Attachment 3 - Green Procurement Form DBEH 20-1521.pdf

PDF 384 KB Posted

Attached to
Solicitation: Restore Shoreline at Complex 46, CCSFS, FL Federal contract opportunity
Solicitation number
FA252122B0001
Issued by
Department of the Air Force Space Command

About this file

This document includes a solicitation for a construction contract and a recovered materials determination form. The solicitation is for a firm-fixed-price contract to repair and stabilize 1,800 feet of ocean shoreline at Space Launch Complex 46 at Cape Canaveral Space Force Station, Florida. The scope of work involves installing sheet pile walls, rock boulders, gravel, sand fill, geotextile, excavation, dune and upland vegetation, and relocating electrical, communication, and security infrastructure. The contract duration is 180 days with no non-access days. This is a 100% small business set-aside with a NAICS code of 237990 and size standard of $39.5 million. The recovered materials determination form requires specifying recovered content for applicable EPA-designated construction products like cement and concrete containing coal fly ash or ground granulated blast furnace slag.

View the file

Other files for this federal contract opportunity

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

C-1

UNCLASSIFIED

RECOVERED MATERIALS DETERMINATION FORM

(Part 1) Design/Procurement

INSTRUCTIONS

This form is to be completed by the requiring activity when EPA-designated items are applicable to the requirement. For questions on whether the product counts as “EPA-designated” or what the required recycled content is, refer to product descriptions on EPA’s website at www.epa.gov/cpg/products.htm.

This form is not required for construction item purchases less than $2,000, or for other purchases less than $3,000. The completed form becomes part of the contracting office contract file.

PROCUREMENT TITLE: DBEH 20-1521, Restore Shoreline at Complex 46, CCSFS__

PROCUREMENT REQUEST NO.

PART 1: RECOVERED MATERIALS DETERMINATION

Part 1 shall be completed by the specifying authority when requesting a procurement action.

EPA-DESIGNATED ITEMS

(Place a check mark next to each product that applies to this procurement)

Construction Products:

Building insulation Polyester carpet Carpet Cushion

Cement & concrete containing:

X Coal fly ash

Ground granulated blast furnace slag

Cenospheres Silica fume Floor tiles (rubber & plastic) Flowable fill Latex paint Laminated paperboard Modular threshold ramps Nonpressure pipe Patio blocks Railroad grade crossings/surfaces Roofing materials Shower & restroom dividers/partitions Structural fiberboard

Landscaping Products:

Compost from yard trimmings or food waste Garden and soaker hoses Hydraulic mulch Lawn and garden edging Plastic lumber landscaping timbers and posts

Park & Recreation Products:

Park and recreational furniture

Playground equipment Playground surfaces Running tracks Plastic fencing (snow or erosion control, safetybarriers) Non-paper Office Products:

Binders (paper, solid plastic or plastic covered)

Plastic clipboards Plastic file folders Plastic clip portfolios Plastic presentation folders Office furniture Office recycling containers Office waste receptacles Plastic desktop accessories Plastic envelopes Plastic trash bags Printer ribbons Toner cartridges

Paper & Paper Products:

Commercial/industrial sanitary tissue products Miscellaneous papers Newsprint Paperboard and packaging

Printing and writing papers Tray liners

Vehicular Products:

Engine coolants Rebuilt vehicular parts Re-refined lubricating oils Retread tires

Transportation Products

Channelizers Delineators Flexible delineators Parking stops Traffic barricades Traffic cones

Miscellaneous Products:

Awards and plaques Bike racks Blasting grit Industrial drums Mats Pallets Signage Sorbents Strapping http://www.epa.gov/cpg/products.htm

GREEN PROCUREMENT FORMS

RECOVERED MATERIALS DETERMINATION FORM

(PART 1) Design/Procurement (Cont’d) PROCUREMENT TITLE: DBEH 20-1521, Restore Shoreline at Complex 46, CCSFS

PROCUREMENT REQUEST NO.

FAR 11.002(c) requires the establishment of statements of work and specification requirements for the procurement of products containing recovered materials and environmentally preferable and energy-efficient products and services.

If no EPA designated items were checked on page 1, than check box A:

A.

I hereby certify that no EPA designated guideline items are included in this procurement action

If any EPA designated items are checked on page 1, than mark box B or C:

X B. I hereby certify that the EPA recycled content requirements have been specified for all of the designated guideline items in this procurement action

OR

C.

I hereby certify that the EPA recycled content requirements have been specified for all but the following designated guideline items for which compliance with EPA standards is not attainable

If Box C is checked, list each designated item and the corresponding justification number from the list below for each exemption being claimed. Attach the supporting documentation for each waiver.

The exemption being claimed for this purchase is:

1. The product is not available competitively (from two or more sources) within a reasonable time frame;

2. The product is only available at an unreasonable price (based on a life-cycle cost analysis);

3. The product does not meet appropriate performance standards (in accordance with

National Institute of Standards and Technology (NIST) guidelines.)

Designated Item Justification # 1.

2.

3.

Design/Specifying Agent Signature Date

Requiring Organization’s Technical Representative Signature

Date

RECOVERED MATERIALS DETERMINATION FORM

(PART 2) Construction

PROCUREMENT TITLE: DBEH 20-1521, Restore Shoreline at Complex 46, CCSFS

PROCUREMENT REQUEST NO.

Part 2 of this certification is to be completed upon receipt of the purchase goods and services.

If EPA designated items were specified in this procurement action, the contractor/supplying agent shall complete Part 2 of this certification upon delivery of the products or services.

Attach supporting documentation identifying percentage of recovered material content used in each designated item. NOTE: A designated item is specified if no exemptions were prepared and identified in Part 1.C of this form during the development of this procurement action.

Check the appropriate box:

A. EPA recycled content requirements have been met for all designated items specified in this procurement action.

OR

B.

EPA recycled content requirements have been met for all but the following EPA designated guideline item(s) for which compliance with EPA standards was not attainable.

If Box B is checked, list each designated item and the corresponding justification number from the list below for each exemption claimed. Attach the supporting documentation for each waiver item listed.

The exemption being claimed for this purchase is:

1. The product is not available competitively (from two or more sources) within a reasonable time frame;

2. The product is only available at an unreasonable price (based on a life-cycle cost analysis);

3. The product does not meet appropriate performance standards (in accordance with

National Institute of Standards and Technology (NIST) guidelines.)

Designated Item Justification #

1.

2.

3.

Contractor/Supplying Agent Signature Date

Requiring Organization’s Technical Representative Signature

Date

MATERIALS DETERMINATION FORM

Waiver Form

PROCUREMENT TITLE: DBEH 20-1521, Restore Shoreline at Complex 46, CCSFS

PROCUREMENT REQUEST NO.

The technical authority shall prepare a separate justification for each designated item purchased that does not meet EPA standards as part of this procurement action:

The following item does not comply with EPA standards for recycled/recovered materials:

The exemption being claimed for this purchase is:

The product is not available competitively (from two or more sources) within a reasonable time frame;

The product does not meet appropriate performance standards (in accordance with National Institute of Standards and Technology (NIST) guidelines);

The product is only available at an unreasonable price (based on a price analysis that considers life-cycle cost). The recycled-content product costs $ per and the non-recycled-content product costs $ per .

This written justification is made in accordance with 42USC 6962(c)(1):

Design/Specifying Agent’s Signature Date

Requiring Organization’s Technical Representative Signature Date

Contracting Officer’s Signature Date

Rationale for exemption: (Please provide the rationale upon which this justification was based. Include vendor names, points of contact, life-cycle cost analysis and any other documentation that supports this decision.)

RECOVERED MATERIALS DETERMINATION FORM
(Part 1) Design/Procurement
INSTRUCTIONS
RECOVERED MATERIALS DETERMINATION FORM
RECOVERED MATERIALS DETERMINATION FORM