Attachment 3 Request for Task Order Proposal (RTOP) Example.pdf
PDF 104 KB Posted
- Attached to
- General Construction IDIQ
- Solicitation number
- 12805B22R0008
View the file
Other files
Show all 15
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ATTACHMENT 3
Sample Request for Task Order Proposal (RTOP)
Request for Task Order Proposal
RTOP Requisition Number: XXXXXX
Date of Issue: XX Month 20XX
Description of Requirement: {INSERT GENERAL DESCRIPTION}
Location of Work: {INSERT GEOGRAPHIC LOCATION}
Site Visit: XX Month 20XX at 1:00 pm (CST/CDT)
Closing Date/Time: XX Month 20XX at 1:00 pm (CST/CDT)
This is a Request for Task Order Proposal (RTOP) for construction to be provided under 12805B21DXXXX contract vehicle. The USDA ARS Plains Area, {INSERT INSTALLATION LOCATION} has a requirement for roofing construction requirement.
Attached are all related documents for this RTOP. Please ensure that you have read the attached documents, to include specific response submission instructions that are included in this RTOP, and then submit your response by the date and time indicated above.
The Government will hold a site visit at {INSERT GEOGRAPHIC LOCATION} on
{INSERT DATE} beginning at {INSERT TIME} in building {INSERT BUILDING ADDRESS}.
(ROUND PROPOSAL PRICE TO THE NEAREST DOLLAR AMOUNT, DO NOT PROVIDE CENTS)
Applicable Wage Determination Reference FAR 52.222-6, Construction Wage Rate Requirements
General Decision Number {NCXXXXX} dated {Date} State: {Insert State Name}, Construction Type:
{Insert Construction WD Type, Building, Commercial, Heavy} County: {Insert County Name}, applies to this task order.
All items within the RTOP must be completed and returned by closing due date and time. In addition to this letter, this RTOP includes the following exhibits:
Attachment 1 – Statement of Work Attachment 2 – Wage Determination Attachment 3 – Additional Task Order Specific Terms and Conditions Attachment 4 – Drawings and Specifications
Your response must be in full compliance with the RTOP instructions in base contract 12805B- 20-D-XXXX Paragraph C.2. The response (to include price) shall be valid for thirty (30) calendar days. If you have any questions, please contact {INSERT ASSIGNED CONTRACT SPECIALIST’S NAME} Contract Specialist at {INSERT TELEPHONE NUMBER AND E-MAIL ADDRESS} or the undersigned at {INSERT TELEPHONE NUMBER AND E-MAIL ADDRESS
OF TOCO}.
{INSERT TOCO NAME}
Task Order Contracting Officer
ATTACHMENT 1
STATMENT OF WORK
{INSERT TASK ORDER SOW HERE}
ATTACHMENT 2
Additional Task Order Specific Terms and Conditions
{INSERT ADDITIONAL TASK ORDER SPECIFIC TERMS AND CONDITIONS HERE}
ATTACHMENT 3
DRAWINGS AND SPECIFICATIONS
{INSERT OR ATTACH SEPERATLY CONCEPT DRAWINGS, CURRENT AS-BUILT
DRAWINGS AND CURRENT AS-BUILT SPECIFICATIONS HERE}
Drawings do NOT have to be uploaded to this word document for the RTOP.
| ATTACHMENT 3 |
| Request for Task Order Proposal |
| ATTACHMENT 1 STATMENT OF WORK |
| ATTACHMENT 2 |
| {INSERT ADDITIONAL TASK ORDER SPECIFIC TERMS AND CONDITIONS HERE} |
| {INSERT OR ATTACH SEPERATLY CONCEPT DRAWINGS, CURRENT AS-BUILT DRAWINGS AND CURRENT AS-BUILT SPECIFICATIONS HERE} |
File details come from the government source that posted it. Updated .