Attachment 4 Backflow list.xls

XLS spreadsheet 2 MB Posted

Attached to
Cross Connection Survey - Offutt AFB, Nebraska Federal contract opportunity
Solicitation number
FA460021SS003
Issued by
Department of the Air Force Air Combat Command

View the file

Other files for this federal contract opportunity

Other files attached to Cross Connection Survey - Offutt AFB, Nebraska, newest first.
File Type Posted
Attachment 1.docx DOCX document
Attachment 2.docx DOCX document
Attachment 3.pdf PDF
Offutt AFB Cross-Connection Survey PWS.docx DOCX document

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

INVENTORY OF CROSS-CONNECTION CONTROL AND BACKFLOW PREVENTION DEVICESPROGRAM MANAGER
OFFUTT AFBPERSONNEL MAKING INVENTORY:Al. Nelson 294-7586 / 4836
CONTROL NO ISSUEDLOCATIONITEM / FACILITY SYSTEM PROTECTEDPOTENTIAL CONTAINMNT/POLLUTENTDEGREE OF HAZARD / DEVICE SERIAL NUMBERBACK PRESS POTENTBACK SIPHONAGE POTENTIALTYPE CONTROL INSTALLED OR (REQUIRED)DATA ON DEVICE INSTALCOMMENTSCOMPTOTNXT YR.TYPE #
MAKEMODELSIZE
1 TEST500 BLDG BOILER RMH.W. MAKEUP TO 750 TON RACKCHEMICALS128893/HIGHYESYESR.P.B.P.WATTS9093/4"DEVICE DELETED, NO LONGER NEEDED 7/19/04 NELSON00
6 TESTBLDG. 500 BOILER ROOMGROSS. MAKE UP TO WATER SOFT / BOILERCHEMICALCY112/HIGHYESYESR.P.B.P.CONBRACO40207A211/2"Device transferred to 500 Maint0051/001
5TEST00
7 TEST500 BLDG BOILER RMMAKEUP TO CHILLED H2O SYSTEMCHEMICALS89971 /HIGHYESYESR.P.B.P.WATTS009-M12"Device transferred to 500 Maint0050/004
11 TESTBLDG 500BH 30 MECH RMMAKEUP FOR REHEAT SYS, H-WINGCHEMICALS89814/HIGHYESYESR.P.B.P.WATTSOO93/4"Device Removed007/21/0750/005
12 TEST500 BLDG BJ WING-MECH RMMAKE-UP FOR BOILERSCHEMICALS568620/HIGHYESYESR.P.B.P.WATTS9093/4"Device transferred to 500 Maint0050/006
13 TEST500 BLDG 3J MECH RMMAKEUP FOR REHEAT SYSTEMCHEMICALS116207/HIGHYESYESR.P.B.P.WATTS9091"Device transferred to 500 Maint0050/007
14 TESTBLDG 500 KITCHENC.W. TO COOKING HOOD SYSTEMGREASE / CHEMICALS34080 / HIGHYESYESR.P.B.P.WATTSOO91 1/4"Device transferred to 500 Maint0050/376
15 TESTBLDG 500 RM 1E11C.W. SUPPLY TO CHEMICAL DISPENSERSOAP CHEMICALSA21613 / HIGHYESYESR.P.B.P.WATTSOO91/2"Device transferred to 500 Maint0050/001
16 TESTBLDG 500 KITCHENPOP DISPENSERSCARBONATION, SYRUP55124/LOWYESYESR.P.B.P.WATTS009M21/2"Device transferred to 500 Maint0050/008
17 FPBLDG 500 THEATER MECH RMFIRE PROTECT SYSTEM THEATERRUST STAGNANT WATERLOWYESYESSINGLE CHECK VALVEVIKINGC421-24"00
INVENTORY OF CROSS-CONNECTION CONTROL AND BACKFLOW PREVENTION DEVICES
OFFUTT AFBPERSONNEL MAKING INVENTORY:
CONTROL NO ISSUEDLOCATIONITEM / FACILITY SYSTEM PROTECTEDPOTENTIAL CONTAINMENT/POLLUTANTDEGREE OF HAZARD / DEVICE SERIAL NUMBERBACK PRESS POTENTBACK SIPHONAGE POTENTIALTYPE CONTROL INSTALLED OR (REQUIRED)DATA ON DEVICE INSTALCOMMENTSCOMPTOTNXT YR.TYPE #
MAKEMODELSIZE
18 VBBLDG 500 H WING11 HOSE BIBBS, 8 SERVICE SINKS, 12 WALL HYDRANTSCHEMICALS / SEWAGEHIGHNOYESSCREW ON VACUUM BREAKERWATTS8A5/8"00
19 VBBLDG 500 JWING4 HOSE BIBS, 4 SERVICE SINKSCHEMICALS / SEWAGEHIGHNOYESSCREW ON VACUUM BREAKERWATTS8A5/8"00
20 VBBLDG 500 D WING2 SERVICE SINKSCHEMICALS / SEWAGEHIGHNOYESSCREW ON VACUUM BREAKERWATTS8A5/8"00
21 VBBLDG 500 G WING4 HOSE BIBS, 4 SERVICE SINKS, 4 WALL HYDR.CHEMICALS / SEWAGEHIGHNOYESSCREW ON VACUUM BREAKERWATTS8A5/8"00
22 VBBLDG 500 A WING6 HOSE BIBBSCHEMICALS / SEWAGEHIGHNOYESSCREW ON VACUUM BREAKERWATTS8A5/8"00
23 VBBLDG 500 F WING6 HOSE BIBBS, 4 SERVICE SINKSCHEMICALS / SEWAGEHIGHNOYESSCREW ON VACUUM BREAKERWATTS8A5/8"00
24 VBBLDG 500 B WING7 HOSE BIBBS, 4 SERVICE SINKSCHEMICALS / SEWAGEHIGHNOYESSCREW ON VACUUM BREAKERWATTS8A5/8"00
25 VBBLDG 500 BOILER RM27 HOSE BIBBSCHEMICALS / SEWAGEHIGHNOYESSCREW ON VACUUM BREAKERWATTS8A5/8"ALL EQUIPMENT DRAINS SHOULD BE LABELED AS NON-POTABLE WATER00
26 TESTBLDG 515 MECH RMC.W. MAKEUP TO REHEAT SYSTEMCHEMICALSHIGH / 115925YESYESR.P.B.P.WATTS9093/4"Device transferred to 500 Maint0050/009
27 FPBLDG 515 MECH RMFIRE PROTECT SYSTEMRUST STAGNANT WATERLOWYESYESSINGLE CHECK VALVERELIABLEDG4"00
INVENTORY OF CROSS-CONNECTION CONTROL AND BACKFLOW PREVENTION DEVICES
OFFUTT AFBPERSONNEL MAKING INVENTORY:
CONTROL NO ISSUEDLOCATIONITEM / FACILITY SYSTEM PROTECTEDPOTENTIAL CONTAINMENT/POLLUTANTDEGREE OF HAZARD / DEVICE SERIAL NUMBERBACK PRESS POTENTBACK SIPHONAGE POTENTIALTYPE CONTROL INSTALLED OR (REQUIRED)DATA ON DEVICE INSTALCOMMENTSCOMPTOTNXT YR.TYPE #
MAKEMODELSIZE
28 FPBLDG 515 MECH RMFIRE PROTECT SYSTEMRUST STAGNANT WATERLOWYESYESSINGLE CHECK VALVERELIABLEDG4"00
29 FPBLDG 515 MECH RMFIRE PROTECT SYSTEMRUST STAGNANT WATERLOWYESYESSINGLE CHECK VALVERELIABLEDG6"00
30 FPBLDG 578 MECH RMFIRE PROTECT SYSTEMRUST STAGNANT WATERLOW/ FO312041310YESYESDCVFEBCO8506"TESTED DEVICE 6/26/13 Alves100/26/201456/031
31 TESTBLDG 597 A 107C.W. MAKEUP TO REHEAT SYSTEMCHEMICALS237479 / HIGHYESYESR.P.B.P.WATTS9093/4"TESTED DEVICE0150/023
32 TESTBLDG 597 A 107C.W. MAKEUP LIEBERT UNITSCHEMICALS155022 / HIGHYESYESR.P.B.P.WATTS9091"TESTED DEVICE0150/024
33 FPBLDG 597 A 213FIRE PROTECT SYSTEMRUST STAGNANT WATERLOWYESYESSINGLE CHECK VALVE4"01
34 EXISTBLDG 5973 HOSE BIBBS 1 SERVICE SINKCHEMICALS / SEWAGEHIGHNOYESSCREW ON VACUUM BREAKERWATTS8A5/8"01
35 TESTBLDG 509 NO SIDE A WINGLAWN SPRINKLER SYSLAWN CHEMICALS156834 / HIGHNOYESR.P.B.P.WATTS90911/2"DEVICE HAS BEEN REMOVED ACCORDING TO BLDG PLUMBER 5/12/9901
36 TESTBLDG 500 FRONT LAWNLAWN SPRINKLER SYSLAWN CHEMICALS156834 / HIGHNOYESR.P.B.P.WATTS9093"TESTED DEVICE0150/018
37 TESTBLDG 500 S SIDE A WINGLAWN SPRINKLER SYSLAWN CHEMICALSHIGHNOYESR.P.B.P.WATTS90911/2"DEVICE HAS BEEN REMOVED ACCORDING TO BLDG PLUMBER 5/12/9901
INVENTORY OF CROSS-CONNECTION CONTROL AND BACKFLOW PREVENTION DEVICES
OFFUTT AFBPERSONNEL MAKING INVENTORY:
CONTROL NO ISSUEDLOCATIONITEM / FACILITY SYSTEM PROTECTEDPOTENTIAL CONTAINMENT/POLLUTANTDEGREE OF HAZARD / DEVICE SERIAL NUMBERBACK PRESS POTENTBACK SIPHONAGE POTENTIALTYPE CONTROL INSTALLED OR (REQUIRED)DATA ON DEVICE INSTALCOMMENTSCOMPTOTNXT YR.TYPE #
MAKEMODELSIZE
38 TESTBLDG. 5O1 U144OIL COOLER MAKEUPCHEMICALS, OIL, FREONHIGHYESYESR.P.B.P.WATTSOO91/2"DEVICE REMOVED ACCORDING TO BLDG. PLBR NELSON 7/20/9901
39 TESTBLDG 501 U 144C.W. MAKEUP TO REHEAT SYSTEMCHEMICALS89800 / HIGHYESYESR.P.B.P.WATTS9093/4"DEVICE DELETED, NO LONGER NEEDED 4/5/05 NELSON0150/011
40 TESTBLDG 501 L 138C.W. MAKEUP TO ABANDONED CHILLERCHEMICALS / STAGNANT WATERHIGHYESYESR.P.B.P.WATTSOO93/4"DEVICE HAS BEEN REMOVED ACCORDING TO BLDG. PLUMBER NELSON / LEWIS 7/20/9901
41 TESTBLDG 501 L 112AC.W. MAKEUP TO REHEAT SYSTEMCHEMICALSHIGH / A05932YESYESR.P.B.P.WATTSOO91"TESTED DEVICE0156/001
42 FPBLDG 501 V 145FIRE PROTECTION SYSTEMRUST STAGNANT WATERLOW / 00139YESYESD.C.V.WATTS7706"TESTED DEVICE0150/012
43 TESTBLDG 501 U 145C.W. MAKE-UP TO REHEAT SYSTEMCHEMICALS12702 / HIGHYESYESR.P.B.P.WATTS9093/4"TEST DEVICE0150/013
45 TESTBLDG 501 U 145C.W. MAKE-UP TO AIR HANDLERCHEMICALS WELL WATER14496 / HIGHYESYESR.P.B.P.WATTS9091 1/2"TESTED DEVICE0150/014
46 TESTBLDG 501 U 145C.W. MAKE-UP GLYCOL TANKGLYCOLA09974 / HIGHYESYESR.P.B.P.WATTSOO91/2"TESTED DEVICE0150/015
47 TESTBLDG 501 U 145C.W. MAKE-UP TO DIESEL JACKET WATERCHEMICALSO5723 / HIGHYESYESR.P.B.P.WATTSOO91 1/4"TESTED DEVICE0150/016
48 TESTBLDG 50112 HOSE BIBBS 4 SERVICE SINKSCHEMICALS SEWAGEHIGHNOYESSCREW ON VACUUM BREAKERWATTS8A5/8"01
49 TESTBLDG 500 1 G HALLWAYC.W. MAKE-UP TO HOT WATERCHEMICALSUnknown/ HIGHYESYESR.P.B.P.WATTS9093/4"TESTED DEVICE0150/017
50 FPBLDG 522 MECH RMFIRE PROTECTION SYSTEMRUST STAGNANT WATERLOWYESYESS.C.V.RELIABLE4"01
INVENTORY OF CROSS-CONNECTION CONTROL AND BACKFLOW PREVENTION DEVICES
OFFUTT AFBPERSONNEL MAKING INVENTORY:
CONTROL NO ISSUEDLOCATIONITEM / FACILITY SYSTEM PROTECTEDPOTENTIAL CONTAINMENT/POLLUTANTDEGREE OF HAZARD / DEVICE SERIAL NUMBERBACK PRESS POTENTBACK SIPHONAGE POTENTIALTYPE CONTROL INSTALLED OR (REQUIRED)DATA ON DEVICE INSTALCOMMENTSCOMPTOTNXT YR.TYPE #
MAKEMODELSIZE
51 TESTBLDG 407 MECH RM 12C.W. MAKE-UP TO REHEAT SYSTEMCHEMICALS128447 / HIGHYESYESR.P.B.P.WATTS9093/4"TESTED DEVICE0150/018
52 TESTBLDG 4072 HOSE BIBBS, 5 WALL HYD, 1 SERVICE SINKCHEMICALS SEWAGEHIGHNOYESSCREW ON VACUUM BREAKERWATTS8A5/8"01
53 TESTBLDG 513 MECH RMC.W. MAKE-UP TO BOILER & VACUUM PUMPCHEMICALS & SALIVAHIGH / 137326YESYESR.P.B.P.WATTSOO93/4"TESTED DEVICE0150/019
54 TESTBLDG 5132 HOSE BIBBS, 2 WALL HYD, 1 SERVICE SINKCHEMICALS SEWAGEHIGHNOYESSCREW ON VACUUM BREAKERWATTS8A5/8"01
55 TESTBLDG 519 CELL 5C.W. MAKE-UP TO COOLING TOWERCHEMICALS / LEGIONAIRES DISEASEHIGHYESYESR.P.B.P.WATTSOO93"DEVICE HAS BEEN REMOVED AND PIPED FROM CELL 101
56 TESTBLDG 519 CELL 1C.W. MAKE-UP TO COOLING TOWERCHEMICALS / LEGIONAIRES DISEASE27715 / HIGHYESYESR.P.B.P.WATTSOO93"TESTED DEVICE0150/020
57 TESTBLDG 519 CELL 1C.W. MAKE-UP TO COOLING TOWERCHEMICALS / LEGIONAIRES DISEASE02785 / HIGHYESYESR.P.B.P.WATTSOO93"TESTED DEVICE0150/021
58 TESTBLDG 518FIRE PROTECTION SYSTEMRUST STAGNANT WATERHIGH / 2CL0889YESYESR.P.B.P.AMES2000SS6"TESTED DEVICE0158/01
60 TESTBLDG 518GENERATOR JACKET WATER BOILER MAKEUPOIL GLYCOL CHEMICALSHIGH / 122185YESYESR.P.B.P.WATTS9091 1/2"TESTED DEVICE0150/022
61 EXISTBLDG 5912 HOSE BIBBS 2 WALL HYDRANTSCHEMICALS SEWAGEHIGHNOYESSCREW ON VACUUM BREAKERWATTS8A5/8"01
62 TESTBLDG 4000 BOILER RMC.W. MAKE-UP TO BOILERCHEMICALS127796 / HIGHYESYESR.P.B.P.WATTS9091 1/4"DEVICE IS REMOVED 8/26/06 ROBLES0150/036
63 FPBLDG 4000 BOILER RMFIRE PROTECTION SYSTEMRUST STAGNANT WATER9601261251 / LOWYESYESD.C.V.FEBCO850 DC6"Hospital Maintenence19/28/1056/03
INVENTORY OF CROSS-CONNECTION CONTROL AND BACKFLOW PREVENTION DEVICES
OFFUTT AFBPERSONNEL MAKING INVENTORY:
CONTROL NO ISSUEDLOCATIONITEM / FACILITY SYSTEM PROTECTEDPOTENTIAL CONTAINMENT/POLLUTANTDEGREE OF HAZARD / DEVICE SERIAL NUMBERBACK PRESS POTENTBACK SIPHONAGE POTENTIALTYPE CONTROL INSTALLED OR (REQUIRED)DATA ON DEVICE INSTALCOMMENTSCOMPTOTNXT YR.TYPE #
MAKEMODELSIZE
64 TESTBLDG 4000 BOILER RMC.W. MAKE-UP TO BOILER & CHILLERCHEMICALS477504 / HIGHYESYESR.P.B.P.WATTS9093/4"Hospital Maintenence19/17/1050/037
65 TESTBLDG 4000 BOILER RMCOLD WATER SUPPLY TO BOILERCHEMICALSSH782 / HIGHYESYESR.P.B.P.CONBRACO40205T21"Hospital Maintenence19/10/1051/011
66 TESTBLDG 4000 RM GD08COLD WATER SUPPLY TO CHEM CLEANCHEM / SOAPA27664 / HIGHYESYESR.P.B.P.WATTSOO91/2"Hospital Maintenence19/11/1050/036
67A TESTBLDG 4000 Main EntranceC.W. SUPPLY TO LAWN SPRINKLERCHEMICAL / FERTILIZERSHIGH / 197507YESYESR.P.B.P.WATTSOO9M21"Hospital Maintenence18/12/1050/038
68 TESTBLDG 4000 BOILER RMC.W. MAKE-UP TO COOLING TOWERCHEMICALS/ LEGIONAIRES DISEASE89975 / HIGHYESYESR.P.B.P.WATTSOO92"Hospital Maintenence19/17/1050/039
69 TESTBLDG 4000 BOILER RMDOMESTIC WATER MAINCONTAMINATES FROM HOSPITAL25478 /HIGHYESYESR.P.B.P.WATTSOO93"Hospital Maintenence19/10/1050/040
70 TESTBLDG 4000 BOILER RMDOMESTIC WATER MAIN BY-PASSCONTAMINATES FROM HOSPITAL06534 /HIGHYESYESR.P.B.P.WATTSOO93"Hospital Maintenence19/21/1050/041
71 TESTBLDG 4000 KITCHENLAUNDRY ROOM BY KITCHENHIGH / 247753YESYESR.P.B.P.WATTSOO91/2"Hospital Maintenence18/22/1050/042
72 TESTBLDG 4000 KITCHENLAUNDRY ROOM BY KITCHENC.W. MAKE UP TO SOAP DISPENSERHIGH /YESYESR.P.B.P.WATTSOO91/2"REMOVED FROM INVENTORY. DEVICE NO LONGER EXISTS01
73 TESTBLDG 4000 JANITOR G105CLEANING CHEM MIX STATIONCHEMICALS / SOAPHIGH / A26777YESYESR.P.B.P.WATTSOO91/2"Hospital Maintenence19/11/1050/050
74 TESTBLDG 4000 LAB GB07C.W. SUPPLY TO CHEMISTRY ANALYZERBLOOD TESTERHIGH / A26791YESYESR.P.B.P.WATTSOO91/2"Hospital Maintenence19/11/1050/059
