Date: January 20, 2020
Anthony Dombrowski Tower Engineering Professionals USDA Forest Service Umpqua National Forest 326 Tryon Road 2691 NE Diamond Lake Blvd. Raleigh, NC 27603 Roseburg, OR 97470 (919) 661-6351
(541) 957-3332 PHX_Structures@tepgroup.net
Subject: Tower Foundation and Anchor Rod Design
Client Designation: Client Site Number: N/A Client Site Name: North Umpqua Ranger District
Engineering Firm Designation: TEP Project Number: 242875.348255
Site Data: 18782 North Umpqua Highway, Glide, Douglas County, OR 97443 Latitude 43° 17' 55.96'', Longitude -123° 05' 54.82'' 80 ± Foot Self Supporting Tower
Dear Anthony Dombrowski:
Tower Engineering Professionals (TEP) is pleased to submit this “Tower Foundation and Anchor Rod Design” for the above referenced project. TEP analyzed the foundation and anchor rods with the following methods:
• A proprietary calculation sheet was used to model the individual soil layers as given in the geotechnical report. The loads from structural analysis by TEP dated January 9, 2020 were applied and the foundation was analyzed to determine the corresponding forces resulting from the ultimate soil resistance and was designed accordingly. See Appendix B for calculations.
• A proprietary calculation sheet was used to analyze and design the anchor rods based on the loads from the structural analysis by TEP dated January 9, 2020. See Appendix A for calculations.
• Geotechnical Report by The Galli Group, Project Number 02-4426-01 dated December 17, 2009
This design meets the requirements of the 2019 Oregon Structural Specialty Code and the TIA-222-H Standard.
Design prepared by: Dan A. Reidenbach, P.E. / RWT
Respectfully submitted by:
Ronald E. Glover, P.E.
01/20/2020
80-ft ± Self Supporting Tower Foundation and Anchor Rod Design January 20, 2020
TEP Project Number 242875.348255, Revision 0 North Umpqua Ranger District
APPENDIX A
FOUNDATION AND ANCHOR ROD DESIGN CALCULATIONS
Project Information
Site Name
Tower Information Tower Type
TIA-222 Rev
ASIF
Comp. Uplift
Axial (k) 20.94 17.49
Shear (k) 2.20 1.84
0.625
A36 Fy=36 ksi Fu=58 ksi
Not Considered, lar<=1(d)
0.625
N-Included
Symmetrical
Anchor Rod Results 5.23
0.55
8.14
2.44
69.4% Pass
Shear Cap., φVn (kips)
Moment Cap., φMn (kip-in)
Thread Type:
Grout Considered:
Configuration:
Anchor Rod Data
Applied Loads
Eta Factor, η:
Iar (in):
Quantity:
Diameter (in):
Stress Rating
Axial, Pu_c (kips)
Shear, Vu (kips)
Moment, Mu (kip-in)
Axial Cap., φPn_c (kips)
Material Grade:
North Umpqua Ranger District
Self Support
H
1.333 Apply TIA-222-H Section 15.5
Analysis Date: 1/20/2020
JOB:
SHEET #: 2 OF 2
CALCULATED BY: DAR DATE 1/20/2020
CHECKED BY: RWT DATE 1/20/2020
f'c 4000 psi Pad width 144.0 in hef 12.00 in 1.5hef 18 in ca1 18.47 in camin 18.5 in s1 4.77 in Cac 30 in ca2 25.12 in Anc 1662.1 in s2 4.77 in Anco 1296.0 in e',N 0 n*Anco 5184.0 in
OK
Ψec,N 1.00 kc 24
Ψed,N 1.00 # Bolts 4
Ψc,N 1.25
Ψcp,N 1.00
Compression, Cu: 20.936 kips
Nb= 63.6 kips
Ncbg= 102.0 kips
Ø 0.75 Condition: A Per ACI 318-App. D, Section D.3.3.3 (0.75ØNn)
Seismic Factor: 1.0 Additional Seismic Factor per D.3.3.6 since failure is brittle
Design Strength: 76.5 kips 1.0
Capacity: 27.4% OK
Abrg= 0.44 in
Ψc,P 1.4
Np= 14.2 kips
Design Strength: 42.7 kips
Uplift, Tu: 17.489 kips
Capacity: 41.0% OK
North Umpqua Ranger District; TEP No. 342875.248255
Pushthrough Strength - ACI 318 kc=24 for cast in place kc=17 for post installed
Pullout Strength
145.917 ft-kips Capacity Demand Rating Check
4.072 kips 11.01 3.48 31.6% Pass
3.478 kips 4.00 0.93 23.3% Pass
20.936 kips 229.51 156.83 68.3% Pass
2.2 kips 134.10 0.00 0.0% Pass
17.489 kips 134.60 0.00 0.0% Pass
1.837 kips #DIV/0! 0.00 0.0% Pass
80 ft 578.28 17.04 2.9% Pass
8.5625 ft 271.51 5.19 1.9% Pass
0.625 in 0.190 0.013 6.9% Pass
4.9375 in 324.56 0.00 0.0% Pass
0.190 0.011 5.8% Pass
324.56 0.00 0.0% Pass ft ft Soil Rating: 68.3%
Structural Rating: 6.9% in
0.00 ft
12.00 ft
2.00 ft
3 in
60 ksi
4 ksi
150 pcf
100 pcf
5.333 ksf <-- Toggle between Gross and Net
0.000 ksf
37 degrees
0.35
0.8 ft
No
None ft
Pad Properties
Groundwater Depth, gw:
Base Friction, µµµµ:
Cohesion, Cu:
Friction Angle, ����:
Total Soil Unit Weight, γγγγ:
Ultimate Gross Bearing, Qult:
SPT Blow Count, Nblows:
Soil Properties
Depth, D:
Pad Clear Cover, ccpad:
Dry Concrete Density, δδδδc:
Pad Rebar Quantity (Bottom), mp:
Rebar Grade, Fy:
Concrete Compressive Strength, F'c:
Material Properties
Leg Comp. Shear, Vu_comp:
Pier Diameter, dpier:
Pier Rebar Quantity, mc:
Pier Tie/Spiral Size, St:
Pier Clear Cover, ccpier:
Neglected Depth, N:
Pier Shape:
Pier Rebar Size, Sc:
Pier Reinforcement Type:
Ext. Above Grade, E:
Pier Tie/Spiral Quantity, mt:
Pad Width, W:
Pad Thickness, T:
Pad Rebar Size (Bottom), Sp:
Foundation Bearing on Rock?
SST Unit Base Foundation
Site Name:
Leg Compression, Pcomp:
TIA-222 Revision:
Superstructure Analysis Reactions
H
Global Axial, P:
Global Shear, V:
North Umpqua Ranger District
Tower Centroid Offset?:
Pier Properties
Global Moment, M:
Leg Uplift. Shear, Vu_uplift:
BP Dist. Above Fdn, bpdist:
Block Foundation?:
Pad Shear - Comp 2-way (ksi)
Pier Compression (kip)
Pier Flexure (Comp.) (kip*ft)
Pad Shear - 1-way (kips)
Tower Height, H:
Base Face Width, BW:
Leg Uplift, Puplift: Pier Flexure (Tension) (kip*ft)
Bearing Pressure (ksf)
Overturning (kip*ft)
Top & Bot. Pad Rein. Different?:
Anchor Bolt Circle, BC: Flexural 2-way (Comp) (kip*ft)
Flexural 2-way (Tension) (kip*ft)
Pad Flexure (kip*ft)
Pad Shear - Tension 2-way (ksi)
Lateral (Sliding) (kips)
Foundation Analysis Checks
Version 3.2.0
JOB:
SHEET NUMBER: 1 OF 1
CALCULATED BY: DAR DATE 1/20/2020
CHECKED BY: LFC DATE 1/20/2020
CHECK BEAM SHEAR
Vu = 13.8 k fVc = 271.5 k Vc > Vu O.K Capacity: 5.08%
CHECK PUNCHING SHEAR
Vu = 15.4 k fVc = 275.1 k Vc > Vu O.K Capacity: 5.59%
CALCULATE REINFORCING REQUIRED
F'c = 4.0 ksi F'y = 60.0 ksi
0.52 in^2/ft (ACI 318 Sec. 10.5.4)
BOTTOM REINFORCING Bar Size= 6
Bar Spacing = 9.8 in.
d = 19.9 in.
Mu=
Solution: As,req = 0.04 in^2/ft As,temp controls
Check, As= 0.54 in^2/ft Capacity: 8.35%
TOP REINFORCING Bar Size= 6 Flexure across the diagonal controls.
Bar Spacing = 9.8 in.
d= 19.9 in.
Mu= fMn=0.9*As*Fy*d(1-0.59*As*Fy/(b*d*F'c))
Solution: As,req = 0.01 in^2/ft As,temp controls
Check, As= 0.54 in^2/ft Capacity: 1.70%
Temp & Shrinkage Reinforcement, As, temp =
9.8 in-k/ft
Stress and capacity calculations of reinforced concrete mat assume a fully rigid foundation and a linear
(triangular or trapeziodal) contact stress distribution based on factored loads.
North Umpqua Ranger District; TEP No. 242875.348255
-48.2 in-k/ft fMn=0.9*As*Fy*(d-1/2*As*Fy/(0.85*b*F'c))
80-ft ± Self Supporting Tower Foundation and Anchor Rod Design January 20, 2020
TEP Project Number 242875.348255, Revision 0 North Umpqua Ranger District
APPENDIX B
FOUNDATION AND ANCHOR ROD DESIGN DRAWINGS
NO. SHEET TITLE
INDEX OF SHEETS
REV
PROJECT TEAM
PROJECT CONTACT:
GEOTECHNICAL ENGINEER:
REFERENCED DOCUMENTS
January 20, 2020
DOCUMENT DATEREMARKS
ENGINEER OF RECORD PROJECT MANAGER:
TOWER MANUFACTURER:
FOUNDATION DESIGN:
0 01-20-20 FOUNDATION DRAWINGS
DAR RWT
TITLE SHEET
TOWER ENGINEERING PROFESSIONALS
326 TRYON ROAD
RALEIGH, NC 27603
OFFICE: (919) 661-6351
www.tepgroup.net
242875.348255T-1
SITE NAME:
NORTH UMPQUA RANGER DISTRICT
SITE NUMBER:
FOUNDATION & ANCHOR ROD DESIGN DRAWINGS
18782 NORTH UMPQUA HIGHWAY
GLIDE, OR 97443
(DOUGLAS COUNTY)
N43°17'55.96", W123°05'54.82"
SITE ADDRESS:
N/A
USDA FOREST SERVICE
UMPQUA NATIONAL
FOREST
FI CHECKLIST
PRE-CONSTRUCTION
X
CONSTRUCTION
POST-CONSTRUCTION
X
X
X
NA
X
X
X
NA
NA
X
X
NA
RECOMMENDATIONS
GENERAL CONTRACTOR
FI INSPECTOR
GENERAL
FOUNDATION INSPECTION NOTES:
REQUIRED PHOTOS
FI VERIFICATION INSPECTIONS
CORRECTION OF FAILING FI'S
CANCELLATION OR DELAYS IN SCHEDULED FI
X
0 01-20-20 FOUNDATION DRAWINGS
NORTH UMPQUA
RANGER DISTRICT
TOWER ENGINEERING PROFESSIONALS
326 TRYON ROAD
RALEIGH, NC 27603-5263
OFFICE: (919) 661-6351
www.tepgroup.net
January 20, 2020
242875.348255
USDA FOREST SERVICE
UMPQUA NATIONAL
FOREST
DAR RWT
N-1
FOUNDATION
INSPECTION
CHECKLIST & NOTES
WELDING NOTES:
STRUCTURAL STEEL NOTES:
ATTENTION
GENERAL NOTES:
N-2
PROJECT NOTES I
0 01-20-20 FOUNDATION DRAWINGS
NORTH UMPQUA
RANGER DISTRICT
TOWER ENGINEERING PROFESSIONALS
326 TRYON ROAD
RALEIGH, NC 27603-5263
OFFICE: (919) 661-6351
www.tepgroup.net
January 20, 2020
242875.348255
USDA FOREST SERVICE
UMPQUA NATIONAL
DAR RWT
LEG
WORKABLE GAGES
NOMINAL HOLE
DIMENSIONS
SHORT
SLOT
STANDARD
HOLE
BOLT
DIAMETER
ALLOWABLE ANGLE COPE
BOLT THREADS
BOLT
DIAMETER
THREAD
LENGTH
BOLT DETAILS
SINGLE SHEAR CONNECTIONS: DOUBLE SHEAR CONNECTIONS:
BOLT EDGE AND SPACING
SPACINGMIN. EDGE
BOLT
DIAMETER
NOTE:
SECTION AT CENTER AND
STITCH CONNECTION
BOLT LENGTHS OVER FOUR DIA. BUT NOT EXCEEDING EIGHT DIA.
BOLT LENGTHS UP TO AND INCLUDING FOUR DIA.
8.2.1 TURN-OF-THE-NUT TIGHTENING
BOLT TIGHTENING PROCEDURE:
N-3
PROJECT NOTES II
0 01-20-20 FOUNDATION DRAWINGS
NORTH UMPQUA
RANGER DISTRICT
TOWER ENGINEERING PROFESSIONALS
326 TRYON ROAD
RALEIGH, NC 27603-5263
OFFICE: (919) 661-6351
www.tepgroup.net
January 20, 2020
242875.348255
USDA FOREST SERVICE
UMPQUA NATIONAL
FINISHING:
CONCRETE:
GENERAL NOTES:
EXCAVATION:
REINFORCING STEEL:
FOUNDATION NOTES:
CONCRETE (CONTINUED):
N-4
FOUNDATION NOTES
0 01-20-20 FOUNDATION DRAWINGS
NORTH UMPQUA
RANGER DISTRICT
TOWER ENGINEERING PROFESSIONALS
326 TRYON ROAD
RALEIGH, NC 27603-5263
OFFICE: (919) 661-6351
www.tepgroup.net
January 20, 2020
242875.348255
USDA FOREST SERVICE
UMPQUA NATIONAL
SHEAR
MOMENT
FACTORED
DESIGN REACTIONS
AXIAL
NOTES:
0 01-20-20 FOUNDATION DRAWINGS
NORTH UMPQUA
RANGER DISTRICT
TOWER ENGINEERING PROFESSIONALS
326 TRYON ROAD
RALEIGH, NC 27603-5263
OFFICE: (919) 661-6351
www.tepgroup.net
January 20, 2020
242875.348255
USDA FOREST SERVICE
UMPQUA NATIONAL
FOREST
DAR RWT
S-1
FOUNDATION DESIGN
DETAILS I
FOUNDATION PLAN VIEW
SLOPE
CHANGE
PROPOSED
FOUNDATION
EXCAVATION
LIMITS
SLOPE TO
DRAIN
SLOPE TO
DRAIN
FILL AND COMPACTION NOTES:
0 01-20-20 FOUNDATION DRAWINGS
NORTH UMPQUA
RANGER DISTRICT
TOWER ENGINEERING PROFESSIONALS
326 TRYON ROAD
RALEIGH, NC 27603-5263
OFFICE: (919) 661-6351
www.tepgroup.net
January 20, 2020
242875.348255
USDA FOREST SERVICE
UMPQUA NATIONAL
FOREST
DAR RWT
FOUNDATION DESIGN
DETAILS II
FOUNDATION SECTION
SOIL PLAN VIEW
S-2
DESCRIPTION MEASUREMENT
DESCRIPTION MEASUREMENT
DESCRIPTION MEASUREMENT
DESCRIPTION MEASUREMENT
ANCHOR BOLT ACCESSORIES
NOTES
ANCHOR BOLT
DESIGN DETAILS
ANCHOR BOLT DETAIL
0 01-20-20 FOUNDATION DRAWINGS
NORTH UMPQUA
RANGER DISTRICT
TOWER ENGINEERING PROFESSIONALS
326 TRYON ROAD
RALEIGH, NC 27603-5263
OFFICE: (919) 661-6351
www.tepgroup.net
January 20, 2020
242875.348255
USDA FOREST SERVICE
UMPQUA NATIONAL
FOREST
S-3
| Sheets and Views |
| 00_T1-Title-Layout1 |
| 01_N1-MI Notes_Foundation Design-other |
| 02_N2-Project Notes I - nonCrown-Layout1 |
| 03_N3-Project Notes II-Layout1 |
| 04_N4-Foundation Notes-Foundation Notes |
| 05_S1-Foundation Design Details I-Layout1 |
| 06_S2-Foundation Design Details II-Layout1 |
| 07_S3-Anchor Bolt Reinforcement Details-1_Thru Base Plate |
File details come from the government source that posted it. Updated .