Attachment 4 Drawings (2 of 3).pdf
PDF 38 MB Posted
- Attached to
- Modernize Supply Chain, Bldg. 1 Basement Project No. 664-21-301 Federal contract opportunity
- Solicitation number
- 36C26223B0013
About this file
This document contains details for a federal solicitation from the Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 22. The solicitation number is 36C26223B0013 and seeks proposals to modernize the supply chain in Building 1's basement for Project No. 664-21-301. An attachment provides three drawings related to the project scope. Interested offerors should review all provided documents for requirements and specifications prior to submitting a response for the work sought.
View the file
Other files for this federal contract opportunity
Show all 19
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FOR CONSTRUCTION
56 of 61 191
57 of 61 191
58 of 61 191
59 of 61 191
61 of 61 191
45 MIN
45 MIN
45 MIN
45 MIN
45 MIN
G E N E R A L S T R U C T U R A L N O T E S (G.S.N.)
STRUCTURAL OBSERVATION
GENERAL
DESIGN CRITERIA
MEP COORDINATION
FOUNDATION:
SHEET LIST
SHEET DESCRIPTION
ITEM STAGE
ITEMS TO BE ANCHORED TO THE BUILDING:
LOCATION
SUBMITTAL ITEM
CONCRETE
STEEL
COLD-FORMED STEEL
SHOP DRAWINGS / SUBMITTALS SPECIAL INSPECTION
SOIL: SPECIAL INSPECTION TASK
- X
CONCRETE: SPECIAL INSPECTION TASK
- X
STRUCTURAL STEEL: QUALITY ASSURANCE (QA) SPECIAL INSPECTION
PER AISC 360, CHAPTER N AND AISC 341, CHAPTER J
VA SAN DIEGO CA
on e ei gh th i nc h o ne f oo t th re e in ch es o ne f oo t 6"
6" on e an d on e ha lf in ch es o ne f oo t on e in ch o ne f oo t
6" 6" th re e qu ar te rs i nc h o ne f oo t on e ha lf in ch o ne f oo t th re e ei gh th s in ch o ne f oo t on e qu ar te r in ch o ne f oo t
654321
A
B
C
D
E
A
B
C
D
E
654321
VA FORM 08-6231
100% CONSTRUCTION DOCUMENTS
- - 23 FEB, 2022 - -
CHAIN MANAGEMENT
MODERNIZE SUPPLY
BLDG. 1 - BASEMENT
664-21-301 Drawing Title
Approved: Project Director
Project Title
Date
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
Revisions: Date
Office of Construction and Real Estate Management
Dwg. of
CONSULTANTS: ARCHITECT/ENGINEERS:
4849 Ronson Court, Suite 200 San Diego, CA 92111
858.344.8900 S1.1003131 Camino Del Rio North, Suite 1080
San Diego, California 92108
(619) 521-8500 Fax (619) 521-8591 www.kpff.com kpff project #2100127
P:
\1
\2
VA
S
U
PP
LY
C
H A
IN
\D
W G
\S 1.
.D W
G 2/
/2
1:
:4
PM
Exp. 9/30/22 No. S4775RE
G
IS
TE
RED PROFESS IONAL ENG
INEER
STATE OF CAL I FORN IA
FA
R I D MOHSEN
I
S T R U C T U R A L
GENERAL STRUCTURAL NOTES
http://www.kpff.com http://www.kpff.com http://www.kpff.com http://www.kpff.com http://www.kpff.com http://www.kpff.com http://www.kpff.com http://www.kpff.com http://www.kpff.com http://www.kpff.com http://www.kpff.com http://www.kpff.com http://www.kpff.com http://www.kpff.com http://www.kpff.com http://www.kpff.com http://www.kpff.com
(G.S.N. CONTINUED)
POST-INSTALLED CONCRETE ANCHORS
CONSTRUCTION JOINTSCONCRETE
MEMBER
COMPRESSIVE
STRENGTH
28 DAY U.N.O.
(PSI)
MAX
DENSITY
(PCF)
MAX
W/C
RATIO
MAX
SHRINKAGE (%)
(NOTE 4)
EXPOSURE
CATEGORY
REINFORCING STEEL
VA SAN DIEGO CA
on e ei gh th i nc h o ne f oo t th re e in ch es o ne f oo t 6"
6" on e an d on e ha lf in ch es o ne f oo t on e in ch o ne f oo t
6" 6" th re e qu ar te rs i nc h o ne f oo t on e ha lf in ch o ne f oo t th re e ei gh th s in ch o ne f oo t on e qu ar te r in ch o ne f oo t
654321
A
B
C
D
E
A
B
C
D
E
654321
VA FORM 08-6231
100% CONSTRUCTION DOCUMENTS
- - 23 FEB, 2022 - -
CHAIN MANAGEMENT
MODERNIZE SUPPLY
BLDG. 1 - BASEMENT
664-21-301 Drawing Title
Approved: Project Director
Project Title
Date
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
Revisions: Date
Office of Construction and Real Estate Management
Dwg. of
CONSULTANTS: ARCHITECT/ENGINEERS:
4849 Ronson Court, Suite 200 San Diego, CA 92111
858.344.8900 S1.1013131 Camino Del Rio North, Suite 1080
San Diego, California 92108
(619) 521-8500 Fax (619) 521-8591 www.kpff.com kpff project #2100127
P:
\1
\2
VA
S
U
PP
LY
C
H A
IN
\D
W G
\S 1.
1.
D W
G 2/
/2
1:
:5
PM
Exp. 9/30/22 No. S4775RE
G
IS
TE
RED PROFESS IONAL ENG
INEER
STATE OF CAL I FORN IA
FA
R I D MOHSEN
I
S T R U C T U R A L
GENERAL STRUCTURAL NOTES
http://www.kpff.com http://www.kpff.com http://www.kpff.com http://www.kpff.com http://www.kpff.com http://www.kpff.com http://www.kpff.com http://www.kpff.com http://www.kpff.com http://www.kpff.com http://www.kpff.com http://www.kpff.com http://www.kpff.com http://www.kpff.com http://www.kpff.com http://www.kpff.com
(G.S.N. CONTINUED)
STEEL DECK
HEADED STUDS COLD-FORMED STEEL (a.k.a. METAL STUD)
IDENTIFICATION
COLD-FORMED STEEL (a.k.a. METAL STUDS)STRUCTURAL STEEL
DESCRIPTION ASTM DESIGNATION
VA SAN DIEGO CA
on e ei gh th i nc h o ne f oo t th re e in ch es o ne f oo t 6"
6" on e an d on e ha lf in ch es o ne f oo t on e in ch o ne f oo t
6" 6" th re e qu ar te rs i nc h o ne f oo t on e ha lf in ch o ne f oo t th re e ei gh th s in ch o ne f oo t on e qu ar te r in ch o ne f oo t
654321
A
B
C
D
E
A
B
C
D
E
654321
VA FORM 08-6231
100% CONSTRUCTION DOCUMENTS
- - 23 FEB, 2022 - -
CHAIN MANAGEMENT
MODERNIZE SUPPLY
BLDG. 1 - BASEMENT
664-21-301 Drawing Title
Approved: Project Director
Project Title
Date
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
Revisions: Date
Office of Construction and Real Estate Management
Dwg. of
CONSULTANTS: ARCHITECT/ENGINEERS:
4849 Ronson Court, Suite 200 San Diego, CA 92111
858.344.8900 S1.1023131 Camino Del Rio North, Suite 1080
San Diego, California 92108
(619) 521-8500 Fax (619) 521-8591 www.kpff.com kpff project #2100127
P:
\1
\2
VA
S
U
PP
LY
C
H A
IN
\D
W G
\S 1.
2.
D W
G 2/
/2
1:
:5
PM
Exp. 9/30/22 No. S4775RE
G
IS
TE
RED PROFESS IONAL ENG
INEER
STATE OF CAL I FORN IA
FA
R I D MOHSEN
I
S T R U C T U R A L
GENERAL STRUCTURAL NOTES
http://www.kpff.com http://www.kpff.com http://www.kpff.com http://www.kpff.com http://www.kpff.com http://www.kpff.com http://www.kpff.com http://www.kpff.com http://www.kpff.com http://www.kpff.com http://www.kpff.com http://www.kpff.com http://www.kpff.com http://www.kpff.com http://www.kpff.com http://www.kpff.com
4.2 5 5.1 6 7
SHRINKING
WRAPPER
BREAKDOWN
PLATFORM - FRAMING PLAN
4.2 4.9 5.1 6.1
Q.2
R.1
PLATFORM - LOADING DOCK FOUNDATION PLAN
4.2 4.9 5.1 6.1
Q.2
R.1
4.2 5 5.1 6 7
SHRINKING
WRAPPER
BREAKDOWN
GRADE BEAM SCHEDULE
4.2 5 5.1 6 7
SHRINKING
WRAPPER
BREAKDOWN
PLATFORM - CEILING FRAMING PLAN
4.2 4.9 5.1 6.1
Q.2
R.1
DUCT
AHU
PARAPET
PLATFORM
COLUMN
NEW FOOTING
(E) FOOTING
3' -6
'-3
6' -3
'-7
4' -5
1 2"
1'-6"
4'-51 2"
48" CLR.
T.O.C.
SECTION1
Q.2R.1
VA SAN DIEGO CA
on e ei gh th i nc h o ne f oo t th re e in ch es o ne f oo t 6"
6" on e an d on e ha lf in ch es o ne f oo t on e in ch o ne f oo t
6" 6" th re e qu ar te rs i nc h o ne f oo t on e ha lf in ch o ne f oo t th re e ei gh th s in ch o ne f oo t on e qu ar te r in ch o ne f oo t
654321
A
B
C
D
E
A
B
C
D
E
654321
VA FORM 08-6231
100% CONSTRUCTION DOCUMENTS
- - 23 FEB, 2022 - -
CHAIN MANAGEMENT
MODERNIZE SUPPLY
BLDG. 1 - BASEMENT
664-21-301 Drawing Title
Approved: Project Director
Project Title
Date
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
Revisions: Date
Office of Construction and Real Estate Management
Dwg. of
CONSULTANTS: ARCHITECT/ENGINEERS:
4849 Ronson Court, Suite 200 San Diego, CA 92111
858.344.8900 S2.2003131 Camino Del Rio North, Suite 1080
San Diego, California 92108
(619) 521-8500 Fax (619) 521-8591 www.kpff.com kpff project #2100127
P:
\1
\2
VA
S
U
PP
LY
C
H A
IN
\D
W G
\S 2.
0.
D W
G 2/
/2
2:
:0
PM
Exp. 9/30/22 No. S4775RE
G
IS
TE
RED PROFESS IONAL ENG
INEER
STATE OF CAL I FORN IA
FA
R I D MOHSEN
I
S T R U C T U R A L
PLATFORM LOADING DOCK PLANS
AND SECTION
http://www.kpff.com http://www.kpff.com http://www.kpff.com http://www.kpff.com http://www.kpff.com http://www.kpff.com http://www.kpff.com http://www.kpff.com http://www.kpff.com http://www.kpff.com http://www.kpff.com http://www.kpff.com http://www.kpff.com http://www.kpff.com http://www.kpff.com http://www.kpff.com
SECTION1 SECTION2
4.24.95.16.1
DUCT
AHU
PARAPET
PLATFORM
COLUMN
NEW FOOTING
(E) FOOTING
3' -6
'-3
6' -3
'-7
4' -5
1 2"
1'-6"
4'-51 2"
48" CLR.
T.O.C.
Q.2R.1
VA SAN DIEGO CA
on e ei gh th i nc h o ne f oo t th re e in ch es o ne f oo t 6"
6" on e an d on e ha lf in ch es o ne f oo t on e in ch o ne f oo t
6" 6" th re e qu ar te rs i nc h o ne f oo t on e ha lf in ch o ne f oo t th re e ei gh th s in ch o ne f oo t on e qu ar te r in ch o ne f oo t
654321
A
B
C
D
E
A
B
C
D
E
654321
VA FORM 08-6231
100% CONSTRUCTION DOCUMENTS
- - 23 FEB, 2022 - -
CHAIN MANAGEMENT
MODERNIZE SUPPLY
BLDG. 1 - BASEMENT
664-21-301 Drawing Title
Approved: Project Director
Project Title
Date
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
Revisions: Date
Office of Construction and Real Estate Management
Dwg. of
CONSULTANTS: ARCHITECT/ENGINEERS:
4849 Ronson Court, Suite 200 San Diego, CA 92111
858.344.8900 S3.3003131 Camino Del Rio North, Suite 1080
San Diego, California 92108
(619) 521-8500 Fax (619) 521-8591 www.kpff.com kpff project #2100127
P:
\1
\2
VA
S
U
PP
LY
C
H A
IN
\D
W G
\S 3.
0.
D W
G 2/
/2
1:
:2
PM
Exp. 9/30/22 No. S4775RE
G
IS
TE
RED PROFESS IONAL ENG
INEER
STATE OF CAL I FORN IA
FA
R I D MOHSEN
I
S T R U C T U R A L
SECTIONS
http://www.kpff.com http://www.kpff.com http://www.kpff.com http://www.kpff.com http://www.kpff.com http://www.kpff.com http://www.kpff.com http://www.kpff.com http://www.kpff.com http://www.kpff.com http://www.kpff.com http://www.kpff.com http://www.kpff.com http://www.kpff.com http://www.kpff.com http://www.kpff.com
1 COLUMN BASE PLATE DETAIL
A
A
DECK PERPENDICULAR TO BEAM
DECK PARALLEL TO BEAM
COMPOSITE METAL DECK SCHEDULE16
PLAN
SECTION
A
B
TYPICAL BOLTED BEAM CONNECTION DETAIL3
STANDARD BOLTED CONNECTION SCHEDULE
AT ONE-SIDED CONNECTIONS AT TWO-SIDED CONNECTIONS
LATERAL BRACE DETAIL9
AT IN-LINE PARALLEL BEAM
14 COLUMN CLOSURE PLATE DETAIL
CONT 316"PL
CONC OVER MTL
DECK PER PLAN
BEAM PER PLAN
(2) 1/2"x8"
STUDS 16" OC
#3 @ 16"
(LOCATE BAR WITHIN 6"
MAX OF TYPICAL SLAB BAR
CONT #4 MIN AT HOOK
TYP BAR PER PLAN,
EXTEND TO WITHIN
4" OF BENT PLATE
STUDS AND CLIPS
PER
3/16 2-12
19 TYPICAL EDGE OF DECK
VA SAN DIEGO CA
on e ei gh th i nc h o ne f oo t th re e in ch es o ne f oo t 6"
6" on e an d on e ha lf in ch es o ne f oo t on e in ch o ne f oo t
6" 6" th re e qu ar te rs i nc h o ne f oo t on e ha lf in ch o ne f oo t th re e ei gh th s in ch o ne f oo t on e qu ar te r in ch o ne f oo t
654321
A
B
C
D
E
A
B
C
D
E
654321
VA FORM 08-6231
100% CONSTRUCTION DOCUMENTS
- - 23 FEB, 2022 - -
CHAIN MANAGEMENT
MODERNIZE SUPPLY
BLDG. 1 - BASEMENT
664-21-301 Drawing Title
Approved: Project Director
Project Title
Date
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
Revisions: Date
Office of Construction and Real Estate Management
Dwg. of
CONSULTANTS: ARCHITECT/ENGINEERS:
4849 Ronson Court, Suite 200 San Diego, CA 92111
858.344.8900 S4.4003131 Camino Del Rio North, Suite 1080
San Diego, California 92108
(619) 521-8500 Fax (619) 521-8591 www.kpff.com kpff project #2100127
P:
\1
\2
VA
S
U
PP
LY
C
H A
IN
\D
W G
\S 4.
0.
D W
G 2/
/2
1:
:3
PM
Exp. 9/30/22 No. S4775RE
G
IS
TE
RED PROFESS IONAL ENG
INEER
STATE OF CAL I FORN IA
FA
R I D MOHSEN
I
S T R U C T U R A L
DECK AND STEEL DETAILS
http://www.kpff.com http://www.kpff.com http://www.kpff.com http://www.kpff.com http://www.kpff.com http://www.kpff.com http://www.kpff.com http://www.kpff.com http://www.kpff.com http://www.kpff.com http://www.kpff.com http://www.kpff.com http://www.kpff.com http://www.kpff.com http://www.kpff.com http://www.kpff.com
LAYOUT OF HEADED STUDS4
TYP. ROOF PENETRATION AT DRAIN9
PERPENDICULAR TO DECK
PARALLEL TO DECK
SECTION X
JOINT PERPENDICULAR TO DECK
JOINT PARALLEL TO DECKA
B
CONSTRUCTION JOINT IN COMPOSITE DECK8
TYPICAL OPENINGS IN COMPOSITE METAL DECK16
PLAN
SECTION D
SECTION E
SECTION F
SECTION G
PLAN
PLAN
MEMBER TO MEMBER CONNECTION AROUND OPENINGH
PLACEMENT AND SPACING OF OPENINGSA
SMALL OPENINGS IN COMPOSITE METAL DECKB
LARGE OPENINGS IN COMPOSITE METAL DECKC
DETAILA DETAILA
AHU-77 ANCHORAGE19
PLAN
A
AHU-78 ANCHORAGE20
PLAN
A
VA SAN DIEGO CA
on e ei gh th i nc h o ne f oo t th re e in ch es o ne f oo t 6"
6" on e an d on e ha lf in ch es o ne f oo t on e in ch o ne f oo t
6" 6" th re e qu ar te rs i nc h o ne f oo t on e ha lf in ch o ne f oo t th re e ei gh th s in ch o ne f oo t on e qu ar te r in ch o ne f oo t
654321
A
B
C
D
E
A
B
C
D
E
654321
VA FORM 08-6231
100% CONSTRUCTION DOCUMENTS
- - 23 FEB, 2022 - -
CHAIN MANAGEMENT
MODERNIZE SUPPLY
BLDG. 1 - BASEMENT
664-21-301 Drawing Title
Approved: Project Director
Project Title
Date
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
Revisions: Date
Office of Construction and Real Estate Management
Dwg. of
CONSULTANTS: ARCHITECT/ENGINEERS:
4849 Ronson Court, Suite 200 San Diego, CA 92111
858.344.8900 S4.4013131 Camino Del Rio North, Suite 1080
San Diego, California 92108
(619) 521-8500 Fax (619) 521-8591 www.kpff.com kpff project #2100127
P:
\1
\2
VA
S
U
PP
LY
C
H A
IN
\D
W G
\S 4.
1.
D W
G 2/
/2
1:
:3
PM
Exp. 9/30/22 No. S4775RE
G
IS
TE
RED PROFESS IONAL ENG
INEER
STATE OF CAL I FORN IA
FA
R I D MOHSEN
I
S T R U C T U R A L
DECK AND STEEL DETAILS
http://www.kpff.com http://www.kpff.com http://www.kpff.com http://www.kpff.com http://www.kpff.com http://www.kpff.com http://www.kpff.com http://www.kpff.com http://www.kpff.com http://www.kpff.com http://www.kpff.com http://www.kpff.com http://www.kpff.com http://www.kpff.com http://www.kpff.com http://www.kpff.com
16 GRADE BEAM AT LOADING DOCK LEVER18
TIE RAMP DETAIL2 TYP NEW OPENING IN EXISTING CONC WALL4
A
B
4.2
PILASTER TO LOW GRADE BEAM15
PEDESTAL DETAILA
4.2
A
DETAIL NOTE6
4.2
Q.2
Q.1
14GRADE BEAM AT (E) COLUMN13
5.1
Q.2
Q.1
PEDESTAL AND GRADE BEAM AT (E) COLUMN
GRADE BEAM AT LOADING DOCK LEVER
A
PLAN
GRADE BEAM AT LOADING DOCK RETAINING WALL20
TIE CONCRETE RETAINING WALL (AT RAMP)1
GRID
VA SAN DIEGO CA
on e ei gh th i nc h o ne f oo t th re e in ch es o ne f oo t 6"
6" on e an d on e ha lf in ch es o ne f oo t on e in ch o ne f oo t
6" 6" th re e qu ar te rs i nc h o ne f oo t on e ha lf in ch o ne f oo t th re e ei gh th s in ch o ne f oo t on e qu ar te r in ch o ne f oo t
654321
A
B
C
D
E
A
B
C
D
E
654321
VA FORM 08-6231
100% CONSTRUCTION DOCUMENTS
- - 23 FEB, 2022 - -
CHAIN MANAGEMENT
MODERNIZE SUPPLY
BLDG. 1 - BASEMENT
664-21-301 Drawing Title
Approved: Project Director
Project Title
Date
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
Revisions: Date
Office of Construction and Real Estate Management
Dwg. of
CONSULTANTS: ARCHITECT/ENGINEERS:
4849 Ronson Court, Suite 200 San Diego, CA 92111
858.344.8900 S4.4023131 Camino Del Rio North, Suite 1080
San Diego, California 92108
(619) 521-8500 Fax (619) 521-8591 www.kpff.com kpff project #2100127
P:
\1
\2
VA
S
U
PP
LY
C
H A
IN
\D
W G
\S 4.
2.
D W
G 2/
/2
1:
:3
PM
Exp. 9/30/22 No. S4775RE
G
IS
TE
RED PROFESS IONAL ENG
INEER
STATE OF CAL I FORN IA
FA
R I D MOHSEN
I
S T R U C T U R A L
FOUNDATION DETAILS
http://www.kpff.com http://www.kpff.com http://www.kpff.com http://www.kpff.com http://www.kpff.com http://www.kpff.com http://www.kpff.com http://www.kpff.com http://www.kpff.com http://www.kpff.com http://www.kpff.com http://www.kpff.com http://www.kpff.com http://www.kpff.com http://www.kpff.com http://www.kpff.com
TYPICAL STIFFENER PLATE DETAIL18
PLAN
MOMENT FRAME CONNECTION
DETAIL4
PLAN
B
DETAILA B
A
HSS TO WF TUBE COLUMN9
DETAILA
A
B
HEADER DETAILB
CANTILEVER HSS DETAIL14
TYP EXT STUD TO EDGE OF DECK20
A
A
ELEVATION AT DISCONTINUOUS COLUMN
TYPICAL BOLTED FLANGE PLATE DETAIL
PARAPET WALL SUPPORT19
GRID
VA SAN DIEGO CA
on e ei gh th i nc h o ne f oo t th re e in ch es o ne f oo t 6"
6" on e an d on e ha lf in ch es o ne f oo t on e in ch o ne f oo t
6" 6" th re e qu ar te rs i nc h o ne f oo t on e ha lf in ch o ne f oo t th re e ei gh th s in ch o ne f oo t on e qu ar te r in ch o ne f oo t
654321
A
B
C
D
E
A
B
C
D
E
654321
VA FORM 08-6231
100% CONSTRUCTION DOCUMENTS
- - 23 FEB, 2022 - -
CHAIN MANAGEMENT
MODERNIZE SUPPLY
BLDG. 1 - BASEMENT
664-21-301 Drawing Title
Approved: Project Director
Project Title
Date
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
Revisions: Date
Office of Construction and Real Estate Management
Dwg. of
CONSULTANTS: ARCHITECT/ENGINEERS:
4849 Ronson Court, Suite 200 San Diego, CA 92111
858.344.8900 S4.4033131 Camino Del Rio North, Suite 1080
San Diego, California 92108
(619) 521-8500 Fax (619) 521-8591 www.kpff.com kpff project #2100127
P:
\1
\2
VA
S
U
PP
LY
C
H A
IN
\D
W G
\S 4.
3.
D W
G 2/
/2
1:
:4
PM
Exp. 9/30/22 No. S4775RE
G
IS
TE
RED PROFESS IONAL ENG
INEER
STATE OF CAL I FORN IA
FA
R I D MOHSEN
I
S T R U C T U R A L
MOMENT FRAME AND MISC STEEL
DETAILS
http://www.kpff.com http://www.kpff.com http://www.kpff.com http://www.kpff.com http://www.kpff.com http://www.kpff.com http://www.kpff.com http://www.kpff.com http://www.kpff.com http://www.kpff.com http://www.kpff.com http://www.kpff.com http://www.kpff.com http://www.kpff.com http://www.kpff.com http://www.kpff.com
M1.001 MECHANICAL LEGENDS AND NOTES
M1.002 MECHANICAL SCHEDULES
M1.003 MECHANICAL SCHEDULES
M1.200 BASEMENT MECHANICAL – OVERALL AND ZONING PLAN
M2.100 PHASE 1 BASEMENT MECHANICAL FLOOR PLAN
M2.101 PHASE 1 BASEMENT PIPING FLOOR PLAN
M2.102 PHASE 1 FIRST FLOOR MECHANICAL FLOOR PLAN
M2.300 PHASE 3 BASEMENT MECHANICAL DEMOLITION PLAN
M2.301 PHASE 3 BASEMENT MECHANICAL DEMOLITION PLAN
M2.302 PHASE 3 BASEMENT MECHANICAL FLOOR PLAN
M2.303 PHASE 3 BASEMENT MECHANICAL FLOOR PLAN
M2.304 PHASE 3 BASEMENT PIPING FLOOR PLAN
M2.305 PHASE 3 BASEMENT PIPING FLOOR PLAN
M2.400 PHASE 4 BASEMENT MECHANICAL DEMOLITION PLAN
M2.401 PHASE 4 BASEMENT MECHANICAL FLOOR PLAN
M2.500 PHASE 5 BASEMENT MECHANICAL DEMOLITION PLAN
M2.501 PHASE 5 BASEMENT MECHANICAL FLOOR PLAN
M2.502 PHASE 5 BASEMENT MECHANICAL PIPING PLAN
M2.600 PHASE 6 BASEMENT MECHANICAL DEMOLITION PLAN
M2.601 PHASE 6 BASEMENT MECHANICAL FLOOR PLAN
M2.700 PHASE 7 BASEMENT MECHANICAL DEMOLITION PLAN
M2.701 PHASE 7 BASEMENT MECHANICAL FLOOR PLAN
M2.702 PHASE 7 BASEMENT MECHANICAL PIPING PLAN
M3.100 MECHANICAL DETAILS
M3.101 MECHANICAL DETAILS
M3.102 MECHANICAL CONTROLS
TRANSFER ASSEMBLY (CEILING WITH FLEX DUCT)
TRANSFER ASSEMBLY (CEILING WITH LINED DUCT)
TRANSFER ASSEMBLY (WALL)
NEW DUCTWORK (1ST NUMBER INDICATES
MECHANICAL LEGEND
RETURN REGISTER / GRILLE
SUPPLY REGISTER WITH EXTRACTOR
DUCT TRANSITION (RECTANGULAR TO ROUND)
DUCT TRANSITION (RECTANGULAR OR ROUND)
EXHAUST REGISTER OR GRILLE
CEILING DIFFUSER
EXHAUST AIR DUCT
RETURN AIR DUCT/OUTSIDE AIR DUCT
SUPPLY AIR DUCT
ACCESS DOOR/ACCESS PANEL
FLEXIBLE DUCTWORK
WALL REGISTER OR GRILLE
RECTANGULAR DUCT DOWN
RECTANGULAR DUCT UP
ROUND DUCT DOWN
ROUND DUCT UP
DUCT DROP
DUCT RISE
FLEXIBLE CONNECTION TO EQUIPMENT
COMBINATION FIRE AND SMOKE DAMPER
MOTOR OPERATED DAMPER
LINED DUCTWORK (OR PLENUM)
SMOKE DAMPER
SQUARE ELBOW WITH TURNING VANES
ROUND ELBOW OR RECTANGULAR RADIUS ELBOW
MANUAL VOLUME DAMPER
UNION
DRAIN
DIRECTION OF SLOPE DOWN
BLIND FLANGE
PRESSURE RELIEF VALVE
PRESSURE GAUGE WITH GAUGE COCK
STRAINER WITH DRAIN VALVE AND HOSE END
THERMOMETER/TEMPERATURE GAUGE
RISE OR RISER
DOWN OR DROP
CAPPED LINE
DIFFERENTIAL
COMBINATION BALANCING VALVE
BALL VALVE
BUTTERFLY VALVE
MOTORIZED BUTTERFLY VALVE
FLEXIBLE CONNECTION (PIPE)
ECCENTRIC REDUCER
CONCENTRIC REDUCER
VALVE ON RISE OR DROP
OVERFLOW DRAIN PIPE
THERMOSTAT
HUMIDISTAT
UNDER CUT (DOOR 1/2'')
DOOR LOUVER
AUTOMATIC FLOW CONTROL VALVE
PIPE ANCHOR
HEATING HOT WATER RETURN
HEATING HOT WATER SUPPLY
PIPE DOWN
PIPE UP
DIRECTION OF FLOW IN PIPE
PIPE TO FLOOR SINK
PIPE RISE
PIPE GUIDE
CONTROL VALVE (2-WAY)
CHECK VALVE
BALANCING
GLOBE VALVE
GATE VALVE/SHUT-OFF VALVE
PRESSURE REDUCING VALVE
CONTROL VALVE (3-WAY)
POINT OF CONNECTION
ABBREV. DESCRIPTION SYMBOL DESCRIPTION
MECHANICAL ABBREVIATIONS
EF EXHAUST FAN
SYSTEM
SYMBOL
TOTAL
VALVE
VOLT
THERMOSTAT
TEMPERATURE
VOLUME
TERMINAL UNIT
VARIABLE FREQUENCY DRIVE
TURNING VANES
UNLESS NOTED OTHERWISE
UNDERGROUND
TOP OF PIPE
TOP OF DUCT
TEMPERATURE TRANSMITTER
VARIABLE AIR VOLUME
VERTICAL
VACUUM
TYPICAL
TEMPERATURE DIFFERENCE
WATT
LEVEL
EQUIPMENT
OPERATIONS AND MAINTENANCE
WET-BULB
WATER
WEIGHT
WITHOUT
LOW PRESSURE RETURN
LOW PRESSURE STEAM
LEAVING WATER TEMPERATURE
LEAVING AIR TEMPERATURE
MANUAL BALANCING DAMPER
1000 BTU PER HOUR
LENGTH, LONG
LONG RADIUS ELBOW
MAX
MBD
MECH
MBH
MIN MINIMUM
MECHANICAL
MAXIMUM
LPR
LBS
LF
LWT
LRE
LPS
KW
LAT
LG
LINEAR FEET
KILOWATT
POUNDS
VOL
HEAT RECOVERY COIL
HEATING WATER SUPPLY
HEATING WATER RETURN
HUMIDITY TRANSMITTER
HEATING, VENTILATING & AIR
INCH, INCHES
INSIDE DIAMETER
HORSE POWER
HEATING COIL
GALVANIZED SHEET METAL
HEAT PUMP UNIT
GRAVITY RELIEF
HS HAND SWITCH
HVAC
HRC
HHWS
HHWR
ID
IN
HT
HPU
GSM
HGT
HD
HC
HP
HR
GR
HSTAT
HEIGHT
HEAD
HOUR(S)
HUMIDISTAT
EQUIP
O&M
W/O
LVL
WTR
WT
WB
W
FLAT ON BOTTOM
ENTERING WATER TEMPERATURE
EXHAUST GRILLE
FIBERGLASS REINFORCED PLASTIC
GALLONS PER MINUTE
GALLONS PER HOUR
ELEC. WATER COOLER
DEGREES FAHRENHEIT
GAGE OR GAUGE
FEET PER MINUTE
GPM
GPH
FPM
FOB
GA
FT
FIN
FD
FLR
FRP
FS
FOOT, FEET
FINISH
FLOOR
FLOOR SINK
FIRE DAMPER
EWT
EWC
EXH
°F
EG
EXHAUST
VA
VAV
VFD
VERT
VAC
V
TV
TU
UNO
UG
TOP
TOD
TEMP
TT
TYP
TOT
SYM
SYS
TSTAT
ΔT
NOT TO SCALE
NORMALLY OPEN
NOT IN CONTRACT
NORMALLY CLOSED
NOT APPLICABLE
OWNER FURNISHED, CONTRACTOR
OUTSIDE AIR
OUTSIDE DIAMETER
OPPOSED BLADE DAMPER
RETURN GRILLE
RETURN AIR DUCT
POINT OF CONNECTION
REHEAT COIL
RELATIVE HUMIDITY
RETURN OR RELIEF FAN
RETURN/EXHAUST FAN
PHASE (ELECTRICAL)
PRESSURE DROP OR DIFFERENTIAL
PRESSURE
POUNDS PER SQUARE INCH
ROUND OR DIAMETER
RETURN AIR
REVOLUTIONS PER MINUTE
PSI GAGE
SUPPLY GRILLE
STANDARD
STAINLESS STEEL
SIDEWALL RETURN
SIDEWALL EXHAUST
SIDEWALL DIFFUSER
SPECIFICATION
SUPPLY AIR
SUPPLY FAN
STATIC PRESSURE
SQUARE
SECOND
PUMP
ALT ALTITUDE
RF
ENTERING AIR TEMPERATURE
INDIRECT DRAIN
CLEAN OUT TO GRADE
COEFFICIENT, VALVE FLOW
CONDENSATE PUMP
CONTINUATION
DRY-BULBDB
DBL
DRN
(E)
EA
EAT
DN
DIA
DRAIN
EXISTING
EXHAUST AIR
DOUBLE
DOWN
DIAMETER
COTG
CONT
CONN
CMPR
D
CV
CP
CONNECTION
COMPRESSOR
SD
SP
SS
SR
SQ
SPEC
STD
SEC
SF
SE
SG
SA
RHC
RPM
RH
RG
BACKDRAFT DAMPER
CHILLED WATER SUPPLY
CHILLED WATER RETURN
CUBIC FEET PER MINUTE
BRITISH THERMAL UNIT
CEILING GRILLE, CENTER OF GRAVITY
COOLING COIL
BTU PER HOUR
BRAKE HORSEPOWER (BOILER HP)
BOTTOM OF DUCT
BOTTOM OF PIPE
BELOW GRADE
BELOW FLOOR
AIR SEPARATOR
BTUH
BDD
CHWS
CHWR
CFM
CL
CG
CC
CENTERLINE
APPROX
AVG
AUTO
BTU
BOD
BOP
BHP
BF
BG
B
AS
BOILER
AUTOMATIC
AVERAGE
APPROXIMATE
RA
RAD
R/EF
PSIG
PSI
POC
PH
PRESS
P
ΔP
OA
OFCI
OD
OBD
ACID FLOOR CLEANOUT
ABOVE FINISHED FLOOR
ABOVE FINISH CEILING
AIR HANDLING UNIT
AIR CONDITIONING
ACCESS DOOR
AFC
AHU
AFCO
AC
AD
AFF
N/A
NIC
NTS
NO
NC
CO CLEAN OUT
CLR CLEAR
CONC CONCRETE
CONTRACTORCONTR
EFF EFFICIENCY
ELEVATIONELEV
ENTERINGENT
EXTERNAL STATIC PRESSUREESP
FAN COIL UNITFCU
FLA FULL LOAD AMP
GALLONSGAL
GALVANIZEDGALV
HEATINGHTG
LEAVINGLVG
LOCKED ROTOR AMPSLRA
MFG MANUFACTURER
PLUMBINGPLBG
REQUIREDREQD
RETURNRET
RUNNING LOAD AMPSRLA
SENSIBLESENS
VELOCITYVEL
AMS AIR MONITORING STATION
MANUAL OPERATED DAMPERMOD
MANUAL VOLUME DAMPERMVD
FSD COMBINATION FIRE & SMOKE DAMPER
ACCESS PANELAP
TEMPERATURE DIFFERENCE
AV AIR VENT
SMOKE DETECTOR
TERMINAL BOX
FFU FAN FILTER UNIT
DESCRIPTIONSYMBOL
CHILLED WATER SUPPLY
CHILLED WATER RETURN
REHEAT WATER SUPPLY
COMPRESSED AIR
INSTRUMENT TEST CONNECTION
STRAINER WITH BLOWDOWN
AIR ELIMINATOR/VACUUM BREAKER
CIRCUIT SETTER
EXPANSION JOINT
FLOW SWITCH
GATE, ANGLE
THROW ARROW
BOTTOM OF STEELBOS
PUMPED CONDENSATE RETURNPC
REHEAT WATER RETURN
LOW PRESSURE STEAM CONDENSATELPC
CLEAN OUT
OVERHEADOH
PRESSURE DROP INDICATORPDI
ANALOG INPUTAI
ANALOG OUTPUTAO
DIGITAL INPUTDI
FAIL OPENFO
TEST WELL (PETE'S PLUG - PRESSURE AND/OR
TEMPERATURE)
TRIPLE DUTY VALVE (COMBINATION SHUT-OFF,
CHECK AND GLOBE, ANGLE
ABBREV. DESCRIPTION
FLEXIBLE DUCT WITH SPIN-IN FITTING AND
DAMPER
TERMINAL BOX WITH REHEAT
STEELSTL
ABOVEABV
UNDERCUTUC
OVERFLOW CONDENSATE DRAIN
EXISTING DUCT OR PIPE
EXISTING TO BE REMOVED
EXISTING TO BE ABANDONED IN PLACE
DUCT MATERIALS SHALL COMPLY WITH SECTION 603 OF I.E.C.C.
PROVIDE DUCT MANUAL VOLUME DAMPERS IN EACH BRANCH DUCT AND IN EACH MAIN DUCT TO PROVIDE FOR COMPLETE AIR BALANCE OF THE SYSTEM. PROVIDE ADEQUATE ACCESS AND IDENTIFICATION.
ALL DUCTWORK AND PIPING SHALL BE INSULATED CONSISTENTLY WITH THE REQUIREMENTS OF SECTION
ROOM THERMOSTATS SHALL BE CAPABLE OF BEING SET TO MAINTAIN SPACE TEMPERATURE SET POINTS FROM 55 °F. TO 85 °F. AND BE CAPABLE OF OPERATING THE HEATING AND COOLING IN SEQUENCE.
THERMOSTATS SHALL BE ADJUSTABLE TO PROVIDE A TEMPERATURE RANGE OF UP TO 10°F. BETWEEN FULL HEATING AND FULL COOLING BEING SUPPLIED. CONTROLS SHALL HAVE CAPABILITY OF TERMINATING ALL HEATING AT A TEMPERATURE NOT MORE THAN 70 °F. AND COOLING AT A TEMPERATURE NOT LESS
TEMPERATURE CONTROL SYSTEM SHALL OPERATE IN ACCORDANCE WITH THE BASE BUILDING SEQUENCE OF
WALL MOUNTED THERMOSTATS SHALL BE MOUNTED 48" A.F.F. TEMPERATURE SENSORS SHALL BE WALL
PROVIDE SMOKE DETECTORS AT HVAC SYSTEMS EXCEEDING 2,000 CFM AT MAIN SUPPLY
DUCT. PROVIDE DUCT SMOKE DETECTORS LOCATED AT EACH STORY FOR RETURN AIR SYSTEMS WHICH
SEE PLUMBING DRAWINGS FOR PRIMARY AND SECONDARY CONDENSATE DRAINS .
NO COMBUSTION VENTS, DRYER VENTS, RANGE HOOD VENTS, OR HEATING DUCTS ARE PERMITTED IN AREA
MATERIAL EXPOSED WITHIN A DUCT OR PLENUM SHALL COMPLY WITH SECTION 602 I.M.C.
ALL OUTLETS FOR FUTURE CONNECTIONS SHALL BE INSTALLED SO AS TO PERMIT EASY CONNECTION.
COORDINATE DUCTWORK, STRUCTURAL CONDITIONS AND ARCHITECTURAL LAYOUT.
SEE ARCHITECTURAL DRAWINGS FOR ROOF ACCESS AND ADDITIONAL ENERGY CONSERVATION NOTES.
SEE ARCHITECTURAL REFLECTED CEILING PLAN FOR EXACT LOCATION OF CEILING DIFFUSERS AND GRILLES.
ALL CEILING DIFFUSERS SHALL BE 4-WAY THROW UNLESS SHOWN OTHERWISE.
ALL H.V.A.C. SYSTEMS SHALL MEET THE REQUIREMENTS PER SECTION 503 I.E.C.C.
ALL H.V.A.C. PIPING SHALL MEET THE REQUIREMENTS PER SECTION 504 I.E.C.C.
SERVE MORE THAN ONE STORY AND EXCEED 15,000 CFM - PER NFPA 90A 6.4.2.1.
SEPARATION WALLS.
MINIMUM OUTDOOR AIR REQUIREMENTS : 15 C.F.M. / PERSON.
AIRCRAFT CABLE SHALL BE PRE-STRETCHED.
MOUNTED 48" A.F.F.
604 OF I.E.C.C.
OPERATION.
THAN 78 °F.
ALL WORK SHALL BE DONE IN ACCORDANCE WITH THE CODES ADOPTED BY THE DEPARTMENT OF VETERAN
CONTRACTOR SHALL BE RESPONSIBLE FOR PROTECTION AND PROVIDE REPAIR OF ADJACENT EXISTING
SURFACES, EQUIPMENT, AREAS, AND PROPERTY THAT MAY BE DAMAGED AS A RESULT OF ANY
ALL DRAWINGS ARE CONSIDERED TO BE PART OF THE CONTRACT DOCUMENTS. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE REVIEW AND COORDINATION OF ALL DRAWINGS PRIOR TO ANY CONSTRUCTION, INCLUDING ARCHITECTURAL, STRUCTURAL, AIR CONDITIONING, PLUMBING, AND ELECTRICAL. ANY DISCREPANCIES THAT OCCUR SHALL BE BROUGHT TO THE ATTENTION OF THE ENGINEER PRIOR TO THE START OF CONSTRUCTION SO THAT A CLARIFICATION MAY BE ISSUED. ANY WORK PERFORMED IN CONFLICT
WITH THE CONTRACT DOCUMENTS OR ANY CODE REQUIREMENT SHALL BE CORRECTED BY THE
CONTRACTOR AT HIS OWN EXPENSE, AND AT NO EXPENSE TO THE OWNER.
DO NOT SCALE DRAWINGS - ALL DIMENSIONS AND JOB SITE CONDITIONS SHALL BE VERIFIED BY THE
CONTRACTOR AT THE JOB SITE PRIOR TO BID SUBMITTAL, START OF CONSTRUCTION AND / OR FABRICATION OF MATERIALS. IF DISCREPANCIES ARE ENCOUNTERED, THE ENGINEER SHALL BE NOTIFIED FOR
CONTRACTOR SHALL COORDINATE ALL DUCT, PIPE AND EQUIPMENT LOCATIONS WITH PLUMBING, ALL DUCTWORK SHALL BE CONSTRUCTED, ERECTED & TESTED IN ACCORDANCE WITH THE MOST
RESTRICTIVE OF LOCAL REGULATIONS AND PROCEDURES DETAILED IN THE A.S.H.R.A.E. HANDBOOK OF FUNDAMENTALS OR THE APPLICABLE STANDARDS ADOPTED BY S.M.A.C.N.A. PROVIDE RECTANGULAR DUCTS
OF GALVANIZED STEEL & PREFABRICATED SPIRAL LOCKSEAM DUCTS AND FITTINGS.
DEMOLITION AND/OR NEW WORK.
ELECTRICAL, STRUCTURAL, AND ALL OTHER TRADES.
CLARIFICATION.
AFFAIRS.
26.
25.
22.
23.
21.
20.
19.
18.
17.
16.
14.
15.
13.
11.
10.
9.
8.
7.
6.
5.
4.
1.
2.
3.
ELECTRICAL INTERLOCK BETWEEN AIR HANDLING UNIT AND EXHAUST AIR TO BE PROVIDED.12.
MECHANICAL GENERAL NOTES
OR FLOW INDICATOR
CONDITIONING
Ø
OWNER FURNISHED, OWNEROFOI
INSTALLED
INSTALLED
SIDE SHOWN)
MECHANICAL SHEET INDEX
POINT OF DISCONNECTION
27.
28.
SEISMIC BRACING AND RESTRAINT/SUPPORTS ARE REQUIRED PER SPECIFICATION SECTION 13 05 41.
ALL DUCTWORK IN SCOPE AND CONNECTED TO SYSTEM WILL BE CLEANED PER SPECIFICATION SECTION 23 01 30.52.
THE CONTRACTOR SHALL FURNISH ALL MATERIALS, LABOR, EQUIPMENT, TRANSPORTATION, AND SERVICES NECESSARY FOR THE COMPLETION OF THE WORK. ALL MATERIALS & WORK SHALL BE IN COMPLIANCE WITH
ALL APPLICABLE CODES AND GOVERNING REGULATIONS.
100% CONSTRUCTION DOCUMENTS
4849 Ronson Court, Suite 200 San Diego, CA 92111 858.344.8900
10680 TREENA ST# 163 320 San Diego, CA 92123 858-368-8630 Fax 866-517-3293 www.dce-inc.net
EF
EF
X
1 BASEMENT
EXISTING
CONDENSER
AREA
BASEMENT FORKLIFT
CHARGING
EXHAUST FAN SCHEDULE
UNIT NO. MFR. &
MODEL NO.
COOK 300 QMX
COOK
ACW-B
COOK
SQN-HP
BASEMENTBASEMENT
LOCATION SERVICE FAN TYPE
INLINE
SIDEWALL
INLINE 8540
16000
C.F.M. T.S.P.
(IN. WG.)
1.5
.5
1.25 BELT
BELT
BELT
DRIVE FAN
R.P.M.
811 460/3/60
460/3/60
460/3/60
V./PH./HZ.
ELECTRICAL
HP
7.5
1/4
5 7.6
.5
FLA
WEIGHT
(LBS.)
REMARKS
EXISTING FOR REFERENCE
AC
(E)
AC
6770AC
DAIKIN
OAH019GDGM ROOF BASEMENT WAREHOUSE
MFR. &
MODEL NO.UNIT NO.
2F DECK
BASEMENT CEILING BASEMENT OFFICES & IT
CENTRAL SUPPLY
SERVICELOCATION
C.F.M.
SUPPLY FAN
T.S.P (in.)
E.S.P (in.) DRIVE C.F.M.
RETURN FAN
T.S.P (in.)
E.S.P (in.) DRIVE TOTAL
MBH
SENS.
MBH D.b.
E.A.T.(°F) W.b. D.b.
L.A.T.(°F) W.b.
COOLING COILS
GPM
W.P.D.
(ft.hd.)
AIR HANDLING UNIT SCHEDULE
E.W.T (°F)
L.W.T (°F)
SENS.
MBH D.b.
E.A.T.(°F) D.b.
L.A.T.(°F)
HEATING COILS
GPM
W.P.D.
(ft.hd.)
E.W.T (°F)
L.W.T
(°F) HP
ELECTRICAL (SUPPLY FAN)
FLA MCA V/PH/HZ HP FLA MCA V/PH/HZ
ELECTRICAL (RETURN FAN)
FILTER
FILTERS
QTY.
EACH
OPER.
WEIGHT
(LBS.)
O.A.
(CFM) REMARKS
50%
100%8/8
2/2
15/10(E) 30% AND 85% EFF.
MERV 8 / MERV 14
MERV 8 / MERV 14460/3/60
460/3/60-
-12
-15
10460/3/60
460/3/60
460/3/60-
-23.5
6.6
-15
5.0
20150
1800.1
-18
5.855
45124.0
53855
4510.2
4.4
12.663.0
17.6
10357.8
53.9
53.754.7
54.4
60.867
80518
61.5
252.9322.3
88.5
728-
DIRECT2.5
2.598300
DIRECT
DIRECT3.5
2.5
-5.1
5.61
6.958300
20500 EXISTING FOR REFERENCE
DAIKIN
CAH006GDAC
2700AC
DAIKIN
CAH012GDAC ROOF
BASEMENT STERILE
CONSUMABLES 50%5/5MERV 8 / MERV 14----460/3/60-17.515-------55456.144.053.954.86780151.8221.8----DIRECT4.57.735500
EF
MED-GAS
STORAGE
MED-GAS
STORAGE
COOK
ACW-HP SIDEWALL 500 .5 BELT 1444 460/3/60 1/4 .5 93
(E)
PROVIDE SPARK 'A' CONSTRUCTION
PROVIDE SPARK 'A' CONSTRUCTION
SF
1 BASEMENT
EXISTING
CONDENSER
AREA
SUPPLY FAN SCHEDULE
UNIT NO. MFR. &
MODEL NO.
COOK
DB
LOCATION SERVICE FAN TYPE
INLINE 8300
C.F.M. T.S.P.
(IN. WG.)
1.0 BELT
DRIVE FAN
R.P.M.
693 460/3/60
V./PH./HZ.
ELECTRICAL
HP
5 -
FLA
WEIGHT
(LBS.)
REMARKS
CONTROL VALVES
UNIT
NO. SERVICE REMARKS(in)
SIZE
(gpm)
FLOW
Cv (psig) P.D.
TYPE
BODY
51.21/2 2.8
REHEAT COIL 1.81/2 .8 5
MANUFACTURER &
MODEL No.
BELIMO
BELIMO
CCV-B209
BELIMO
CCV-B207 51/2 .7 .3
REHEAT COILCCV-B210
BELIMO
CCV-B208 51/2 1.0 .46REHEAT COIL
REHEAT COIL 2-WAY
2-WAY
2-WAY
2-WAY
51.91/2 4.2BELIMO REHEAT COILCCV-B211 2-WAY
531/2 6.8BELIMO REHEAT COILCCV-B212 2-WAY
CV
CV
CV
CV
CV
CV
54.73/4 11BELIMO REHEAT COILCCV-B217 2-WAY
CV
EXHAUST TERMINAL BOX SCHEDULE
EV
1-1N
A 900 0.2 12 12 27 20 -
UNIT
NO.
MFR &
MODEL NO. TYPE MAX.
C.F.M.
MIN. SP
DROP
(IN. W.C.)
INLET
SIZE
(IN)
SOUND
LEVEL
(NC)
WEIGHT REMARKS
OUTLET
SIZE
(IN)
PHOENIX
THERIS
EV
1-7N
A 280 0.2 8 8 27 20 -PHOENIX
THERIS
EV
1-7E
A 220 0.2 8 8 27 20 EXISTING TO REMAIN, REBALANCE TO LISTED CFMPHOENIX
THERIS
EV
1-10E
A 225 0.2 8 8 27 20 EXISTING TO REMAIN, REBALANCE TO LISTED CFMPHOENIX
THERIS
FACTORY PROVIDED VFD. UNIT FURNISHED WITH INTERNAL VIBRATION
ISOLATORS. COOLING COIL WITH COPPER TUBE AND COPPER FINS. FACTORY
PROVIDED 4" BASE RAIL.
FACTORY PROVIDED VFD'S. UNIT FURNISHED WITH INTERNAL VIBRATION ISOLATORS.
COOLING COIL WITH COPPER TUBE AND COPPER FINS. PROVIDE 16" TALL FACTORY
ROOF CURB.
2-WAY CHARACTERIZED CONTROL VALVE, MODULATING TYPE.
PROVIDE WITH ELECTRONIC ACTUATOR.
57.41 18BELIMO AC-72 COOLING COILCCV-B222 2-WAY
CV
5292 65BELIMO AC-77 COOLING COILCCV-B248 2-WAY
CV
5291-1/2 45BELIMO AC-78 COOLING COILCCV-B239 2-WAY
CV
2-WAY CHARACTERIZED CONTROL VALVE, MODULATING TYPE.
PROVIDE WITH ELECTRONIC ACTUATOR.
2-WAY CHARACTERIZED CONTROL VALVE, MODULATING TYPE.
PROVIDE WITH ELECTRONIC ACTUATOR.
2-WAY CHARACTERIZED CONTROL VALVE, MODULATING TYPE.
PROVIDE WITH ELECTRONIC ACTUATOR.
2-WAY CHARACTERIZED CONTROL VALVE, MODULATING TYPE.
PROVIDE WITH ELECTRONIC ACTUATOR.
2-WAY CHARACTERIZED CONTROL VALVE, MODULATING TYPE.
PROVIDE WITH ELECTRONIC ACTUATOR.
2-WAY CHARACTERIZED CONTROL VALVE, MODULATING TYPE.
PROVIDE WITH ELECTRONIC ACTUATOR.
2-WAY CHARACTERIZED CONTROL VALVE, MODULATING TYPE.
PROVIDE WITH ELECTRONIC ACTUATOR.
2-WAY CHARACTERIZED CONTROL VALVE, MODULATING TYPE.
PROVIDE WITH ELECTRONIC ACTUATOR.
2-WAY CHARACTERIZED CONTROL VALVE, MODULATING TYPE.
PROVIDE WITH ELECTRONIC ACTUATOR.
EV
1-12E
A 475 0.2 10 10 27 20 EXISTING TO REMAIN, REBALANCE TO LISTED CFMPHOENIX
THERIS
EV
1-14E
A 900 0.2 12 12 27 20 EXISTING TO REMAIN, REBALANCE TO LISTED CFMPHOENIX
THERIS
EV
1-11E
A 1700 0.2 14 14 27 20 EXISTING TO REMAIN, REBALANCE TO LISTED CFMPHOENIX
THERIS
54.73/4 11BELIMO AC-77 HEATING COILCCV-B217 2-WAY
CV
2-WAY CHARACTERIZED CONTROL VALVE, MODULATING TYPE.
PROVIDE WITH ELECTRONIC ACTUATOR.
FACTORY PROVIDED VFD'S. UNIT FURNISHED WITH INTERNAL VIBRATION ISOLATORS.
COOLING COIL WITH COPPER TUBE AND COPPER FINS. PROVIDE 16" TALL FACTORY
ROOF CURB.
100% CONSTRUCTION DOCUMENTS
4849 Ronson Court, Suite 200 San Diego, CA 92111 858.344.8900
10680 TREENA ST# 163 320 San Diego, CA 92123 858-368-8630 Fax 866-517-3293 www.dce-inc.net
PROVIDE SUPPORT AT EACH
END OF UNIT PER 1/M3.101
1 FACTORY PROVIDED 30% FILTER AND BACKDRAFT DAMPER. 2 PROVIDE SUPPORT AT EACH END OF UNIT PER 1/M3.101
1 2
AIR DISTRIBUTION SCHEDULE
REMARKSMAKE &
MODELTAG
STEEL MODULAR CORE DIFFUSER, ADJUSTABLE PATTERN. T-BAR LAY-IN OR HARD CEILING.
ROUND OR SQUARE NECK. SEE FLOOR PLANS FOR NECK SIZES. TYPICAL DIFFUSER UNLESS NOTED OTHERWISE.
ASMCD IS ALUMINUM FACE FOR TOILET AND CANOPY AREA.
STEEL RETURN REGISTER. 3/4" BLADE SPACING, 35° FIXED DEFLECTION. T-BAR LAY-IN OR HARD CEILING.
ROUND OR SQUARE NECK. SEE FLOOR PLANS FOR NECK SIZES. TYPICAL CEILING RETURN/EXHASUT
GRILLE, UNLESS NOTED OTHERWISE. ALUMINUM FACE FOR TOILET AND CANOPY AREA.
FACE
SIZE
TITUS - 350RL STEEL RETURN GRILLE, 3/4" BLADE SPACING, 35° FIXED DEFLECTION.
BLADES PARALLEL TO LONG DIMENSION. NO OPPOSED BLADE DAMPER. ALUMINUM FACE FOR OUTDOOR
AREA
TITUS - MCD
TITUS - PAR
24x24, 12x12
24X24, 12x12
AS INDICATED
ON PLANS
C
D
DIFFUSER NECK SIZE (SUPPLY)
EXHAUST
REGISTER
SUPPLY AIR
DIFFUSER
REGISTER
RETURN
AIRFLOW (CFM)
AIRFLOW (CFM)
AIRFLOW (CFM)
REGISTER NECK SIZE (RETURN)
REGISTER NECK SIZE (EXHAUST)
DIFFUSERS
SLOT & BAR
AIR DISTRIBUTION LEGEND
PLENUM NECK SIZE (SUPPLY/RETURN)
AIRFLOW (CFM)
B
A
MECHANICAL NOTE
ALL HVAC SYSTEM CONTROLS SHALL BE INTERFACED WITH THE EXISTING BUILDING AUTOMATION SYSTEM/CONTROLS (BAS/CONTROLS) JOHNSON METASYS CONTROLS, EXISTING DIRECT DIGITAL CONTROLS (DDC), AND NETWORK AUTOMATION ENGINE (NAE). HVAC SYSTEM GRAPHICS SHALL BE DEVELOPED AND INCORPORATED INTO EXISTING JOHNSON METASYS BAC. ALL HVAC SYSTEMS SHALL BE COMPATIBLE WITH
THE EXISTING BUILDING AUTOMATION CONTROLS.
TITUS - 300R STEEL SUPPLY GRILLE, 3/4" BLADE SPACING, 35° FIXED DEFLECTION.
BLADES PARALLEL TO LONG DIMENSION. NO OPPOSED BLADE DAMPER.
AS INDICATED
ON PLANS
100% CONSTRUCTION DOCUMENTS
4849 Ronson Court, Suite 200 San Diego, CA 92111 858.344.8900
10680 TREENA ST# 163 320 San Diego, CA 92123 858-368-8630 Fax 866-517-3293 www.dce-inc.net
1 RATED FOR INDOOR USE, 22 GA FILLED WITH GLASS FIBER.
SOUND ATTENUATOR SCHEDULE
UNIT NO. MANUFACTURER MODEL NO. SERVICE AIRFLOW
(C.F.M.)
DUCT
TYPE W H L
FACE
VELOCITY
(F.P.M.)
PD (in.
w.g.)
ATTENUATION IN OCTAVE BAND (dB) OPER. WT.
(LBS.) REMARKS
63 125 250 500 1000 2000 4000 8000 SA-1 IAC 5UGS AC-102 2,200 SUPPLY 24" 24" 60" 550 0.12" 6 11 24 44 46 45 38 23 158 1
UP
145 SF
LOUNGE
B114
173 SF
OFFICE,
TECHNICIAN
B114A
167 SF
OFFICE,
STAFF
B115
415 SF
CORRIDOR
B117
655 SF
LOBBY
B100
422 SF
LOBBY
B101
293 SF
OFFICE,
TECHNICIAN
B141
201 SF
OFFICE,
TECHNICIAN
B142
214 SF
LAB
B142A
144 SF
OFFICE,
TECHNICIAN
B142B
124 SF
OFFICE,
TECHNICIAN
B142D
294 SF
OFFICE,
TECHNICIAN
B142E
343 SF
LAB
B143
179 SF
LOUNGE
B144
122 SF
CORRIDOR
B141A
564 SF
LOCKER,
WOMEN'S
B144A
396 SF
TOILET,
FEMALE
B146
435 SF
OFFICE
B147
243 SF
LOCKER,
MEN'S
B148
188 SF
LOUNGE
B149
699 SF
LOCKER,
MEN'S
B149A
38 SF
MECHANICAL
ROOM
B149B
549 SF
PHARMACY
B145
265 SF
CORRIDOR
B140
364 SF
CONFERENCE
ROOM
B152
113 SF
OFFICE,
STAFF
B152A
106 SF
OFFICE,
STAFF
B152B
99 SF
OFFICE,
STAFF
B152C
150 SF
OFFICE,
STAFF
B152D
135 SF
OFFICE,
STAFF
B152E
105 SF
STORAGE,
WARD
SUPPLIES
B153
317 SF
CORRIDOR
B154
396 SF
OFFICE,
STAFF
B155
132 SF
OFFICE
B155A
114 SF
OFFICE, ASST.
CHIEF
B155B
257 SF
OFFICE, CHIEF
B155C
138 SF
CORRIDOR
B155E
1727 SF
STORAGE,
WARD
SUPPLIES
B156
360 SF
LAB
B156A
156 SF
STORAGE,
WARD
SUPPLIES
B157
STAIRWELL
B158
91 SF
OFFICE
B159B
90 SF
OFFICE
B159A
91 SF
OFFICE
B159
611 SF
CLOSET,
TELEPHONE
B165
152 SF
STORAGE,
EQUIPMENT
B165A
737 SF
MECHANICAL
ROOM
B166
670 SF
CLOSET,
TELEPHONE
B167 1051 SF
ELECTRICAL
ROOM
B231
645 SF
OFFICE,
TECHNICIAN
B232
474 SF
OFFICE,
TECHNICIAN
B233
222 SF
OFFICE,
TECHNICIAN
B234
183 SF
REFRIGERATOR,
WALK-IN
B235
689 SF
MORGUE
B236
61 SF
HOUSEKEEPING
AID CLOSET
B237
79 SF
CORRIDOR
B238
262 SF
CORRIDOR
B239
708 SF
CORRIDOR
B240
133 SF
OFFICE,
STAFF
B241
86 SF
TOILET, MALE
B242
86 SF
TOILET,
FEMALE
B243
191 SF
STORAGE,
GENERAL
B244
263 SF
MORGUE
B245
160 SF
CORRIDOR
B246
212 SF
OFFICE,
TECHNICIAN
B232A
187 SF
OFFICE,
TECHNICIAN
B232B
3133 SF
MECHANICAL
ROOM
B251
850 SF
CORRIDOR
B1211266 SF
CORRIDOR
B125
210 SF
STAIRWELL
SW9-B-1
198 SF
MECHANICAL
ROOM
B180
408 SF
CORRIDOR
B177B
1174 SF
CORRIDOR
B117B
3565 SF
STORAGE,
GENERAL
B177-1
140 SF
STORAGE,
GENERAL
B172
127 SF
STORAGE,
EQUIPMENT
B172B
130 SF
OFFICE
B171C
103 SF
B171D
384 SF
BUILDING
SERVICES
B171B
57 SF
JANITOR
100 SF
STORAGE,
GENERAL
B172D
116 SF
TOILET,
FEMALE
99 SF
TOILET, MALE
B173
184 SF
HALLWAY
B-SPS-28
136 SF
LOUNGE
B174A
92 SF
FEMALE
LOCKERS
B174B
97 SF
LOCKER,
MEN'S
B174C
98 SF
TOILET, MALE
156 53 SF
JANITOR
B174E
215 SF
ETO
B-SPS-13
165 SF
CART WASH
TRANSFER
131 SF
AUTOMATIC
CARTWASH
B171H
314 SF
STERILE
STORAGE
B171G
697 SF
STORAGE
AREA
228 SF
STORAGE,
EQUIPMENT
B102B
1923 SF
STORAGE,
GENERAL
B191K
286 SF
BREAK
B175
23 SF
CLOSET
78 SF
BREAK
1303 SF
SPS/O.R.
SUPPLY
B175
121 SF
STORAGE,
GENERAL
B196
109 SF
PET ELEV
S5-B-1
659 SF
UTILITY
ROOM,
SOILED
B194
190 SF
SHOP, A/C
B190A
347 SF
SHOP, A/C
B254
142 SF
SHOP, A/C
B253
122 SF
OFFICE,
TECHNICIAN
B252
641 SF
SHOP, ELEC.
B255
68 SF
TOILET,
FEMALE
B191B
70 SF
TOILET, MALE
B191A
102 SF
SHOP, PAINT
B189A
97 SF
CORRIDOR
B212A
517 SF
CORRIDOR
B191M
893 SF
CORRIDOR
B191R
488 SF
CORRIDOR
B212B
1746 SF
STORAGE,
GENERAL
141 SF
OFFICE
123 SF
OFFICE
1035 SF
STORAGE,
GENERAL
B191G
819 SF
STORAGE,
GENERAL
B191J
899 SF
STORAGE,
GENERAL
B191I
214 SF
STORAGE,
GENERAL
B191E
80 SF
STORAGE,
GENERAL
B191D
332 SF
BIOMED
ENGINEERING
B191P
109 SF
OFFICE
B215B
107 SF
UTILITY
ROOM, CLEAN
B223A
1567 SF
STAGING
AREA
B223C
232 SF
OFFICE,
TECHNICIAN
B218
197 SF
STORAGE,
GENERAL
B220
235 SF
OFFICE,
TECHNICIAN
B223B
251 SF
UTILITY
ROOM,
SOILED
B224
159 SF
OFFICE,
TECHNICIAN
B230
144 SF
TOILET, MALE
B222
650 SF
UTILITY
ROOM,
SOILED
B216
283 SF
UTILITY
ROOM,
SOILED
B217A
536 SF
OFFICE,
STAFF
B172C
1035 SF
STORAGE,
EQUIPMENT
B217
53 SF
CLOSET,
TELEPHONE
B217B
70 SF
MECHANICAL
ROOM
B217C
1033 SF
OFFICE
B213
138 SF
OFFICE,
TECHNICIAN
B211
136 SF
OFFICE
B214
278 SF
MECHANICAL
ROOM
B210C
136 SF
OFFICE,
TECHNICIAN
B210A
20 SF
MECHANICAL
ROOM
B210B
831 SF
SHOP,
CARPENTER
B210
744 SF
SHOP, ELEC.
B198
87 SF
OFFICE,
STAFF
B198A
658 SF
SHOP, PAINT
B189
237 SF
OFFICE,
TECHNICIAN
B205
158 SF
OFFICE,
TECHNICIAN
B206
86 SF
STORAGE,
GENERAL
B189B
227 SF
OFFICE,
TECHNICIAN
B202
405 SF
OFFICE
B201
68 SF
STORAGE,
GENERAL
B201A
87 SF
STORAGE,
GENERAL
B201B
57 SF
STORAGE,
EQUIPMENT
B200A
202 SF
MECHANICAL
ROOM
B140A
165 SF
KITCHEN,
MISC.
B182
403 SF
KITCHEN,
MISC.
B184
239 SF
KITCHEN,
MISC.
B186
69 SF
UTILITY
ROOM,
SOILED
B187
175 SF
OFFICE,
STAFF
B127
161 SF
OFFICE
B126D
30 SF
UTILITY ROOM
SOILED
B120
225 SF
288 SF
OFFICE
B162
68 SF
CORRIDOR
B232C
260 SF
ELEVATORS
268 SF
KITCHEN,
MISC.
B183
911 SF
OFFICE,
STAFF
B110
287 SF
REFRIGERATOR,
WALK-IN
B137
249 SF
REFRIGERATOR,
WALK-IN
B138
373 SF
REFRIGERATOR,
WALK-IN
B181
230 SF
REFRIGERATOR,
WALK-IN
B136
160 SF
OFFICE,
STAFF
B129
150 SF
OFFICE,
STAFF
B130
47 SF
STORAGE,
GENERAL
B219
293 SF
STAIRWELL
SW6-B-1
267 SF
CORRIDOR
B212B
160 SF
DIETETICS
RESIDENTS
B115A
457 SF
OFFICE,
TECHNICIAN
B247
240 SF
OFFICE,
STAFF
B160
49 SF
CORRIDOR
B154
280 SF
CORRIDOR
135 SF
LOCKER,
MEN'S
B172E
383 SF
CORRIDOR
B174
413 SF
STORAGE,
FILE ROOM
B134
112 SF
IT
B135
108 SF
TOILET,
FEMALE
B133
95 SF
TOILET, MALE
B125A
154 SF
CORRIDOR
B125C
116 SF
OFFICE,
TECHNICIAN
B132
117 SF
OFFICE
B126C
87 SF
OFFICE
B126B
115 SF
OFFICE,
STAFF
B126A
176 SF
OFFICE,
STAFF
B131
124 SF
OFFICE
B127A
408 SF
CLASS ROOM
B126
180 SF
CLINICAL
NUTRITION
MANAGER
B128A
222 SF
OFFICE
B128C
30 SF
CLOSET
39 SF
STORAGE,
GENERAL
B195B
1321 SF
CORRIDOR
131 SF
TOILET,
CONGREGATE
B104
296 SF
UTILITY
ROOM,
SOILED
B102A
76 SF
DRESSING
ROOM
B144B
538 SF
MECHANICAL
ROOM
B200
1400 SF
OFFICE
B215
36 SF
CLOSET
793 SF
ELECTRICAL
B118
386 SF
EQUIPMENT
STORAGE
B128B
69 SF
B190E
293 SF
STAIRWELL
SW7-B-1
293 SF
STAIRWELL
SW8-B-1
6670 SF
KITCHEN,
DIETETICS
B128
148 SF
B229
97 SF
STAIRWELL
SW13-B-1
148 SF
EMS BREAK
B108C
497 SF
STORAGE,
EQUIPMENT
B108A/B
49 SF
MECHANICAL
ROOM
B108
229 SF
ENGINEERING/IT
B-SPS-48
463 SF
CORRIDOR
B224A
923 SF
CORRIDOR
B212
339 SF
CORRIDOR
B225
935 SF
CORRIDOR
B109
50 SF
HAC
B135A
293 SF
STAIRWELL
SW1-B-1
144 SF
OFFICE
B128D
418 SF
UTILITY
ROOM,
SOILED
B102
92 SF
ELEVATOR
S3
96 SF
ELEVATOR
S1
2398 SF
STERILE
STORAGE
CART
HOLDING
AREA
B172C
489 SF
STORAGE
1298 SF
STORAGE,
GENERAL
B191F
2636 SF
TEXTILE CARE
UNIT
B223
234 SF
KITCHEN,
MISC.
B183A
237 SF
KITCHEN,
MISC.
B185
998 SF
UTILITY
ROOM,
SOILED
B122397 SF
KITCHEN MISC
B123
490 SF
CART WASH
B119
115 SF
OFFICE,
STAFF
B249
30 SF
CLOSET,
TELEPHONE
B230A
88 SF
ELEVATOR
S2
92 SF
ELEVATOR
S4
2353 SF
STORAGE,
EQUIPMENT
B191
102 SF
STORAGE,
GENERAL
B195C
61 SF
UTILITY
ROOM, CLEAN
B223D
104 SF
FIRE PUMP
889 SF
SHOP, A/C
B190
99 SF
TOILET,
FEMALE
B-SPS-9
199 SF
BB191M
107 SF
STORAGE
KITCHEN
EQUIPMENT
S
R
Q.1
Q
P
O.1
O
N.7
N.6
N.5
N.4
N.2
N
M
L.1
L
K
J.4
J.5
J.1
J
H
1 2 2.1 3' 3.1 3.2 4 4.2 5 5.1 6 7 7.1 8 9 9.1 9.5 9.4 10 11 11.1 12 13 13.3 14 14.1 15 15.1 15.3 16 16.116.3 17 18
T
T
T T
T
T
T
T
T
T
T T
T
T
T
T
THERMOSTAT FOR
ZONE TEMPERATURE
CONTROL (TYP.)
DESIGNATES AREA COVERED
WITHIN TEMPERATURE
CONTROL ZONE (TYP.)
T
T
T
T
TCAV-1
CAV-2
CAV-3
CAV-8
CAV-18A
CAV-18B
CAV-5
CAV-7
CAV-4
CAV-9
CAV-20
CAV-22
CAV-10 CAV-11 CAV-12 CAV-13
CAV-14E CAV-15A
CAV-15B
CAV-16E
CAV-19E
CAV-23
T
CAV-6
CAV-18C
T
FOR ENLARGED VIEW
SEE SHEET 1/M110
KEY NOTESGENERAL NOTES
1. -
100% CONSTRUCTION DOCUMENTS
4849 Ronson Court, Suite 200 San Diego, CA 92111 858.344.8900
10680 TREENA ST# 163 320 San Diego, CA 92123
PHASE 1 SCOPE
BOUNDARY
389 SF
SPD
RECEIVING
408 SF
CORRIDOR
B177B
340 SF
STORAGE,
GENERAL
B177C
1174 SF
CORRIDOR
B117B
127 SF
STORAGE,
EQUIPMENT
B172B
RECEIVING
ISSUE
EQUIPMENT PREP, AND STAGING
STORAGE
BULK STORAGE
SHRINKING
WRAPPER
UNIT ITEM STORAGE
BREAKDOWN
WALL OPENINGS AS
HIGH AS POSSIBLE
BELOW TRUSSES
50x28 OSA
30x30
30x30 66x18 RA
30x30
EF
x3
R
A x2
SA
62x14 UP
TO AC-104
62x14 UP
TO AC-104
66x18 UP
TO AC-103
(TYP. 2)
52x32 UP
TO AC-103
100 CFM-E
165 CFM-S
(E ) 6
0X
-E
(E ) 5
0X
-E
XH
120X28
,5
C
FM
EX
H
(E
9, CF
M
EX
H
(E
F.D.
42 120 78X19
7, CF
M
EX
H
(E
78X16
165 CFM-E
13X6
6X 6-
T.
R.
165 CFM-S
CF
M
-S
F.D.
8X6
F.D.
8X6-B.R.
100 CFM-E
(E)(GX-1)
(E)(X-1)
S.F.D.
225 CFM-S
(E) FC-1
(E) HP-1
(E) VFD-1
(X-9)
(E) EXHAUST FAN
2 2.1 3' 3.1 3.2 4 4.2 5 5.1 6 7 7.1 8
SD SD
30x30 OSA
CAP
500 CFM
16x16
S
R
Q.1
Q
P
O.1
KEY NOTESGENERAL NOTES
1. DUCT SIZE FROM MAIN SUPPLY DUCT TO TERMINAL BOX INLET SHALL BE ROUND
SHEET METAL THE SAME SIZE AS THE BOX INLET UNLESS OVERALL LENGTH OF DUCT
IS MORE THAN 5 FEET. IN THAT CASE, ONE SIZE LARGER DUCT AND A REDUCER AT
THE TERMINAL BOX SHALL BE INSTALLED.
2. DUCT CONNECTION FROM TERMINAL BOX SUPPLY AIR PLENUM TO DIFFUSER SHALL
BE INSULATED FLEXIBLE DUCT MAX LENGTH OF 7 FEET. IF DISTANCE EXCEEDS 7
FEET, USE INSULATED ROUND SHEET METAL DUCT TO WITHIN 5 FEET OF DIFFUSER
THEN INSULATED FLEXIBLE DUCT TO DIFFUSER.
3. PROVIDE VOLUME DAMPER AT TAKE OFF FROM SUPPLY AND EXHAUST AIR MAINS
(TYPICAL).
4. REFER TO SHEET METAL DETAILS ON DETAIL SHEETS FOR METHOD OF BRANCH
DUCT TAKE-OFF FROM MAIN DUCT.
5. OUTLET DUCT SIZE ON TERMINAL BOX AS SHOWN MAY BE DIFFERENT THAN BOX
OUTLET. PROVIDE TRANSITION AS REQUIRED.
6. SEISMIC BRACING AND RESTRAINT/SUPPORTS ARE REQUIRED PER SPECIFICATION
SECTION 13 05 41.
7. ALL DUCTWORK IN SCOPE AND CONNECTED TO SYSTEM WILL BE CLEANED PER
SPECIFICATION SECTION 23 01 30 52.
1 FURNISH FLEXIBLE DUCT CONNECTOR WITH 4" TOTAL MOVEMENT, VERIFY WITH STRUCTURAL
PLAN FOR REQUIRED SEISMIC MOVEMENT. REFER TO 9/M3.101 FOR MOUNTING DETAIL.
EXISTING TO REMAIN
EXISTING TO BE MODIFIED, REFER TO PHASE 7 PLAN
EXISTING TO BE REMOVED, REFER TO PHASE 6 PLAN
EXISTING TO BE REMOVED, REFER TO PHASE 5 PLAN
LOCATION OF PUSH BUTTON DEVICE (VA TO VERIFY) WITH MOTORIZED DAMPER. SEE AHU
CONTROL DIAGRAM.
120"x42" OUTDOOR OSA INLET WITH BIRDSCREEN
MECHANICAL / CONTROLS CONTRACTOR TO PROVIDE NEMA-3R PUSH BUTTON FOR
AC-103/AC-104 TO OVERRIDE AND SHUTDOWN OUTSIDE AIR INTAKE DURING GREASE
INTERCEPTOR CLEANING.
REFER TO 8/M3.101 FOR MOUNTING DETAIL.
MOTORIZED DAMPER, REFER TO KEY NOTE 6.
PROVIDE FIRE DAMPER IN DUCT THRU 2-HR RATED WALL. REFER TO DAMPER DETAIL
5/M3.100.
1/8" = 1'-0" 01PHASE 1 BASEMENT MECHANICAL DUCTWORK PLAN
PHASING NOTES
PHASE BOUNDARY LINES ARE SHOWN ON LIMITS OF
THE ARCHITECTURAL SCOPE OF WORK. PLANS
IDENTIFY WORK THAT MUST BE CONDUCTED THIS
PHASE AND WORK OUTSIDE THE ARCHITECTURALLY
DEFINED PHASING AREA MUST BE COORDINATED WITH
OWNER AND CONSTRUCTION TEAM TO COMPLETE
WORK REQUIRED IN EACH PHASE.
100% CONSTRUCTION DOCUMENTS
4849 Ronson Court, Suite 200 San Diego, CA 92111 858.344.8900
10680 TREENA ST# 163 320 San Diego, CA 92123 858-368-8630 Fax 866-517-3293 www.dce-inc.net
3043 SF
STORAGE,
GENERAL
B177E
404 SF
STORAGE,
GENERAL
B177D
210 SF
STAIRWELL
SW9-B-1
198 SF
MECHANICAL
ROOM
B180
428 SF
OFFICE
B176
105 SF
TOILET, MALE
B176A
109 SF
TOILET,
FEMALE
B176B
160 SF
CORRIDOR
B117P
408 SF
CORRIDOR
B177B
1174 SF
CORRIDOR
B117B
556 SF
CORRIDOR
B177M
1575 SF
CORRIDOR
B177A
334 SF
STORAGE
B177N
3565 SF
STORAGE,
GENERAL
B177-1
1793 SF
IT SERVICE
CENTER
OFFICE
B1000
75 SF
STAIR
SW11-B-1
STORAGE,
EQUIPMENT
STORAGE,
KITCHEN
EQUIPMENT
CHWR
HH
W
S
HH
W R
2" MPS
1 1/2" MPS
3" CHWS
3" CHWR
2" RHWR
2" RHWS
3" CHWS
3" CHWR
3" CHWS
3" CHWR
2" CHWS
2" CHWR
2 1/2" CHWS/CHWR
CAP
REFER TO PARTIAL PLAN ON
THIS SHEET FOR PIPING
FROM EXISTING RISER 2
2 2.1 3' 3.1 3.2 4 4.2 5 5.1 6 7 7.1 8
1" HHWS
1" HHWR
1" HHWS
1" HHWR
1" HHWS/HHWR
1" HHWS
1" HHWR
PHASE 3 SCOPE
BOUNDARY
S
R
Q.1
Q
P
O.1
O N.7
N.6
N.5
N.4
287 SF
REFRIGERATOR,
WALK-IN
B137
249 SF
REFRIGERATOR,
WALK-IN
B138
230 SF
REFRIGERATOR,
WALK-IN
B136
STORAGE,
FILE ROOM
B134
112 SF
IT
B135
50 SF
HAC
B135A
293 SF
STAIRWELL
SW1-B-1
4"4"
3" CHWS
3" CHWR
2" RHWR
2" RHWS
(E) RISER 2
1" HHWS
1" HHWR
2 2.1 3' 3.1 3.2 4
M
L.1
L
K
KEY NOTESGENERAL NOTES
1. PLAN SHOWS THE EXISTING HVAC PIPING IS APPROXIMATE LAYOUT OF EXISTING
BUILDING AND IS NOT INTENDED TO REPRESENTED "AS-BUILT" CONDITIONS,
CONTRACTOR SHALL VISIT SITE AND BECOME FAMILIAR WITH ACTUAL CONDITIONS
WHEN BIDDING THE WORK.
2. PRIOR TO ANY WORK, INCLUDING DEMO AND NEW, CONTRACTOR MUST FIELD
VERIFY ALL EXISTING MECHANICAL WORK LOCATED IN THE SPACE WITH OTHER
TRADES WHICH MAY AFFECT THE SPACES, SINCE THE EXISTING CONDITIONS OF THE
INTERSTITIAL SPACE, THE ROUTING OF NEW PIPING WILL BE FOLLOWED THE SAME
AS THE EXISTING.
3. THE OWNER MUST BE NOTIFIED PRIOR TO SHUTDOWN OF ANY MECHANICAL HVAC
WATER SYSTEMS, INCLUDING HEATING HOT WATER LOOP AND REHEAT HOT WATER
LOOP.
4. EXISTING PIPING, VALVES, CONTROLS SHOWN TO REMAIN SHALL BE PROTECTED
DURING CONSTRUCTION, DAMAGE TO EXISTING CONSTRUCTION SHOWN TO REMAIN
SHALL BE RESTORED TO MATCH PRE-DAMAGED CONDITION.
5. PROVIDE 2-WAY CONTROL VALVE FOR TERMINAL BOX REHEAT WATER PIPING
CONNECTION, REFER TO PIPING DIAGRAM 10/M501, UNLESS NOTED OTHERWISE.
6. PROVIDE MINIMUM 3/4" BRANCH PIPE TO REHEAT COIL CONNECTION ON TERMINAL
BOX (TYPICAL), UNLESS NOTED OTHERWISE.
7. REFER TO DETAIL 10/M501 FOR TYPICAL REHEAT COIL PIPING
8. SEISMIC BRACING AND RESTRAINT/SUPPORTS ARE REQUIRED PER SPECIFICATION
SECTION 13 05 41
1 RUN 3" CHWS/R, 1" HHWS/R, AND 2" RHWS/R FROM EXISTING RISER #2.
2-1/2" CHWS/R UP THROUGH ROOF TO AC-103.REFER TO 10/M3.101 FOR PIPE THROUGH ROOF DETAIL.
2" CHWS/R UP THROUGH ROOF TO AC-104.REFER TO 10/M3.101 FOR PIPE THROUGH ROOF DETAIL.
1" HHWS/R UP THROUGH ROOF TO AC-103.REFER TO 10/M3.101 FOR PIPE THROUGH ROOF DETAIL.
HOT TAPPING AS NEEDED FOR NEW PIPE CONNECTIONS.
1/8" = 1'-0" 01PHASE 1 BASEMENT MECHANICAL PIPING PLAN
1/4" = 1'-0" 02PHASE 1 BASEMENT MECHANICAL PIPING PLAN
PHASING NOTES
PHASE BOUNDARY LINES ARE SHOWN ON LIMITS OF
THE ARCHITECTURAL SCOPE OF WORK. PLANS
IDENTIFY WORK THAT MUST BE CONDUCTED THIS
PHASE AND WORK OUTSIDE THE ARCHITECTURALLY
DEFINED PHASING AREA MUST BE COORDINATED WITH
OWNER AND CONSTRUCTION TEAM TO COMPLETE
WORK REQUIRED IN EACH PHASE.
100% CONSTRUCTION DOCUMENTS
4849 Ronson Court, Suite 200 San Diego, CA 92111 858.344.8900
10680 TREENA ST# 163 320 San Diego, CA 92123
UPDN
VOID
010-1-1
AC
66x18 RA
66x18 SA
52x32 OA
REQUIRED UNIT
CLEARANCES (TYP.)
AC
62x14 RA
62x14 SA
2 1/2" CHWS/CHWR
2" CHWS/CHWR
S
R
Q.1
Q
P
O.1
1 2 2.1 3' 3.1 3.2 4 4.2 5 5.1 6 7 7.1 8 9 9.1
2 1/2" CHWS/CHWR
1" HHWS/HHWR
KEY NOTESGENERAL NOTES
1 2-1/2" CHWS/R DOWN THROUGH ROOF TO BASEMENT. REFER TO 10/M3.101 FOR PIPE THROUGH ROOF DETAIL.
1" HHWS/R DOWN THROUGH ROOF TO BASEMENT. REFER TO 10/M3.101 FOR PIPE THROUGH ROOF DETAIL.
2" CHWS/R DOWN THROUGH ROOF TO BASEMENT. REFER TO 10/M3.101 FOR PIPE THROUGH ROOF DETAIL.
REFER TO 7/M3.101 FOR AHU MOUNTING DETAIL.
REFER TO ARCHITECTURAL PLANS FOR ACCESS TO MECHANICAL SPACE.
REFER TO PLUMBING PLANS FOR CONDENSATE LINES FROM AHUS.
1. MAINTAIN REQUIRED CLEARANCE FOR SERVICE AREAS PER AHU MANUFACTURER
DIRECTIONS.
2. SEISMIC BRACING AND RESTRAINT/SUPPORTS ARE REQUIRED PER SPECIFICATION
SECTION 13 05 41.
3. ALL DUCTWORK IN SCOPE AND CONNECTED TO SYSTEM WILL BE CLEANED PER
SPECIFICATION SECTION 23 01 30 52.
1/8" = 1'-0" 01PHASE 1 FIRST FLOOR MECHANICAL PLAN
PHASING NOTES
PHASE BOUNDARY LINES ARE SHOWN ON LIMITS OF
THE ARCHITECTURAL SCOPE OF WORK. PLANS
IDENTIFY WORK THAT MUST BE CONDUCTED THIS
PHASE AND WORK OUTSIDE THE ARCHITECTURALLY
DEFINED PHASING AREA MUST BE COORDINATED WITH
OWNER AND CONSTRUCTION TEAM TO COMPLETE
WORK REQUIRED IN EACH PHASE.
100% CONSTRUCTION DOCUMENTS
4849 Ronson Court, Suite 200 San Diego, CA 92111 858.344.8900
10680 TREENA ST# 163 320 San Diego, CA 92123 858-368-8630 Fax 866-517-3293 www.dce-inc.net
PHASE 3 SCOPE
BOUNDARY
1174 SF
CORRIDOR
B117B
140 SF
STORAGE,
GENERAL
B172
127 SF
STORAGE,
EQUIPMENT
B172B
130 SF
OFFICE
B171C
103 SF
B171D
384 SF
BUILDING
SERVICES
B171B
57 SF
JANITOR
100 SF
STORAGE,
GENERAL
B172D
116 SF
TOILET,
FEMALE
99 SF
TOILET, MALE
B173
184 SF
HALLWAY
B-SPS-28
136 SF
LOUNGE
B174A
92 SF
FEMALE
LOCKERS
B174B
97 SF
LOCKER,
MEN'S
B174C
98 SF
TOILET, MALE
156 53 SF
JANITOR
B174E
215 SF
ETO
B-SPS-13
165 SF
CART WASH
TRANSFER
131 SF
AUTOMATIC
CARTWASH
B171H
1923 SF
STORAGE,
GENERAL
B191K
286 SF
BREAK
B175
23 SF
CLOSET
78 SF
BREAK
1303 SF
SPS/O.R.
SUPPLY
B175
121 SF
STORAGE,
GENERAL
B196
109 SF
PET ELEV
S5-B-1
STORAGE,
GENERAL
280 SF
CORRIDOR
135 SF
LOCKER,
MEN'S
B172E
383 SF
CORRIDOR
B174
30 SF
CLOSET
1321 SF
CORRIDOR
36 SF
CLOSET
293 SF
STAIRWELL
SW7-B-1
293 SF
STAIRWELL
SW8-B-1
2398 SF
STERILE
STORAGE
CART
HOLDING
AREA
B172C
102 SF
STORAGE,
GENERAL
B195C
99 SF
TOILET,
FEMALE
B-SPS-9
99 SF
TOILET,
FEMALE
B-SPS-9
102 SF
STORAGE,
GENERAL
B195C
223 SF
STORAGE,
GENERAL
B173
2398 SF
STERILE
STORAGE
CART
HOLDING
AREA
B172C
293 SF
STAIRWELL
SW8-B-1 293 SF
STAIRWELL
SW7-B-1
36 SF
CLOSET
1321 SF
CORRIDOR
30 SF
CLOSET
383 SF
CORRIDOR
B174
135 SF
LOCKER,
MEN'S
B172E
280 SF
CORRIDOR
STORAGE,
GENERAL
109 SF
PET ELEV
S5-B-1
121 SF
STORAGE,
GENERAL
B1961303 SF
SPS/O.R.
SUPPLY
B175
78 SF
BREAK
23 SF
CLOSET
286 SF
BREAK
B175
227 SF
SPS
EDUCATION
HUB
B173C
135 SF
SPS
SUPERVISOR
B173B
1923 SF
STORAGE,
GENERAL
B191K
131 SF
AUTOMATIC
CARTWASH
B171H
165 SF
CART WASH
TRANSFER
215 SF
ETO
B-SPS-13
53 SF
JANITOR
B174E
98 SF
TOILET, MALE
97 SF
LOCKER,
MEN'S
B174C
92 SF
FEMALE
LOCKERS
B174B136 SF
LOUNGE
B174A
184 SF
HALLWAY
B-SPS-28
99 SF
TOILET, MALE
B173
116 SF
TOILET,
FEMALE
100 SF
STORAGE,
GENERAL
B172D
57 SF
JANITOR
384 SF
BUILDING
SERVICES
B171B
103 SF
B171D
130 SF
OFFICE
B171C
127 SF
STORAGE,
EQUIPMENT
B172B
140 SF
STORAGE,
GENERAL
B172
223 SF
OFFICE
B171A
178 SF
OFFICE,
STAFF
B171
1174 SF
CORRIDOR
B117B
340 SF
STORAGE,
GENERAL
B177C
225 CFM-E
100 CFM-E
165 CFM-S
(E ) 5
2X
(E ) 5
2X
(E ) E
F-
F.
D.165 CFM-E
12X10-T.R.
225 CFM-E
13X6 6X
6- T.
R.
165 CFM-S
CF
M
-S
F.D.
8X6
8X6
8X6-B.R.
100 CFM-E
5X
-D N
F.D.
X5
-E (E
) 5 6X
(E
) 5 6X
32X13-EXH
F.D.
2, CF
M -E
XH
X1
8- B.
R.
6"
6X12-EXH, DN
F.D.
12X6-EXH.
200 CFM-EXH
10X10-B.R. +6"
12X6-EXH
F.D.
12X12-T.R.
200 CFM-R
(BOTH SIDES)
(X-2) x1
8- E
SFDSFD
32X13-E. DN.
RH
W
R
RH
W S
(E)GX-109
S.F.D.
225 CFM-S
(E) EF-1 DISCHARGE
OUTLET
8 9 9.1 9.5 9.4 10 11
R
Q.1
Q
P
O.1
O N.7
N.6
N.5
N.4
N.2
KEY NOTESGENERAL NOTES
1. DEMOLITION PLAN SHOWS APPROXIMATE LAYOUT OF EXISTING BUILDING AND IS
NOT INTENDED TO REPRESENT "AS-BUILT" CONDITIONS, FOLLOW PROCEDURES
OUTLINED IN SPECIFICATIONS FOR REQUIREMENTS TO VISIT SITE AND OTHERWISE
BECOME FAMILIAR WITH ACTUAL CONDITIONS WHEN BIDDING THE WORK.
2. PRIOR TO ANY DEMOLITION WORK CONTRACTOR MUST FIELD VERIFY ALL EXISTING
MECHANICAL WORK LOCATED IN THE SPACE WHICH AFFECTS THE SPACES. THE
OWNER MUST BE NOTIFIED PRIOR TO SHUTDOWN OF ANY MECHANICAL SYSTEMS.
3. DUCTS, PIPES, AIR DIFFUSERS, TERMINAL UNITS, AND HVAC EQUIPMENT AND OTHER
ITEMS TO BE REMOVED ARE SHOWN HATCHED.
4. EXISTING CONSTRUCTION SHOWN TO REMAIN INCLUDING BUT NOT LIMITED TO
DUCTS, PIPES, DIFFUSERS, ETC.
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .