About this file
This combined synopsis and solicitation requests quotes for regulated medical waste management services. The contractor shall be responsible for collecting, transporting, and disposing of regulated medical waste from the Michael E. DeBakey VA Medical Center and affiliated clinics. The base period of performance is one year from July 2022 to June 2023, with four one-year option periods extending to June 2027. Quotes are due by June 21, 2022. The solicitation is set aside for service-disabled veteran-owned small businesses. The contractor will provide waste services for the Veterans Health Administration Veterans Integrated Service Network 16 in accordance with the quality assurance surveillance plan and past performance questionnaire attached to the solicitation.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 36C25622Q0263 0002_1.docx | DOCX document | |
| question _ answer rmw.pdf | ||
| 36C25622Q0263 0002.pdf | ||
| pws regulated medical waste.pdf | ||
| 36C25622Q0263 0001_1.docx | DOCX document | |
| RFQ 36C25622Q0263 Amendment 0001.pdf | ||
| wd angelina.pdf | ||
| attachment 2 wage determination.pdf | ||
| RFQ 36C25622Q0263 NEW.pdf | ||
| wd jefferson.pdf | ||
| attachment 4 - past performance questionnaire.pdf | ||
| wd harris.pdf | ||
| attachment 1 far 52.217-8 six month option pricing.pdf | ||
| 36C25622Q0263_1.docx | DOCX document |
Show all 14
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
D.3 QUALITY ASSURANCE SURVEILLANCE PLAN (QASP)
QUALITY ASSURANCE SURVEILLANCE PLAN
For: Regulated Medical Waste (RMW) Management
Contract Number: ________________
Contract Description: Contractor shall be responsible for allocating all equipment and personnel, including back-up resources, to meet all requirements for the comprehensive management of the RMW at the Houston, Michael E. DeBakey Veteran Affairs Medical Center (MEDVAMC) and all affiliated facilities Community Based Outpatient Clinics (CBOCs) in Beaumont, Conroe, Galveston, Katy, Lake Jackson, Lufkin, Richmond, Texas City, Tomball, Sugarland, Houston and Humble. Pickup schedule for each location(s) is identified in location.
The comprehensive waste services shall not only include the collection and disposal of the waste, but also the training and support required to ensure compliance with all Federal, State, and Local regulations.
Contractor’s name: ____________________________________
1. PURPOSE
This Quality Assurance Surveillance Plan (QASP) provides a systematic method to evaluate performance for the stated contract. This QASP explains the following:
• What will be monitored.
• How monitoring will take place.
• Who will conduct the monitoring.
• How monitoring efforts and results will be documented.
This QASP does not detail how the contractor accomplishes the work. Rather, the QASP is created with the premise that the contractor is responsible for management and quality control actions to meet the terms of the contract. It is the Government’s responsibility to be objective, fair, and consistent in evaluating performance.
This QASP is a “living document” and the Government may review and revise it on a regular basis. However, the Government shall coordinate changes with the contractor. Copies of the original QASP and revisions shall be provided to the contractor and Government officials implementing surveillance activities.
2. GOVERNMENT ROLES AND RESPONSIBILITIES
The following personnel shall oversee and coordinate surveillance activities.
a. Contracting Officer (CO) - The CO shall ensure performance of all necessary actions for effective contracting, ensure compliance with the contract terms, and shall safeguard the interests of the United States in the contractual relationship. The CO shall also assure that the contractor receives impartial, fair, and equitable treatment under this contract. The CO is ultimately responsible for the final determination of the adequacy of the contractor’s performance.
Assigned CO:
b. Contracting Officer’s Technical Representative (COR) - The COR is responsible for technical administration of the contract and shall assure proper Government surveillance of the contractor’s performance. The COR shall keep a quality assurance file. The COR is not empowered to make any contractual commitments or to authorize any contractual changes on the Government’s behalf.
Assigned COR: _________________
Alternate COR: _________________
c. Other Key Government Personnel: __________________
3. CONTRACTOR REPRESENTATIVES
The following employees of the contractor serve as the contractor’s program manager for this contract.
a. Program Manager: ______________
b. Other Contractor Personnel: ___________________ Title: _________________
4. PERFORMANCE STANDARDS
Performance standards define desired services. The Government performs surveillance to determine if the contractor exceeds, meets or does not meet these standards.
5. INCENTIVES
The Government shall use exercise of option period and past performance as incentives.
Incentives shall be based on exceeding, meeting, or not meeting performance standards.
6. METHODS OF QA SURVEILLANCE
Various methods exist to monitor performance. The COR shall use the surveillance methods listed below in the administration of this QASP.
PERIODIC INSPECTION: Inspections may be scheduled at each pickup date.
Performance Standard ID – 1, 2, 3 and 4
7. RATINGS
Metrics and methods are designed to determine if performance exceeds, meets, or does not meet a given standard and acceptable quality level. A rating scale shall be used to determine a positive, neutral, or negative outcome. The following ratings shall be used:
Excellent = Exceeds Standards Satisfactory = Meets Standards
Performance Objective Standard
Performance Threshold Acceptable Quality Level
Method of Surveillance
Treatment and Disposition of Special Waste from Health Care- Related Facilities
25 TAC Chapter 1, Subchapter K Zero Deviations 90% Inspection
Off-site treatment must be conducted at a facility authorized to accept untreated medical waste.
Chapter 326, Subchapter F Zero Deviations 90% Inspection
Transporting Untreated Medical Waste 30 TAC 326.23(f) Zero Deviations 90% Inspection
Reports: Monthly, Quarterly and Annually
PWS Section 13.2, 30 TAC 326.87, 30 TAC 326.89 Zero Deviations 90% Inspection
Maintaining Registrations and Hazardous Waste Permit
30 TAC 326.53
TCEQ Form #00426
RCRA Permits Zero Deviations 90% Inspection
Unsatisfactory = Fails to Meet Standards
8. DOCUMENTING PERFORMANCE
a. ACCEPTABLE PERFORMANCE
The Government shall document positive performance. Any report may become a part of the supporting documentation for any contractual action.
b. UNACCEPTABLE PERFORMANCE
When unacceptable performance occurs, the COR shall inform the contractor. This will normally be in writing unless circumstances necessitate verbal communication. In any case the COR shall document the discussion and place it in the COR file.
When the COR determines formal written communication is required, the COR shall prepare a Contract Discrepancy Report (CDR) and present it to the contractor's program manager with a copy to the Contracting Officer.
The contractor shall acknowledge receipt of the CDR in writing. The CDR will specify if the contractor is required to prepare a corrective action plan to document how the contractor shall correct the unacceptable performance and avoid a recurrence. The CDR will also state how long after receipt the contractor has to present this corrective action plan to the COR. The Government shall review the contractor's corrective action plan to determine acceptability.
Any CDRs may become a part of the supporting documentation for any contractual action deemed necessary by the CO.
9. FREQUENCY OF MEASUREMENT
a. Frequency of Measurement.
During contract performance, the COR will periodically analyze whether the negotiated frequency of surveillance is appropriate for the work being performed.
b. Frequency of Performance Assessment Meetings.
The COR shall meet with the contractor monthly to assess performance and shall provide a written assessment.
<After award, both the contractor’s Program Manager and the COR shall sign this document.>
Signature – Contractor Program Manager
Signature – Contracting Officer’s Technical Representative
| D.3 QUALITY ASSURANCE SURVEILLANCE PLAN (QASP) |
| Various methods exist to monitor performance. The COR shall use the surveillance methods listed below in the administration of this QASP. |
| Performance Standard ID – 1, 2, 3 and 4 |