75 TESTBLDG 4000 RADIOLOGY IJ08-AC.W. MAKE-UP TO X-RAY PROCESSORCHEMICALS/ HIGHYESYESR.P.B.P.WATTSOO91/2"Decice Removed0150/043
INVENTORY OF CROSS-CONNECTION CONTROL AND BACKFLOW PREVENTION DEVICES
OFFUTT AFBPERSONNEL MAKING INVENTORY:
CONTROL NO ISSUEDLOCATIONITEM / FACILITY SYSTEM PROTECTEDPOTENTIAL CONTAINMENT/POLLUTANTDEGREE OF HAZARD / DEVICE SERIAL NUMBERBACK PRESS POTENTBACK SIPHONAGE POTENTIALTYPE CONTROL INSTALLED OR (REQUIRED)DATA ON DEVICE INSTALCOMMENTSCOMPTOTNXT YR.TYPE #
MAKEMODELSIZE
76 TESTBLDG 4000 RADIOLOGY 1008-AC.W. MAKE-UP TO X-RAY PROCESSORCHEMICALS/ HIGHYESYESR.P.B.P.WATTSOO91/2"Device Removed0150/044
77 VBBLDG 4000 RADIOLOGY 1008-A2 HOSE BIBBS 1 SERVICE SINKCHEMICALS SEWAGEHIGHNOYESSCREW ON VACUUM BREAKERWATTS8A5/8"01
78 TESTBLDG 4000 MAMOGRAPHY 1002-BC.W. MAKE-UP TO X-RAY PROCESSORCHEMICALS55126 / HIGHYESYESR.P.B.P.WATTSOO91/2"Hospital Maintenence18/7/1050/045
79 TESTMAKEUP WATER TO X-RAY PROCESSORCHEMICALS/ HIGHYESYESR.P.B.P.WATTSOO9QT1/2"Device Removed 9/8/08 Robles/Pyle01N/A50/046
80 TESTMAKEUP WATER TO X-RAY PROCESSORCHEMICALS/ HIGHYESYESR.P.B.P.WATTSOO91/2"Device Removed 9/8/08 Robles/Pyle01N/A50/047
81 TESTBLDG 4000 DENTAL LABC.W. MAKE-UP TO PERO. AIR CONDFREON OILHIGHYESYESR.P.B.P.WATTSOO91/2"DEVICE IS STILL IN PLACE, BUT AIR CONDITIONING EQUIP HAS BEEN REMOVED. GREG KIEPKE 8/13/9901
82 TESTBLDG 4000 S MECH RMC.W. MAKE-UP TO WATER SOFTENERSODIUM CHEMICALS88414 / HIGHYESYESR.P.B.P.FEBCO825Y2"DEVICE NO LONGER EXISTS DELETE FROM INVENT 6/13/050156/04
83 VBBLDG 4000 S MECH RM5 HOSE BIBBS 1 SERVICE SINKCHEMICALS SEWAGELOWNOYESSCREW ON VACUUM BREAKERWATTS8A5/8"01
84 FPBLDG 4000 S MECH RMFIRE PROTECTION SYSTEMRUST STAGNANT WATER9601301340 / LOWYESYESD.C.V.FEBCO8506"Hospital Maintenence19/28/1056/05
85 TESTBLDG 4000 S MECH RMC.W. MAKE-UP TO CHILLERCHEMICALS547163 / HIGHYESYESR.P.B.P.WATTS9093/4"Hospital Maintenence19/10/1050/048
86 TESTBLDG 4000 S MECH RMC.W. MAKE-UP PERIMETER HTG.CHEMICALS127069 / HIGHYESYESR.P.B.P.WATTS9093/4"Hospital Maintenence19/10/1050/049
87 TESTBLDG 4000 S MECH RMC.W. MAKE-UP TO VACUMM RECEIVERSCHEMICALS WASTE147752/ highYESYESR.P.B.P.WATTS9091 1/2"Hospital Maintenence19/10/10
INVENTORY OF CROSS-CONNECTION CONTROL AND BACKFLOW PREVENTION DEVICES
OFFUTT AFBPERSONNEL MAKING INVENTORY:
CONTROL NO ISSUEDLOCATIONITEM / FACILITY SYSTEM PROTECTEDPOTENTIAL CONTAINMENT/POLLUTANTDEGREE OF HAZARD / DEVICE SERIAL NUMBERBACK PRESS POTENTBACK SIPHONAGE POTENTIALTYPE CONTROL INSTALLED OR (REQUIRED)DATA ON DEVICE INSTALCOMMENTSCOMPLETEDTOTALNXT YR.TYPE #
MAKEMODELSIZE
88 TESTBLDG 4000C.W. MAKE-UP TO COOLING TOWERGLYCOL / RUST56161 / HIGHYESYESR.P.B.P.WATTS009M21/2"Hospital Maintenence18/10/1050/051
89 TESTBLDG 4000 gi27H.W. MAKE-UP TO EMBALMINGCHEMICALHIGH / 57213YESYESR.P.B.P.WATTSOO91/2"Hospital Maintenence19/22/1050/052
90 TESTBLDG 4209 MECH RMC.W. MAKE-UP TO CHILLERCHEMICALS386525 / HIGHYESYESR.P.B.P.WATTS9093/4"TESTED DEVICE0150/053
91 TESTBLDG 4209 MECH RMC.W. MAKE-UP TO AIR COMPRESSORCOMPRESSOR OIL124967/ HIGHYESYESR.P.B.P.WATTSOO93/4"TESTED DEVICE0150/054
92 VBBLDG 4209 MECH RM1 SERVICE SINK 6 WALL HYD. 4 HOSE BIBBSCHEMICALS SEWAGEHIGHNOYESSCREW ON VACUUM BREAKERWATTS8A5/8"01
93 FPBLDG 4209 BOILER RMFIRE PROTECTION SYSTEMRUST STAGNANT WATERNDL96/LOWYESYESD.C.V.CONBRACO4"TESTED DEVICE0151/012
94 TESTBLDG 4209 BOILER RMLAWN IRRIGATION SYSTEMLAWN CHEMICALS06571/HIGHYESYESR.P.B.P.WATTSOO91 1/2"TESTED DEVICE0150/055
95 TESTBLDG 4209 BOILER RMC.W. MAKE-UP TO BOILER & CHILLERCHEMICALS89830 / HIGHYESYESR.P.B.P.WATTSOO93/4"TESTED DEVICE0150/056
96 FPBLDG 3998FIRE PROTECTION SYSTEMRUST STAGNANT WATERLOWYESYESSINGLE CHECK VALVERELIABLEDG4"No Longer Our Device, Belongs to Contractor019/13/0853/001
97 TESTBLDG 4000 BOILER RMC.W. MAKE-UP TO DOM. H.W. HEAT EXCH.CHEMICALS88972 / HIGHYESYESR.P.B.P.WATTSOO92"Hospital Maintenence19/17/1050/057
99 TESTBLDG 4000 gi27C.W. MAKE-UP TO EMBALMINGBIOLOGICAL WASTE55121 / HIGHYESYESR.P.B.P.WATTSOO91/2"Hospital Maintenence19/22/1050/057
100 TESTBLDG 4000 KITCHENC.W. MAKE-UP TO DOM. H.W. HEAT EXCH.CHEMICALS05713 / HIGHYESYESR.P.B.P.WATTSOO91 1/4"Hospital Maintenence01
INVENTORY OF CROSS-CONNECTION CONTROL AND BACKFLOW PREVENTION DEVICES
OFFUTT AFBPERSONNEL MAKING INVENTORY:
CONTROL NO ISSUEDLOCATIONITEM / FACILITY SYSTEM PROTECTEDPOTENTIAL CONTAINMENT/POLLUTANTDEGREE OF HAZARD / DEVICE SERIAL NUMBERBACK PRESS POTENTBACK SIPHONAGE POTENTIALTYPE CONTROL INSTALLED OR (REQUIRED)DATA ON DEVICE INSTALCOMMENTSCOMPTOTNXT YR.TYPE #
MAKEMODELSIZE
101 TESTBLDG 457 RM 235C.W. MAKE-UP TO LIEBERT UNITCHEMICALS57203 / HIGHYESYESR.P.B.P.WATTSOO91/2"TESTED DEVICE0150/060
102 FPBLDG 457 MECH RM 515FIRE PROTECTION SYSTEMRUST STAGNANT WATERLOWYESYESSINGLE CHECK VALVECSC176-F2 1/2"01
103 FPBLDG 457 RM 273FIRE PROTECTION SYSTEMRUST STAGNANT WATERLOWYESYESSINGLE CHECK VALVE3526"01
104 FPBLDG 457 RM 273FIRE PROTECTION SYSTEMRUST STAGNANT WATERLOWYESYESSINGLE CHECK VALVEAUTO SPRINKLERD2 1/2"01
105 FPBLDG 457 RM 273FIRE PROTECTION SYSTEMRUST STAGNANT WATERLOWYESYESSINGLE CHECK VALVEAUTO SPRINKLERD2 1/2"01
106 FPBLDG 457 RM 456FIRE PROTECTION SYSTEMRUST STAGNANT WATERLOWYESYESSINGLE CHECK VALVEAUTO SPRINKLER17.5F2 1/2"01
107 FPBLDG 457 RM 456FIRE PROTECTION SYSTEMRUST STAGNANT WATERLOWYESYESSINGLE CHECK VALVEAUTO SPRINKLER17.5F2 1/2"01
108 FPBLDG 457 RM 651FIRE PROTECTION SYSTEMRUST STAGNANT WATERLOWYESYESSINGLE CHECK VALVE6"VALVE PAINTED--NO MAKE OR MODEL01
109 FPBLDG 457 RM 6515FIRE PROTECTION SYSTEMRUST STAGNANT WATERLOWYESYESSINGLE CHECK VALVEAUTO SPRINKLER3526"01
110 FPBLDG 457 RM615FIRE PROTECTION SYSTEMRUST STAGNANT WATERLOWYESYESSINGLE CHECK VALVE4"VALVE PAINTED--NO MAKE OR MODEL01
111 FPBLDG 457 RM 593FIRE PROTECTION SYSTEMRUST STAGNANT WATERLOWYESYESSINGLE CHECK VALVEAUTO SPRINKLER4"01
INVENTORY OF CROSS-CONNECTION CONTROL AND BACKFLOW PREVENTION DEVICES
OFFUTT AFBPERSONNEL MAKING INVENTORY:
CONTROL NO ISSUEDLOCATIONITEM / FACILITY SYSTEM PROTECTEDPOTENTIAL CONTAINMENT/POLLUTANTDEGREE OF HAZARD / DEVICE SERIAL NUMBERBACK PRESS POTENTBACK SIPHONAGE POTENTIALTYPE CONTROL INSTALLED OR (REQUIRED)DATA ON DEVICE INSTALCOMMENTSCOMPTOTNXT YR.TYPE #
MAKEMODELSIZE
112 FPBLDG 457 RM 551FIRE PROTECTION SYSTEMRUST STAGNANT WATERLOWYESYESSINGLE CHECK VALVECSC2 1/2"01
113 FPBLDG 457 RM 551FIRE PROTECTION SYSTEMRUST STAGNANT WATERLOWYESYESSINGLE CHECK VALVEAUTO SPRINKLERD2 1/2"01
114 FPBLDG 457 BOILER RMFIRE PROTECTION SYSTEMRUST STAGNANT WATERLOWYESYESSINGLE CHECK VALVEAUTO SPRINKLER6"01
01
116 TESTBLDG 457 RM 665C.W. MAKE-UP TO HYD. TEST STANDHYDRAULIC OIL CHEMICALS233505 / HIGHYESYESR.P.B.P.WATTSOO91"TESTED DEVICE0150/025
117 TESTBLDG 457 RM 665C.W. MAKE-UP TP WASH TANKSCHEMICALS SOAP55146 / HIGHYESYESR.P.B.P.WATTSOO91/2"TESTED DEVICE0150/026
118 TESTBLDG 457 RM 651C.W. MAKE-UP TO WELDERSCHEMICALS89815 / HIGHYESYESR.P.B.P.WATTSOO93/4"TESTED DEVICE0150/027
119 TESTC.W. SUPPLY TO BOILERSTAGNENT WATER / CHEMICALS228878 / HIGHYESYESR.P.B.P.WATTSOO91/2"Device removed013/6/0750/028
120 VBBLDG 457 RM 6362 HOSE BIBBSCHEMICALSHIGHNOYESSCREW-ON VACUUM BREAKERSWATTS8A5/8"01
121 TESTBLDG 457 RM 593C.W. MAKEUP TO MANIFOLD TESTERCHEMICALS55160 / HIGHYESYESR.P.B.P.WATTSOO91/2"TESTED DEVICE0150/029
122 VBBLDG 457 RM 59312 HOSE BIBBS 4 SERVICE SINKSCHEMICALSHIGHNOYESSCREW ON VACUUM BREAKERWATTS8A5/8"01
123 TESTBLDG 304 CHILLC.W. SUPPLY TO COOLING TOWERSTAG WATER / CHEMICALS120570 / HIGHYESYESR.P.B.P.WATTS90921/2"TESTED DEVICE0150/030
INVENTORY OF CROSS-CONNECTION CONTROL AND BACKFLOW PREVENTION DEVICES
OFFUTT AFBPERSONNEL MAKING INVENTORY:
CONTROL NO ISSUEDLOCATIONITEM / FACILITY SYSTEM PROTECTEDPOTENTIAL CONTAINMENT/POLLUTANTDEGREE OF HAZARD / DEVICE SERIAL NUMBERBACK PRESS POTENTBACK SIPHONAGE POTENTIALTYPE CONTROL INSTALLED OR (REQUIRED)DATA ON DEVICE INSTALCOMMENTSCOMPTOTNXT YR.TYPE #
MAKEMODELSIZE
124 TESTBLDG 493 EQUIP ROOMC.W. SUPPLY TO BLDG ISOLATIONUNKNOWN20522 / HIGHYESYESR.P.B.P.WATTS9093"TESTED DEVICE012/25/1450/245
125 TESTBLDG 457 RM 564C.W. MAKEUP TO PARTS WASHERCHEMICALS89762 / HIGHYESYESR.P.B.P.WATTS009M23/4"TESTED DEVICE0150/031
126 TESTBLDG 457 RM 944C.W. MAKEUP TO CHILLER & COOL TOWERCHEMICALS89973 / HIGHYESYESR.P.B.P.WATTS009M12"TESTED DEVICE0150/032
127 TESTBLDG 457 RM 936SOAP RM. EQUIP, HEAT EX F/HEAT SYS.SOAP CHEMICALSHIGH / 14494YESYESR.P.B.P.WATTS009m211/2"TESTED DEVICE013/11/1456/002
128 TESTBLDG 457 RM 936C.W. MAKEUP TO BOILERCHEMICALS07224 / HIGHYESYESR.P.B.P.WATTSOO93"TESTED DEVICE0150/033
129 TESTBLDG 457 BOILER RMC.W. MAKEUP TO BOILERS & CHILLERSCHEMICALS20315 / HIGHYESYESR.P.B.P.WATTSOO921/2"TESTED DEVICE0150/034
130 TESTBLDG 457 BOILER RMC.W. MAKEUP TO DOM.H.W. HEAT EXCH.CHEMICALS89974 / HIGHYESYESR.P.B.P.WATTSOO92"TESTED DEVICE0150/035
131 TESTBLDG 493 RM 103COLD WATER SUPPLY TO BOILERSTAGNENT WATER / CHEMICALS228878 / HIGHYESYESR.P.B.P.WATTSOO91/2"TESTED DEVICE0150/028
132 TESTBLDG 47 SE CORNERC.W. MAKEUP TO IRRIG. SYSCHEMICALSA05214 / HIGHYESYESR.P.B.P.FEBCO8601/2"Not Currently Installed 4/27/07014/27/1050/061
134 TESTBLDG 47 NE CORNERC.W. MAKEUP TO IRRIG. SYS.CHEMICALS215082 / HIGHYESYESR.P.B.P.WATTSOO91/2"Not Currently Installed 4/27/07014/27/1050/062
136 TESTBLDG 29 ON FENCEC.W. MAKEUP TO IRRIG. SYS.CHEMICALS63402 / HIGHYESYESR.P.B.P.WATTSOO91/2"Not Currently Installed 4/27/07014/27/1050/063
INVENTORY OF CROSS-CONNECTION CONTROL AND BACKFLOW PREVENTION DEVICES
OFFUTT AFBPERSONNEL MAKING INVENTORY:
CONTROL NO ISSUEDLOCATIONITEM / FACILITY SYSTEM PROTECTEDPOTENTIAL CONTAINMENT/POLLUTANTDEGREE OF HAZARD / DEVICE SERIAL NUMBERBACK PRESS POTENTBACK SIPHONAGE POTENTIALTYPE CONTROL INSTALLED OR (REQUIRED)DATA ON DEVICE INSTALCOMMENTSCOMPTOTNXT YR.TYPE #
MAKEMODELSIZE
138 TESTBLDG 495 NORTHC.W. MAKEUP TO HOSE BIBBCHEMICALS566628 / HIGHYESYESR.P.B.P.WATTS9093/4"TESTED DEVICE 6/11/13 Robles/Bodell116/11/1450/064
140 TESTBLDG 592 LIFT STATIONC.W. MAKEUP TO HOSE BIBBCHEMICALS290248/ HIGHYESYESR.P.B.P.WATTS9093/4"TESTED DEVICE0250/065
142 TESTBLDG 552C.W. MAKEUP TO FIRE SUPPRESSCHEMICALS/AFFF0011291346/ HIGHYESYESR.P.B.P.FEBCO8604"TESTED DEVICE 6/13/13 Alves126/13/1450/066
143 TEST03
146 TEST288 MECH RMC.W. MAKEUP TO Lawn IrrigationCHEMICALSH08561/HighYESYESR.P.B.P.FEBCO8602"TESTED DEVICE 3/19/2013 Robles/Dean133/19/1450/68
148 TEST288 MECH RMC.W. SUPPLY TO FIRE SUPPRESSIONSTAGNET WATERNW262 / LOWYESYESR.P.B.P.CONBRACO6DC6"TEST DEVICE 3/18/13 ALVES143/18/1450/069
150 TEST288 TRUCK BAYC.W. SUPPLY TO FIRE TRUCK FILLSTAGNET WATERF0302261124 / HIGHYESYESR.P.B.P.FEBCO8604"TEST DEVICE 3/19/13 ROBLES/Dean153/19/1450/70
152 TEST288 TRUCK BAYC.W. SUPPLY TO FIRE TRUCK FILLSTAGNET WATERF0407151401 / HIGHYESYESR.P.B.P.FEBCO8604"TESTED DEVICE 3/11/13 ROBLES/Dean163/11/1450/071
154 TEST288 MECH RMC.W. SUPPLY TO BUILDING ISOLATIONCHEMICALSHIGH / F0407151529YESYESR.P.B.P.FEBCO8603/4"TESTED DEVICE 3/12/13 ROBLES/Dean173/12/1450/072
156 TESTBLDG 565 CSTSC.W. MAKE-UP TO MISC.CHEMICALSHIGH / 18973YESYESR.P.B.P.WATTSOO9M33/4"TESTED DEVICE 4/17/2013 Robles/Dean183/17/1450/073
158 TESTBLDG 9950 KITCHCOLD WATER SUPPLY TO SOAP DISPCHEMICALSA09492 / HIGHYESYESR.P.B.P.WATTSOO91/2"TESTED DEVICE 4/9/13 Robles/Dean194/9/1450/074
160 TESTBLDG 9950 KITCHCOLD WATER SUPPLY TO DISPOSERSEWAGEHIGH / A09920YESYESR.P.B.P.WATTSOO91/2"TESTED DEVICE 4/9/13 Robles/DEAN1104/9/1450/075
INVENTORY OF CROSS-CONNECTION CONTROL AND BACKFLOW PREVENTION DEVICES
OFFUTT AFBPERSONNEL MAKING INVENTORY:
CONTROL NO ISSUEDLOCATIONITEM / FACILITY SYSTEM PROTECTEDPOTENTIAL CONTAINMENT/POLLUTANTDEGREE OF HAZARD / DEVICE SERIAL NUMBERBACK PRESS POTENTBACK SIPHONAGE POTENTIALTYPE CONTROL INSTALLED OR (REQUIRED)DATA ON DEVICE INSTALCOMMENTSCOMPTOTNXT YRTYPE #
MAKEMODELSIZE
162 TESTBLDG 809 FAMC.W. SUPPLY TO FAM CAMP AREAISOLATION DEVICEHIGH / 433881YESYESR.P.B.P.WATTS9092"TESTED DEVICE 4/16/13 Robles/Dean1114/16/1450/361
164 TEST727 BOILER RMC.W. MAKE-UP TO BOILERCHEMICALS137493 / HIGHYESYESR.P.B.P.WATTS9093/4"Device is out of service, building is pickled.01250/077
166 TEST728 BOILER RMC.W. MAKE-UP TO BOILERCHEMICALS469431 / HIGHYESYESR.P.B.P.WATTS9093/4"Device is out of service, building is pickled.01250/078
168 TEST729 BOILER RMC.W. MAKE-UP TO BOILERCHEMICALS130257 /HIGHYESYESR.P.B.P.WATTS9093/4"Device is out of service, building is pickled.01250/079
170 TEST730 BOILER RMC.W. MAKE-UP TO BOILERCHEMICALS131566 / HIGHYESYESR.P.B.P.WATTS9093/4"BUILDING HAS BEEN DEADLINED012
172 TEST731 BOILER RMC.W. MAKEUP TO BOILERCHEMICALS469431 / HIGHYESYESR.P.B.P.WATTS9093/4"BUILDING HAS BEEN DEADLINED012
174 TEST732 BOILER RMC.W. MAKE-UP TO BOILERCHEMICALS128946 / HIGHYESYESR.P.B.P.WATTS9093/4"BUILDING HAS BEEN DEADLINED012
176 TEST733 BOILER RMC.W. MAKE-UP TO BOILERCHEMICALS128943 / HIGHYESYESR.P.B.P.WATTS9093/4"BUILDING HAS BEEN DEADLINED012
178 TEST734 BOILER RMC.W. MAKE-UP TO BOILERCHEMICALS130221 / HIGHYESYESR.P.B.P.WATTS9093/4"BUILDING HAS BEEN DEADLINED012
180 TEST735 BOILER RMC.W. MAKE-UP TO BOILERCHEMICALS128952 / HIGHYESYESR.P.B.P.WATTS9093/4"BUILDING HAS BEEN DEADLINED012
182 TEST736 BOILER RMC.W. MAKE-UP TO BOILERCHEMICALS118445 / HIGHYESYESR.P.B.P.WATTS9093/4"BUILDING HAS BEEN DEADLINED012
184 TEST737 BOILER RMC.W. MAKE-UP TO BOILERCHEMICALS130205 / HIGHYESYESR.P.B.P.WATTS9093/4"BUILDING HAS BEEN DEADLINED012
INVENTORY OF CROSS-CONNECTION CONTROL AND BACKFLOW PREVENTION DEVICES
OFFUTT AFBPERSONNEL MAKING INVENTORY:
CONTROL NO ISSUEDLOCATIONITEM / FACILITY SYSTEM PROTECTEDPOTENTIAL CONTAINMENT/POLLUTANTDEGREE OF HAZARD / DEVICE SERIAL NUMBERBACK PRESS POTENTBACK SIPHONAGE POTENTIALTYPE CONTROL INSTALLED OR (REQUIRED)DATA ON DEVICE INSTALCOMMENTSCOMPTOTNXT YR.TYPE #
MAKEMODELSIZE
186 TEST738 BOILER RMC.W. MAKE-UP TO BOILERCHEMICALS118442 / HIGHYESYESR.P.B.P.WATTS9093/4"BUILDING HAS BEEN DEADLINED012
188 TEST739 BOILER RMC.W. MAKE-UP TO BOILERCHEMICALS128940 / HIGHYESYESR.P.B.P.WATTS9093/4"BUILDING HAS BEEN DEADLINED012
190 TEST740 BOILER RMC.W. MAKE-UP TO BOILERCHEMICALS118447 / HIGHYESYESR.P.B.P.WATTS9093/4"BUILDING HAS BEEN DEADLINED012
192 TEST741 BOILER RMC.W. MAKE-UP TO BOILERCHEMICALS118450 / HIGHYESYESR.P.B.P.WATTS9093/4"BUILDING HAS BEEN DEADLINED012
194 TEST742 BOILER RMC.W. MAKE-UP TO BOILERCHEMICALS139255 / HIGHYESYESR.P.B.P.WATTS9093/4"BUILDING HAS BEEN DEADLINED012
196 TEST743 BOILER RMC.W. MAKE-UP TO BOILERCHEMICALS118503 / HIGHYESYESR.P.B.P.WATTS9093/4"BUILDING HAS BEEN DEADLINED012
198 TEST744 BOILER RMC.W. MAKE-UP TO BOILERSCHEMICALS118439 / HIGHYESYESR.P.B.P.WATTS9093/4"BUILDING HAS BEEN DEADLINED012
200 TEST745 BOILER RMC.W. MAKE-UP TO BOILERCHEMICALS128953 / HIGHYESYESR.P.B.P.WATTS9093/4"BUILDING HAS BEEN DEADLINED012
202 TEST746 BOILER RMC.W. MAKE-UP TO BOILERCHEMICALS118509 / HIGHYESYESR.P.B.P.WATTS9093/4"BUILDING HAS BEEN DEADLINED012
204 TEST747 BOILER RMC.W. MAKE-UP TO BOILERCHEMICALS118440 / HIGHYESYESR.P.B.P.WATTS9093/4"BUILDING HAS BEEN DEADLINED012
206 TEST748 BOILER RMC.W. MAKE-UP TO BOILERCHEMICALS130250 / HIGHYESYESR.P.B.P.WATTS9093/4"BUILDING HAS BEEN DEADLINED012
208 TEST749 BOILER RMC.W. MAKE-UP TO BOILERCHEMICALS118404 / HIGHYESYESR.P.B.P.WATTS9093/4"BUILDING HAS BEEN DEADLINED012
INVENTORY OF CROSS-CONNECTION CONTROL AND BACKFLOW PREVENTION DEVICES
OFFUTT AFBPERSONNEL MAKING INVENTORY:
CONTROL NO ISSUEDLOCATIONITEM / FACILITY SYSTEM PROTECTEDPOTENTIAL CONTAINMENT/POLLUTANTDEGREE OF HAZARD / DEVICE SERIAL NUMBERBACK PRESS POTENTBACK SIPHONAGE POTENTIALTYPE CONTROL INSTALLED OR (REQUIRED)DATA ON DEVICE INSTALCOMMENTSCOMPTOTNXT YR.TYPE #
MAKEMODELSIZE
210 FPBLDG 586C.W. SUPPLY TO FIRE SUPPRESSIONRUST STAGNANT WATER0001261015/LOWYESYESDCVFEBCO7706"TESTED DEVICE01256/029
216 TESTBLDG 585 LABC.W. MAKE-UP TO LAB SINKCHEMICALS06122 / HIGHYESYESR.P.B.P.WATTSOO93/8"TESTED DEVICE01250/081
218 TESTBLDG 524 RM. 227C.W. MAKE-UP TO SOAP DISPCHEMICALSA21625 / HIGHYESYESR.P.B.P.WATTS9091/2"TESTED DEVICE01250/082
220 TESTBLDG 4000 ROOM GJ19-AC.W. MAKE-UP TO STERLIZERA12272 / HIGHYESYESR.P.B.P.WATTSOO91/2"Hospital Maintenence129/22/1050/129
222 TESTBLDG 4000 RM GJ16-AC.W. MAKE-UP TO STEAM MACHINEA03001 / HIGHYESYESR.P.B.P.WATTSOO93/4"Hospital Maintenence129/22/1050/130
224 TESTBLDG 4000 RM 1L13WATER SUPPLY TO STERILIZERCHEMICALS06138 / HIGHYESYESR.P.B.P.WATTSOO93/8"Hospital Maintenence129/11/1050/138
226 TESTBLDG 4000 RMGJ16BWATER SUPPLY TO STERILIZERCHEMICALS06136 / HIGHYESYESR.P.B.P.WATTSOO93/8"Hospital Maintenence129/22/1050/132
228 TESTBLDG 4000 RMGJ19-BWATER SUPPLY TO STERILIZERCHEMICALS06125 / HIGHYESYESR.P.B.P.WATTSOO93/8"Hospital Maintenence129/22/1050/080
230 TESTBLDG 4000 2P07WATER SUPPLY TO STERILIZERCHEMICALSA202111 / HIGHYESYESR.P.B.P.WATTSOO93/4"Hospital Maintenence129/16/1050/087
232 TESTBLDG 4000 HOSP TOWERSUPPLY FILTER COOLING TOWERCHEMICALSA26846 / HIGHYESYESR.P.B.P.WATTSOO91/2"Hospital Maintenence129/10/1050/088
234 TESTBldg 4000 rm 2p07C.W. MAKEUP TO Steris sterlizerCHEMICALSA25503 / HIGHYESYESR.P.B.P.WATTSOO93/4"Hospital Maintenence129/16/1050/089
236 TESTBldg 4000 Rm 2001 DentalC.W. MAKEUP TO Curing MachineUNKNOWNA26774 / HIGHYESYESR.P.B.P.WATTSOO91/2"Hospital Maintenence129/22/1050/090
INVENTORY OF CROSS-CONNECTION CONTROL AND BACKFLOW PREVENTION DEVICES
OFFUTT AFBPERSONNEL MAKING INVENTORY:
CONTROL NO ISSUEDLOCATIONITEM / FACILITY SYSTEM PROTECTEDPOTENTIAL CONTAINMENT/POLLUTANTDEGREE OF HAZARD / DEVICE SERIAL NUMBERBACK PRESS POTENTBACK SIPHONAGE POTENTIALTYPE CONTROL INSTALLED OR (REQUIRED)DATA ON DEVICE INSTALCOMMENTSCOMPTOTNXT YR.TYPE #
MAKEMODELSIZE
238 TESTBldg 4000 Rm G123-BC.W. MAKEUP TO STERILIZERUNKNOWNA20212 / HIGHYESYESR.P.B.P.WATTSOO93/4"Hospital Maintenence129/22/1050/091
240 TESTBldg 4000 RM GJ15C.W. MAKEUP TO chem mix stationCHEMICALSA21647 / HIGHYESYESR.P.B.P.WATTSOO91/2"Hospital Maintenence129/22/1050/092
242 TESTBldg 4000 Rm GB07-BC.W. MAKEUP TO chem mix stationCHEMICALSA12304 / HIGHYESYESR.P.B.P.WATTSOO91/2"Hospital Maintenence129/11/1050/094
244 TESTBldg 4000 Rm 217C.W. MAKEUP TO chem mix stationCHEMICALSA21612 / HIGHYESYESR.P.B.P.WATTSOO91/2"Hospital Maintenence129/22/1050/096
246 TESTBldg 4000 Rm 1E41C.W. MAKEUP TO chem mix stationCHEMICALSA21623 / HIGHYESYESR.P.B.P.WATTSOO91/2"Hospital Maintenence129/22/1050/095
248 TESTBldg 4000 Rm GJ05C.W. MAKEUP TO chem mix stationCHEMICALSA26799 / HIGHYESYESR.P.B.P.WATTSOO91/2"Hospital Maintenence129/11/1050/093
250 TESTBldg 4000 Rm 261C.W. MAKEUP TO chem mix stationCHEMICALSA12345/ HIGHYESYESR.P.B.P.WATTSOO91/2"Hospital Maintenence129/16/1050/097
252 TESTBldg 4000 Rm2P05C.W. MAKEUP TO chem mix stationCHEMICALSHIGH / A26820YESYESR.P.B.P.WATTSOO91/2"Hospital Maintenence129/11/1050/098
254 TESTBLDG 4000 RM1K23C.W. SUPPLY TO CHEM DISP UNITCHEMICALSA26923 / HIGHYESYESR.P.B.P.WATTSOO91/2"Hospital Maintenence129/11/1050/099
256 TESTBLDG 4000 RM 232C.W. SUPPLY TO CHEM DISP UNITCHEMICALSA26819 / HIGHYESYESR.P.B.P.WATTSOO91/2"Hospital Maintenence129/11/1050/100
258 TESTBLDG 4000 RM 323C.W. SUPPLY TO CHEM DISP UNITCHEMICALSA21571 / HIGHYESYESR.P.B.P.WATTSOO91/2"Hospital Maintenence129/11/1050/101
260 TESTBLDG 4000 RMIL28C.W. SUPPLY TO CHEM DISP UNITCHEMICALSA27987/ HIGHYESYESR.P.B.P.WATTSOO91/2"Hospital Maintenence129/11/1050/102
INVENTORY OF CROSS-CONNECTION CONTROL AND BACKFLOW PREVENTION DEVICES
OFFUTT AFBPERSONNEL MAKING INVENTORY:
CONTROL NO ISSUEDLOCATIONITEM / FACILITY SYSTEM PROTECTEDPOTENTIAL CONTAINMENT/POLLUTANTDEGREE OF HAZARD / DEVICE SERIAL NUMBERBACK PRESS POTENTBACK SIPHONAGE POTENTIALTYPE CONTROL INSTALLED OR (REQUIRED)DATA ON DEVICE INSTALCOMMENTSCOMPTOTNXT YR.TYPE #
MAKEMODELSIZE
262 TESTBLDG 4000 RM1L36C.W. SUPPLY TO CHEM DISP UNITCHEMICALSA21559 / HIGHYESYESR.P.B.P.WATTSOO91/2"Hospital Maintenence129/11/1050/103
264 TESTBLDG 4000 S MECH RMC.W. SUPPLY BLDG ISOLATIONCHEMICALS / BIO252640 / HIGHYESYESR.P.B.P.WATTS9096"Hospital Maintenence129/23/1050/104
266 TEST301 BOILER RMC.W. MAKE-UP TO HOT WATER BUNDLECHEMICALS468513 / HIGHYESYESR.P.B.P.WATTS9093/4"TESTED DEVICE 2/12/13 ROBLES/Dean1122/13/1450/105
268 TESTBLDG 4000 RM 2P01WATER MAKE-UP TO STERLIZERCHEMICALSA10264 / HIGHYESYESR.P.B.P.WATTS9091"Hospital Maintenence133/4/1050/106
270 TESTBLDGC.W. SUPPLY TO BLDGCHEMICALSNBD83/LOWYESYESR.P.B.P.WATTSUnkn1Device is out of service, building is pickled.0135/11/1050/107
272 TEST784 BOILER RMC.W. MAKE-UP TO BOILERCHEMICALS468511 / HIGHYESYESR.P.B.P.WATTS200023/4"Device is out of service, building is pickled.0134/12/0250/108
274 TEST785 BOILER RMC.W. MAKE-UP TO BOILERCHEMICALS118423 / HIGHYESYESR.P.B.P.WATTS9093/4"Device is out of service, building is pickled.0131/7/0150/109
276 TEST786 BOILER RMC.W. MAKE-UP TO BOILERCHEMICALS130242 / HIGHYESYESR.P.B.P.WATTS9093/4"Device is out of service, building is pickled.01350/110
278 TEST787 BOILER RMC.W. MAKE-UP TO BOILERSCHEMICALS130229 / HIGHYESYESR.P.B.P.WATTS9093/4"Device is out of service, building is pickled.01350/111
285 A NEWTRAINING EXC AREA1 FIRE HYDRANTWATERLOWNOYESR.P.B.P.WATTS009M22"SOMETIMES CAN BE USED TO FILL WATER TRUCK. IF THAT HAPPENS A TEMP DEVICE IS INSTALLED013
286 TESTBldg 363 ARTS & CRAFTSC.W. MAKE-UP TO BOILERCHEMICALS89790 / HIGHYESYESR.P.B.P.WATTS009M23/4"TESTED DEVICE 2/11/13 ROBLES/Dean11350/112
287 TESTBLDG 282C.W SUPPLY TO BLDG ISOLATIONWATERLK135 / LOWYESYESRPBPWILKINS40205TC21"TESTED DEVICE01460/005
INVENTORY OF CROSS-CONNECTION CONTROL AND BACKFLOW PREVENTION DEVICES
OFFUTT AFBPERSONNEL MAKING INVENTORY:
CONTROL NO ISSUEDLOCATIONITEM / FACILITY SYSTEM PROTECTEDPOTENTIAL CONTAINMENT/POLLUTANTDEGREE OF HAZARD / DEVICE SERIAL NUMBERBACK PRESS POTENTBACK SIPHONAGE POTENTIALTYPE CONTROL INSTALLED OR (REQUIRED)DATA ON DEVICE INSTALCOMMENTSCOMPTOTNXT YR.TYPE #
MAKEMODELSIZE
288 TESTBLDG 282C.W. SUPPLY TO FIRE SUPPRN.STAGNENT WATER / RUSTFH-2938 / LOWYESYESD.C.V.WATTS757 DC4"TESTED DEVICE01450/375
289 TESTBLDG 660C.W. SUPPLY TO UNKNWATER48285/HIGHYESYESRPBPWATTS009QTTESTED DEVICE01450/115
290 TESTBLDG 405C.W. MAKEUP TO AIR CONDITIONERFREON OIL STAGNANT WATER124912/HIGHYESYESR.P.B.P.WATTS009M23/4"Removed From Service 2/26/06 Robles/Pyle01450/114
292 TESTBLDG 463 MECH RMC.W. MAKEUP TO A/C & HEAT SYSTEMCHEMICALS131549 / HIGHYESYESR.P.B.P.WATTS009M23/4"TESTED DEVICE 2/19/13 ROBLES/Dean1142/19/1450/116
293 FPBLDG 402 MECH RMC.W. SUPPLY TO FIRE SUPPRESSIONRUST STAGNANT WATERLOW /YESYESD.C.V.FEBCO8504"Bldg Pickeled 11/23/09 Will be torn down in the spring015
296 TESTBLDG 400 MECH RMC.W. MAKEUP TO HEAT SYSTEMCHEMICALS114921 / HIGHYESYESR.P.B.P.WATTS9093/4"BLDG DESTROYED DEVICE REMOVED0156/24/0950/117
298FPBLDG 400 MECH.C.W. SUPPLY TO FIRE SUPR SYSTEMRUST STAGNANT WATER9901261640 / LOWYESYESD.C.V.FEBCO85021/2"BLDG DESTROYED DEVICE REMOVED0156/24/0956/06
300 TESTBLDG 402 MECH RMC.W. MAKEUP TO HEAT SYSTEMCHEMICALS/ HIGHYESYESR.P.B.P.WATTS9093/4"Bldg Pickeled 11/23/09 Will be torn down in the spring1550/357
302 TESTBLDG 402 MECH RMC.W. MAKEUP TO DOM. H.W. HEAT EXCH.CHEMICALS/ HIGHYESYESR.P.B.P.WATTSOO911/2"Bldg Pickeled 11/23/09 Will be torn down in the spring1550/358
307 TESTC.W. MAKEUP TO HEAT SYSTEMCHEMICALSHIGHYESYESR.P.B.P.WATTS9093/4"01550/118
308 TESTBLDG 135 MECHC/W SUPPLY TO BLDG ISOLATIONCHEMICALSA02687 / HIGHYESYESR.P.B.P.WATTS009QT11/2"TESTED DEVICE01550/119
309 TESTBLDG 525 MECH RMC.W. MAKE-UP TO HEAT SYSCHEMICALS600592 / HIGHYESYESR.P.B.P.WATTS9093/4TESTED DEVICE 2/19/13 ROBLES/Dean1152/19/1450/120
INVENTORY OF CROSS-CONNECTION CONTROL AND BACKFLOW PREVENTION DEVICES
OFFUTT AFBPERSONNEL MAKING INVENTORY:
CONTROL NO ISSUEDLOCATIONITEM / FACILITY SYSTEM PROTECTEDPOTENTIAL CONTAINMENT/POLLUTANTDEGREE OF HAZARD / DEVICE SERIAL NUMBERBACK PRESS POTENTBACK SIPHONAGE POTENTIALTYPE CONTROL INSTALLED OR (REQUIRED)DATA ON DEVICE INSTALCOMMENTSCOMPTOTNXT YR.TYPE #
MAKEMODELSIZE
310 TESTBLDG 525 MECH RMC.W. MAKEUP TO DOM. H.W. HEAT EXCH.CHEMICALS89977 / HIGHYESYESR.P.B.P.WATTS009M12"TESTED DEVICE 2/19/13 ROBLES/Dean1162/19/1450/121
313 TESTBLDG 526 MECH RMC.W. MAKEUP TO HEAT SYSTEMCHEMICALS114712 / HIGHYESYESR.P.B.P.WATTS9093/4"TESTED DEVICE2/20/13 ROBLES/Deanm1172/20/1450/122
314 TESTBLDG 526 MECH RMC.W. MAKEUP TO DOM. H.W.HEAT EXCH.CHEMICALS89976 / HIGHYESYESR.P.B.P.WATTSOO92"TESTED DEVICE 2/20/13 ROBLES/DEAN1182/20/1450/123
317 TESTBLDG 527 MECH RMMASTER RPBP ON WATER SERVICEUNKNOWNN5888 / HIGHYESYESR.P.B.P.CON-BRACO402090221/2"TESTED DEVICE 3/4/13 ROBLES/DEAN1193/4/1451/03
318 TESTBLDG 527 MECH RMC.W. MAKEUP TO HEAT SYSTEMCHEMICALS568896 / HIGHYESYESR.P.B.P.WATTS9091"TESTED DEVICE 3/4/13 ROBLES/Dean1203/4/1451/04
321 TESTBLDG 457 NDI RMC.W. MAKEUP Film DevelporCHEMICALSHIGH/ 80560NOYESR.P.B.P.WATTS009QT1/2"TESTED DEVICE 6/3/13 Robles/Dean1216/3/1450/124
322 TESTBLDG 451 MECH RMC.W. MAKEUP TO COOLING TOWERCHEMICALS / LEGIONAIRES DISEASEHIGH 05657NOYESR.P.B.P.WATTSOO92 1/2"TESTED DEVICE 6/3/13 Robles/Dean1226/3/1450/125
325 FSBLDG 404 YOUTH CENTERC.W. SUPPLY TO FIRE SUPR SYSTEMRUST STAGNANT WATERAH3484 LOWYESYESD.C.V.FEBCO805Y1"TESTED DEVICE 2/14/13 Alves1232/14/1456/025
326 TESTBLDG 9958 PATRIOTC.W. SUPPLY TO HEAT SYSTEMCHEMICALS / LEGIONAIRES DISEASEHIGH / A02526YESYESR.P.B.P.FEBCO8601"2/23/2009 Removed from inventory, Tesred by Housing Maintenance0242/23/10
327 TESTBLDG 9958 PATRIOTC.W. SUPPLY TO FIRE SUPR SYSTEMRUST STAGNANT WATERLOW / 9954301217YESYESD.C.V.FEBCO8503"2/23/2009 Removed from inventory, Tesred by Housing Maintenance0242/27/10
328 TESTBLDG 404 BOILER RMC.W. MAKEUP TO BOILER FILLCHEMICALS568627 / HIGHYESYESR.P.B.P.WATTS9093/4"TESTED DEVICE 1/28/13 Robles/Dean1241/28/1450/126
329 TESTBLDG 565 Hanger AreaHOT WATER SUPPLY TO HOSE REELFUEL / SOAP CHEMICALS008855 / HIGHYESYESP.V.B.WATTS800M411/2"TESTED DEVICE 4/22/13 Robles/Deanm1254/22/1450/323
INVENTORY OF CROSS-CONNECTION CONTROL AND BACKFLOW PREVENTION DEVICES
OFFUTT AFBPERSONNEL MAKING INVENTORY:
CONTROL NO ISSUEDLOCATIONITEM / FACILITY SYSTEM PROTECTEDPOTENTIAL CONTAINMENT/POLLUTANTDEGREE OF HAZARD / DEVICE SERIAL NUMBERBACK PRESS POTENTBACK SIPHONAGE POTENTIALTYPE CONTROL INSTALLED OR (REQUIRED)DATA ON DEVICE INSTALCOMMENTSCOMPTOTNXT YR.TYPE #
MAKEMODELSIZE
331 TESTBLDG 9958 BOILER RMC.W. SUPPLY TO LOOP SYSTEMRUST STAGNANT WATER67860 / HIGHYESYESR.P.B.P.WATTS009M21"PATRIOT MAINTENCE TO TEST AND REPORT RESULTS TO MUD265/25/0950/11
333 TESTBLDG 323 RM 119C.W. MAKEUP TO HEAT SYSTEMCHEMICALS180242 / HIGHYESYESR.P.B.P.WATTS9093/4"TESTED DEVICE 2/11/13 ROBLES/Dean1262/11/1450/127
334 TESTBLDG 362C.W. MAKEUP TO HOTSY CAR WASHSOAP CHEMICALS63996 / HIGHYESYESR.P.B.P.WATTSOO91/2"TESTED DEVICE02750/128
335 FPBLDG 362 MECH RMFIRE PROTECTION SYSTEMRUST STAGNANT WATERLOWNOYESSINGLE CHECK VALVE2 1/2"027
337 TESTBLDG 789 MECH RMISOLATION VALVE BETW EEN BASE & CITYNONELOWYESYESD.C.V.WATTS7092"DEVICE TESTED BY OUTSIDE CONTRACTOR YEARLY FOR FAA027
338 TESTBLDG 789 MECH RMC.W. MAKEUP TO HEAT SYSTEMCHEMICALS112350 / HIGHYESYESR.P.B.P.WATTS009M23/4"DEVICE TESTED BY AN OUTSIDE CONTRACTOR YEARLY FOR FAA027
341 TESTBLDG 789 OUTSIDELAWN SPRINKLERS SYSTEMLAWN CHEMICALSO7273 / HIGHNOYESR.P.B.P.WATTS009M211/4"DEVICE TESTED BY AN OUTSIDE CONTRACTOR YEARLY FOR FAA027
342 TESTBLDG 789 MECH RMC.W. MAKEUP TO FLASH TANKCHEMICALS STAGNANT WATERO5151 / HIGHYESYESR.P.B.P.WATTSOO91/2"DEVICE IS NO LONGER IN USE, AND IS REMOVED027
343 TESTBLDG 789 MECH RMSOFT WATER MAKEUP TO BOILERCHEMICALS STAGNANT WATER113588 / HIGHYESYESR.P.B.P.WATTS009M23/4"DEVICE TESTED BY AN OUTSIDE CONTRACTOR YEARLY FOR FAA027
344 TESTBLDG 280 MINIC.W. SUPPLY TO SODA DISPENSER306204 / HIGHYESYESR.P.B.P.WATTS009M21/2"TESTED DEVICE02750/374
INVENTORY OF CROSS-CONNECTION CONTROL AND BACKFLOW PREVENTION DEVICES
OFFUTT AFBPERSONNEL MAKING INVENTORY:
CONTROL NO ISSUEDLOCATIONITEM / FACILITY SYSTEM PROTECTEDPOTENTIAL CONTAINMENT/POLLUTANTDEGREE OF HAZARD / DEVICE SERIAL NUMBERBACK PRESS POTENTBACK SIPHONAGE POTENTIALTYPE CONTROL INSTALLED OR (REQUIRED)DATA ON DEVICE INSTALCOMMENTSCOMPTOTNXT YR.TYPE #
MAKEMODELSIZE
345 TESTBLDG 280 MINIPOTABLE SUPPLY TO BLDG ISOLAT.258969 / HIGHYESYESR.P.B.P.WATTS009M2QT2"TESTED DEVICE02750/371
346 EXISTBLDG 280 MINIPOTABLE SUPPLY TO LAWN IRRIG.CHEMICALHIGH / 261258YESYESR.P.B.P.WATTS009M2QT1"TESTED DEVICE02750/372
347 EXISTBLDG 280 MINIPOTABLE SUPPLY TO FIRE SUPPR.RUST / STAGNENT WATERHIGH/FJ3033YESYESD.C.V.AMESCOLT 2004"TESTED DEVICE02758/07
348 TESTBLDG 305 BOILER ROOMC.W. MAKEUP TO WATR SOFTNR. & BOILERSODIUM CHEMICALS/ HIGHYESYESR.P.B.P.WATTS9093/4"BLDG DESTROYED DEVICE REMOVED02750/257
354 TESTBLDG 42 MECH RMC.W. MAKEUP TO HEAT SYSTEMCHEMICALS215795 / HIGHYESYESR.P.B.P.WATTS9093/4"TESTED DEVICE02750/259
356 TESTBLDG 165 MECH RMC.W. MAKEUP TO CHILLERCHEMICALS63967 / HIGHYESYESR.P.B.P.WATTSOO91/2"BLDG DESTROYED DEVICE REMOVED0272/20/0950/263
357 TESTBLDG 165 MECH RMC.W. MAKEUP TO LAWN SPRINKLERSLAWN CHEMICALS132919 / HIGHNOYESR.P.B.P.WATTS9091 1/2"BLDG DESTROYED DEVICE REMOVED0272/20/0950/134
358 TESTBLDG 165 MECH RMC.W. MAKEUP TO HEAT SYSTEMCHEMICALS400745 / HIGHYESYESR.P.B.P.WATTS9093/4"BLDG DESTROYED DEVICE REMOVED0272/20/0950/135
360 TESTBLDG 165 KITCHENC.W. MAKEUP TO POP DISPENSER EQUIPCARBONATION SYRUP14144 / LOWYESYESR.P.B.P.WATTSOO9M33/4"BLDG DESTROYED DEVICE REMOVED0272/20/0950/136
365 TESTBLDG 78 KITCHENC.W. TO WATER COOLED ICE MAKERHIGHYESYESR.P.B.P.WATTSOO91/2"02750/137
366 TESTNOYESR.P.B.P.WATTS027
367 TESTCHEMICALSYESYESR.P.B.P.WATTS009 RT02750/139
INVENTORY OF CROSS-CONNECTION CONTROL AND BACKFLOW PREVENTION DEVICES
OFFUTT AFBPERSONNEL MAKING INVENTORY:
CONTROL NO ISSUEDLOCATIONITEM / FACILITY SYSTEM PROTECTEDPOTENTIAL CONTAINMENT/POLLUTANTDEGREE OF HAZARD / DEVICE SERIAL NUMBERBACK PRESS POTENTBACK SIPHONAGE POTENTIALTYPE CONTROL INSTALLED OR (REQUIRED)DATA ON DEVICE INSTALCOMMENTSCOMPTOTNXT YR.TYPE #
MAKEMODELSIZE
369 TESTBLDG 327 MECH AREAFIRE SUPRESSION SYSTEMSTAGNANT WATER / RUST05108 / LOWYESYESD.C.V.WATTS7706"TESTED DEVICE02750/140
370 TESTC.W. MAKEUP TO DOM. H.W. HEAT EXCH.STEAM CHEMICALSYESYESR.P.B.P.WATTS009M12"Backflow Removed 12/23/08 Robles/pyle0273/14/0950/141
371 TESTBLDG 41 BOILER RMC.W. MAKEUP TO BOILERSCHEMICALS258966 / HIGHYESYESR.P.B.P.FEBCO825Y2"TESTED DEVICE02756/07
375 TESTBLDG 41 MECH RMC.W. MAKEUP TO CHILLERCHEMICALS118412 / HIGHYESYESR.P.B.P.WATTS9093/4"DEVICE NO LONGER NEEDED. REMOVED 11/7/07 KIEPKE02750/142
376 TESTBLDG 41 GARAGEC.W. MAKE-UP TO BOILERCHEMICALS SEWAGE159835 / HIGHYESYESR.P.B.P.WATTS9093/4"TESTED DEVICE 2/19/13 ROBLES/DEAN1272/19/1450/143
380 TESTBLDG 113 MECH RMC.W. MAKEUP TO CHILLERCHEMICALS469445 / HIGHYESYESR.P.B.P.WATTS9093/4"Device Removed 7 Feb 13 Bldg. DEMO0282/28/1256/08
381 TESTBLDG 113 MECH RMC.W. MAKEUP TO WATER SOFTENERSODIUM CHEMICALSO5732 / LOWYESYESR.P.B.P.WATTS009M21 1/4"Device Removed 7 Feb 13 Bldg. DEMO0282/28/1250/144
384 TESTBLDG 113 BASEMENTC.W. MAKEUP TO AIR COMP. COOLERFREON OIL CHEMICALS57286 / HIGHYESYESR.P.B.P.WATTSOO91/2"Device Removed 7 Feb 13 Bldg. DEMO0283/14/1250/145
385 TESTYESYESR.P.B.P.WATTSDEVICE REMOVED 3/2/04028
386 TESTLAWN CHEMICALSNOYESR.P.B.P.WATTS9091 1/4"backflow Removed 08/18/11 Robles/Bodell0286/6/12
387 TESTBLDG 113 DELIC.W. MAKEUP TO SOAP DISPENSERSOAP CHEMICALS57226 / HIGHYESYESR.P.B.P.WATTSOO91/2"Device Removed0286/3/0950/147
388 TESTBLDG 113 CAVALIER LOUNGEC.W. MAKEUP TO CARBONATORSSYRUP CARBONATIONLOWYESYESR.P.B.P.WATTSOO91/2"Device Removed028
INVENTORY OF CROSS-CONNECTION CONTROL AND BACKFLOW PREVENTION DEVICES
OFFUTT AFBPERSONNEL MAKING INVENTORY:
CONTROL NO ISSUEDLOCATIONITEM / FACILITY SYSTEM PROTECTEDPOTENTIAL CONTAINMENT/POLLUTANTDEGREE OF HAZARD / DEVICE SERIAL NUMBERBACK PRESS POTENTBACK SIPHONAGE POTENTIALTYPE CONTROL INSTALLED OR (REQUIRED)DATA ON DEVICE INSTALCOMMENTSCOMPTOTALNXT YR.TYPE #
MAKEMODELSIZE
389 TESTBLDG 113 BALL RM LOUNGEC.W. MAKEUP TO CARBONATORSSYRUP CARBONATION102015 / LOWYESYESR.P.B.P.WATTSOO91/2"Device Removed 7 Jan 13 Bldg. DEMO0283/8/1250/149
390 TESTBLDG 113 BALL RM LOUNGEC.W. MAKEUP TO CARBONATORSSYRUP CARBONATION57204 / LOWYESYESR.P.B.P.WATTSOO91/2"Device Removed 7 Feb 13 Bldg. DEMO0283/8/1250/150
391 TESTBLDG 13 2ND FLRWATER COOLED COMPRESSORFREON06130 / HIGHYESYESR.P.B.P.WATTSOO93/8"TESTED DEVICE02850/151
396 TESTBLDG 121 POOL AREAC.W.MAKE-UP TO CHILD WADING POOLCHEMICALS POOL WATER14702 / HIGHNOYESR.P.B.P.WATTSOO9M21 1/2"Device Removed02850/229
398 TESTBLDG 73 MECH RMC.W. MAKEUP TO BOILERS & AIR HANDLERCHEMICALS112341 / HIGHYESYESR.P.B.P.WATTSOO93/4"TESTED DEVICE 3/18/13 ROBLES/DEAN1283/18/1450/152
402 TESTLAWN CHEMICALS/ HIGHNOYESR.P.B.P.WATTS3/4"02950/153
403 TESTC.W. MAKEUP TO DENTAL EQUIPANIMAL WASTENOYESR.P.B.P.WATTSOO91/2"Backflow Removed 12/23/08 Robles/pyle293/10/0950/154
404 TESTBLDG 78 MECH RMC.W. MAKE-UP TO WATER SOFTENERA00298 / HIGHYESYESR.P.B.P.WATTSOO91 1/4"TESTED DEVICE02950/155
405 TESTBLDG 517 WASH RACKC.W. MAKE-UP TO PART WASHERFUEL / SOAP CHEMICALSA28994 / HIGHYESYESR.P.B.P.WATTS009M23/4"TESTED DEVICE02950/156
406 TESTBLDG 552 MECHCOLD WATER SUPPLY TO BLDGFUEL / SOAP CHEMICALS123986 / HIGHYESYESR.P.B.P.WATTS009M211/4"TESTED DEVICE02950/157
407 TESTBLDG 324 1 B WINGC.W. SUPPLY TO SOAP DISPENSERSOAP CHEMICALSA28585 / HIGHYESYESR.P.B.P.WATTSOO91/2"Device Removed 26 Apr 1302950/335
408 TESTBLDG 324 2 B WINGC.W. SUPPLY TO SOAP DISPENSERSOAP CHEMICALSA21608 / HIGHYESYESR.P.B.P.WATTSOO91/2"Device Removed 26 Apr 1302950/336
409 TESTBLDG 324 3 B WINGC.W. SUPPLY TO SOAP DISPENSERSOAP CHEMICALSA09233 / HIGHYESYESR.P.B.P.WATTSOO91/2"Device Removed 26 Apr 1302950/337
INVENTORY OF CROSS-CONNECTION CONTROL AND BACKFLOW PREVENTION DEVICES
OFFUTT AFBPERSONNEL MAKING INVENTORY:
CONTROL NO ISSUEDLOCATIONITEM / FACILITY SYSTEM PROTECTEDPOTENTIAL CONTAINMENT/POLLUTANTDEGREE OF HAZARD / DEVICE SERIAL NUMBERBACK PRESS POTENTBACK SIPHONAGE POTENTIALTYPE CONTROL INSTALLED OR (REQUIRED)DATA ON DEVICE INSTALCOMMENTSCOMPTOTALNXT YR.TYPE #
MAKEMODELSIZE
411 TESTBLDG 40 MECH RM 56C.W. MAKEUP TO HEAT SYSTEMCHEMICALS11923 / HIGHYESYESR.P.B.P.WATTS009M11 1/4"Device Removed0293/17/0450/158
413 TESTBLDG. 49 MECH. RM.C.W. TO DOM. H.W. HEAT EXCHANGERSTEAM CHEMICALSO7271 / HIGHYESYESR.P.B.P.WATTS009M21 1/4"Device Removed0293/17/0450/159
415 VBBLDG 49 C.A.P.2 HOSE BIBBS ON SINKCHEMICALS SEWAGEHIGHNOYESSCREW ON VACUUM BREAKERSWATTS8A5/8"Device Removed029
416 TESTBLDG 49E RM. B110C.W. MAKEUP TO HEAT SYSTEMCHEMICALS/ HIGHYESYESR.P.B.P.WATTS9093/4"Device Removed02950/160

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .