Material Submittals Schedule

Project Number:
201151Project Title:
Replace Covered Entry Triangle Chapel B7402Solicitation / Contract Number:

[ enter here ]

Line Number(To be completed by Project Engineer)(To be completed by Contract Administrator)
Number of Copies Required (if not electronically submitted)Remarks
Item or Description of Item, Contract Reference, Type of SubmittalCertificate of ComplianceShop DrawingsSamplesColor SelectionManufacturer's RecommendationWarranty-Manufacturer and/or WorkmanshipCatalog DataOperating InstructionsSchedules, Listings, Reports, PlansTechnical DataTest ReportsField ReportsRequired Submission DateDate Received in ContractingDate to Civil EngineeringReturn Suspense DateSubmittal NumbersDate Contractor
NotifiedContractor ResubmittalFinal Approval
ApprovedDisapproved
1HazMat Questionnaire335 Days Prior to Start Date
2HazMat MSDS35 Days Prior to Start DateMust be filled out if Contractor answers YES to to the HazMat questinnaire
3HazMat Reporting Entry Form335 Days Prior to Start DateSubmit Final Quantities
4HazMat Reporting entry Form33End of Contract
5Recycling and Landfill Report33End of Contract
6Warranty (Manufacture's)3End of Contract
71-Year Warranty (Contractor's)3End of Contract
8Section 072413-EIFS System111310 Days Following NTP
9Section 061000-Rough Carpentry310 Days Following NTP
10Section 075216-SBS Modified Membrane Roofing11310 Days Following NTP
11Section 076000- Flashing and Sheet Metal1111310 Days Following NTP
12084010 Aluminum Doors and Frames11111310 Days Following NTP
1309900 Painting1111310 Days Following NTP
14Section 079200 Joint Sealants111310 Days Following NTP
15
14
15
16
17
18
19
20
21
22
23
24
25

&L&"Verdana,Bold"&12Schedule of Material Submittals&C&12Print on Legal size paper ( 8 x 14 ).

&R&P of &N Enter the due date from the Contractor (MM/DD/YY) Enter the date received from the Contractor. (MM/DD/YY) Enter the date submittal was given to CE for review. (MM/DD/YY) Enter the date the submittal is due back from CE

(MM/DD/YY)

Enter the Submittal Number Enter date the Contractor was notified of submittal approval

(MM/DD/YY)

Enter date the Contractor was notified of submittal disapproval

(MM/DD/YY)

Enter Resubmittal Number Enter the submittal final approval date

(MM/DD/YY)

File details come from the government source that posted it. Updated .