S

12X12-CD

25X10-E

13X7

440CFM-S

12X12-CD

(A C-

1)

X7 -S

X7

-S

(E-1) 58X21-E

16X6-E

(E )5

2X

12X12-CD

440CFM-S

13X7

440 CFM-S

12X12-C.D.

12X12-C.D.

440 CFM-S

X2

3- E

(E )5

2X

(E)(AC-4)

21X13-S

200CFM-E

(TYP 5)

X9

-S145 SF

LOUNGE

B114

173 SF

OFFICE,

TECHNICIAN

B114A

167 SF

OFFICE,

STAFF

B115

415 SF

CORRIDOR

B117

314 SF

STERILE

STORAGE

B171G

697 SF

STORAGE

AREA

911 SF

OFFICE,

STAFF

B110

160 SF

DIETETICS

RESIDENTS

B115A

180 SF

CLINICAL

NUTRITION

MANAGER

B128A

30 SF

CLOSET

178 SF

CORRIDOR

229 SF

ENGINEERING/IT

B-SPS-48

144 SF

OFFICE

B128D

418 SF

UTILITY

ROOM,

SOILED

B102

92 SF

ELEVATOR

S3

96 SF

ELEVATOR

S1

88 SF

ELEVATOR

S2

ELEVATOR

2350 SF

STORAGE

AREA

B-SPS-35

1897 SF

BULK

STORAGE

PHASE 3 SCOPE

BOUNDARY

CHWR

3" CHWS&R

3" CHWS&R

3" 3/4"

3/4"

1"

2-1/2" HHWS&R

1" MPS

2 1/2" HPS

1" HPR

HHWRHHWS

2" MPS

1" MPR

3" CHWS&R

3" CHWS&R

3/4"

2-1/2" HHWS&R

1" MPS

2 1/2" HPS

1" HPR

2" MPS

1" MPR

CAV

14E

SH

2E

CAV

10E

CAV

15E

CAV

16E

CAV

11E

CAV

18E

CAV

17E

2"

3/4"

3/4"

1-1/2"

3/4"

3/4"

3/4"

3/4"

1"

1"

3/4"

2" 3/4"

1-1/2" 1-1/4"

1"

3/4" 1"

3/4"

1-1/4"

3/4"

2"

145 SF

LOUNGE

B114

173 SF

OFFICE,

TECHNICIAN

B114A

167 SF

OFFICE,

STAFF

B115

415 SF

CORRIDOR

B117

314 SF

STERILE

STORAGE

B171G

697 SF

STORAGE

AREA

911 SF

OFFICE,

STAFF

B110

160 SF

DIETETICS

RESIDENTS

B115A

180 SF

CLINICAL

NUTRITION

MANAGER

B128A

30 SF

CLOSET

178 SF

CORRIDOR

229 SF

ENGINEERING/IT

B-SPS-48

144 SF

OFFICE

B128D

418 SF

UTILITY

ROOM,

SOILED

B102

92 SF

ELEVATOR

S3

96 SF

ELEVATOR

S1

88 SF

ELEVATOR

S2

ELEVATOR

2350 SF

STORAGE

AREA

B-SPS-35

1897 SF

BULK

STORAGE

PHASE 3 SCOPE

BOUNDARY

N.4

N.2

N

M

L.1

L

K

N.4

N.2

N

M

L.1

L

K

7.1 8 9 9.1 9.5 9.4 8 9 9.1 9.5 9.4

KEY NOTESDEMOLITION NOTES

1. DEMOLITION PLAN SHOWS APPROXIMATE LAYOUT OF EXISTING BUILDING AND IS

NOT INTENDED TO REPRESENT "AS-BUILT" CONDITIONS, FOLLOW PROCEDURES

OUTLINED IN SPECIFICATIONS FOR REQUIREMENTS TO VISIT SITE AND OTHERWISE

BECOME FAMILIAR WITH ACTUAL CONDITIONS WHEN BIDDING THE WORK.

2. PRIOR TO ANY DEMOLITION WORK CONTRACTOR MUST FIELD VERIFY ALL EXISTING

MECHANICAL WORK LOCATED IN THE SPACE WHICH AFFECTS THE SPACES. THE

OWNER MUST BE NOTIFIED PRIOR TO SHUTDOWN OF ANY MECHANICAL SYSTEMS.

3. DUCTS, PIPES, AIR DIFFUSERS, TERMINAL UNITS, AND HVAC EQUIPMENT AND OTHER

ITEMS TO BE REMOVED ARE SHOWN HATCHED.

4. EXISTING CONSTRUCTION SHOWN TO REMAIN INCLUDING BUT NOT LIMITED TO

DUCTS, PIPES, DIFFUSERS, ETC. SHALL BE PROTECTED DURING DEMOLITION,

DAMAGE TO EXISTING CONSTRUCTION SHOWN TO REMAIN SHALL BE RESTORED TO

MATCH PRE-DAMAGED CONDITION, NOTIFY THE ENGINEER IMMEDIATELY FOR ANY

DISCREPANCIES.

5. PROTECT FROM DAMAGE ALL EXISTING FINISH WORK TO REMAIN IN PLACE AND

WHICH BECOMES EXPOSED DURING DEMOLITION OPERATIONS.

6. THE SCOPE OF DEMOLITION AND NEW WORK WILL REQUIRE CLOSE COORDINATION

BETWEEN ALL TRADES. CONTRACTOR SHALL TAKE PROVISIONS FOR THIS FACT AND

IDENTIFY CONFLICTS AND PROPOSE SOLUTION TO THE ARCHITECT BEFORE

PROCEEDING WITH THE WORK.

1 REMOVE EXISTING TERMINAL UNITS, DUCTS, GRILLES AS SHOWN, DISCONNECT REHEAT WATER

PIPING, ASSOCIATED CONTROLS.

REMOVE EXISTING REHEAT WATER PIPING AS SHOWN, CAP PIPING NEAR MAINS.

REMOVE EXISTING STEAM AND CONDENSATE PIPING, CAP PIPES IN SCOPE AREA.

1/8" = 1'-0" 02PHASE 3 BASEMENT MECHANICAL DUCTWORK PLAN - DEMOLITION

1/8" = 1'-0" 01PHASE 3 BASEMENT MECHANICAL PIPING PLAN - DEMOLITION

PHASING NOTES

PHASE BOUNDARY LINES ARE SHOWN ON LIMITS OF

THE ARCHITECTURAL SCOPE OF WORK. PLANS

IDENTIFY WORK THAT MUST BE CONDUCTED THIS

PHASE AND WORK OUTSIDE THE ARCHITECTURALLY

DEFINED PHASING AREA MUST BE COORDINATED WITH

OWNER AND CONSTRUCTION TEAM TO COMPLETE

WORK REQUIRED IN EACH PHASE.

100% CONSTRUCTION DOCUMENTS

4849 Ronson Court, Suite 200 San Diego, CA 92111 858.344.8900

10680 TREENA ST# 163 320 San Diego, CA 92123 858-368-8630 Fax 866-517-3293 www.dce-inc.net

PHASE 3 SCOPE

BOUNDARY

1174 SF

CORRIDOR

B117B

140 SF

STORAGE,

GENERAL

B172

127 SF

STORAGE,

EQUIPMENT

B172B

130 SF

OFFICE

B171C

103 SF

B171D

384 SF

BUILDING

SERVICES

B171B

57 SF

JANITOR

100 SF

STORAGE,

GENERAL

B172D

116 SF

TOILET,

FEMALE

99 SF

TOILET, MALE

B173

184 SF

HALLWAY

B-SPS-28

136 SF

LOUNGE

B174A

92 SF

FEMALE

LOCKERS

B174B 97 SF

LOCKER,

MEN'S

B174C

98 SF

TOILET, MALE

156 53 SF

JANITOR

B174E

215 SF

ETO

B-SPS-13

165 SF

CART WASH

TRANSFER

131 SF

AUTOMATIC

CARTWASH

B171H

1923 SF

STORAGE,

GENERAL

B191K

121 SF

STORAGE,

GENERAL

B196

109 SF

PET ELEV

S5-B-1

STORAGE,

GENERAL

280 SF

CORRIDOR

135 SF

LOCKER,

MEN'S

B172E

383 SF

CORRIDOR

B174

CLOSET

1321 SF

CORRIDOR

36 SF

CLOSET

293 SF

STAIRWELL

SW7-B-1

293 SF

STAIRWELL

SW8-B-1

2398 SF

STERILE

STORAGE

CART

HOLDING

AREA

B172C

102 SF

STORAGE,

GENERAL

B195C

99 SF

TOILET,

FEMALE

B-SPS-9

32X13-EXH

12X6-EXH.

12X12-T.R.

200 CFM-R

(BOTH SIDES)

(X-2)

CAV

(E )5

2X

(E ) E

F-

(E )5

6X

(E )56

X2

F.D.

2, CF

M -E

XH

X1

8- B.

R.

6"

12X6-EXH

F.D.

x1

8- E

SFDSFD

32X13-E. DN.

RH

W

R

RH

W S

(E)GX-109

S.F.D.

AC

CAV

CAV

11 CAV

CAV

CAV

CAV

EV

1-1N

EV

1-7N

SD

SA

10"

150 CFM

150 CFM

160 CFM

110 CFM

125 CFM

145 CFM

135 CFM

6"

8" 10"

14"

8"

8"

8" x2

14" 14"

125 CFM 8" 865 CFM

14"

16"

CAP

CAP

12" 14"

190 CFM

8"

8"

8"

8"

8"

10" 12"

CAP

8"

8"

CAP

16" OSA

600 CFM

CAP

110 CFM

8"

14"

8"

8"

10"

135 CFM

145 CFM

190 CFM

8"

300 CFM10"160 CFM12"

10"

215 CFM

(TYP. 4)

12"

8" 8"

8"

8"

(TYP.)

(TYP.)

8 9 9.1 9.5 9.4 10 11

R

Q.1

Q

P

O.1

O N.7

N.6

N.5

N.4

1/8" = 1'-0" 01PHASE 3 BASEMENT MECHANICAL DUCTWORK PLAN

KEY NOTESGENERAL NOTES

1. DUCT SIZE FROM MAIN SUPPLY DUCT TO TERMINAL BOX INLET SHALL BE ROUND

SHEET METAL THE SAME SIZE AS THE BOX INLET UNLESS OVERALL LENGTH OF DUCT

IS MORE THAN 5 FEET. IN THAT CASE, ONE SIZE LARGER DUCT AND A REDUCER AT

THE TERMINAL BOX SHALL BE INSTALLED.

2. DUCT CONNECTION FROM TERMINAL BOX SUPPLY AIR PLENUM TO DIFFUSER SHALL

BE INSULATED FLEXIBLE DUCT MAX LENGTH OF 7 FEET. IF DISTANCE EXCEEDS 7

FEET, USE INSULATED ROUND SHEET METAL DUCT TO WITHIN 5 FEET OF DIFFUSER

THEN INSULATED FLEXIBLE DUCT TO DIFFUSER.

3. PROVIDE VOLUME DAMPER AT TAKE OFF FROM SUPPLY AND EXHAUST AIR MAINS

(TYPICAL).

4. REFER TO SHEET METAL DETAILS ON DETAIL SHEETS FOR METHOD OF BRANCH

DUCT TAKE-OFF FROM MAIN DUCT.

5. OUTLET DUCT SIZE ON TERMINAL BOX AS SHOWN MAY BE DIFFERENT THAN BOX

OUTLET. PROVIDE TRANSITION AS REQUIRED.

6. SEISMIC BRACING AND RESTRAINT/SUPPORTS ARE REQUIRED PER SPECIFICATION

SECTION 13 05 41.

7. ALL DUCTWORK IN SCOPE AND CONNECTED TO SYSTEM WILL BE CLEANED PER

SPECIFICATION SECTION 23 01 30 52.

1 POC OF NEW DUCTWORK TO EXISTING

16"x16" OSA LOUVER WITH BIRDSCREEN

34"x14" SUPPLY DUCT AND 34"x16" RETURN DUCT FROM SSC AREA TO AC-104, REFER TO 2/M2.303

FOR CONTINUATION.

REFER TO ARCHITECTURAL PLANS FOR ACCESS TO MECHANICAL SPACE.

TERMINAL UNIT WITH 3' ATTENUATOR.

REFER TO PLUMBING PLANS FOR CONDENSATE LINE FROM AHU.

PHASING NOTES

PHASE BOUNDARY LINES ARE SHOWN ON LIMITS OF

THE ARCHITECTURAL SCOPE OF WORK. PLANS

IDENTIFY WORK THAT MUST BE CONDUCTED THIS

PHASE AND WORK OUTSIDE THE ARCHITECTURALLY

DEFINED PHASING AREA MUST BE COORDINATED WITH

OWNER AND CONSTRUCTION TEAM TO COMPLETE

WORK REQUIRED IN EACH PHASE.

100% CONSTRUCTION DOCUMENTS

4849 Ronson Court, Suite 200 San Diego, CA 92111 858.344.8900

10680 TREENA ST# 163 320 San Diego, CA 92123 858-368-8630 Fax 866-517-3293 www.dce-inc.net

145 SF

LOUNGE

B114

173 SF

OFFICE,

TECHNICIAN

B114A

167 SF

OFFICE,

STAFF

B115

415 SF

CORRIDOR

103 SF 165 SF 131 SF

314 SF

STERILE

STORAGE

B171G

697 SF

STORAGE

AREA

911 SF

OFFICE,

STAFF

B110

30 SF

CLOSET

229 SF

ENGINEERING/IT

B-SPS-48

144 SF

OFFICE

B128D

418 SF

UTILITY

ROOM,

SOILED

B102

92 SF

ELEVATOR

S3

96 SF

ELEVATOR

S1

88 SF

ELEVATOR

S2

ELEVATOR

2" S

LO

T

LI

N.

P

T.

5C

FM

-S

58X21-E (E-1) 58X21-E

(E )5

2X

(E ) E

F-

X9

-S

(E ) E

F-

(E )5

2X

(E)(AC-4)

CAV

15B

CAV

15A

(E ) E

F-

250 CFM

14x6

(TYP. 2)

10" 10"

12"

CAP

CAP

CAP

CAP

18"

18"

18"

20"

28x16

14"

12"

400 CFM

500 CFM

500 CFM500 CFM

500 CFM

500 CFM

450 CFM

12"

12"

12"

400 CFM

12"

12"

12"

12"

36x24

36x14

475 CFM

900 CFM

14"

12"

12"

14"

CAP

500 CFM

500 CFM

18x10

12"

220 CFM

10"

930 CFM

14"

225 CFM

22x16

CAP CAP

12" 10"

(TYP.)

(TYP.)

(TYP.)

PHASE 3 SCOPE

BOUNDARY

N.4

N.2

N

M

L.1

L

K

8 9 9.1 9.5 9.4

5 5.1 6 7 7.1 8

Q.1

Q

P

O.1

O N.7

N.6

N.5

408 SF

CORRIDOR

B177B

1174 SF

CORRIDOR

B117B

CORRIDOR

334 SF

STORAGE

B177N

3565 SF

STORAGE,

GENERAL

B177-1

1793 SF

IT SERVICE

CENTER

OFFICE

B1000

75 SF

STAIR

SW11-B-1

127 SF

STORAGE,

EQUIPMENT

B172B

130 SF

OFFICE

B171C

103 SF

B171D

225 CFM-E

100 CFM-E

165 CFM-S

12X10-T.R.

225 CFM-E

13X6

6X 6-

T.

R.

165 CFM-S

CF

M

-S

F.D.

8X6

8X6-B.R.

100 CFM-E

S.F.D.

225 CFM-S

x2

R

A x2

SA

12"

36x24

36x14

24x20 OSA 36 x2

R

A

PHASE 3 SCOPE

BOUNDARY

REFER TO M2.100 FOR

CONTINUATION OF MAIN

OSA DUCT

KEY NOTESGENERAL NOTES

1. DUCT SIZE FROM MAIN SUPPLY DUCT TO TERMINAL BOX INLET SHALL BE ROUND

SHEET METAL THE SAME SIZE AS THE BOX INLET UNLESS OVERALL LENGTH OF DUCT

IS MORE THAN 5 FEET. IN THAT CASE, ONE SIZE LARGER DUCT AND A REDUCER AT

THE TERMINAL BOX SHALL BE INSTALLED.

2. DUCT CONNECTION FROM TERMINAL BOX SUPPLY AIR PLENUM TO DIFFUSER SHALL

BE INSULATED FLEXIBLE DUCT MAX LENGTH OF 7 FEET. IF DISTANCE EXCEEDS 7

FEET, USE INSULATED ROUND SHEET METAL DUCT TO WITHIN 5 FEET OF DIFFUSER

THEN INSULATED FLEXIBLE DUCT TO DIFFUSER.

3. PROVIDE VOLUME DAMPER AT TAKE OFF FROM SUPPLY AND EXHAUST AIR MAINS

(TYPICAL).

4. REFER TO SHEET METAL DETAILS ON DETAIL SHEETS FOR METHOD OF BRANCH

DUCT TAKE-OFF FROM MAIN DUCT.

5. OUTLET DUCT SIZE ON TERMINAL BOX AS SHOWN MAY BE DIFFERENT THAN BOX

OUTLET. PROVIDE TRANSITION AS REQUIRED.

6. SEISMIC BRACING AND RESTRAINT/SUPPORTS ARE REQUIRED PER SPECIFICATION

SECTION 13 05 41.

7. ALL DUCTWORK IN SCOPE AND CONNECTED TO SYSTEM WILL BE CLEANED PER

SPECIFICATION SECTION 23 01 30 52.

1 POC OF NEW DUCTWORK TO EXISTING

POC OF NEW DUCTWORK TO EXISTING TERMINAL BOX

34x14 SUPPLY DUCT AND 34x16 RETURN DUCT FROM AC-104 TO SSC AREA, REFER TO 1/M2.303

FOR CONTINUATION

34x14 SUPPLY DUCT AND 34x16 RETURN DUCT FROM SSC AREA TO AC-104, REFER TO 2/M2.303

FOR CONTINUATION

CAV-15B PHASE 3 CFM IS 500 CFM. THIS VALUE INCREASES TO 2000 CFM IN PHASE 4.

REFER TO PHASE 4 SCOPE M2.401 FOR CONTINUATION.

1/8" = 1'-0" 02PHASE 3 BASEMENT MECHANICAL DUCTWORK PLAN

1/8" = 1'-0" 01PHASE 3 BASEMENT MECHANICAL DUCTWORK PLAN

PHASING NOTES

PHASE BOUNDARY LINES ARE SHOWN ON LIMITS OF

THE ARCHITECTURAL SCOPE OF WORK. PLANS

IDENTIFY WORK THAT MUST BE CONDUCTED THIS

PHASE AND WORK OUTSIDE THE ARCHITECTURALLY

DEFINED PHASING AREA MUST BE COORDINATED WITH

OWNER AND CONSTRUCTION TEAM TO COMPLETE

WORK REQUIRED IN EACH PHASE.

100% CONSTRUCTION DOCUMENTS

4849 Ronson Court, Suite 200 San Diego, CA 92111 858.344.8900

10680 TREENA ST# 163 320 San Diego, CA 92123 858-368-8630 Fax 866-517-3293 www.dce-inc.net

3/4" MPS

3/4" MPR

2" MPS

CHWRCHWS 2" MPS

CAV

SH

CAV

CAV

CAV

CAV

3 CAV

CAV

CAV

SG-1

3/4" HHWS&R

1 1/2"

3/4"

1 1/4" 1 1/4"

3"

2-1/2" HHWS&R

3/4"

2"

CHWS&R

(TYP/3)

3/4"

MPS

(TYP/3)

1"MPS

2" MPS

1-1/2" MPS

3/4"

1 1/2" HHWS&R

1" 3/4"

2" HHWS&R

1 1/4"

1"

1 1/4" HHWS&R

3/4"

1 1/4" LPR

1 1/4" LPRHH

W

S

HH

W R

CHWRCHWS

3/4" 3/4"

1 1/2" VENT

2" MPS

1 1/2" MPS 1"

1"

3/4" LPR

1" MPR

HHWRHHWS

MPS MPR

3/4"

AC

3/4" HHWS

3/4"

3/4"

3/4" HHWR

3/4" HHWS

3/4" HHWR

3/4" HHWS

3/4" HHWR

3/4" HHWS

3/4" HHWR

3/4" HHWS

3/4" HHWR

1" HHWS

1" HHWR

3/4" HHWS

3/4" HHWR

3/4" HHWS

3/4" HHWR

3/4" HHWS

3/4" HHWR

3/4" HHWS

3/4" HHWR 1 1/4" HHWS

1 1/4" HHWR

3/4" HHWS

3/4" HHWR

CAV

CAV

CAV

CAV

CAV

CAV

CAV

223/4" RHWS

3/4" RHWR

CAV-7

(PHASE 6)

PHASE 3 SCOPE

BOUNDARY

8 9 9.1 9.5 9.4 10 11

R

Q.1

Q

P

O.1

O N.7

N.6

N.5

N.4

KEY NOTESGENERAL NOTES

1 POC OF NEW RHWS/R PIPING TO EXISTING

RECONNECT NEW 1-1/4" CHWS/R LINES TO EXISTING.

1. PLAN SHOWS THE EXISTING HVAC PIPING IS APPROXIMATE LAYOUT OF EXISTING

BUILDING AND IS NOT INTENDED TO REPRESENTED "AS-BUILT" CONDITIONS,

CONTRACTOR SHALL VISIT SITE AND BECOME FAMILIAR WITH ACTUAL CONDITIONS

WHEN BIDDING THE WORK.

2. PRIOR TO ANY WORK, INCLUDING DEMO AND NEW, CONTRACTOR MUST FIELD

VERIFY ALL EXISTING MECHANICAL WORK LOCATED IN THE SPACE WITH OTHER

TRADES WHICH MAY AFFECT THE SPACES, SINCE THE EXISTING CONDITIONS OF

THE INTERSTITIAL SPACE, THE ROUTING OF NEW PIPING WILL BE FOLLOWED THE

SAME AS THE EXISTING.

3. THE OWNER MUST BE NOTIFIED PRIOR TO SHUTDOWN OF ANY MECHANICAL HVAC

WATER SYSTEMS, INCLUDING HEATING HOT WATER LOOP AND REHEAT HOT WATER

LOOP.

4. EXISTING PIPING, VALVES, CONTROLS SHOWN TO REMAIN SHALL BE PROTECTED

DURING CONSTRUCTION, DAMAGE TO EXISTING CONSTRUCTION SHOWN TO REMAIN

SHALL BE RESTORED TO MATCH PRE-DAMAGED CONDITION.

5. PROVIDE 2-WAY CONTROL VALVE FOR TERMINAL BOX REHEAT WATER PIPING

CONNECTION, REFER TO PIPING DIAGRAM 10/M501, UNLESS NOTED OTHERWISE.

6. PROVIDE MINIMUM 3/4" BRANCH PIPE TO REHEAT COIL CONNECTION ON TERMINAL

BOX (TYPICAL), UNLESS NOTED OTHERWISE.

7. REFER TO DETAIL 10/M501 FOR TYPICAL REHEAT COIL PIPING

8. SEISMIC BRACING AND RESTRAINT/SUPPORTS ARE REQUIRED PER SPECIFICATION

SECTION 13 05 41

1/8" = 1'-0" 01PHASE 3 BASEMENT MECHANICAL PIPING PLAN

PHASING NOTES

PHASE BOUNDARY LINES ARE SHOWN ON LIMITS OF

THE ARCHITECTURAL SCOPE OF WORK. PLANS

IDENTIFY WORK THAT MUST BE CONDUCTED THIS

PHASE AND WORK OUTSIDE THE ARCHITECTURALLY

DEFINED PHASING AREA MUST BE COORDINATED WITH

OWNER AND CONSTRUCTION TEAM TO COMPLETE

WORK REQUIRED IN EACH PHASE.

100% CONSTRUCTION DOCUMENTS

4849 Ronson Court, Suite 200 San Diego, CA 92111 858.344.8900

10680 TREENA ST# 163 320 San Diego, CA 92123 858-368-8630 Fax 866-517-3293 www.dce-inc.net

LOUNGE

B114

173 SF

OFFICE,

TECHNICIAN

B114A

167 SF

OFFICE,

STAFF

B115

415 SF

CORRIDOR

B117

103 SF

314 SF

STERILE

STORAGE

B171G

697 SF

STORAGE

AREA

911 SF

OFFICE,

STAFF

B110

160 SF

DIETETICS

RESIDENTS

B115A

180 SF

CLINICAL

NUTRITION

MANAGER

B128A

793 SF

ELECTRICAL

B118

386 SF

EQUIPMENT

STORAGE

B128B

97 SF

STAIRWELL

SW13-B-1

148 SF

EMS BREAK

B108C

229 SF

ENGINEERING/IT

B-SPS-48

935 SF

CORRIDOR

B109

144 SF

OFFICE

B128D

ELEVATOR

96 SF

ELEVATOR

S1

88 SF

ELEVATOR

S2

4" M

PS

3/4" 6"

3/4"

ANCHORS(TYPICAL)

MPR F&T.-150#/HR

MPSCHWS

PLBG. PIPE

3" CHWS&R

RHWS RHWR

2" MPS

CHWR CHWS

1" MPR

3" CHWS&R

3" CHWS&R

3" 3/4"

3/4"

1"

(E)2-1/2" HHWS&R

1" MPR

2 1/2" HPS

1" HPR

HHWRHHWS

2" MPS

1" MPR

CAV

14E

CAV

18E

(E)3/4"

(E)1"

(E)3/4"

(E)1-1/4"

1" MPS

CAV

15B

CAV

15A

1" HHWS

1" HHWR

1" HHWS

1" HHWR

(E) 2" HHWS

(E) 2" HHWR

CAP

CAV

10E

CAV

16E

CAV

17E

(E) 2"

(E) 3/4"

(E) 3/4"

(E) 1-1/2"

(E) 3/4"

(E) 3/4"

(E) 1-1/2"

(E) 1"

(E) 1"

(E) 3/4"

(E) 1-1/4"

PHASE 3 SCOPE

BOUNDARY

N.4

N.2

N

M

L.1

L

K

J.4

7 7.1 8 9 9.1 9.5 9.4

KEY NOTESGENERAL NOTES

1. DUCT SIZE FROM MAIN SUPPLY DUCT TO TERMINAL BOX INLET SHALL BE ROUND

SHEET METAL THE SAME SIZE AS THE BOX INLET UNLESS OVERALL LENGTH OF DUCT

IS MORE THAN 5 FEET. IN THAT CASE, ONE SIZE LARGER DUCT AND A REDUCER AT

THE TERMINAL BOX SHALL BE INSTALLED.

2. DUCT CONNECTION FROM TERMINAL BOX SUPPLY AIR PLENUM TO DIFFUSER SHALL

BE INSULATED FLEXIBLE DUCT MAX LENGTH OF 7 FEET. IF DISTANCE EXCEEDS 7

FEET, USE INSULATED ROUND SHEET METAL DUCT TO WITHIN 5 FEET OF DIFFUSER

THEN INSULATED FLEXIBLE DUCT TO DIFFUSER.

3. PROVIDE VOLUME DAMPER AT TAKE OFF FROM SUPPLY AND EXHAUST AIR MAINS

(TYPICAL).

4. REFER TO SHEET METAL DETAILS ON DETAIL SHEETS FOR METHOD OF BRANCH

DUCT TAKE-OFF FROM MAIN DUCT.

5. OUTLET DUCT SIZE ON TERMINAL BOX AS SHOWN MAY BE DIFFERENT THAN BOX

OUTLET. PROVIDE TRANSITION AS REQUIRED.

6. SEISMIC BRACING AND RESTRAINT/SUPPORTS ARE REQUIRED PER SPECIFICATION

SECTION 13 05 41.

7. ALL DUCTWORK IN SCOPE AND CONNECTED TO SYSTEM WILL BE CLEANED PER

SPECIFICATION SECTION 23 01 30 52.

1 POC OF NEW RHWS/R PIPING TO EXISTING

1/8" = 1'-0" 01PHASE 3 BASEMENT MECHANICAL PIPING PLAN

PHASING NOTES

PHASE BOUNDARY LINES ARE SHOWN ON LIMITS OF

THE ARCHITECTURAL SCOPE OF WORK. PLANS

IDENTIFY WORK THAT MUST BE CONDUCTED THIS

PHASE AND WORK OUTSIDE THE ARCHITECTURALLY

DEFINED PHASING AREA MUST BE COORDINATED WITH

OWNER AND CONSTRUCTION TEAM TO COMPLETE

WORK REQUIRED IN EACH PHASE.

100% CONSTRUCTION DOCUMENTS

4849 Ronson Court, Suite 200 San Diego, CA 92111 858.344.8900

10680 TREENA ST# 163 320 San Diego, CA 92123

(E ) E

F-

2" S

LO

T

LI

N.

P

T.

0C

FM

-S

13X7

FD

39X22-S 55X22-S

X1

X1

FD

330CFM-E

X6

-S

5C

FM

-S

58X21-E

(TF-1)

55X22-S

37X20-E

260CFM-S

10X10-CD

440CFM-S

12X12-CD

25X10-E

13X7

440CFM-S

12X12-CD

(A C-

1)

X7 -S

X7

-S

12X7-S55X22-S

(E-1) 58X21-E

16X6-E

(AC-4)

(E )5

2X

12X12-CD

440CFM-S

13X7

440 CFM-S

12X12-C.D.

12X12-C.D.

440 CFM-S

X2

3- E

(E )5

2X

380CFM-S

20X8-S

12X7-S

(E)(AC-4)

21X13-S

(TYP 5)

X9

-S

PHASE 4 SCOPE

BOUNDARY

N.4

N.2

N

M

L.1

L

K

J.4

7.1 8 9 9.1 9.5 9.4

LPS

MPS

HHWR

RHWS

CHWR

3" CHWS&R

3" CHWS&R

3" CHWS&R

RHWS RHWR

3/4"

2-1/2" HHWS&R

1" MPS

2" MPS

CHWR CHWS

2 1/2" HPS

1" HPR

HHWRHHWS

2" MPS

1" MPR

3" CHWS&R

3" CHWS&R

3/4"

2-1/2" HHWS&R

1" MPS

2 1/2" HPS

1" HPR

2" MPS

1" MPR

CAV

14E

CAV

10E

CAV

16E

CAV

18E

2"

3/4"

3/4"

1-1/2"

3/4"

3/4"

3/4"

1"

1"

2" 3/4"

1-1/2" 1-1/4"

1"

1"

3/4"

1-1/4"

3/4"

CAV

17E

PHASE 4 SCOPE

BOUNDARY

7.1 8 9 9.1 9.5 9.4

N.4

N.2

N

M

L.1

L

K

J.4

DEMOLITION NOTES

1. DEMOLITION PLAN SHOWS APPROXIMATE LAYOUT OF EXISTING BUILDING AND IS

NOT INTENDED TO REPRESENT "AS-BUILT" CONDITIONS, FOLLOW PROCEDURES

OUTLINED IN SPECIFICATIONS FOR REQUIREMENTS TO VISIT SITE AND OTHERWISE

BECOME FAMILIAR WITH ACTUAL CONDITIONS WHEN BIDDING THE WORK.

2. PRIOR TO ANY DEMOLITION WORK CONTRACTOR MUST FIELD VERIFY ALL EXISTING

MECHANICAL WORK LOCATED IN THE SPACE WHICH AFFECTS THE SPACES. THE

OWNER MUST BE NOTIFIED PRIOR TO SHUTDOWN OF ANY MECHANICAL SYSTEMS.

3. DUCTS, PIPES, AIR DIFFUSERS, TERMINAL UNITS, AND HVAC EQUIPMENT AND OTHER

ITEMS TO BE REMOVED ARE SHOWN HATCHED.

4. EXISTING CONSTRUCTION SHOWN TO REMAIN INCLUDING BUT NOT LIMITED TO

DUCTS, PIPES, DIFFUSERS, ETC. SHALL BE PROTECTED DURING DEMOLITION,

DAMAGE TO EXISTING CONSTRUCTION SHOWN TO REMAIN SHALL BE RESTORED TO

MATCH PRE-DAMAGED CONDITION, NOTIFY THE ENGINEER IMMEDIATELY FOR ANY

DISCREPANCIES.

5. PROTECT FROM DAMAGE ALL EXISTING FINISH WORK TO REMAIN IN PLACE AND

WHICH BECOMES EXPOSED DURING DEMOLITION OPERATIONS.

6. THE SCOPE OF DEMOLITION AND NEW WORK WILL REQUIRE CLOSE COORDINATION

BETWEEN ALL TRADES. CONTRACTOR SHALL TAKE PROVISIONS FOR THIS FACT AND

IDENTIFY CONFLICTS AND PROPOSE SOLUTION TO THE ARCHITECT BEFORE

PROCEEDING WITH THE WORK.

KEY NOTES

1 REMOVE EXISTING TERMINAL UNITS, DUCTS, GRILLES AS SHOWN, DISCONNECT REHEAT WATER

PIPING, ASSOCIATED CONTROLS.

REMOVE EXISTING REHEAT WATER PIPING AS SHOWN, CAP PIPING NEAR MAINS.2

1/8" = 1'-0" 02PHASE 4 BASEMENT MECHANICAL DUCTWORK PLAN - DEMOLITION

1/8" = 1'-0" 01PHASE 4 BASEMENT MECHANICAL PIPING PLAN - DEMOLITION

PHASING NOTES

PHASE BOUNDARY LINES ARE SHOWN ON LIMITS OF

THE ARCHITECTURAL SCOPE OF WORK. PLANS

IDENTIFY WORK THAT MUST BE CONDUCTED THIS

PHASE AND WORK OUTSIDE THE ARCHITECTURALLY

DEFINED PHASING AREA MUST BE COORDINATED WITH

OWNER AND CONSTRUCTION TEAM TO COMPLETE

WORK REQUIRED IN EACH PHASE.

100% CONSTRUCTION DOCUMENTS

4849 Ronson Court, Suite 200 San Diego, CA 92111 858.344.8900

10680 TREENA ST# 163 320 San Diego, CA 92123

415 SF

CORRIDOR

B117

422 SF

LOBBY

B101

130 SF

OFFICE

B171C

103 SF

B171D

384 SF

BUILDING

SERVICES

B171B

165 SF

CART WASH

TRANSFER

131 SF

AUTOMATIC

CARTWASH

B171H

314 SF

STERILE

STORAGE

B171G

697 SF

STORAGE

AREA

160 SF

DIETETICS

RESIDENTS

B115A

180 SF

CLINICAL

NUTRITION

MANAGER

B128A

30 SF

CLOSET

STAIRWELL EMS BREAK

229 SF

ENGINEERING/IT

B-SPS-48

935 SF

CORRIDOR

B109

144 SF

OFFICE

B128D

92 SF

ELEVATOR

S3

96 SF

ELEVATOR

S1

88 SF

ELEVATOR

S2

2" S

LO

T

LI

N.

P

T.

0C

FM

-S

13X7

FD

39X22-S 55X22-S

X1

X1

FD

330CFM-E

X6

-S

5C

FM

-S

58X21-E

(TF-1)

55X22-S

(E) 37X20

260CFM-S

10X10-CD

440CFM-S

12X12-CD

25X10-E

13X7

440CFM-S

12X12-CD

(A C-

1)

X7 -S

X7

-S

12X7-S55X22-S

(E-1) 58X21-E

(AC-4)

12X12-CD

440CFM-S

13X7

440 CFM-S

12X12-C.D.

12X12-C.D.

440 CFM-S

(E )5

2X

(E ) E

F-

380CFM-S

20X8-S

12X7-S

X9

-S

(E ) E

F-

(E )5

2X

(E)(AC-4)

250 CFM

14x6

(TYP. 2)

10" 10"

12"

CAP

CAP

CAV

15B

CAV

15A

CAP

CAP

18"

18"

18"

20"

28x16

14"

12"

400 CFM

500 CFM

500 CFM500 CFM

500 CFM

500 CFM

450 CFM

12"

12"

12"

400 CFM

12"

12"

12"

12"

36x24

36x14 (E

) E F-

475 CFM 900 CFM

14"

12"

12"

14"

CAP

10"

12"

120 CFM

120 CFM 325 CFM

165 CFM160 CFM

500 CFM

500 CFM

500 CFM

6" 10"

8" 10" 8"

10"

12"12"

12"

500 CFM

18x10

12"

220 CFM

10"

930 CFM

14"

225 CFM

22x16

(TYP.)

(TYP.)(TYP.)

(TYP.)

(TYP.)

PHASE 4 SCOPE

BOUNDARY

N.5

N.4

N.2

N

M

L.1

L

K

J.4

7.1 8 9 9.1 9.5 9.4

415 SF

CORRIDOR

B117

422 SF

LOBBY

B101

130 SF

OFFICE

B171C

103 SF

B171D

384 SF

BUILDING

SERVICES

B171B

165 SF

CART WASH

TRANSFER

131 SF

AUTOMATIC

CARTWASH

B171H

314 SF

STERILE

STORAGE

B171G

697 SF

STORAGE

AREA

30 SF

CLOSET

STAIRWELL EMS BREAK

229 SF

ENGINEERING/IT

B-SPS-48

935 SF

CORRIDOR

B109

144 SF

OFFICE

B128D

92 SF

ELEVATOR

S3

96 SF

ELEVATOR

S1

88 SF

ELEVATOR

S2

LPS

MPS

HHWR

RHWS

CHWR

3" CHWS&R

RHWS RHWR

2" MPS

CHWR CHWS

2" MPS

3" CHWS&R

3" CHWS&R

CAV

3"

2-1/2" HHWS&R

3/4"

2"

CHWS&R

(TYP/3)

3/4"

MPS

(TYP/3)

1"MPS

1-1/2" MPS

3/4"

1"

(E)2-1/2" HHWS&R

1" MPS

CHWRCHWS

2" MPS

1 1/2" MPS

1" MPR

2 1/2" HPS

1" HPR

HHWRHHWS

2" MPS

1" MPR

SH

CAV

16E

CAV

18E

(E)3/4"

(E)1"

(E) 3/4" HHWS

(E) 3/4" HHWR

CAV

14E

(E)3/4"

(E)3/4"

(E)1-1/4"

CAV

15B

CAV

15A

(E) 1" HHWS

(E) 1" HHWR

(E) 1" HHWS

(E) 1" HHWR

(E) 2" HHWS

(E) 2" HHWR

CAP

CAV

10E

2"

(E) 3/4"

(E) 3/4"

(E) 1-1/2"

3/4"

(E) 1-1/2"

(E) 1"

(E) 1"

(E) 3/4"

(E) 1-1/4"

PHASE 3

PHASE 3

PHASE 4 SCOPE

BOUNDARY

8 9 9.1 9.5 9.4

N.5

N.4

N.2

N

M

L.1

L

K

J.4

KEY NOTESGENERAL NOTES

1 36x14 SUPPLY FROM AC-104

36x16 RETURN TO AC-104

POC OF NEW RHWS/R PIPING TO EXISTING

1. DUCT SIZE FROM MAIN SUPPLY DUCT TO TERMINAL BOX INLET SHALL BE ROUND

SHEET METAL THE SAME SIZE AS THE BOX INLET UNLESS OVERALL LENGTH OF

DUCT IS MORE THAN 5 FEET. IN THAT CASE, ONE SIZE LARGER DUCT AND A

REDUCER AT THE TERMINAL BOX SHALL BE INSTALLED.

2. DUCT CONNECTION FROM TERMINAL BOX SUPPLY AIR PLENUM TO DIFFUSER SHALL

BE INSULATED FLEXIBLE DUCT MAX LENGTH OF 7 FEET. IF DISTANCE EXCEEDS 7

FEET, USE INSULATED ROUND SHEET METAL DUCT TO WITHIN 5 FEET OF DIFFUSER

THEN INSULATED FLEXIBLE DUCT TO DIFFUSER.

3. PROVIDE VOLUME DAMPER AT TAKE OFF FROM SUPPLY AND EXHAUST AIR MAINS

(TYPICAL).

4. REFER TO SHEET METAL DETAILS ON DETAIL SHEETS FOR METHOD OF BRANCH

DUCT TAKE-OFF FROM MAIN DUCT.

5. OUTLET DUCT SIZE ON TERMINAL BOX AS SHOWN MAY BE DIFFERENT THAN BOX

OUTLET. PROVIDE TRANSITION AS REQUIRED.

6. SEISMIC BRACING AND RESTRAINT/SUPPORTS ARE REQUIRED PER SPECIFICATION

SECTION 13 05 41.

7. ALL DUCTWORK IN SCOPE AND CONNECTED TO SYSTEM WILL BE CLEANED PER

SPECIFICATION SECTION 23 01 30 52.

1/8" = 1'-0" 02PHASE 4 BASEMENT MECHANICAL DUCTWORK PLAN

1/8" = 1'-0" 01PHASE 4 BASEMENT MECHANICAL PIPING PLAN

PHASING NOTES

PHASE BOUNDARY LINES ARE SHOWN ON LIMITS OF

THE ARCHITECTURAL SCOPE OF WORK. PLANS

IDENTIFY WORK THAT MUST BE CONDUCTED THIS

PHASE AND WORK OUTSIDE THE ARCHITECTURALLY

DEFINED PHASING AREA MUST BE COORDINATED WITH

OWNER AND CONSTRUCTION TEAM TO COMPLETE

WORK REQUIRED IN EACH PHASE.

100% CONSTRUCTION DOCUMENTS

4849 Ronson Court, Suite 200 San Diego, CA 92111 858.344.8900

10680 TREENA ST# 163 320 San Diego, CA 92123

3043 SF

STORAGE,

GENERAL

B177E

404 SF

STORAGE,

GENERAL

B177D

210 SF

STAIRWELL

SW9-B-1

198 SF

MECHANICAL

ROOM

B180

408 SF

CORRIDOR

B177B

1174 SF

CORRIDOR

B117B

556 SF

CORRIDOR

B177M

1575 SF

CORRIDOR

B177A

334 SF

STORAGE

B177N

3565 SF

STORAGE,

GENERAL

B177-1

1793 SF

IT SERVICE

CENTER

OFFICE

B1000

75 SF

STAIR

SW11-B-1

KITCHEN

EQUIPMENT

RECEIVING

ISSUE

EQUIPMENT PREP, AND STAGING

STORAGE

BULK STORAGE

SHRINKING

WRAPPER

UNIT ITEM STORAGE

BREAKDOWN

KITCHEN

EQUIPMENT

75 SF

STAIR

SW11-B-1

1793 SF

IT SERVICE

CENTER

OFFICE

B1000

3565 SF

STORAGE,

GENERAL

B177-1

334 SF

STORAGE

B177N

1575 SF

CORRIDOR

B177A

556 SF

CORRIDOR

B177M

1174 SF

CORRIDOR

B117B

340 SF

STORAGE,

GENERAL

B177C

408 SF

CORRIDOR

B177B

160 SF

CORRIDOR

B117P

109 SF

TOILET,

FEMALE

B176B

105 SF

TOILET, MALE

B176A

428 SF

OFFICE

B176

198 SF

MECHANICAL

ROOM

B180

210 SF

STAIRWELL

SW9-B-1

404 SF

STORAGE,

GENERAL

B177D

3043 SF

STORAGE,

GENERAL

B177E

389 SF

SPD

RECEIVING

225 CFM-E

165 CFM-S

(E ) 6

0X

(E ) 5

0X

-E

XH

120X28

,5

C

FM

EX

H.

9, CF

M

EX

H.

F.D.

42 120 78X19

(E ) 4

4X

(E ) 2

8X

F.D.

C.O.

(E )(X

-2

(E )(K

X- 1)

28X12-E (KX-2)

F.D.

C.O.

F.

D.

(E) 28X44, UP TO KX-1

(E) 28X12, UP TO KX-2

WITH F.D. & C.D. TO REMAIN

WITH F.D. & C.D. TO REMAIN

2.

7, CF

M

EX

H.

7, CF

M

(E)(X-9)

EXHAUST FAN

78X16

W

IT

H

SC

RE

EN

OV

ER

O

PE

NI

NG

EX

HA

US

T

12X10-T.R.

225 CFM-E

6X 6-

T.

R.

165 CFM-S

CF

M

-S

F.D.

(E)(GX-1)

(E)(X-1)

(E) FC-1

(E) HP-1

(E) VFD-1

PHASE 5 SCOPE

BOUNDARY

2.1 3' 3.1 3.2 4 4.2 5 5.1 6 7 7.1 8

R

Q.1

Q

P

O.1

O N.7

N.6

N.5

N.4

N.2

KEY NOTESGENERAL NOTES

1. DEMOLITION PLAN SHOWS APPROXIMATE LAYOUT OF EXISTING BUILDING AND IS

NOT INTENDED TO REPRESENT "AS-BUILT" CONDITIONS, FOLLOW PROCEDURES

OUTLINED IN SPECIFICATIONS FOR REQUIREMENTS TO VISIT SITE AND OTHERWISE

BECOME FAMILIAR WITH ACTUAL CONDITIONS WHEN BIDDING THE WORK.

2. PRIOR TO ANY DEMOLITION WORK CONTRACTOR MUST FIELD VERIFY ALL EXISTING

MECHANICAL WORK LOCATED IN THE SPACE WHICH AFFECTS THE SPACES. THE

OWNER MUST BE NOTIFIED PRIOR TO SHUTDOWN OF ANY MECHANICAL SYSTEMS.

3. DUCTS, PIPES, AIR DIFFUSERS, TERMINAL UNITS, AND HVAC EQUIPMENT AND OTHER

ITEMS TO BE REMOVED ARE SHOWN HATCHED.

4. EXISTING CONSTRUCTION SHOWN TO REMAIN INCLUDING BUT NOT LIMITED TO

DUCTS, PIPES, DIFFUSERS, ETC. SHALL BE PROTECTED DURING DEMOLITION,

DAMAGE TO EXISTING CONSTRUCTION SHOWN TO REMAIN SHALL BE RESTORED TO

MATCH PRE-DAMAGED CONDITION, NOTIFY THE ENGINEER IMMEDIATELY FOR ANY

DISCREPANCIES.

5. PROTECT FROM DAMAGE ALL EXISTING FINISH WORK TO REMAIN IN PLACE AND

WHICH BECOMES EXPOSED DURING DEMOLITION OPERATIONS.

6. THE SCOPE OF DEMOLITION AND NEW WORK WILL REQUIRE CLOSE COORDINATION

BETWEEN ALL TRADES. CONTRACTOR SHALL TAKE PROVISIONS FOR THIS FACT AND

IDENTIFY CONFLICTS AND PROPOSE SOLUTION TO THE ARCHITECT BEFORE

PROCEEDING WITH THE WORK.

1 REMOVE (E) X-9, ASSOCIATED DUCT AND WIRING.

(E) FC-1, (E) HP-1, AND (E) VFD-1 TO BE REMOVED WITH ALL ASSOCIATED DUCTS/GRILLES, PIPING, AND CONTROLS. PROVIDE VALVES TO SHUT OFF PIPING INSIDE PROJECT AREA.

1/8" = 1'-0" 01PHASE 5 BASEMENT MECHANICAL DUCTWORK PLAN - DEMOLITION

PHASING NOTES

PHASE BOUNDARY LINES ARE SHOWN ON LIMITS OF

THE ARCHITECTURAL SCOPE OF WORK. PLANS

IDENTIFY WORK THAT MUST BE CONDUCTED THIS

PHASE AND WORK OUTSIDE THE ARCHITECTURALLY

DEFINED PHASING AREA MUST BE COORDINATED WITH

OWNER AND CONSTRUCTION TEAM TO COMPLETE

WORK REQUIRED IN EACH PHASE.

100% CONSTRUCTION DOCUMENTS

4849 Ronson Court, Suite 200 San Diego, CA 92111 858.344.8900

10680 TREENA ST# 163 320 San Diego, CA 92123

GENERAL

B177E

404 SF

STORAGE,

GENERAL

B177D

210 SF

STAIRWELL

SW9-B-1

198 SF

MECHANICAL

ROOM

B180

408 SF

CORRIDOR

B177B

1174 SF

CORRIDOR

B117B

556 SF

CORRIDOR

B177M

CORRIDOR

334 SF

STORAGE

B177N 1793 SF

IT SERVICE

CENTER

OFFICE

B1000

75 SF

STAIR

SW11-B-1

KITCHEN

EQUIPMENT

RECEIVING

ISSUE

EQUIPMENT PREP, AND STAGING

STORAGE

BULK STORAGE

SHRINKING

WRAPPER

UNIT ITEM STORAGE

BREAKDOWN

,5

C

FM

EX

H.

F.D.

42 120 (E)78X19

F.D.

F.

D.

28X44-E, UP TO KX-1

28X12-E, UP TO KX-2

WITH F.D. & C.D.

WITH F.D. & C.D.

CAV

18C

CAV

18B

CAV

CAV

CAV

(GX-1)

CAV

CAV

CAP

CAP CAP CAP

CAP

(E )5

0X

-E

XH

CAV

18A

SD SD

(E)(X-1)

CAP

120 CFM 120 CFM

16x10

16"

34x12 16" 10"

8"

16x10

20x10 30x12

18"

20"

12"

16"

20"

18"

8" 8"

225 CFM

240 CFM

12"

14"16"

10"

10"

18"

28x24

16"

225 CFM

10"

40x30 INLET

WITH SCREEN

12"

400 CFM

8" x2

R

A x2

SA

36x24

36x14

PHASE 7 SCOPE

BOUNDARY

8"8" 10"

12"

10"

535 CFM

18x12

(TYP. 4)

130 CFM

14x6

(TYP. 3)

30x30

30x30 66x18 RA

30x30 24 x2

SA

62x14 UP

TO AC-104

95 CFM

90 CFM

10"

10"

12"

6"

6"

95 CFM

90 CFM

14"

6"

6"

24x20 OSA

390 CFM

14x6

12"

32x1828x24

28x24

66x18 UP

TO AC-103

(TYP. 2)

52x14 UP

TO AC-103

535 CFM

18x12 SD

(TYP. 4)

16"

50x28 OSA x3

R

A

62x14 UP

TO AC-104

4300 CFM

42x24

(TYP.)

(TYP.)

PHASE 5 SCOPE

BOUNDARY

2.1 3' 3.1 3.2 4 4.2 5 5.1 6 7 7.1 8

R

Q.1

Q

P

O.1

O N.7

N.6

N.5

N.4

1/8" = 1'-0" 01PHASE 5 BASEMENT MECHANICAL DUCTWORK PLAN

KEY NOTESGENERAL NOTES

1. DUCT SIZE FROM MAIN SUPPLY DUCT TO TERMINAL BOX INLET SHALL BE ROUND

SHEET METAL THE SAME SIZE AS THE BOX INLET UNLESS OVERALL LENGTH OF DUCT

IS MORE THAN 5 FEET. IN THAT CASE, ONE SIZE LARGER DUCT AND A REDUCER AT

THE TERMINAL BOX SHALL BE INSTALLED.

2. DUCT CONNECTION FROM TERMINAL BOX SUPPLY AIR PLENUM TO DIFFUSER SHALL

BE INSULATED FLEXIBLE DUCT MAX LENGTH OF 7 FEET. IF DISTANCE EXCEEDS 7

FEET, USE INSULATED ROUND SHEET METAL DUCT TO WITHIN 5 FEET OF DIFFUSER

THEN INSULATED FLEXIBLE DUCT TO DIFFUSER.

3. PROVIDE VOLUME DAMPER AT TAKE OFF FROM SUPPLY AND EXHAUST AIR MAINS

(TYPICAL).

4. REFER TO SHEET METAL DETAILS ON DETAIL SHEETS FOR METHOD OF BRANCH

DUCT TAKE-OFF FROM MAIN DUCT.

5. OUTLET DUCT SIZE ON TERMINAL BOX AS SHOWN MAY BE DIFFERENT THAN BOX

OUTLET. PROVIDE TRANSITION AS REQUIRED.

6. SEISMIC BRACING AND RESTRAINT/SUPPORTS ARE REQUIRED PER SPECIFICATION

SECTION 13 05 41.

7. ALL DUCTWORK IN SCOPE AND CONNECTED TO SYSTEM WILL BE CLEANED PER

SPECIFICATION SECTION 23 01 30 52.

PHASING NOTES

PHASE BOUNDARY LINES ARE SHOWN ON LIMITS OF

THE ARCHITECTURAL SCOPE OF WORK. PLANS

IDENTIFY WORK THAT MUST BE CONDUCTED THIS

PHASE AND WORK OUTSIDE THE ARCHITECTURALLY

DEFINED PHASING AREA MUST BE COORDINATED WITH

OWNER AND CONSTRUCTION TEAM TO COMPLETE

WORK REQUIRED IN EACH PHASE.

100% CONSTRUCTION DOCUMENTS

4849 Ronson Court, Suite 200 San Diego, CA 92111 858.344.8900

10680 TREENA ST# 163 320 San Diego, CA 92123

HH

W

S

HH

W R

CAV

18C

CAV

18B

CAV

CAV

CAV

2" RHWR

2" RHWS

3/4" RHWS

3/4" RHWR

3/4" RHWS

3/4" RHWR

1" RHWS

1" RHWR

3/4" RHWS

3/4" RHWR

1" RHWS

1" RHWR

3/4" RHWS

3/4" RHWR

3/4" RHWS

3/4" RHWR

1" RHWS

1" RHWR

3/4" RHWS

3/4" RHWR

3/4" RHWS

3/4" RHWR

3/4" RHWS

3/4" RHWR

3/4" RHWS

3/4" RHWR

3/4" RHWS

3/4" RHWR

1" RHWS

1" RHWR

1" RHWS

1" RHWR

1 1/2" RHWS

1 1/2" RHWR

1 1/2" RHWS

1 1/2" RHWR

1 1/4" RHWS

1 1/4" RHWR

2" RHWS

2" RHWR

2" RHWS

2" RHWR

3/4" RHWS

3/4" RHWR

CAV

18A

3/4" RHWS

3/4" RHWR

2" CHWS

2" CHWR

3" CHWS

3" CHWR

2" RHWR

2" RHWS

3" CHWS

3" CHWR

1" HHWS

1" HHWR

1" HHWS

1" HHWR

3" CHWS

3" CHWR

2 1/2" CHWS/CHWR

1" HHWS/HHWR

1" HHWS

1" HHWR

CAV-5

(PHASE 6)

CAV-2

(PHASE 7)

CAV-6

(PHASE 6)

CAV-7

(PHASE 6)

CAV-1

(PHASE 7)

CAV-23

(PHASE 7)

PHASE 5 SCOPE

BOUNDARY

2 2.1 3' 3.1 3.2 4 4.2 5 5.1 6 7 7.1

R

Q.1

Q

P

O.1

O N.7

N.6

N.5

N.4

KEY NOTESGENERAL NOTES

1 POC OF NEW RHWS/R PIPING TO EXISTING

MECHANICAL RHWS/R PIPING TO BE PLACED IN THIS PHASE AS SHOWN AND CAV BOXES TO

BE ADDED IN FUTURE PHASES WHERE NOTED.

1. PLAN SHOWS THE EXISTING HVAC PIPING IS APPROXIMATE LAYOUT OF EXISTING

BUILDING AND IS NOT INTENDED TO REPRESENTED "AS-BUILT" CONDITIONS,

CONTRACTOR SHALL VISIT SITE AND BECOME FAMILIAR WITH ACTUAL CONDITIONS

WHEN BIDDING THE WORK.

2. PRIOR TO ANY WORK, INCLUDING DEMO AND NEW, CONTRACTOR MUST FIELD

VERIFY ALL EXISTING MECHANICAL WORK LOCATED IN THE SPACE WITH OTHER

TRADES WHICH MAY AFFECT THE SPACES, SINCE THE EXISTING CONDITIONS OF

THE INTERSTITIAL SPACE, THE ROUTING OF NEW PIPING WILL BE FOLLOWED THE

SAME AS THE EXISTING.

3. THE OWNER MUST BE NOTIFIED PRIOR TO SHUTDOWN OF ANY MECHANICAL HVAC

WATER SYSTEMS, INCLUDING HEATING HOT WATER LOOP AND REHEAT HOT WATER

LOOP.

4. EXISTING PIPING, VALVES, CONTROLS SHOWN TO REMAIN SHALL BE PROTECTED

DURING CONSTRUCTION, DAMAGE TO EXISTING CONSTRUCTION SHOWN TO REMAIN

SHALL BE RESTORED TO MATCH PRE-DAMAGED CONDITION.

5. PROVIDE 2-WAY CONTROL VALVE FOR TERMINAL BOX REHEAT WATER PIPING

CONNECTION, REFER TO PIPING DIAGRAM 10/M501, UNLESS NOTED OTHERWISE.

6. PROVIDE MINIMUM 3/4" BRANCH PIPE TO REHEAT COIL CONNECTION ON TERMINAL

BOX (TYPICAL), UNLESS NOTED OTHERWISE.

7. REFER TO DETAIL 10/M501 FOR TYPICAL REHEAT COIL PIPING

8. SEISMIC BRACING AND RESTRAINT/SUPPORTS ARE REQUIRED PER SPECIFICATION

SECTION 13 05 41

1/8" = 1'-0" 01PHASE 5 BASEMENT MECHANICAL PIPING PLAN

PHASING NOTES

PHASE BOUNDARY LINES ARE SHOWN ON LIMITS OF

THE ARCHITECTURAL SCOPE OF WORK. PLANS

IDENTIFY WORK THAT MUST BE CONDUCTED THIS

PHASE AND WORK OUTSIDE THE ARCHITECTURALLY

DEFINED PHASING AREA MUST BE COORDINATED WITH

OWNER AND CONSTRUCTION TEAM TO COMPLETE

WORK REQUIRED IN EACH PHASE.

100% CONSTRUCTION DOCUMENTS

4849 Ronson Court, Suite 200 San Diego, CA 92111 858.344.8900

10680 TREENA ST# 163 320 San Diego, CA 92123 858-368-8630 Fax 866-517-3293 www.dce-inc.net

GENERAL

B177E

404 SF

STORAGE,

GENERAL

B177D

210 SF

STAIRWELL

SW9-B-1

198 SF

MECHANICAL

ROOM

B180

408 SF

CORRIDOR

B177B

1174 SF

CORRIDOR

B117B

556 SF

CORRIDOR

B177M

1575 SF

CORRIDOR

B177A

334 SF

STORAGE

B177N 1793 SF

IT SERVICE

CENTER

OFFICE

B1000

75 SF

STAIR

SW11-B-1

KITCHEN

EQUIPMENT

RECEIVING

ISSUE

EQUIPMENT PREP, AND STAGING

STORAGE

BULK STORAGE

SHRINKING

WRAPPER

UNIT ITEM STORAGE

BREAKDOWN

KITCHEN

EQUIPMENT

75 SF

STAIR

SW11-B-1

1793 SF

IT SERVICE

CENTER

OFFICE

B1000

3565 SF

STORAGE,

GENERAL

B177-1

334 SF

STORAGE

B177N

1575 SF

CORRIDOR

B177A

556 SF

CORRIDOR

B177M

1174 SF

CORRIDOR

B117B

340 SF

STORAGE,

GENERAL

B177C

408 SF

CORRIDOR

B177B

160 SF

CORRIDOR

B117P

109 SF

TOILET,

FEMALE

B176B

105 SF

TOILET, MALE

B176A

428 SF

OFFICE

B176

198 SF

MECHANICAL

ROOM

B180

210 SF

STAIRWELL

SW9-B-1

404 SF

STORAGE,

GENERAL

B177D

3043 SF

STORAGE,

GENERAL

B177E

389 SF

SPD

RECEIVING

170cfm

225 CFM-E

165 CFM-S

X2

2- E

X2

2-

EX

H.

120X28

,5

C

FM

EX

H.

9, CF

M

EX

H.

F.D.

42 120 78X19

X2

8- E

X1

2- E

F.D.

F.D.

C.O.

(X -2

)(K X-

1)

28X12-E (KX-2)

F.D.

C.O.

F.

D.

28X44-E, UP TO KX-1

28X12-E, UP TO KX-2

WITH F.D. & C.D.

WITH F.D. & C.D.

2.

12X10-T.R.

225 CFM-E

6X 6-

T.

R.

165 CFM-S

CF

M

-S

(E)(GX-1)

(E)(X-1)

PHASE 6 SCOPE

BOUNDARY

2.1 3' 3.1 3.2 4 4.2 5 5.1 6 7 7.1 8

Q.1

Q

P

O.1

O N.7

N.6

N.5

N.4

N.2

KEY NOTESGENERAL NOTES

1. DEMOLITION PLAN SHOWS APPROXIMATE LAYOUT OF EXISTING BUILDING AND IS

NOT INTENDED TO REPRESENT "AS-BUILT" CONDITIONS, FOLLOW PROCEDURES

OUTLINED IN SPECIFICATIONS FOR REQUIREMENTS TO VISIT SITE AND OTHERWISE

BECOME FAMILIAR WITH ACTUAL CONDITIONS WHEN BIDDING THE WORK.

2. PRIOR TO ANY DEMOLITION WORK CONTRACTOR MUST FIELD VERIFY ALL EXISTING

MECHANICAL WORK LOCATED IN THE SPACE WHICH AFFECTS THE SPACES. THE

OWNER MUST BE NOTIFIED PRIOR TO SHUTDOWN OF ANY MECHANICAL SYSTEMS.

3. DUCTS, PIPES, AIR DIFFUSERS, TERMINAL UNITS, AND HVAC EQUIPMENT AND OTHER

ITEMS TO BE REMOVED ARE SHOWN HATCHED.

4. EXISTING CONSTRUCTION SHOWN TO REMAIN INCLUDING BUT NOT LIMITED TO

DUCTS, PIPES, DIFFUSERS, ETC. SHALL BE PROTECTED DURING DEMOLITION,

DAMAGE TO EXISTING CONSTRUCTION SHOWN TO REMAIN SHALL BE RESTORED TO

MATCH PRE-DAMAGED CONDITION, NOTIFY THE ENGINEER IMMEDIATELY FOR ANY

DISCREPANCIES.

5. PROTECT FROM DAMAGE ALL EXISTING FINISH WORK TO REMAIN IN PLACE AND

WHICH BECOMES EXPOSED DURING DEMOLITION OPERATIONS.

6. THE SCOPE OF DEMOLITION AND NEW WORK WILL REQUIRE CLOSE COORDINATION

BETWEEN ALL TRADES. CONTRACTOR SHALL TAKE PROVISIONS FOR THIS FACT AND

IDENTIFY CONFLICTS AND PROPOSE SOLUTION TO THE ARCHITECT BEFORE

PROCEEDING WITH THE WORK.

1 (E) AC-38 TO BE REMOVED WITH ALL DUCTS/GRILLES, CHW AND HHW PIPING, AND CONTROLS.

PROVIDE VALVES TO SHUT OFF PIPING INSIDE PROJECT AREA.

1/8" = 1'-0" 01PHASE 6 BASEMENT MECHANICAL DUCTWORK PLAN - DEMOLITION

PHASING NOTES

PHASE BOUNDARY LINES ARE SHOWN ON LIMITS OF

THE ARCHITECTURAL SCOPE OF WORK. PLANS

IDENTIFY WORK THAT MUST BE CONDUCTED THIS

PHASE AND WORK OUTSIDE THE ARCHITECTURALLY

DEFINED PHASING AREA MUST BE COORDINATED WITH

OWNER AND CONSTRUCTION TEAM TO COMPLETE

WORK REQUIRED IN EACH PHASE.

100% CONSTRUCTION DOCUMENTS

4849 Ronson Court, Suite 200 San Diego, CA 92111 858.344.8900

10680 TREENA ST# 163 320 San Diego, CA 92123

GENERAL

B177E

404 SF

STORAGE,

GENERAL

B177D

408 SF

CORRIDOR

B177B

1174 SF

CORRIDOR

B117B

556 SF

CORRIDOR

B177M

KITCHEN

EQUIPMENT

F.D.

(E)78X19

(E )4

4X

(E )2

8X

C.O.

(X -2

)(K X-

1)

28X12-E (KX-2)

(E) F.D.

C.O.

F.

D.

(E)28X44, UP TO KX-1

(E)28X12, UP TO KX-2

WITH F.D. & C.D.

WITH F.D. & C.D.

CAV

18B

CAV

CAV

CAV

CAV

CAV

(GX-1)

CAV

CAV

CAP

CAP

CAP

CAP

(E )5

0X

-E

XH

CAV

18C

CAV

18A

CAV

SD SD

130 CFM

130 CFM 130 CFM

80 CFM

100 CFM 100 CFM

240 CFM

80 CFM

80 CFM

120 CFM 120 CFM

12x10

16x10

22x12

16"

34x12 16" 10"

8"

8"

8"

16x10

20x10 30x12

6" 6"

8"

18"

20"

12"

16"

20"

18"

6"8"8"8"

10"10"12"

6"

6"

8" 8"

10"

80 CFM195 CFM

195 CFM

1000 CFM

24x14

240 CFM

80 CFM

225 CFM

240 CFM

80 CFM

10"

6"

6"

12"

14"16"

10"

10"

18"

6" 10"

14"

8"

28x24

16"

8"8"

10"

225 CFM

10"

8"

8"

12"

12"

400 CFM

8"

120 CFM 120 CFM

10" x2

R

A x2

SA

36x24

36x14

14"

PHASE 7 SCOPE

BOUNDARY

8"8" 10"

12"

10"

535 CFM

18x12

(TYP. 4)

130 CFM

14x6

(TYP. 3)

30x30

30x30 66x18 RA

30x30 24 x2

SA

62x14 UP

TO AC-104

8"

95 CFM

90 CFM

10"

10"

12"

6"

6"

95 CFM

90 CFM

14"

6"

6"

24x20 OSA

390 CFM

14x6

12"

32x1828x24

28x24

66x18 UP

TO AC-103

(TYP. 2)

52x14 UP

TO AC-103

12"

535 CFM

18x12 SD

(TYP. 4)

16"

50x28 OSA x3

R

A

62x14 UP

TO AC-104

8"

12"

4300 CFM

42x24

(TYP.)

(TYP.)

PHASE 6 SCOPE

BOUNDARY

4.2 5 5.1 6 7 7.1 8

R

Q.1

Q

P

O.1

O N.7

N.6

N.5

N.4

N.2

R

Q.1

Q

P

O.1

O N.7

N.6

N.5

N.4

N.2

4.2 5 5.1 6 7 7.1 8

404 SF

STORAGE,

GENERAL

B177D

408 SF

CORRIDOR

B177B

1174 SF

CORRIDOR

B117B

556 SF

CORRIDOR

B177M

127 SF

STORAGE,

EQUIPMENT

B172B

130 SF

OFFICE

B171C

103 SF

B171D

STAIRWELL

SW8-B-1

KITCHEN

EQUIPMENT

2" MPS

CHWRCHWS

3"

2" MPS

3/4"

HH

W

S

HH

W R

2" MPS

1 1/2" MPS

1" MPR

CAV

18C

CAV

18B

CAV

CAV

CAV

CAV

CAV

CAV

CAV

CAV

CAV

CAV

18A

2" RHWR

2" RHWS

3/4" RHWS

3/4" RHWR

3/4" RHWS

3/4" RHWR

1" RHWS

1" RHWR

3/4" RHWS

3/4" RHWR

1" RHWS

1" RHWR

3/4" RHWS

3/4" RHWR

3/4" RHWS

3/4" RHWR

1" RHWS

1" RHWR

3/4" RHWS

3/4" RHWR

3/4" RHWS

3/4" RHWR

3/4" RHWS

3/4" RHWR

3/4" RHWS

3/4" RHWR

3/4" RHWS

3/4" RHWR

1" RHWS

1" RHWR

1" RHWS

1" RHWR

1 1/2" RHWS

1 1/2" RHWR

1 1/2" RHWS

1 1/2" RHWR

1 1/4" RHWS

1 1/4" RHWR

2" RHWS

2" RHWR

2" RHWS

2" RHWR

3/4" RHWS

3/4" RHWR

3/4" RHWS

3/4" RHWR

2" CHWS

2" CHWR

3" CHWS

3" CHWR

2 1/2" CHWS/CHWR

1" HHWS/HHWR

1" HHWS

1" HHWR

CAV-2

(PHASE 7)

CAV-1

(PHASE 7)

CAV-23

(PHASE 7)

PHASE 6 SCOPE

BOUNDARY

KEY NOTESDEMO GENERAL NOTES

1 POC OF NEW DUCTWORK TO EXISTING (TYP.)

FOR CONTINUATION, SEE PHASE 1 PLAN M2.100.

COORDINATE PHASE 6 PIPING WITH PHASE 5 WORK IN M2.502.

1. PLAN SHOWS THE EXISTING HVAC PIPING IS APPROXIMATE LAYOUT OF EXISTING

BUILDING AND IS NOT INTENDED TO REPRESENTED "AS-BUILT" CONDITIONS,

CONTRACTOR SHALL VISIT SITE AND BECOME FAMILIAR WITH ACTUAL CONDITIONS

WHEN BIDDING THE WORK.

2. PRIOR TO ANY WORK, INCLUDING DEMO AND NEW, CONTRACTOR MUST FIELD

VERIFY ALL EXISTING MECHANICAL WORK LOCATED IN THE SPACE WITH OTHER

TRADES WHICH MAY AFFECT THE SPACES, SINCE THE EXISTING CONDITIONS OF

THE INTERSTITIAL SPACE, THE ROUTING OF NEW PIPING WILL BE FOLLOWED THE

SAME AS THE EXISTING.

3. THE OWNER MUST BE NOTIFIED PRIOR TO SHUTDOWN OF ANY MECHANICAL HVAC

WATER SYSTEMS, INCLUDING HEATING HOT WATER LOOP AND REHEAT HOT WATER

LOOP.

4. EXISTING PIPING, VALVES, CONTROLS SHOWN TO REMAIN SHALL BE PROTECTED

DURING CONSTRUCTION, DAMAGE TO EXISTING CONSTRUCTION SHOWN TO REMAIN

SHALL BE RESTORED TO MATCH PRE-DAMAGED CONDITION.

5. PROVIDE 2-WAY CONTROL VALVE FOR TERMINAL BOX REHEAT WATER PIPING

CONNECTION, REFER TO PIPING DIAGRAM 10/M501, UNLESS NOTED OTHERWISE.

6. PROVIDE MINIMUM 3/4" BRANCH PIPE TO REHEAT COIL CONNECTION ON TERMINAL

BOX (TYPICAL), UNLESS NOTED OTHERWISE.

7. REFER TO DETAIL 10/M501 FOR TYPICAL REHEAT COIL PIPING

8. SEISMIC BRACING AND RESTRAINT/SUPPORTS ARE REQUIRED PER SPECIFICATION

SECTION 13 05 41

1/8" = 1'-0" 02PHASE 6 BASEMENT MECHANICAL DUCTWORK PLAN

1/8" = 1'-0" 01PHASE 6 BASEMENT MECHANICAL PIPING PLAN

PHASING NOTES

PHASE BOUNDARY LINES ARE SHOWN ON LIMITS OF

THE ARCHITECTURAL SCOPE OF WORK. PLANS

IDENTIFY WORK THAT MUST BE CONDUCTED THIS

PHASE AND WORK OUTSIDE THE ARCHITECTURALLY

DEFINED PHASING AREA MUST BE COORDINATED WITH

OWNER AND CONSTRUCTION TEAM TO COMPLETE

WORK REQUIRED IN EACH PHASE.

100% CONSTRUCTION DOCUMENTS

4849 Ronson Court, Suite 200 San Diego, CA 92111 858.344.8900

10680 TREENA ST# 163 320 San Diego, CA 92123 858-368-8630 Fax 866-517-3293 www.dce-inc.net

210 SF

STAIRWELL

SW9-B-1

198 SF

MECHANICAL

ROOM

B180

408 SF

CORRIDOR

B177B

3565 SF

STORAGE,

GENERAL

B177-1

KITCHEN

EQUIPMENT

KITCHEN

EQUIPMENT

1793 SF

IT SERVICE

CENTER

OFFICE

B1000

3565 SF

STORAGE,

GENERAL

B177-1

334 SF

STORAGE

B177N

1575 SF

CORRIDOR

B177A

556 SF

CORRIDOR

B177M

408 SF

CORRIDOR

B177B

105 SF

TOILET, MALE

B176A

428 SF

OFFICE

B176

198 SF

MECHANICAL

ROOM

B180

210 SF

STAIRWELL

SW9-B-1

404 SF

STORAGE,

GENERAL

B177D

3043 SF

STORAGE,

GENERAL

B177E

389 SF

SPD

RECEIVING

X2

2- E

X2

2-

EX

H.

120X28

,5

C

FM

EX

H.

9, CF

M

EX

H.

F.D.

42 120 78X19

X2

8- E

X1

2- E

F.D.

F.D.

C.O.

(X -2

)(K X-

1)

28X12-E (KX-2)

F.D.

C.O.

F.

D.

28X44-E, UP TO KX-1

28X12-E, UP TO KX-2

WITH F.D. & C.D.

WITH F.D. & C.D.

2.

(GX-1)

(X-1)

PHASE 7 SCOPE

BOUNDARY

2.1 3' 3.1 3.2 4 4.2 5 5.1 6

R

Q.1

Q

P

O.1

O N.7

N.6

N.5

N.4

N.2

KEY NOTESGENERAL NOTES

1. DEMOLITION PLAN SHOWS APPROXIMATE LAYOUT OF EXISTING BUILDING AND IS

NOT INTENDED TO REPRESENT "AS-BUILT" CONDITIONS, FOLLOW PROCEDURES

OUTLINED IN SPECIFICATIONS FOR REQUIREMENTS TO VISIT SITE AND OTHERWISE

BECOME FAMILIAR WITH ACTUAL CONDITIONS WHEN BIDDING THE WORK.

2. PRIOR TO ANY DEMOLITION WORK CONTRACTOR MUST FIELD VERIFY ALL EXISTING

MECHANICAL WORK LOCATED IN THE SPACE WHICH AFFECTS THE SPACES. THE

OWNER MUST BE NOTIFIED PRIOR TO SHUTDOWN OF ANY MECHANICAL SYSTEMS.

3. DUCTS, PIPES, AIR DIFFUSERS, TERMINAL UNITS, AND HVAC EQUIPMENT AND OTHER

ITEMS TO BE REMOVED ARE SHOWN HATCHED.

4. EXISTING CONSTRUCTION SHOWN TO REMAIN INCLUDING BUT NOT LIMITED TO

DUCTS, PIPES, DIFFUSERS, ETC. SHALL BE PROTECTED DURING DEMOLITION,

DAMAGE TO EXISTING CONSTRUCTION SHOWN TO REMAIN SHALL BE RESTORED TO

MATCH PRE-DAMAGED CONDITION, NOTIFY THE ENGINEER IMMEDIATELY FOR ANY

DISCREPANCIES.

5. PROTECT FROM DAMAGE ALL EXISTING FINISH WORK TO REMAIN IN PLACE AND

WHICH BECOMES EXPOSED DURING DEMOLITION OPERATIONS.

6. THE SCOPE OF DEMOLITION AND NEW WORK WILL REQUIRE CLOSE COORDINATION

BETWEEN ALL TRADES. CONTRACTOR SHALL TAKE PROVISIONS FOR THIS FACT AND

IDENTIFY CONFLICTS AND PROPOSE SOLUTION TO THE ARCHITECT BEFORE

PROCEEDING WITH THE WORK.

1 REMOVE (E) X-1 AND PAIR OF PANTS DUCT AS SHOWN. 78x19 OPENING TO REMAIN, (E) MAIN DUCT

TO REMAIN FOR NEW FAN CONNECTION.

1/8" = 1'-0" 01PHASE 7 BASEMENT MECHANICAL DUCTWORK PLAN - DEMOLITION

PHASING NOTES

PHASE BOUNDARY LINES ARE SHOWN ON LIMITS OF

THE ARCHITECTURAL SCOPE OF WORK. PLANS

IDENTIFY WORK THAT MUST BE CONDUCTED THIS

PHASE AND WORK OUTSIDE THE ARCHITECTURALLY

DEFINED PHASING AREA MUST BE COORDINATED WITH

OWNER AND CONSTRUCTION TEAM TO COMPLETE

WORK REQUIRED IN EACH PHASE.

100% CONSTRUCTION DOCUMENTS

4849 Ronson Court, Suite 200 San Diego, CA 92111 858.344.8900

10680 TREENA ST# 163 320 San Diego, CA 92123

SW9-B-1

198 SF

MECHANICAL

ROOM

B180

408 SF

CORRIDOR

B177B

KITCHEN

EQUIPMENT

RECEIVING

ISSUE

EQUIPMENT PREP, AND STAGING

STORAGE

BULK STORAGE

SHRINKING

WRAPPER

UNIT ITEM STORAGE

BREAKDOWN

EF

X

X2

2- E

120X28

,5

C

FM

EX

H.

F.D.

42 120 (E)78X19

X2

8- E

X1

2- E

F.D.

F.D.

C.O.

(X

-2 )(K

X- 1)

28X12-E (KX-2)

F.D.

C.O.

F.

D.

28X44-E, UP TO KX-1

28X12-E, UP TO KX-2

WITH F.D. & C.D.

WITH F.D. & C.D.

CAV

18B

CAV

CAV

CAV

CAV

CAV

CAV

CAV

(GX-1)

175 CFM

175 CFM

130 CFM

130 CFM 130 CFM

80 CFM

100 CFM 100 CFM

240 CFM

80 CFM

80 CFM

120 CFM 120 CFM

12x10

16x10

22x12

10"

14"

16"

34x12 16" 10"

8"

8"

8"

16x10

20x10 30x12

6" 6"

8"

18"

20"

12"

16"

20"

18"

6"8"8"8"

10"10"12"

6"

6"

8" 8"

8"

8"

12" 16"

10"

80 CFM195 CFM

195 CFM

175 CFM

1000 CFM

24x14

240 CFM

80 CFM

225 CFM

240 CFM

80 CFM

10"

6"

6"

12"

14"16"

10"

10"

18"

6" 10"

14"

8"

28x24

16"

8"8"

10"

225 CFM

10"

250 CFM

12x6

(TYP. 4)

175 CFM

8"

8"

12"

SF

CAV

40x30 INLET

WITH SCREEN

30x16

1660 CFM

(TYP. 5)

36x36

4150 CFM

(TYP. 2)

22x18

12"

200 CFM

200 CFM

400 CFM

10"

10"

10"

12"

120 CFM 120 CFM

10" x2

R

A x2

SA

36x24

36x14

(E )5

0X

-E

XH

14"

PHASE 7 SCOPE

BOUNDARY

CAV

18C

CAV

18A

8"8" 10"

12"

10"

535 CFM

18x12

(TYP. 4)

130 CFM

14x6

(TYP. 3)

30x30

30x30 66x18 RA

30x30 24 x2

SA

62x14 UP

TO AC-104

8"

CAV

95 CFM

90 CFM

10"

10"

12"

6"

6"

95 CFM

90 CFM

14"

6"

6"

SD SD

24x20 OSA

390 CFM

14x6

12"

32x1828x24

28x24

WALL OPENINGS AS

HIGH AS POSSIBLE

BELOW TRUSSES

66x18 UP

TO AC-103

(TYP. 2)

52x14 UP

TO AC-103

12"

535 CFM

18x12 SD

(TYP. 4)

16"

200 CFM

12x12

50x28 OSA x3

R

A

62x14 UP

TO AC-104

8"

12"

4300 CFM

42x24

2 2.1 3' 3.1 3.2 4 4.2 5 5.1 6 7 7.1

R

Q.1

Q

P

O.1

O N.7

N.6

N.5

N.4

N.2

KEY NOTESGENERAL NOTES

1 POC OF NEW DUCTWORK TO EXISTING (TYP.)

POC OF NEW GRILLE TO DUCTWORK (TYP.)

1. PLAN SHOWS THE EXISTING HVAC PIPING IS APPROXIMATE LAYOUT OF EXISTING

BUILDING AND IS NOT INTENDED TO REPRESENTED "AS-BUILT" CONDITIONS,

CONTRACTOR SHALL VISIT SITE AND BECOME FAMILIAR WITH ACTUAL CONDITIONS

WHEN BIDDING THE WORK.

2. PRIOR TO ANY WORK, INCLUDING DEMO AND NEW, CONTRACTOR MUST FIELD

VERIFY ALL EXISTING MECHANICAL WORK LOCATED IN THE SPACE WITH OTHER

TRADES WHICH MAY AFFECT THE SPACES, SINCE THE EXISTING CONDITIONS OF

THE INTERSTITIAL SPACE, THE ROUTING OF NEW PIPING WILL BE FOLLOWED THE

SAME AS THE EXISTING.

3. THE OWNER MUST BE NOTIFIED PRIOR TO SHUTDOWN OF ANY MECHANICAL HVAC

WATER SYSTEMS, INCLUDING HEATING HOT WATER LOOP AND REHEAT HOT WATER

LOOP.

4. EXISTING PIPING, VALVES, CONTROLS SHOWN TO REMAIN SHALL BE PROTECTED

DURING CONSTRUCTION, DAMAGE TO EXISTING CONSTRUCTION SHOWN TO REMAIN

SHALL BE RESTORED TO MATCH PRE-DAMAGED CONDITION.

5. PROVIDE 2-WAY CONTROL VALVE FOR TERMINAL BOX REHEAT WATER PIPING

CONNECTION, REFER TO PIPING DIAGRAM 10/M501, UNLESS NOTED OTHERWISE.

6. PROVIDE MINIMUM 3/4" BRANCH PIPE TO REHEAT COIL CONNECTION ON TERMINAL

BOX (TYPICAL), UNLESS NOTED OTHERWISE.

7. REFER TO DETAIL 10/M501 FOR TYPICAL REHEAT COIL PIPING

8. SEISMIC BRACING AND RESTRAINT/SUPPORTS ARE REQUIRED PER SPECIFICATION

SECTION 13 05 41

1/8" = 1'-0" 01PHASE 7 BASEMENT MECHANICAL DUCTWORK PLAN

PHASING NOTES

PHASE BOUNDARY LINES ARE SHOWN ON LIMITS OF

THE ARCHITECTURAL SCOPE OF WORK. PLANS

IDENTIFY WORK THAT MUST BE CONDUCTED THIS

PHASE AND WORK OUTSIDE THE ARCHITECTURALLY

DEFINED PHASING AREA MUST BE COORDINATED WITH

OWNER AND CONSTRUCTION TEAM TO COMPLETE

WORK REQUIRED IN EACH PHASE.

100% CONSTRUCTION DOCUMENTS

4849 Ronson Court, Suite 200 San Diego, CA 92111 858.344.8900

10680 TREENA ST# 163 320 San Diego, CA 92123

SW9-B-1

198 SF

MECHANICAL

ROOM

B180

408 SF

CORRIDOR

B177B

1174 SF

CORRIDOR

3565 SF

STORAGE,

GENERAL

B177-1

KITCHEN

EQUIPMENT

CAV

18C

CAV

18B

CAV

CAV

CAV

CAV

CAV

CAV

CAV

CAV

CAV

CAV

18A

2" RHWR

2" RHWS

3/4" RHWS

3/4" RHWR

3/4" RHWS

3/4" RHWR

1" RHWS

1" RHWR

3/4" RHWS

3/4" RHWR

1" RHWS

1" RHWR

3/4" RHWS

3/4" RHWR

3/4" RHWS

3/4" RHWR

1" RHWS

1" RHWR

3/4" RHWS

3/4" RHWR

3/4" RHWS

3/4" RHWR

3/4" RHWS

3/4" RHWR

3/4" RHWS

3/4" RHWR

3/4" RHWS

3/4" RHWR

1" RHWS

1" RHWR

1" RHWS

1" RHWR

1 1/2" RHWS

1 1/2" RHWR

1 1/2" RHWS

1 1/2" RHWR

1 1/4" RHWS

1 1/4" RHWR

2" RHWS

2" RHWR

2" RHWS

2" RHWR

3/4" RHWS

3/4" RHWR

3/4" RHWS

3/4" RHWR

2" CHWS

2" CHWR

3" CHWS

3" CHWR

2" RHWR

2" RHWS

3" CHWS

3" CHWR

1" HHWS

1" HHWR

1" HHWS

1" HHWR

3" CHWS

3" CHWR

2 1/2" CHWS/CHWR

1" HHWS/HHWR

1" HHWS

1" HHWR

PHASE 7 SCOPE

BOUNDARY

2 2.1 3' 3.1 3.2 4 4.2 5 5.1 6 7 7.1

R

Q.1

Q

P

O.1

O N.7

N.6

N.5

N.4

KEY NOTESGENERAL NOTES

1. PLAN SHOWS THE EXISTING HVAC PIPING IS APPROXIMATE LAYOUT OF EXISTING

BUILDING AND IS NOT INTENDED TO REPRESENTED "AS-BUILT" CONDITIONS,

CONTRACTOR SHALL VISIT SITE AND BECOME FAMILIAR WITH ACTUAL CONDITIONS

WHEN BIDDING THE WORK.

2. PRIOR TO ANY WORK, INCLUDING DEMO AND NEW, CONTRACTOR MUST FIELD

VERIFY ALL EXISTING MECHANICAL WORK LOCATED IN THE SPACE WITH OTHER

TRADES WHICH MAY AFFECT THE SPACES, SINCE THE EXISTING CONDITIONS OF

THE INTERSTITIAL SPACE, THE ROUTING OF NEW PIPING WILL BE FOLLOWED THE

SAME AS THE EXISTING.

3. THE OWNER MUST BE NOTIFIED PRIOR TO SHUTDOWN OF ANY MECHANICAL HVAC

WATER SYSTEMS, INCLUDING HEATING HOT WATER LOOP AND REHEAT HOT WATER

LOOP.

4. EXISTING PIPING, VALVES, CONTROLS SHOWN TO REMAIN SHALL BE PROTECTED

DURING CONSTRUCTION, DAMAGE TO EXISTING CONSTRUCTION SHOWN TO REMAIN

SHALL BE RESTORED TO MATCH PRE-DAMAGED CONDITION.

5. PROVIDE 2-WAY CONTROL VALVE FOR TERMINAL BOX REHEAT WATER PIPING

CONNECTION, REFER TO PIPING DIAGRAM 10/M501, UNLESS NOTED OTHERWISE.

6. PROVIDE MINIMUM 3/4" BRANCH PIPE TO REHEAT COIL CONNECTION ON TERMINAL

BOX (TYPICAL), UNLESS NOTED OTHERWISE.

7. REFER TO DETAIL 10/M501 FOR TYPICAL REHEAT COIL PIPING

8. SEISMIC BRACING AND RESTRAINT/SUPPORTS ARE REQUIRED PER SPECIFICATION

SECTION 13 05 41

1/8" = 1'-0" 01PHASE 7 BASEMENT MECHANICAL PIPING PLAN

100% CONSTRUCTION DOCUMENTS

4849 Ronson Court, Suite 200 San Diego, CA 92111 858.344.8900

10680 TREENA ST# 163 320 San Diego, CA 92123

1 BRANCH DUCT LOW-LOSS FITTING DETAIL

NO SCALE

2 NO SCALE

DUCT OFFSET AND TRANSITION DETAILS

3 NO SCALE

ROUND DUCT TAKE-OFF

4 NO SCALE

LOW CLEARANCE CEILING DIFFUSER DETAIL

5 NO SCALE

FIRE DAMPER DETAIL

6 NO SCALE

THERMOSTAT/SENSOR HEIGHT & LOCATION

1-1\2d d

1-1\2d d

4" M

IN

MAIN ROUND DUCT

45°

ATTACH WITH SHEET METAL

SCREWS AND SEAL WITH MEDIUM

PRESSURE DUCT SEALER

SUPPLY, RETURN OR

EXHAUST AIR MAIN

RECTANGULAR TO

RECTANGULAR

LOW-LOSS FITTINGFITTING

ROUND LOW-LOSS

RECTANGULAR TO

1.

4.

3.

2.

SEE SPECIFICATION & DRAWINGS FOR AIR DISTRIBUTION TYPE.

OPERATED DAMPERS.

ATTACH DIFFUSER BOOT TO TERMINAL WITH SHEET METAL SCREWS AND MEDIUM PRESSURE DUCT SEALANT.

FOR HARD CEILINGS PROVIDE SURFACE MOUNTED TYPE CEILING DIFFUSERS AND REMOTE

RETURN AND EXHAUST REGISTERS INSTALLED SIMILARLY.

45°

VOLUME DAMPER WITH LOCKING

DAMPER REGULATOR. LOCATE AT

BRANCH CONNECTION

TO TOP

" M

AX

3"-6"

LIGHT SWITCH

CLOSED DOOR

FINISHED

FLOOR

PREFERRED

SENSOR/ T-STAT

LOCATION

FINISHED

FLOOR

OBSTRUCTION

SENSOR/T-STAT

48"MAX

24" MAX

" M

AX

NOTES:

1. DO NOT INSTALL T-STATS ON EXTERIOR WALLS.

NOTES:

DIFFUSER BOOT. BOOT SHALL

BE SIZED SIM. TO DIFFUSER

NECK WITH HEIGHT = BRANCH

DUCT SIZE PLUS 2" (MIN).

S.M. SCREWS MIN. TWO PER

SIDE. SEAL W/MEDIUM

PRESSURE DUCT SEALANT.

BRANCH DUCT (SIZE AS

INDICATED ON FLOOR PLANS)

STAINLESS STEEL CLAMP WITH

WORM OPERATOR. SEE NOTE 4.

12GA BRACING WIRE AT TWO

OPPOSITE CORNERS W/(4) TIGHT

TURNS OVER 1-1/2". SEE SHEET A957

12GA HANGER WIRE. SEE SHEET A957

FOR ATTACHMENT TO CONCRETE ABOVE

9 NO SCALE

TRANSITIONS MAY CONVERT DUCT PROFILES TO ANY COMBINATION FOR RECTANGULAR,

OFFSETS 1 AND 3 AND TRANSITIONS MAY HAVE EQUAL INLET AND OUTLET AREAS.

15° MAX.

OFFSET TYPE 2

(ANGLED)

ROUND OR FLAT OVAL SHAPES.

ECCENTRIC TRANSITION

1W

W

A (MAX.)=30°

A 2W

L

W

L

W

(MITERED)

OFFSET TYPE 1

W

30° MAX.

L

W

W

W

W

A (MAX.)=45° DIVERGING, 60° CONVERGING

CONCENTRIC TRANSITION

W1 A

STANDARD BELLMOUTH

L

SHORT BELLMOUTH

3"

A

R=2/10A

1/2

OFFSET TYPE 3

(RADIUSSED)

R=1.5W

1/4

A 1"

1/4

W

L

FOR ATTACHMENT TO CONCRETE ABOVE

FLEXIBLE DUCT "FLEXMASTER

6B OR 6M" MAX 5'-0" LONG

ACOUSTICAL INSULATED

CAV SUPPLY

DUCT

MAIN

CONTROLS ENCLOSURE.

MAINTAIN ACCESS

CLEARANCE

LOW-LOSS

FITTING

SUPPLY DUCT

SIZE PER PLANS

CAV BOX DUCT INLET

SIZE STRAIGHT

SECTION , MIN LENGTH

3x DIA. MAX 6 FT, NO

TURNS

REHEAT COIL

CAV BOX DETAIL

45°

45°

SPIRAL ROUND BRANCH DUCT (SIZE AS

INDICATED ON FLOOR PLANS)

DUCT OR BRANCH CONN. TO MAIN DUCT.

REGULATOR. LOCATE AT CONN. TO FLEX

VOLUME DAMPER WITH LOCKING DAMPER

45 DEGREE ROUND

ELBOW FITTING

FLEX DUCT

MID-LENGTH OF

METAL STRAP @

2" WIDE SHEET

PER MANUFACTURER

ATTACH TO CEILING

FOR SQUARE NECK DIFFUSERS.

1. ROUND NECK CEILING DIFFUSER SHOWN. PROVIDE SQUARE TO ROUND TRANSITION (8" MIN. HEIGHT)

NOTES:

2. FOR HARD CEILINGS PROVIDE SURFACE MOUNTED TYPE CEILING DIFFUSERS AND REMOTE OPERATED DAMPERS.

3. WHERE FACTORY INSTALLED SHEET METAL FITTING ENDS ARE PROVIDED, ATTACH TO BRANCH DUCT WITH

SHEET METAL SCREWS AND DUCT SEALER.

STAINLESS STEEL CLAMP WITH WORM

OPERATOR. SEE NOTE 4.

12 GA. BRACING WIRE

SECURE TO STRUCT.

ABOVE PER ARCH DETAILS

MOUNT BRACING WIRE TO

STRUCTURE ABOVE PER

ARCH. DETAILS

15° MAX.

15° MAX.

15° MAX.

7 NO SCALE

CEILING DIFFUSER DETAIL

8 NO SCALE

DUCT TRANSITION

10 NO SCALE

MAKE TRANSITION

TO BOX OUTLET

AS NEEDED

REHEAT COIL

H.H.W.S.

1/4" MALE 125 LB. BRONZE GAUGE

COCK W/ NIPPLE & CAP, FOR

TESTING & DRAIN (TYP.)

H.H.W.R.

UNION

STRAINER W/END

VALVE & HOSE

END & CAP

BALANCING

VALVE

ISOLATION

VALVE

NOTES:

1. REDUCE PIPE DIAMETER AT THE CONTROL VALVE ONLY. ALL OTHER VALVES

AND ACCESSORIES TO BE SAME SIZE AS BRANCH PIPE DIA.

2. PIPE CONNECTIONS LESS THAN 2-1/2" SHALL HAVE FLEXIBLE CONNECTORS

OR THREE (3)90-DEGREE OFFSETS IN CLOSE PROXIMITY OF THE

CONNECTION.

FLEXIBLE CONNECTOR

FLEXIBLE CONNECTOR

REHEAT COILUNION (TYP.)

GOOSENECK (TYP.)

(3-WAY)

(2-WAY)

CONTROL VALVE

REDUCER

FLEXIBLE CONNECTOR

FLEXIBLE CONNECTOR

REHEAT COIL PIPING DIAGRAMS

12 NO SCALE

DUCTWORK SQUARE VANE ELBOWS

NOTE:

1.

2.

3.

4.

ALL VANE ELBOWS SHALL BE CONSTRUCTED AND INSTALLED AS DETAILED BY SMACNA.

WHEN W1 DOES NOT EQUAL W2, VANE SHALL BE SINGLE THICKNESS VANE TYPE

REGARDLESS OF W DIMENSION.

ALL SINGLE THICKNESS VANES SHALL HAVE A 2" RADIUS, 1 1/2" MAXIMUM SPACE BETWEEN

VANES AND A 3/4" TRAILING EDGE.

WHEN W EQUALS W2 AND W1 IS GREATER THAN 20" VANES SHALL BE DOUBLE VANE TYPE.

AUTOMATIC AIR VENT

PICCV

REDUCER (TYP.)

ISOLATION VALVE

STRAINER A.H.U.

COIL

DRAIN VALVE

MANUAL VENT

P.T.

P.T.

BALANCING VALVE (TYP).

THERMOMETER (TYP.)

THERMOWELL (TYP.)

P.T.P.T.

P/T TEST WELL

(TYP.)

UNION (TYP.)

SIZE PER

PLAN

(TYP).

NOTES:

1. STRAINERS AND COILS TO BE FLUSHED AND CLEANED PRIOR TO SUBSTANTIAL COMPLETION.

2. COMBINATION STRAINER-ISOLATION VALVES AND COIL PIPING KITS ARE NOT ALLOWED.

3. PROVIDE FLEXIBLE PIPE CONNECTIONS W/S.S. HOSE AND BRAID AS SHOWN.

S.S. HOSE & BRAID (TYP.)

3"CHWR

3"CHWS

11 NO SCALE

AHU COOLING COIL PIPING DIAGRAM

SIZE PER

PLAN

100% CONSTRUCTION DOCUMENTS

4849 Ronson Court, Suite 200 San Diego, CA 92111 858.344.8900

10680 TREENA ST# 163 320 San Diego, CA 92123 858-368-8630 Fax 866-517-3293 www.dce-inc.net

PROVIDE 1/8" CLEARANCE TOP & SIDES

SEAL JOINTS OF BREAK-AWAY

DUCT CONNECTIONS PER

S.M.A.C.N.A. GUIDELINES

FUSIBLE LINK

GALVANIZED STEEL SLEEVE

SHALL NOT BE OF LESSOR

GAUGE THAN THAT OF

CONNECTING DUCT. FASTEN

TO DAMPER FRAME & TO

PERIMETER ANGLES.

"S" CLIP CONN. (TYP.)

PROVIDE ACCESS DOOR OF

ADEQUATE SIZE & LOCATION TO

PERMIT MAINTENENCE &

RESETTING OF DAMPER

NOTES:

1. USE ONLY STATE OF CALIFORNIA FIRE MARSHAL LISTED FIRE DAMPERS & INSTALL IN

ACCORDANCE WITH STATE FIRE MARSHAL LISTING NO. 3225 & U. L. STANDARD 555.

2. GENERAL CONTRACTOR SHALL COORDINATE DAMPER ACCESS DOORS AS

REQUIRED FOR ACCESS TO DAMPERS.

3. FIRE DAMPER ASSEMBLIES…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .