01010 - 1

SUMMARY OF WORK

SECTION 01010

SUMMARY OF WORK

PART 1 - GENERAL

1.1 LOCATION

A. East Ash Fence: Access to the project location can be obtained off East Ash Road. The fence will run along the east side of the road providing easy access and will cross through Sections 21 & 28 of T31N; R50W of Dawes County Nebraska.

B. Chadron Creek Fence: Access to the project location can be obtained off Broken Plow Road. The fence replacement will remain in the same location as the old fence and will mostly run along the road providing easy access. The fence will cross through Sections 1 & 12 of T31N; R49W of Dawes County Nebraska.

C. Bordeaux Creek Fence: Access to the project location can be obtained off FS Road #723. The fence will run along the west side of the road and remain on the east side of the creek, providing easy access. The fence will cross through Sections 26 & 27 of T32N; R48W of Dawes County Nebraska.

1.2 SUMMARY

A. The contractor is responsible for checking the measurement of the line and bringing up any significant difference between the measurement in this contract and what they measured.

B. Work for this project consists of a contractor supplying labor and materials for the construction of a new fence as specified and described below, plus the removal of existing fences as described. The Forest Service shall flag new fence locations:

1. East Ash Fence Construction – the fence construction will begin at the cattle guard on the north end of the fence (refer to the attached map). The fence will run SE for approximately 6,500-ft. There are existing H-braces that will be replaced to meet the specifications on the attached fence drawings.

2. Chadron Creek Fence Construction –this fence will replace the existing fence line and will be built on-line with the existing fence. The fence construction will begin at the NW end of the fence (refer to the attached map) starting at an existing fenceline and head east for approximately 500-ft. This section of fence may be difficult to access. The fence will then run SW for about 3,000-ft. There are existing t-posts and wire from the original fence, all old fence material will be removed by the contractor and thereafter become the property of the contractor to dispose of.

3. Bordeaux Creek Fence Construction – the fence construction will begin at the S end of the fence (refer to the attached map) starting adjacent to the road and vertically above an existing fenceline that runs east to west. The new fenceline will head N and slightly E for approximately 550-ft, along a flat top and through a small drainage, adjacent to the road. In this section, the old fence runs parallel (to the W) and will be removed by the contractor. From the small drainage, the new fence will

01010 - 2 then head W for approximately 215-ft and then NE for approximately 875-ft. This section of fence will be similar to the old fenceline. All existing posts and wire will be removed by the contractor. This section of fence should be relatively easy to access and install. The last section of new fence crosses a steep drainage and heads NW for approximaly 700-ft; portions of this fence may require installing by hand. In this section, the existing fence runs parallel (to the W) and will be removed by the contractor and thereafter become the property of the contractor to dispose of.

C. Work Specifications are listed below (also refer to the attaching drawings and specification sheets).

1. Fence Type: The fence will be wildlife friendly with the following specifications:

a. 3-Wire Fence.

b. Smooth bottom wire spaced 16" above the ground.

c. The middle wire will be barbed and spaced 10" above the bottom wire.

d. The top wire will be barbed and spaced 12" above the middle wire or will be spaced at a maximum of 38" in height.

2. Post Spacing: Posts will be spaced 16' apart.

3. Wire: The wire will be double stranded and a minimum of 12.5G.

4. Barbs: Barbs on wire will be 2-point 14G and will be spaced 4-6” apart.

5. Post Ratio: There will be a maximum of 3 steel t-posts to every wood post.

Unless topography will only allow for steel t-posts which will require the approval of the Contracting Officer (CO).

6. Post Depth: The steel t-posts will be buried at a minimum of 1.5' deep, the wood posts will be buried at a minimum of 2' deep, and corner, gate, and brace posts will be buried a minimum of 3' deep.

7. Line Posts: A minimum of 3”x6’ pressure treated wood posts will be used. A minimum of 5.5’ t-posts with an anchor will be used.

8. Brace Posts: H-Braces material will be 2 3/8" steel pipe with a 0.125" wall thickness and sealed top or a substitute of 5"x7’ pressure treated wood posts can be used. H-Brace materials will be 7' long (or as approved by the contracting officer).

9. Horizontal Brace Material: H-Braces will be a minimum of 7’ in length. The horizontal brace material will be 2 3/8" steel pipe with a 0.125" wall thickness.

10. Number of Braces: Braces are required at every corner, gate, and angle change greater than 15 degrees. Braces should be installed every 1,320-ft intervals or closer if required by industry standard construction.

11. Brace Wire: The #9 smooth wire around H-Braces will be double wrapped at a minimum and attached to the steel brace posts using industry standard for this type of application.

12. Staples & Clips: Fence staples will be a minimum of 1.5" and 9G steel and manufacturer fence clips or 12G wire can be used for steel t-posts.

13. Wire Stays: Wire stays shall be galvanized, twisted wire of a size and thickness that is industry standard for this type of application.

New Gate Construction

1. New gate construction shall be as specified and as shown on the Drawings. Each gate will be installed with a wood post gate stick. The type and style of gate closer

01010 - 3 shall be as shown on the Drawings and/or approved by the Forest Service. The gate closer shall be considered incidental to the cost of building the gate.

a. Refer to the attached maps for the locations of each gate. The Forest Service shall approve the locations of the new installed gates.

b. East Ash Fence: four gates will be installed along the fence line.

c. Chadron Creek Fence: three gates will be installed along the fence line.

d. Big Bordeaux Fence: one gate will be installed at the N end, along the fenceline; a second gate will be installed at the S end, along an existing fenceline running east to west.

2.2 GENERAL SITE CONDITIONS

A. East Ash Fence: Access to the project location can be obtained off East Ash Road.

The fence will run along the east side of the road providing easy access and will cross through Sections 21 & 28 of T31N; R50W of Dawes County, Nebraska. Elevation along the fence ranges from 4050-4100-ft. The new fence wii be mainly located in open and even terrain. Some portions of the new fence will be built through timber, deadfall, and drainages. Clearing of deadfall may be necessary in portions of the the fence and may be built through some steep drainages and up to cliff edges.

Vehicle/equipment access to some of the south portions of the new fence may be limited.

B. Chadron Creek Fence: Access to the project location can be obtained off Broken Plow Road. The fence will run along the west side of the road providing easy access and will cross through Sections 1 & 12 of T31N; R49W of Dawes County, Nebraska.

Elevation along the fence ranges from 3900-4100-ft. The new fence is mainly located in open and even terrain. Some portions of the new fence will be built through timber, deadfall, and drainages. Clearing of deadfall away from the fence line to the west will be necessary in portions of the the fence. The new fence may have be built through some steep drainages. Vehicle and equipment access to some of the north portions of the fence may be limited.

C. Big Bordeaux Fence: Access to the project location can be obtained off FS Road #723. The new fence will run along the west side of the road and remain on the east side of the creek, providing easy access. The new fence will cross through Sections 26 & 27 of T32N; R48W of Dawes County Nebraska. Elevation along the fence ranges from 3800-3850-ft. The new fence is mainly located in open and even terrain. Some portions of the new fence will be built through timber, deadfall, and drainages.

Clearing of deadfall away from the new fence line will be necessary in portions of the the fence. The new fence may have be built through some steep drainages. Vehicle and equipment access to some portions of the fnew ence may be limited.

2.3 GOVERNMENT SUPPLIED MATERIALS

A. No supplies will be provided by the US Forest Service.

01010 - 4

2.4 USE OF PREMISES

A. General: Contractor shall have full use of premises for construction operations, including the use of the project site during the allotted construction period. The contractor's use of the premises is limited only by the Government's right to perform work within the area.

B. Confine storage of materials at the project site to areas as approved by the Contracting Officer (CO).

C. Preservation of Natural Features: Confines all operations to work limits of the project.

1. Do not remove, injure, or destroy trees or other plants without prior approval.

Consult with CO and remove agreed-on roots, branches, and other vegetative mateials that interfere with construction.

2. Do not fasten ropes, cables, or guys to existing trees.

D. Existing Utilities: Notify the Nebraska Diggers Hotline of the location and times for post digging.

1. The contractor shall be responsible for locating and preventing damage to known utilities. If damage occurs, repair the utility at no additional expense to the Government.

2. If any utilities are found and would interfer with fence construction, notify the CO immediately.

2.5 MEALS AND LODGING

A. Meals and lodging are commercially available in the City of Chadron or the City of Crawford within 25 miles of the construction site. Meals or lodging will not be available at Forest Service facilities.

2.6 CAMPING

A. With approval by the Pine Ridge Ranger District, National Forest Service lands may be used by the Contractor to have one, fully contained recreation vehicle which may remain at the site for security.

2.7 CONSTRUCTION SEQUENCE

A. There is no specified construction sequence or season for this project.

B. Depending on conditions, normal fire restrictions may apply to activities associated with this project.

2.8 FIELD VERIFICATION

A. Field verify all new and existing dimensions affecting the work of this contract before ordering products.

01010 - 5

PART 2 – PRODUCTS

2.9 PRODUCT SPECIFICATIONS

A. See required product specifications in Part 1; 1.2; B. Also refer to the attached specification sheet.

B. All materials shall be new and free of damage.

PART 3 - EXECUTION (NOT USED)

END OF SECTION 01010

01025-1

DEFINITION OF BID ITEMS &

MEASUREMENT AND PAYMENT

SECTION 01025

DEFINITION OF BID ITEMS

AND

MEASUREMENT AND PAYMENT

PART 1 - GENERAL

1.1 SUMMARY

A. The intent of this section is to explain, in general; what is and what is not included in a bid item; the limits or cut-off points where one bid item ends and another begins; and method of measurements and basis of payment for work items listed in the Bid Item Schedule.

B. Work:

1. Furnishing all labor, materials, and equipment necessary to successfully complete the project or any portion of it and carrying out all duties and obligations imposed by the contract on the Contractor.

C. Payment:

1. For each individual item listed here and in the Schedule of Items, payment shall be full compensation for all work related to the item in accordance with these specifications, as shown on the drawings, and as staked in the field.

2. Measurement and payment for contract work shall be made only for and under those pay items included in the Schedule of Items. All other work and materials shall be considered incidental or as included in the payment for items shown.

1.1 DETERMINATION OF QUANTITIES

D. Quantity Measurements:

1. The Contractor shall verify the measurements of the new construction and fence modification work and notify the Government of any variations.

E. The following measurements and calculations are used to determine contract quantities.

1. For items that are measured by the linear foot, such as fencing, measurements shall be made parallel to the base or foundation upon which the structures are placed.

2. For standard manufactured items--such as fence and wire, identified by gauge, weight, section dimensions, and so forth, such identifications shall be considered the nominal weights or dimensions. Unless controlled by tolerances in cited specifications, manufacturer's tolerances shall be accepted.

1.2 UNITS OF MEASUREMENT

01025-2

MEASUREMENT AND PAYMENT

1. Payment shall be by units defined and determined according to U.S. Standard measure and by the following:

a. Each: One complete unit, which may consist of one or more parts.

b. Linear Foot: Linear feet measured horizontally.

c. Lump Sum: Do not measure directly. The bid amount is complete payment for all work described in the contract and necessary to complete the work for that item.

1.3 DEFINITION OF BID ITEMS

A. Definition of Bid Item No. 1: East Ash Fence

1. Description: New Fence Construction (Labor only). This work consists of the labor associated with constructing an approximately 6,500 foot new three wire fence according to the specifications and drawings, and as common practice dictates.

Work also includes installing and deadman anchors as a common practice at appropriate locations, and installing wire stays as described in the Fence Specification Sheet.

a. Measurement and payment: Actual Quantity (AQ), Lineal Foot (LF).

2. Description: Gates and Gate Closers Installation and Materials. This work consists of purchasing materials associated with building approximately four (4) gates with closers/levers and constructing/installing as specified and shown on the drawings and maps.

a. Measurement and Payment: Actual Quantity (AQ), Each (EA).

3. Description: Brace Post Installation and Materials. This work consists of purchasing materials associated with building approximately twelve (12) brace post configurations with tension wire, and construction/installing as specified and shown on the drawings and maps, and as common practice dictates.

a. Measurement and Payment: Actual Quantity (AQ), Each (EA)

4. Description: Corner Brace Post Installation and Materials. This work consists of purchasing materials associated with building approximately eight (8) corner brace configurations with tension wire, and construction/installing as specified and

5. Description: New Fence Construction (Materials only). This work consists of purchasing materials needed to construct an approximately 6,500 foot new three wire fence according to the specifications and drawings, and as common practice dictates. Work also includes purchasing wire stays and deadman anchor material as needed.

a. Measurements and Payment: Lump Sum Quantities (LSQ), Lump Sum

(LS).

B. Definition of Bid Item No. 2: Big Bordeaux Fence

01025-3

MEASUREMENT AND PAYMENT

1. Description: New Fence Construction (Labor only). This work consists of the labor associated with constructing an approximately 1,500 foot new three wire fence according to the specifications and drawings, and as common practice dictates.

Work also includes installing deadman anchors as a common practice at appropriate locations, and installing wire stays as described in the Fencing Specification Sheet.

2. Description: Existing Fence Removal. This work consists of the labor associated with removal of an approximately 1,500-foot existing wire fence, posts, and other associated appurtenances.

a. Measurement and Payment: Actual Quantity (AQ), Lineal Foot (LF).

3. Description: Gates and Gate Closers Installation and Materials. This work consists of purchasing materials associated with building approximately two (2) gates with closers/levers and constructing/installing as specified and shown on the drawings

4. Description: Brace Post Installation and Materials. This work consists of purchasing materials associated with building approximately five (5) brace post configurations with tension wire, and construction/installing as specified and

5. Description: Corner Brace Post Installation and Materials. This work consists of purchasing materials associated with building approximately four (4) corner brace configurations with tension wire, and construction/installing as specified and

6. Description: New Fence Construction (Materials only). This work consists of purchasing materials needed to construct an approximately 1,500 foot new three wire fence according to the specifications and drawings, and as common practice dictates. Work also includes purchasing wire stays and deadman anchor material as needed.

a. Measurements and Payment: Lump Sum Quantities (LSQ), Lump Sum

(LS).

C. Definition of Bid Item No. 3: Chadron Creek Fence

1. Description: New Fence Construction (Labor only). This work consists of the labor associated with constructing an approximately 3,500 foot new three wire fence according to the specifications and drawings, and as common practice dictates.

Work also includes installing deadman anchors as a common practice at appropriate locations, building/installing gates, and installing wire stays as described on the Fencing Specification Sheet.

01025-4

MEASUREMENT AND PAYMENT

2. Description: Existing Fence Removal. This work consists of the labor associated with removal of an approximately 3,500 foot existing wire fence, posts, and other associated appurtanences.

a. Measurement and Payment: Actual Quantity (AQ), Lineal Foot (LF).

3. Description: Gates and Gate Closers Installation and Materials. This work consists of purchasing materials associated with building approximately three (3) gates with closers/levers and constructing/installing as specified and shown on the drawings

4. Description: Brace Post Installation and Materials. This work consists of purchasing materials associated with building approximately eight (8) brace post configurations with tension wire, and construction/installing as specified and

5. Description: Corner Brace Post Installation and Materials. This work consists of purchasing materials associated with building approximately two (2) corner brace configurations with tension wire, and construction/installing as specified and

6. Description: New Fence Construction (Materials only). This work consists of the materials needed to construct an approximately 3,500 foot new three wire fence according to the specifications and drawings, and as common practice dictates.

Work also includes purchasing wire stays and deadman anchor material as needed.

a. Measurements and Payment: Lump Sum Quantities (LSQ), Lump Sum

(LS).

PART 2 - METHOD OF MEASUREMENT

2.1 GENERAL

A. One of the following methods of measurement for determining final payment is designated on the Schedule of Items for each pay item:

1. MATERIALS: ACTUAL QUANTITIES (AQ)

a. These estimated quantities are determined from actual quantities of material for completed work.

2. LABOR: LINEAL FOOT (LF)

a. These estimated lengths are determined from actual measurements of completed work.

3. LUMP SUM QUANTITY (LS)

01025-5

MEASUREMENT AND PAYMENT

a. These quantities denote one complete unit of work as required by or described in the contract, including necessary materials, equipment, and labor to complete the job.

END OF SECTION 01025

01140 - 1

WORK RESTRICTIONS

SECTION 01140

WORK RESTRICTIONS

PART 1-GENERAL

2.1 USE OF PREMISES

A. Use of Site: Limit use of premises to areas along the fences. Do not disturb portions of site beyond areas in which the Work is indicated.

1. Limits: Keep constructions operations out of East Ash Creek unless directed other-wise by the Contracting Officer.

PART 2- PRODUCTS

2.2 PRODUCT RESTRICTIONS

A. Posts: Railroad tie or creosote treated posts cannot be used to construct the fence.

PART 3- EXECUTION

3.1 TIMING RESTRICTIONS (NOT APPLICABLE)

END OF SECTION 01140

01010_02 STATEMENT OF WORK
1.
1.1 location
A. East Ash Fence: Access to the project location can be obtained off East Ash Road. The fence will run along the east side of the road providing easy access and will cross through Sections 21 & 28 of T31N; R50W of Dawes County Nebraska.
B. Chadron Creek Fence: Access to the project location can be obtained off Broken Plow Road. The fence replacement will remain in the same location as the old fence and will mostly run along the road providing easy access. The fence will cross through...
C. Bordeaux Creek Fence: Access to the project location can be obtained off FS Road #723. The fence will run along the west side of the road and remain on the east side of the creek, providing easy access. The fence will cross through Sections 26 & 2...
1.2 summary
A. The contractor is responsible for checking the measurement of the line and bringing up any significant difference between the measurement in this contract and what they measured.
B. Work for this project consists of a contractor supplying labor and materials for the construction of a new fence as specified and described below, plus the removal of existing fences as described. The Forest Service shall flag new fence locations:
1. East Ash Fence Construction – the fence construction will begin at the cattle guard on the north end of the fence (refer to the attached map). The fence will run SE for approximately 6,500-ft. There are existing H-braces that will be replaced to me...
2. Chadron Creek Fence Construction –this fence will replace the existing fence line and will be built on-line with the existing fence. The fence construction will begin at the NW end of the fence (refer to the attached map) starting at an existing fe...
3. Bordeaux Creek Fence Construction – the fence construction will begin at the S end of the fence (refer to the attached map) starting adjacent to the road and vertically above an existing fenceline that runs east to west. The new fenceline will head...
C. Work Specifications are listed below (also refer to the attaching drawings and specification sheets).
1. Fence Type: The fence will be wildlife friendly with the following specifications:
a. 3-Wire Fence.
b. Smooth bottom wire spaced 16" above the ground.
c. The middle wire will be barbed and spaced 10" above the bottom wire.
d. The top wire will be barbed and spaced 12" above the middle wire or will be spaced at a maximum of 38" in height.
2. Post Spacing: Posts will be spaced 16' apart.
3. Wire: The wire will be double stranded and a minimum of 12.5G.
4. Barbs: Barbs on wire will be 2-point 14G and will be spaced 4-6” apart.
5. Post Ratio: There will be a maximum of 3 steel t-posts to every wood post. Unless topography will only allow for steel t-posts which will require the approval of the Contracting Officer (CO).
6. Post Depth: The steel t-posts will be buried at a minimum of 1.5' deep, the wood posts will be buried at a minimum of 2' deep, and corner, gate, and brace posts will be buried a minimum of 3' deep.
7. Line Posts: A minimum of 3”x6’ pressure treated wood posts will be used. A minimum of 5.5’ t-posts with an anchor will be used.
8. Brace Posts: H-Braces material will be 2 3/8" steel pipe with a 0.125" wall thickness and sealed top or a substitute of 5"x7’ pressure treated wood posts can be used. H-Brace materials will be 7' long (or as approved by the contracting officer).
9. Horizontal Brace Material: H-Braces will be a minimum of 7’ in length. The horizontal brace material will be 2 3/8" steel pipe with a 0.125" wall thickness.
10. Number of Braces: Braces are required at every corner, gate, and angle change greater than 15 degrees. Braces should be installed every 1,320-ft intervals or closer if required by industry standard construction.
11. Brace Wire: The #9 smooth wire around H-Braces will be double wrapped at a minimum and attached to the steel brace posts using industry standard for this type of application.
12. Staples & Clips: Fence staples will be a minimum of 1.5" and 9G steel and manufacturer fence clips or 12G wire can be used for steel t-posts.
13. Wire Stays: Wire stays shall be galvanized, twisted wire of a size and thickness that is industry standard for this type of application.
New Gate Construction
2.
1. New gate construction shall be as specified and as shown on the Drawings. Each gate will be installed with a wood post gate stick. The type and style of gate closer shall be as shown on the Drawings and/or approved by the Forest Service. The gate...
a. Refer to the attached maps for the locations of each gate. The Forest Service shall approve the locations of the new installed gates.
b. East Ash Fence: four gates will be installed along the fence line.
c. Chadron Creek Fence: three gates will be installed along the fence line.
d. Big Bordeaux Fence: one gate will be installed at the N end, along the fenceline; a second gate will be installed at the S end, along an existing fenceline running east to west.
2.2 GENERAL SITE CONDITIONS
A. East Ash Fence: Access to the project location can be obtained off East Ash Road. The fence will run along the east side of the road providing easy access and will cross through Sections 21 & 28 of T31N; R50W of Dawes County, Nebraska. Elevation al...
B. Chadron Creek Fence: Access to the project location can be obtained off Broken Plow Road. The fence will run along the west side of the road providing easy access and will cross through Sections 1 & 12 of T31N; R49W of Dawes County, Nebraska. Eleva...
C. Big Bordeaux Fence: Access to the project location can be obtained off FS Road #723. The new fence will run along the west side of the road and remain on the east side of the creek, providing easy access. The new fence will cross through Sections ...
2.3 GOVERNMENT SUPPLIED MATERIALS
A. No supplies will be provided by the US Forest Service.
2.4 USE OF PREMISES
A. General: Contractor shall have full use of premises for construction operations, including the use of the project site during the allotted construction period. The contractor's use of the premises is limited only by the Government's right to perfo...
B. Confine storage of materials at the project site to areas as approved by the Contracting Officer (CO).
C. Preservation of Natural Features: Confines all operations to work limits of the project.
1. Do not remove, injure, or destroy trees or other plants without prior approval. Consult with CO and remove agreed-on roots, branches, and other vegetative mateials that interfere with construction.
2. Do not fasten ropes, cables, or guys to existing trees.
D. Existing Utilities: Notify the Nebraska Diggers Hotline of the location and times for post digging.
1. The contractor shall be responsible for locating and preventing damage to known utilities. If damage occurs, repair the utility at no additional expense to the Government.
2. If any utilities are found and would interfer with fence construction, notify the CO immediately.
2.5 MEALS AND LODGING
A. Meals and lodging are commercially available in the City of Chadron or the City of Crawford within 25 miles of the construction site. Meals or lodging will not be available at Forest Service facilities.
2.6 camping
A. With approval by the Pine Ridge Ranger District, National Forest Service lands may be used by the Contractor to have one, fully contained recreation vehicle which may remain at the site for security.
2.7 construction sequence
A. There is no specified construction sequence or season for this project.
B. Depending on conditions, normal fire restrictions may apply to activities associated with this project.
2.8 Field verification
A. Field verify all new and existing dimensions affecting the work of this contract before ordering products.
2.9 PRODUCT SPECIFICATIONS
A. See required product specifications in Part 1; 1.2; B. Also refer to the attached specification sheet.
B. All materials shall be new and free of damage.
3.
4.
01025_02 DEFINITION OF BID ITEMS
1.
2.
3.
1.1 summary
A. The intent of this section is to explain, in general; what is and what is not included in a bid item; the limits or cut-off points where one bid item ends and another begins; and method of measurements and basis of payment for work items listed in ...
B. Work:
1. Furnishing all labor, materials, and equipment necessary to successfully complete the project or any portion of it and carrying out all duties and obligations imposed by the contract on the Contractor.
C. Payment:
1. For each individual item listed here and in the Schedule of Items, payment shall be full compensation for all work related to the item in accordance with these specifications, as shown on the drawings, and as staked in the field.
2. Measurement and payment for contract work shall be made only for and under those pay items included in the Schedule of Items. All other work and materials shall be considered incidental or as included in the payment for items shown.
1.1 DETERMINATION OF QUANTITIES
D. Quantity Measurements:
1. The Contractor shall verify the measurements of the new construction and fence modification work and notify the Government of any variations.
E. The following measurements and calculations are used to determine contract quantities.
1. For items that are measured by the linear foot, such as fencing, measurements shall be made parallel to the base or foundation upon which the structures are placed.
2. For standard manufactured items--such as fence and wire, identified by gauge, weight, section dimensions, and so forth, such identifications shall be considered the nominal weights or dimensions. Unless controlled by tolerances in cited specificat...
1.2 UNITS OF MEASUREMENT
1. Payment shall be by units defined and determined according to U.S. Standard measure and by the following:
a. Each: One complete unit, which may consist of one or more parts.
b. Linear Foot: Linear feet measured horizontally.
c. Lump Sum: Do not measure directly. The bid amount is complete payment for all work described in the contract and necessary to complete the work for that item.
1.3 deFINItion of bid items
A. Definition of Bid Item No. 1: East Ash Fence
1. Description: New Fence Construction (Labor only). This work consists of the labor associated with constructing an approximately 6,500 foot new three wire fence according to the specifications and drawings, and as common practice dictates. Work als...
a. Measurement and payment: Actual Quantity (AQ), Lineal Foot (LF).
2. Description: Gates and Gate Closers Installation and Materials. This work consists of purchasing materials associated with building approximately four (4) gates with closers/levers and constructing/installing as specified and shown on the drawing...
a. Measurement and Payment: Actual Quantity (AQ), Each (EA).
3. Description: Brace Post Installation and Materials. This work consists of purchasing materials associated with building approximately twelve (12) brace post configurations with tension wire, and construction/installing as specified and shown on t...
a. Measurement and Payment: Actual Quantity (AQ), Each (EA)
4. Description: Corner Brace Post Installation and Materials. This work consists of purchasing materials associated with building approximately eight (8) corner brace configurations with tension wire, and construction/installing as specified and sho...
a. Measurement and Payment: Actual Quantity (AQ), Each (EA).
5. Description: New Fence Construction (Materials only). This work consists of purchasing materials needed to construct an approximately 6,500 foot new three wire fence according to the specifications and drawings, and as common practice dictates. W...
a. Measurements and Payment: Lump Sum Quantities (LSQ), Lump Sum (LS).
B. Definition of Bid Item No. 2: Big Bordeaux Fence
1. Description: New Fence Construction (Labor only). This work consists of the labor associated with constructing an approximately 1,500 foot new three wire fence according to the specifications and drawings, and as common practice dictates. Work als...
a. Measurement and payment: Actual Quantity (AQ), Lineal Foot (LF).
2. Description: Existing Fence Removal. This work consists of the labor associated with removal of an approximately 1,500-foot existing wire fence, posts, and other associated appurtenances.
a. Measurement and Payment: Actual Quantity (AQ), Lineal Foot (LF).
3. Description: Gates and Gate Closers Installation and Materials. This work consists of purchasing materials associated with building approximately two (2) gates with closers/levers and constructing/installing as specified and shown on the drawings...
a. Measurement and Payment: Actual Quantity (AQ), Each (EA).
4. Description: Brace Post Installation and Materials. This work consists of purchasing materials associated with building approximately five (5) brace post configurations with tension wire, and construction/installing as specified and shown on the ...
a. Measurement and Payment: Actual Quantity (AQ), Each (EA).
5. Description: Corner Brace Post Installation and Materials. This work consists of purchasing materials associated with building approximately four (4) corner brace configurations with tension wire, and construction/installing as specified and show...
a. Measurement and Payment: Actual Quantity (AQ), Each (EA).
6. Description: New Fence Construction (Materials only). This work consists of purchasing materials needed to construct an approximately 1,500 foot new three wire fence according to the specifications and drawings, and as common practice dictates. W...
a. Measurements and Payment: Lump Sum Quantities (LSQ), Lump Sum (LS).
C. Definition of Bid Item No. 3: Chadron Creek Fence
1. Description: New Fence Construction (Labor only). This work consists of the labor associated with constructing an approximately 3,500 foot new three wire fence according to the specifications and drawings, and as common practice dictates. Work als...
a. Measurement and payment: Actual Quantity (AQ), Lineal Foot (LF).
2. Description: Existing Fence Removal. This work consists of the labor associated with removal of an approximately 3,500 foot existing wire fence, posts, and other associated appurtanences. ...
a. Measurement and Payment: Actual Quantity (AQ), Lineal Foot (LF).
3. Description: Gates and Gate Closers Installation and Materials. This work consists of purchasing materials associated with building approximately three (3) gates with closers/levers and constructing/installing as specified and shown on the drawin...
a. Measurement and Payment: Actual Quantity (AQ), Each (EA).
4. Description: Brace Post Installation and Materials. This work consists of purchasing materials associated with building approximately eight (8) brace post configurations with tension wire, and construction/installing as specified and shown on the...
a. Measurement and Payment: Actual Quantity (AQ), Each (EA).
5. Description: Corner Brace Post Installation and Materials. This work consists of purchasing materials associated with building approximately two (2) corner brace configurations with tension wire, and construction/installing as specified and shown...
a. Measurement and Payment: Actual Quantity (AQ), Each (EA).
6. Description: New Fence Construction (Materials only). This work consists of the materials needed to construct an approximately 3,500 foot new three wire fence according to the specifications and drawings, and as common practice dictates. Work also...
a. Measurements and Payment: Lump Sum Quantities (LSQ), Lump Sum (LS).
2
2.1 GENERAL
A. One of the following methods of measurement for determining final payment is designated on the Schedule of Items for each pay item:
1. MATERIALS: ACTUAL QUANTITIES (AQ)
a. These estimated quantities are determined from actual quantities of material for completed work.
2. LABOR: LINEAL FOOT (LF)
a. These estimated lengths are determined from actual measurements of completed work.
3. LUMP SUM QUANTITY (LS)
a. These quantities denote one complete unit of work as required by or described in the contract, including necessary materials, equipment, and labor to complete the job.
01140_02 WORK RESTRICTIONS
1.
2.
2.1 USE OF PREMISES
A. Use of Site: Limit use of premises to areas along the fences. Do not disturb portions of site beyond areas in which the Work is indicated.
1. Limits: Keep constructions operations out of East Ash Creek unless directed otherwise by the Contracting Officer.
2.2 PRODUCT RESTRICTIONS
A. Posts: Railroad tie or creosote treated posts cannot be used to construct the fence.
3.
3.1 timing RESTRICTIONS (NOT APPLICABLE)

4.

File details come from the government source that posted it. Updated .