USDA FOREST SERVICE PROJECT SPECIFICATIONS
SUMMARY OF WORK 011000 - 1
Umpqua National Forest – North Umpqua Radio Tower
SECTION 011000 – SUMMARY OF WORK
PART 1 - GENERAL
1.1 PROJECT INFORMATION
A. Project Identification: Umpqua National Forest – North Umpqua Radio Tower Installation
This project consists of installation of a concrete pad to support an 80-ft Rohn tower. Electrical, grounding, and lightning protection systems shall be installed as directed on the Drawings and Specifications. Electrical, grounding, telecommunication lines, and lightning protection systems shall be stubbed to the appropriate location for the future Radio Building (NIC). The completion of this project will result in a fully erected radio tower ready for installation of radio and telecommunication equipment. If awarded as an Option Item, the contractor will also mount said equipment in the correct location and orientation as directed by the Government.
Offerors are expected to familiarize themselves with the project locations and all conditions affecting work prior to submitting bids. Where available, the Government has provided site drawings; these are provided as information only and do not substitute thorough site investigation.
B. Project Location – North Umpqua Range Station (North Umpqua District Administrative Site) Address: 18782 North Umpqua Highway, Glide, OR Point of Contact: Will be assigned at time of contract award, or during prework meeting
C. The Work consists of:
1. BASE ITEMS:
a. Item No. B-1 Mobilization
1) See 012000 Mobilization
b. Item No. B-2 Tower Foundation
1) Complete installation of tower foundation as shown on Drawings and as described in these Specifications. Includes, but is not limited to, all work to construct a concrete pad, including surface preparation, grading, forming, installation of rebar, installation of anchor bolts and associated tower mounting hardware, concrete pouring and finishing, connection of Ufer and grounding systems, and final grading around the new tower pad.
2) Contractor shall thoroughly plan out the work site and notify the COR if adjustments in pad location are needed to facilitate the installation of all required components and systems, including, but not limited to the grading requirements as shown on the Drawings, connection to utilities, as well as grounding and lightning protection systems.
3) Contractor shall ensure the tower and future building can be placed in such a way that a standard ice bridge can span between the two structures.
Typically, the ice bridge should be no more than 10’ to 12’ long. Verify locations will work with all components and code requirements. Verify size and availability of ice bridge that is approved for this type of installation.
c. Item No. B-3 Tower Installation
SUMMARY OF WORK 011000 - 2
Umpqua National Forest – North Umpqua Radio Tower
1) All work, equipment, and hardware required to erect the tower on the pad prepared in Bid Item B-2. Contractor shall ensure all hardware, tools, equipment, accessories, and appurtenances are on hand as required to erect the tower in conformance with the plans, specifications, and the installation requirements of Rohn and all relevant codes governing the erection of communication towers of this type and size.
2) Install the tower in accordance with all the requirements of the latest version of ANSI/TIA/EIA-222 Structural Standards for Steel Antenna Towers and Antenna Supporting Structures.
3) Comply with OSHA standards and best practices for installation of steel towers.
d. Item No. B-4 Grounding and Lightning Protection Systems
1) Includes ground rods, bare conductor wire, ground connectors, ground bars, air terminals, lightning down-conductors, supports, and other accessories and appurtenances for a complete and functional grounding and lightning protection system.
2) Also includes testing of final grounding system.
e. Item No. B-5 Electrical Service to Radio Building
1) Includes, but is not limited to, installation of panelboard, circuit breakers, feeders, and associated trenching. All buried wire shall have XHHW-XLP- 2/USE insulation rated for direct bury and/or submersion. If conductor size prohibits availability of XHHW-XLP-2/USE Contractor shall submit another conductor that is rated for direct bury AND submersion.
Additionally, conductor wires shall be run in conduit alongside telecommunication wires in a separate conduit in the same trench. Includes all wire, hardware, conduit, accessories, and appurtenances for a full and complete installation.
2) The contractor shall arrange for an AHJ inspection of all electrical equipment installed under this contract. See Contract Clause C-5.
Contractor shall arrange for inspection only, permits are not required, however, final energizing of equipment will not be authorized until the AHJ has signed off on all work.
3) The contractor shall follow electrical specifications and provide all required quality assurance and testing as described in the specifications.
4) Once all electrical equipment has been submitted, approved, and installed, the COR will transmit this data to an electrical engineer that will provide requirements for arc-flash warning labels. The arc-flash data will then be provided to the Contractor. The Contractor will ensure the labels are affixed to the appropriate equipment utilizing the data provided by the electrical engineer. Label information, locations, and other requirements related to this task:
a) Arc flash labeling must meet the requirements of: NFPA 70E, Section
110.1 Standard for Electrical Safety in the Workplace, NFPA 70E, Section 130.5 Arc Flash Analysis, NFPA 70E, Section 130.5 (H) Labeling, NFPA 70E, Section 110.3 (A) Host Employer Responsibilities, and OSHA’s 29 CFR 1910.132(d)(1). Utilize current (at time of contract award) adopted NFPA 70E.
5) Important Note: Radio building has not been placed on site and is not expected to be placed on site before this contract is awarded. Contractor shall submit a plan to install as much equipment as possible, turn over any equipment that cannot be installed, and prepare the site for future
SUMMARY OF WORK 011000 - 3
Umpqua National Forest – North Umpqua Radio Tower connections. Utilities will be stubbed up, sealed, and capped for future connection. If Option Item O-4 is awarded, the contract will be held open until such time the Government can place a suitable radio building. See Optional Bid Item O-4 for additional information.
a) For bidding purposes, plan the radio building termination as stub up only, however, include the price of panelboard, breakers, and all associated equipment and appurtenances. If Option Item O-4 is not awarded this equipment will be turned over to the Government.
f. Item No. B-6 Telecommunication Connection to Fire Warehouse
1) Place conduit parallel to electrical feeder. Conduit shall be suitable for direct bury. Place the following in a 4” HDPE conduit to accommodate two (2) sets of 25-pair Cat6 CMX cable plus one (1) 12-strand, 50 micron (50/125) multimode with SC duplex connectors at termination points. Notify COR if a larger conduit is needed. Fiber line shall be contained within an innerduct.
Cat6 wire shall be shielded.
2) Telecommunication lines shall be continuous, with no splices or breaks.
Spool up enough extra wire on both ends to ensure telecommunication lines can extend to appropriate points of termination. Do not cut wires until Government has inspected and ensured the lengths are sufficient to reach intended points of connection. Seal both ends of conduit to prevent water and rodent intrusion.
2. OPTION ITEMS
a. Item No. O-1 Installation of Radio Equipment on Tower
1) Includes installing the following equipment at the height and orientation directed by the Government. Equipment shall be mounted per manufacturer requirements and industry standards (heights listed below are approximate and shall be verified by the Government prior to final mounting):
a) One (1) MW dish 3.5’ @ 75’ RAD – 187 at azimuth
b) Two (2) Omni @ 80’
c) Three (3) Yagi antennas @ 45’, 50’, 55’ – 187 azimuth
d) Six (6) 7/8” coax lines
2) Provide enough extra cabling as needed to ensure connection to the radio building if radio building is not existing at time of award. Spool up cable ends and protect from weather until final connection can be made.
b. Item No. O-2 Supply of Ice Bridge
1) Provide an ice bridge of appropriate size, type, and with installation hardware. If Bid Item O-4 is awarded, Contractor shall install the ice bridge along with the work described in Bid Item O-4. Ensure ice bridge is grounded appropriately, or, alternatively uses non-conductive slip joints.
Products and installation (if awarded) shall conform to ANSI/TIA-222-G, NFPA-780, UL 96 for equipment and UL 96A for installation requirements
c. Item No. O-3 Third Party Inspections
1) Contractor shall arrange for an accredited, independent testing company to perform the following inspections. A written report showing conformance with the plans and specifications will be provided for each inspection.
a) Rebar inspection. Inspector shall be certified and accredited in performing ACI inspections for reinforced, cast-in-place concrete.
Items the Inspector shall verify include, but are not limited to, type, size, spacing, placement relative to grade, clear cover requirements, condition of rebar, etc. Contractor shall not proceed with concrete pour until rebar inspector certifies acceptability.
SUMMARY OF WORK 011000 - 4
Umpqua National Forest – North Umpqua Radio Tower
b) Concrete placement inspection. Inspector shall be certified and accredited in performing ACI-318 inspections for reinforced, cast-in-place concrete. Items the inspector shall verify include, but are not limited to, taking test cylinders during the pour, providing at least six cylinders with two cylinders taken at each of the following intervals:
the beginning, middle, and end of the pour. A 7-day compressive strength for the three cylinders (beginning, middle, and end of pour) will be provided to the government. Similarly, the other three cylinders (taken at the beginning, middle, and end of the pour) will be tested for 28-day compressive strength. If more than one truck is needed for the pour the Contractor shall take two additional cylinders from the additional truck. These cylinders will also be tested for 7-day and 28-day compressive strength. Inspector shall also verify slump and air entrainment, will collect and verifying delivery tickets and provide copies of the tickets to the government, and will monitor placement operations and ensuring concrete pour meets plans, specifications, and ACI-318 requirements.
c) Final tower inspection. This task to be completed by an inspector that is certified and/or accredited in inspecting communication towers.
Inspector shall verify the tower was installed per the plans and specifications, that it meets all industry standard practices and that there are no oversights in the final erection and tie-in of the tower to adjacent utilities. Inspector shall verify appropriateness and torque of connections, ensure all equipment is mounted safely and torqued to appropriate specifications.
d. Item No. O-4 Final Connection to New Radio Building
1) If exercised, the Contractor will agree to wait up to one year (365 days) from the date of award of this contract to return to the site and complete the installation of electrical equipment in the Radio Building. Contractor shall utilize the utility stub-ups from Base Bid Item B-5. All requirements described under Base Bid Item B-5 apply.
1.2 FURNISHING OF MATERIAL
A. Unless otherwise stated in the specifications, Contractor shall furnish all material required for performance of the contract. All material shall comply with the specifications. Contractor shall verify the kind and amount of work that may be necessary in furnishing the material. Contractor shall furnish and deliver the material to the site of the work in such a manner that their quality and fitness for the work is preserved.
1.3 WORK RESTRICTIONS
A. General: Contractor shall have full access to project buildings for construction operations as indicated by the Contract limits.
B. Check in: The General Contractor, Sub-Contractors and Suppliers must check in at the front desk. Due to COVID check-in might be done via phone or other means. Details will be discussed at the prework meeting.
SUMMARY OF WORK 011000 - 5
Umpqua National Forest – North Umpqua Radio Tower
C. Use of Site: Limit use of premises to work in areas indicated. Do not disturb portions of Project site beyond areas in which the Work is indicated.
D. Limits: Confine constructions operations to immediate area of work.
E. Government Occupancy: Allow for Government occupancy of Project site and building.
F. Storage of Contractor Materials: Prior to Mobilization – Coordinate with the CO and COR as to where tools and equipment may be stored while on site.
G. Driveways and Entrances: Keep driveways, parking areas, loading areas and entrances serving premises clear and available to Government, Government's employees, and emergency vehicles at all times. Do not use these areas for parking or storage of materials.
H. Schedule deliveries to minimize use of driveways and entrances. Schedule deliveries to minimize space and time requirements for storage of materials and equipment on-site.
I. Use of Existing Building: Maintain existing building in a weather tight condition throughout construction period. Repair damage caused by construction operations. Protect building and its components during the construction period.
1.4 GOVERNMENT'S OCCUPANCY REQUIREMENTS
A. Full Government Occupancy: Government will occupy the site during entire construction period. Cooperate with Government during construction operations to minimize conflicts and facilitate Government usage. Perform the Work so as not to interfere with Government's day-to-day operations.
B. Maintain access to existing walkways, corridors, and other adjacent occupied or used facilities.
Do not close or obstruct walkways, corridors, or other occupied or used facilities without written permission from Government and authorities having jurisdiction.
1.5 ADDITIONAL CONTRACTOR RESPONSIBILITIES
A. Confine storage of materials to areas as approved by the COR.
B. Contractor shall provide adequate signing and barricades and take necessary safety measures to protect the public during all construction operations. Contractor shall minimize disturbance of all undisturbed areas.
C. Preservation of Natural Features and Existing Structures: Confines all operations to work limits of the project. Prevent damage to natural surroundings and structures. Restore damaged areas, by repairing or replacing damaged trees and plants, structures or infrastructure at no additional expense to the Government.
D. Provide temporary barriers to protect existing trees and plants and root zones.
E. Do not remove, injure, or destroy trees or other plants without prior approval. Consult with COR and remove agreed-on roots and branches that interfere with construction.
SUMMARY OF WORK 011000 - 6
Umpqua National Forest – North Umpqua Radio Tower
F. Do not fasten ropes, cables, or guys to existing trees.
G. Provide temporary protection to existing structures, finishes and surfaces during construction.
H. Contractor shall be responsible for locating and preventing damage to known utilities. If utility damage occurs, repair utility at no additional expense to the Government.
I. Interruption of Existing Utility Service: Notify COR, 48 hours in advance of any interruption of existing utilities.
1.6 CAMPING
A. Camping will not be permitted at the project site.
1.7 FIELD VERIFICATION
A. Field verify all new and existing conditions affecting the work of this contract before ordering products.
1.8 QUALITY CONTROL
A. Quality control for this project shall be the responsibility of the Contractor. The Contractor shall provide testing, inspections, etc. as necessary to ensure the construction meets the requirements of these Specifications, Drawings, and applicable construction codes and standards. In the event of any discrepancies between the Specifications, Drawings, and applicable codes and standards, the Contractor shall immediately notify the Contracting Officer (CO) of the discrepancy and work with the CO to yield a finished product that meets the applicable codes and standards while still meeting the original intent of the Specifications and Drawings. The Contractor shall provide test reports, inspection reports, certifications, photos, and all other documentation needed to demonstrate compliance with the Project Specifications and Drawings.
PART 2 - PRODUCTS (Not USED)
PART 3 - EXECUTION
3.1 SUBMITTAL PROCEDURES
A. This Section includes administrative and procedural requirements for submitting Shop Drawings, Product Data, Samples, and other miscellaneous information. The following requirements and procedures are required in addition to and as an explanation of FAR Clause 52.236-21 and AGAR Clause 452.236-76.
B. Transmit submittals in electronic (PDF) format by e-mail. E-mail submittals to john.beagle@usda.gov. Notify Contracting Officer (CO) if this procedure cannot be utilized.
SUMMARY OF WORK 011000 - 7
Umpqua National Forest – North Umpqua Radio Tower
C. The electronic submittal process is not intended for color samples, color-charts or physical material samples. Mail samples and color selection data to the following location:
Attn: John Beagle USDA Forest Service 2900 NW Stewart Parkway Roseburg, OR 97471
Note: due to COVID alternate methods of receiving physical samples may be needed.
D. All submittals shall be accompanied by a submittal transmittal form.
E. Before submitting submittals to the CO, provide electronic approval stamp or Contractor signature block certifying the submittal complies with the requirements of the Contract Documents including verification of manufacturer/product, dimensions, and coordination of information with other parts of the work.
F. Submittals shall include items such as: Contractor’s, manufacturer’s, or fabricator’s Drawings;
descriptive literature including but not limited to catalog cuts, diagrams, test reports; samples;
certifications and other such required submittals.
G. Obtain written approval from the CO for the above submittals prior to ordering, construction, assembly, and delivery.
H. Where manufacturer’s catalog sheets are used, indicate the specific items to be supplied either by arrow, encircled on sheet, or the inapplicable portion blocked out. Identify where equipment is to be used, if not obvious.
I. Material submittals shall be sufficient to demonstrate compliance with the Specifications and Drawings. Include the following information, as applicable:
1. Manufacturer's written recommendations.
2. Manufacturer's product specifications.
3. Manufacturer's installation instructions.
4. Manufacturer's catalog cuts.
5. Wiring diagrams showing factory-installed wiring.
6. Compliance with recognized trade association standards.
7. Compliance with recognized testing agency standards.
J. Quantities and measurements provided in the Contract Drawings and Specifications are for informational purposes only. Jobsite dimensions, such as the dimensions between two surfaces on the jobsite, need to be verified by the Contractor. A dimension may be shown on the construction Drawings, but the actual dimension may vary, from very small to large increments, depending on jobsite conditions. It is extremely important that the fabricated item arrive on the jobsite ready to be installed without field modification. Special care must be taken by the Contractor to measure and verify dimensions before preparing shop drawings and ordering materials.
K. Provide Shop Drawings with complete material and hardware lists. List material descriptions and provide quantities.
1. Provide Shop Drawings that are custom to the innate designs described in the
Specifications and Drawings.
SUMMARY OF WORK 011000 - 8
Umpqua National Forest – North Umpqua Radio Tower
2. Boiler plate Shop Drawings will not be accepted.
3. Show all fabrication, installation, and material details.
4. Address the appearance, performance, and prescriptive descriptions in the specifications and construction drawings.
5. Attach manufacturer’s catalog cut sheets and other manufacturer’s information that is needed to convey conformance to the Specifications and Drawings.
6. Include all FIELD VERIFIED dimensions, manufacturing conventions, and special fabrication instructions on the shop drawing. It should be clear to fabrication personnel what will be manufactured from the shop drawings alone.
3.2 DELIVERABLES
A. The work items for this Contract are listed in the Schedule of Items.
PART 4 – MEASUREMENT AND PAYMENT
4.1 METHOD OF MEASUREMENT
A. The basis for measurement and payment for all work performed under this contract shall be as listed in the Schedule of Items. Unless the work to be performed is specifi-cally called out to be measured and paid for in the Schedule of Items, payment for such work shall be included in other applicable items of the Schedule of Items. There shall be no separate measurement and payment for any such work not specifically listed in the Schedule of Items.
B. Unit bid items in the Schedule shall be per the unit of measurement indicated in the schedule. Payment shall be made on the quantity of work performed by the Contractor.
C. Items listed in the Schedule of Items as lump sum shall be on a lump sum all required basis. No direct measurement will be made for lump sum bid items. Payment to the Contractor shall be made on the quantity of work actually performed by the Contrac-tor.
D. The summation of all bid items under the Schedule of Items shall equal all work re-quired by the Drawings and Specifications regardless of whether individual items of work are described under bid item descriptions or not. Payment shall be made at the contract unit bid or lump sum prices listed in the Bid. The prices listed therein shall be payment in full for all labor, tools, equipment, materials, etc., which are required to construct respective bid items according to the Contract Documents, including all work and materials incidental thereto.
E. Payment for unit bid items and lump sum bid items only partially completed at the end of monthly pay periods shall be based on a percentage of work completed as deter-mined by the Government. An example is the construction of pipelines where the unit bid price includes the excavation and backfill of the trenches, installation of pipe, trench compaction, flushing and testing, although the Contractor may have installed certain footage of pipeline, yet has not completed the testing and/or restoration work.
SUMMARY OF WORK 011000 - 9
Umpqua National Forest – North Umpqua Radio Tower
The actual payment for that bid item will be reduced to reflect the actual amount of work completed.
END OF SECTION 011000
North Umpqua Radio Tower 012000 MOBILIZATION
``1
012000 - MOBILIZATION
PART 1 - GENERAL
1.1.01 SUMMARY
A. The work consists of the mobilization and demobilization of the contractor's forces and equipment necessary for performing the work required under the Contract. This work shall consist of preparatory work and operations necessary for the movement of personnel, equipment, supplies, and incidentals to the project site, and for all other work and operations that must be performed or that cause costs to be incurred prior to beginning work on the various items on the project site.
B. This item also includes the cost of transportation of Contractor’s personnel, materials, and equipment to and from the job site during accomplishment of the project.
C. Mobilization will not be considered as work in fulfilling the contract requirements for commencement of work.
D. The cost of any required bonds may also be included in mobilization.
PART 2 - PRODUCTS (NOT
USED) PART 3 - EXECUTION
2.3.01 GENERAL
A. The Contractor shall do the necessary preparatory work and operations, including but not limited to, those required for the movement of personnel, equipment, supplies, and incidentals to the project site to assure completion of the project within the required time frames.
3.3.02 BASIC MOBILIZATION
A. Mobilization for contact work at or near major administrative sites as identified in the contract documents.
PART 4 - MEASUREMENT AND PAYMENT
4.4.01 PROGRESS PAYMENTS WILL BE MADE AS FOLLOWS:
A. When 5 percent or more of the original bid amount is earned from other pay items, 25 percent of the amount for mobilization will be paid.
B. When 10 percent or more of the original bid amount is earned from other pay items, 50 percent of the amount for mobilization will be paid.
C. When 50 percent or more of the total amount bid is earned, 100 percent of the amount bid for mobilization will be paid.
D. The total of all payments shall not exceed the original contract amount for this item.
END OF SECTION
015000 TEMPORARY FACILITIES AND CONTROLS
North Umpqua Radio Tower
SECTION 015000 - TEMPORARY FACILITIES AND
CONTROLS
PART 1 - GENERAL
1.1 SECTION REQUIREMENTS
A. Water and Electric Power: Available from Owner's existing system without metering and without payment of use charges. Provide connections and extensions of services as required for construction operations.
1.2 SUBMITTALS
A. Safety Plan: Submit plan showing compliance with requirements of OSHA.
1. Add provisions for security and protection of facilities as described in this section.
PART 2 - PRODUCTS (Not Used)
PART 3 - EXECUTION
3.1 SUPPORT FACILITIES INSTALLATION
A. Install project identification and other signs to inform the public and persons seeking entrance to Project.
3.2 SECURITY AND PROTECTION FACILITIES INSTALLATION
A. Barricades, Warning Signs, and Lights: Erecting structurally adequate barricades, including warning signs to protect people from construction activities.
B. Provide temporary enclosures for protection of construction, in progress and completed, from exposure, foul weather, other construction operations, and similar activities. Provide temporary weathertight enclosure for building exterior.
3.3 MOISTURE AND MOLD CONTROL
A. Before installation of weather barriers, protect materials from water damage and keep porous and organic materials from coming into prolonged contact with concrete.
1. Protect stored and installed material from flowing or standing water.
015000 TEMPORARY FACILITIES AND CONTROLS
North Umpqua Radio Tower
3.4 OPERATION, TERMINATION, AND REMOVAL
A. Supervision: Enforce strict discipline in use of temporary facilities. To minimize waste and abuse, limit availability of temporary facilities to essential and intended uses.
B. Remove each temporary facility when need for its service has ended, when it has been replaced by authorized use of a permanent facility, or no later than Substantial Completion.
C. At Substantial Completion, repair, renovate, and clean permanent facilities used during construction period.
END OF SECTION 015000
USDA Forest Service Project Specifications
April, 21 North Umpqua Radio Tower 01 77 00.00 - 1
SECTION 01 77 00
PROJECT CLOSEOUT
1. PART 1 GENERAL
1.01 DESCRIPTION
A. The work of this section consists of final cleanup, closeout submittals, and final inspection procedures.
2. PART 2 PRODUCTS
2.01 CLEANING MATERIALS
A. As recommended by the manufacturer of surface to be cleaned or refinished.
3. PART 3 EXECUTION
3.01 CLEANING/REFINISHING
A. Before scheduling the final inspection, remove all tools, equipment, surplus materials, and rubbish. Remove grease, dirt, stains, foreign materials, and labels from finished surfaces. Pick up all construction debris from the site.
B. Apply touch-up paint or otherwise refinish surfaces that are damaged due to work of this contract to original condition.
3.02 PROJECT RECORD DRAWINGS
A. Maintain one complete full-size set of contract drawings and one full-size set of vendor-supplied drawings. Clearly mark changes, deletions, and additions, to show actual construction conditions. Show additions in red, deletions in green, and special instructions in blue. Final locations of all water lines shall be identified by dimensions from permanent structures (building corners, signs, etc.).
B. Keep record drawings current. Make record drawings available to the Contracting Officer for inspection at any time and at invoices. If project record drawings are not current, the Contracting Officer may retain an appropriate amount of the progress payment. At the completion of the project the Contracting Officer shall review the redline markup drawings for preparation of the electronic files.
C. On completion of the total project, modify existing electronic design drawings to reflect the record drawing markups. Submit both electronic and marked up project record drawings. Include all shop drawings, sketches, and additional drawings that are to be included in the final set, with clear instructions showing the location of these drawings. All drawings shall be both hardcopy and electronically submitted.
3.03 CLOSEOUT SUBMITTALS
A. Submit before final inspection request.
3.04 PROJECT RECORD DRAWINGS: AS SPECIFIED ABOVE.
A. Guarantees and Bonds: As specified in individual sections.
B. Spare Parts and Materials: As specified in individual sections.
C. Operations and Maintenance Manuals.
USDA Forest Service Project Specifications
April, 21 North Umpqua Radio Tower 01 77 00.00 - 2
D. All keys, locks, spare parts and instruction materials as required or requested by the Contracting Officer.
3.05 SUBSTANTIAL COMPLETION AND FINAL INSPECTION
A. Submit written certification that project, or designated portion of project, is substantially complete, and request in writing a final inspection. Contracting Officer will make an inspection within 10 days of receipt of request. Certification shall include a listing of significant items that are not complete in accordance with the contract and shall indicate the schedule date for the completion of these items. Upon receipt of written certification project is substantially complete, the Contracting Officer will proceed with inspection within 10 days of receipt of request or will advise the Contractor of items that prevent the project from being designated as substantially complete.
B. If, following final inspection, the work is determined to be substantially complete, Contracting Officer will prepare a list of deficiencies to be corrected before final acceptance and issue a Letter of Substantial Completion. Contractor shall complete the work described on the list of deficiencies within 30 calendar days, as weather permits.
If the Contractor fails to complete the work within this time frame, the Contracting Officer may either replace or correct the work with an appropriate reduction in the contract price or charge for reinspection costs.
C. If, following final inspection, the work is not determined to be substantially complete, Contracting Officer will notify Contractor in writing. After completing work, Contractor shall resubmit certification and request a new final inspection. All re-inspection costs may be charged in accordance with the Inspection of Construction clause of the contract.
3.06 ACCEPTANCE OF THE WORK
A. After all deficiencies have been corrected, a Letter of Acceptance will be issued.
Rev 6/7/14 North Umpqua Radio Tower 02230 - 1/2 Clearing & Grubbing
SECTION 02230
CLEARING AND GRUBBING
1. PART 1 - GENERAL
1.01 SUMMARY
A. This section specifies clearing, grubbing, removing, and disposing of all vegetation and debris within the clearing limits except objects designated to remain. Work includes preserving objects designated to remain. (Clearing includes snags and unstable trees outside the clearing limits.)
B. Clearing Limits.
1. Clearing limits are within 5 feet of the building limits (unless otherwise shown on the Drawings or staked on the ground).
2. Clearing limits are within a 5-foot swath offset from utility (both sides) centerline (unless otherwise shown on the drawings or staked on the ground).
2. PART 2 - PRODUCTS (NOT USED)
3. PART 3 - EXECUTION
3.01 SURFACE PREPARATION
A. Clearing.
1. Clear all trees, brush and other objects not designated to remain.
B. Grubbing.
1. Grub all stumps, brush, and roots (to a minimum 3” diameter) within the clearing limits.
2. Grub stumps, shrubs, brush, and roots (to a minimum 3” diameter) within the excavation limits.
3.02 DEBRIS DISPOSAL
A. Other vegetative debris may be hauled to the debris disposal site or chipped and spread evenly in areas and depths designated by the COR.
B. Haul vegetative debris to the debris disposal site.
C. Dispose of non-vegetative debris off National Forest System Lands.
3.03 CLEARING FOR BUILDINGS
A. Minimize disruption of existing landscape.
B. Remove all rubbish, vegetative material, and debris from the area to be occupied by the building.
Rev 6/7/14 North Umpqua Radio Tower 02230 - 2/2 Clearing & Grubbing
4.
5.
6. PART 4 - MEASUREMENT AND PAYMENT (NOT USED)
Rev 6/7/14 North Umpqua Radio Tower 02310 - 1/1 Grading
SECTION 02310
GRADING
1. PART 1 - GENERAL
1.01 SUMMARY
A. This section specifies grading requirements for project.
1.02 RELATED SECTIONS
A. 02230 - Clearing and Grubbing.
B. 02317 - Excavation and Backfill for Structures.
2. PART 2 - PRODUCTS
2.01 MATERIALS
A. Fill Material.
1. Material free from frozen or organic material, and rocks larger than 2 inches.
3. PART 3 - EXECUTION
3.01 CONSTRUCTION
A. General.
1. Grade around buildings to the contours and elevations shown on the Drawings and smoothly blend into existing contours. Grade to uniform levels or slopes between points where grades or contours are given, round surfaces at abrupt changes in levels. Slope ground away from building walls and walks to facilitate drainage.
2. Hand rake areas within the grading limit lines. Remove all roots, brush, weeds and stones larger than 2 inches from the finish graded surface.
B. Grading Around Buildings.
1. Control grading within 5 feet of buildings and all other structures to prevent water from running into excavated areas. Remove all water, which accumulates in excavated areas.
C. Excess Material.
1. Remove excess material not required for grading from the site to a location specified by COR.
4. PART 4 - MEASUREMENT AND PAYMENT
4.01 BASIS OF PAYMENT
A. Payment will be made based on the Contract Schedule of Items.
Rev 6/19/14 North Umpqua Radio Tower 02317 - 1/4 Excavation & Backfill for Structures
SECTION 02317
EXCAVATION AND BACKFILL FOR STRUCTURES
1. PART 1 - GENERAL
1.01 SUMMARY
A. This section specifies excavation and backfill for structures, including excavation;
furnishing, hauling and placing of backfill material; disposal of excess or unsuitable backfill material; and grading. Follow equipment manufacturer's recommendations where more stringent.
B. Material to be excavated is unclassified.
1.02 RELATED SECTIONS
A. 02230 - Clearing and Grubbing B. 02310 - Grading
1.03 OWNER’S INSTRUCTIONS
A. In general, excavation below the gravel layer is discouraged on this site. In cases where plans, specifications, codes, or other requirements necessitate digging below this gravel layer the Contractor shall submit a site plan with areas identified for digging. Allow 14 calendar days for Government to review these drawings before proceeding with digging.
B. Conform to the dimensions and elevations indicated on the Drawings. Suitable bearing may be encountered at different elevations from those on the Drawings. If so, the COR may direct, by written order, that the excavation elevations be changed to the elevation where suitable bearing was encountered. Extend excavation a sufficient distance from walls and footings to allow placing and removal of forms.
Undercutting will not be permitted. Prevent surface water from entering the excavation.
2. PART 2 - PRODUCTS
2.01 MATERIALS
A. Backfill Materials.
1. Backfill materials shall contain no organic or frozen material.
a. General Backfill Material.
1) Excavated material containing no rock larger than 6 inches.
b. Designated Backfill Material.
1) Excavated material containing no rock larger than 3 inches.
c. Crushed Rock.
1) Crushed aggregate, conforming to the requirements of AASHTO
M147, grade D.
d. Bedding Material.
1) 1/4 inch minus pea gravel or sand; 100 percent passing the #4 sieve.
e. Topsoil.
Rev 6/19/14 North Umpqua Radio Tower 02317 - 2/4 Excavation & Backfill for Structures
1) Loam or excavated topsoil with no rocks larger than 2 inches in greatest dimension.
3. PART 3 - EXECUTION
3.01 CONSTRUCTION
A. Excavation.
1. Topsoil Material.
a. Remove loose surface and organic material in areas to be excavated.
Stockpile this material separately from other excavated material, for use in grading the site.
2. Other Material.
a. Extend excavation beyond exterior finished footing dimensions, to allow for placing and removal of forms and other appurtenances. Do not undercut.
b. Grade areas in vicinity of construction to prevent surface water from running into excavated areas.
3. Overexcavation Under Footings.
a. Increase the depth of the footing by the amount of overexcavation. Pour entire footing, including overexcavated volume, in one continuous pour to rest on undisturbed soil.
B. Backfill.
1. Preparation for Backfill.
a. Remove all forms from structure, and clean the excavated area of all debris. Remove any standing water from excavation. Prior to backfill, obtain approval from COR to backfill excavated area.
b. Backfilling all Structures.
1) Do not backfill in a manner to cause structure to become point loaded.
Place backfill in uniform lifts around structure.
c. Backfilling of Concrete.
1) Do not backfill until concrete has been in place for 14 days or a strength of 1,000 psi has been reached, unless allowed in writing by
COR.
d. Backfill Over Pipes Under Slabs.
1) Use designated backfill material or crushed rock. Place in layers not greater than 6 inches thick to 6 inches below slab. Compact at or near optimum moisture by hand tamping or mechanical vibrating tamper with 2 passes of the entire lift surface. Finish backfill lift as specified for Overexcavation Backfill Under Slabs.
e. Overexcavation Backfill Under Slabs.
1) Restore grade for slabs as follows:
a) Within 2 inches of slab bottom: Use bedding material.
b) From 2 inches to 6 inches below slab: Use crushed rock.
c) Over 6 inches below slab: Use general backfill material.
Rev 6/19/14 North Umpqua Radio Tower 02317 - 3/4 Excavation & Backfill for Structures
d) Place material in 6 inch maximum lifts and compact with a minimum of 2 passes over the entire layer with mechanical vibrating tamper.
f. Placing Backfill Material.
1) Place all backfill material in 12 inch maximum lifts. Compact each lift with a minimum of 2 passes over the entire layer with mechanical tampers.
2) Do not use tracked or wheeled equipment to compact backfill.
g. Topsoil.
1) Deposit original surface material as the final backfill lift and compact with a minimum of 2 passes over the entire surface with mechanical tamper.
C. Grading.
1. Grade surface uniformly between spot elevations or contours to match existing adjacent ground elevations. Slope surface to provide drainage away from structures.
3.02 REPAIR/RESTORATION
A. Underground Utilities.
1. Stop all work associated with damage to existing utilities, and notify COR.
Repair utility as directed by the COR.
2. Repair at Contractor's expense Contractor-damaged utilities shown on the Drawings, marked on the ground, or discovered by calling Oregon Utility Notification Center.
3. Repair at Government expense any Contractor-damaged utilities not shown on Drawings or not marked on the ground; and that are located on Federal land.
The Government is not responsible for locating, nor maintaining, municipal and public utilities within local agency Rights-of-way.
3.03 EXCESS EXCAVATED MATERIAL (SUITABLE AND UNSUITABLE)
A. Remove all excess or unsuitable material from the site.
1. Spread material in designated location. Finish to a smooth, uniform grade and texture, well blended to the original contours, showing minimum evidence of construction activity.
B. Small amounts of excess material may be placed adjacent to structure site to blend with existing contours or to facilitate grading and drainage around the structure.
Do not place fill around structure unless it is authorized by COR.
C. Do not spread excess material in drainage areas or in any way that could wash out or cause debris to wash away from the site before seeding can take effect. Utilize erosion control measures as appropriate. Do not allow materials to enter any streams, waterways, ditches, seasonal drainages, etc.
Rev 6/19/14 North Umpqua Radio Tower 02317 - 4/4 Excavation & Backfill for Structures
4. PART 4 - MEASUREMENT AND PAYMENT (NOT USED)
Rev 6/19/14 North Umpqua Radio Tower 02318 - 1/5 Excavation & Backfill for Utilities
SECTION 02318
EXCAVATION AND BACKFILL FOR UTILITIES
1. PART 1 - GENERAL
1.01 SUMMARY
A. This section specifies excavation and backfill for utilities, including excavation;
furnishing, hauling and placing of backfill material; disposal of excess or unsuitable backfill material; and grading.
B. The disposal site will be staked in the field at a mutually agreed upon location adjacent to the work area.
C. Class of Material.
1. Material to be excavated for installation of utilities is unclassified.
1.02 RELATED SECTIONS
A. 02230 - Clearing and Grubbing.
B. 02310 – Grading
1.03 SUBMITTALS
A. Excavation.
1. Notify COR when excavation is completed. Do not place pipe, cable or bedding backfill until the excavation is approved by the COR.
B. The Contractor shall provide submittals in accordance with Contract requirements and shall include:
1. Certification, test results, source and samples for all imported material.
2. Required permits.
1.04 PROJECT CONDITIONS
A. The materials investigation data shown on the Drawings is from Government conducted investigations, and is provided as information only. This information is subject to interpretation and should be considered as representative of the material only at the specific materials investigation test sites.
B. Contractor shall be responsible to call for utility locate services, if available in area.
2. PART 2 - PRODUCTS
2.01 MATERIALS
A. Backfill Materials.
1. Backfill material shall contain no frozen or organic material.
2. Bedding Material.
a. Fine soil or sand, 100 percent passing the #4 sieve; or crushed rock less than 1/2 inch.
3. Crushed Rock.
Rev 6/19/14 North Umpqua Radio Tower 02318 - 2/5 Excavation & Backfill for Utilities
a. Crushed aggregate, meeting the requirements of AASHTO M147 grading D.
4. Drain Rock Material.
a. Round, washed gravel, ASTM D448 (AASHTO M43), Size Number 24.
5. Select Material.
a. Fine soil or sand, 100 percent passing the #4 sieve.
6. Select Excavated Material.
a. Excavated material containing no rocks larger than 6 inches in largest dimension.
7. Topsoil.
a. Soil or loam containing no rock larger than 2 inches.
b. Loose, nonplastic soil free of roots, weeds, subsoil admixture, excessive organic matter, clods, stones, gravel or other material detrimental to plant growth. Maximum particle size 1/2 inch.
3. PART 3 - EXECUTION
3.01 CONSTRUCTION
A. Excavation.
1. Excavation shall not begin until all clearing and grubbing work is completed except for final debris disposal. Operations shall be in compliance with the requirements and restrictions of OSHA, and the Oregon or Washington Occupational Safety and Health Code.
2. All trenches shall be excavated in reasonably close conformity with the lines and grades shown on the Drawings. Any shifting or change from the alignment and grade shown on the Drawings must receive prior approval by the COR in writing.
3. Lay utilities in continuous open trench. Horizontal Directional Drilling may be used in lieu of open trenching with the approval of the COR.
B. Trim roots flush with trench wall.
C. Overexcavation.
1. Restore to grade any overexcavation by backfilling with select material.
D. Salvage of Topsoil.
1. Suitable topsoil not containing well-bound pieces of sod may be conserved for use as topsoil backfill material.
E. Wet Excavation.
1. If water is encountered during trench excavation, provide adequate pumping equipment and piping to keep trench free from water and dispose of the water without damage to adjacent property. Separate payment will not be made for pumping of water from trenches or for excavation of material rendered unsuitable as a result of water encountered.
F. Unsuitable Material.
Rev 6/19/14 North Umpqua Radio Tower 02318 - 3/5 Excavation & Backfill for Utilities
1. Where unsuitable material is encountered in the trench bottom, as determined by the COR, excavate the trench below grade to the depth specified by the
COR.
G. Backsloping, Sheeting and Shoring.
1. Backsloping of trench walls will be allowed only upon prior written approval of the COR.
2. Remove all shoring and sheeting when construction is completed. Withdraw to prevent trench wall caving while backfilling.
3. When necessary, provide shoring and escape routes per OSHA requirements.
H. Excavated Material.
1. Pile excavated material at the side of the trench where it will give the best protection for the work. Leave adequate space between the toe of the spoil pile and edge of trench to prevent material from falling into the trench.
I. Backfill.
1. Do not place backfill until installation of pipe or cable has been approved by the COR.
2. Before compacting backfill other than rock or sand, prepare material to a water content that will permit proper compaction by either aerating the material if it is too wet, or spraying the material with water if it is too dry. Thoroughly mix each lift before compaction to assure uniform distribution of water content. Do not compact material above pipe or cable until there are 6 inches of cover over the pipe or cable.
3. Compact each lift (with the required number of passes of a mechanical vibrating tamper over the entire layer) (to the required density).
a. Select Material.
b. Select Material.
1) Place in 6 inches lifts or less and compact with a minimum of 3 passes over the entire lift surface.
c. Bedding Material.
1) Place in lifts 4 inches or less in thickness and compact with a minimum of 3 passes over the entire lift surface. Compact around pipe barrel and bells by hand tamping.
d. Select Excavated Material.
1) Distribute large rocks so they are individually surrounded by fine materials. Place select excavated material as follows where backfill classes are indicated on Drawings.
a) Select Excavated Material: Place in 24 inch lifts or less to within
8 inches of finished grade and compact each lift with 3 passes of tamper. On pipe gradients over 30 percent (0.3 foot/foot) place in 12 inch horizontal lifts and compact each lift with 3 passes of tamper.
b) Topsoil: Place in l2 inch lifts or less and compact each lift with 3 passes of tamper.
Rev 6/19/14 North Umpqua Radio Tower 02318 - 4/5 Excavation & Backfill for Utilities
c) Crushed Rock: Place in l2 inch lifts or less, and compact each lift with 6 passes of tamper. At depths greater than 5 feet, compact each lift with 3 passes of tamper.
e. The number of tamper passes required may be reduced upon acceptance by the COR, if approved test method results demonstrate that the backfill compaction meets or exceeds the density of the natural ground adjacent to the trench. Any such testing shall be performed at the Contractor's expense.
4. Water compaction shall not be used.
3.02 REPAIR/RESTORATION
A. Damage to existing underground utilities.
1. Stop all work associated with damage to existing utilities, and notify the COR.
Repair utility as directed by the COR.
2. Repair at Contractor's expense Contractor-damaged utilities shown on the
Drawings, marked on the ground, or discovered by calling Oregon Utility Notification Center.
B. Repair at Government expense any Contractor-damaged utilities not shown on Drawings or not marked on the ground; and that are located on Federal land. The Government is not responsible for locating, nor maintaining, municipal and public utilities within local agency Rights-of-way. Surface Restoration.
1. Restore all surfaces in kind and in accordance with backfill classes indicated on Drawings:
a. Select Excavated Material: Mound final uncompacted lift above finished grade.
b. Topsoil: Place topsoil in 6 inch maximum lifts and compact each lift with
3 passes of tamper.
c. Crushed Rock: Place crushed rock in 6 inch lifts or less and compact each lift with 6 passes of tamper. Add water if necessary to compact at near optimum moisture content.
2. Final Finish.
a. After the utility installation and backfill has been completed, finish all disturbed areas, except trench area required to be mounded, to a smooth, uniform grade and texture, well blended to the original contours, showing minimum evidence of construction activity.
3.03 CLEANING
A. Disposal of Excess of Excavation and Unsuitable Material.
1. Haul excess (and unsuitable) material to the disposal site (shown on the Drawings or as specified by the COR at a mutually agreed upon location adjacent to the work area). Remove excess and unsuitable material from the site for disposal off National Forest System Lands.
2. Spread excess excavation, without mounding, within the clearing limits.
Rev 6/19/14 North Umpqua Radio Tower 02318 - 5/5 Excavation & Backfill for Utilities
3.04 SCHEDULES
A. Backfill and restore surface materials of utility line trenches located in existing roadways, parking areas, driveways, and lawns within 7 days after approval to place backfill by COR.
Rev. Date 12/01 North Umpqua Radio Tower 03100 - 1/2 Concrete Forms and Accessories
SECTION 03100
CONCRETE FORMS AND ACCESSORIES
1. PART 1 - GENERAL
1.01 SUMMARY
A. This section specifies construction of concrete forms.
1.02 RELATED SECTIONS
2. PART 2 - PRODUCTS
2.01 MATERIALS
A. Plywood: B-B Plyform.
B. Steel.
1. Prefabricated.
C. Lumber.
1. Standard grade, (concealed surfaces only).
D. Form Ties and Spreaders.
1. Form Ties: Snap-off type, galvanized metal, fixed length, cone type, with waterproofing washer and leaving no metal within 1 inch of the concrete face.
E. Form Release Agent.
1. Colorless mineral oil which will not stain concrete, or absorb moisture, or impair natural bonding or color…