Attachment 3 - DE USF 141 - Provide Allied Support PMO Facility.pdf

PDF 133 KB Posted

Attached to
Temporary Facility Lease Federal contract opportunity
Solicitation number
FA558722Q0041
Issued by
Department of the Air Force United States Air Forces in Europe - Air Forces Africa

View the file

Other files for this federal contract opportunity

Other files attached to Temporary Facility Lease, newest first.
File Type Posted
Amendment 08 - FA558722Q0041.pdf PDF
Attachment 9 Project 2 indicative floor plan.pptx PPTX presentation
Statement of Work 08 Aug 2022.docx DOCX document
Amendment 07 - FA558722Q0041.pdf PDF
Amendment 06 - FA558722Q0041.pdf PDF
Attachment 9 Project 2 indicative floor plan.pptx PPTX presentation
Statement of Work 22 July 2022.docx DOCX document
Attachment 8 Project 1 indicative floor plan.pptx PPTX presentation
Amendment 05 - FA558722Q0041.pdf PDF
Statement of Work 08 July 2022.docx DOCX document
Amendment 04 - FA558722Q0041.pdf PDF
Attachment 2- Offer Sheet.pdf PDF
Amendment 03 - FA558722Q0041.pdf PDF
Amendment 02 - FA558722Q0041.pdf PDF
Amendment 01 - FA558722Q0041.pdf PDF
Attachment 2- Offer Sheet.pdf PDF
Statement of Work 15 June 2022.docx DOCX document
Solicitation - FA558722Q0041.pdf PDF
Attachment 2- Offer Sheet.pdf PDF
Attachment 1 - MOD Building Regs Policy Instruction 02-10.pdf PDF
Attachment 6 - DE USF 141 - Provide Allied Support PMO Facility.pdf PDF
Attachment 4 - Example of a Combined Fire Strategy - Redacted.pdf PDF
Attachment 7 - TECH 012 Example.pdf PDF
Statement of Work 21 April 2022 - Final.docx DOCX document
Attachment 5 - Tech-012 Handover Process for Works Projects V0.1.pdf PDF
Attachment 2 - 20170421-D2C_New_Works_Compliance_Guide.pdf PDF
Show all 26

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Form DE USF 141 (07/08) Page 1 of 3 Defence Estates is an Agency of the MOD

SCHEDULE OF DOCUMENTS - PROJECT HANDOVER

Project Title : Provide Allied Support Temporary PMO Facility Location (Establishment) : RAF Lakenheath Building / Facility No. : TBD CPM / FSC / PSP-3* : 48th Contracting Contractor : Portakabin

Project Number : Contract Number :

FACILITY MANAGEMENT MANUAL

The Facility Management, (FM), Manual shall be produced by the Principal Contractor and submitted by the PM to DE USF at handover. The FM Manual shall be a concise document that lists all relevant documentation for compliance with CDM, in particular the Health & Safety File and to enable operation and maintenance of the facility. As a minimum, the following information / documents will be catalogued and indexed in accordance with the guidance procedure detailed in the Handover Booklet, (TECH-012).

GENERAL REQUIREMENTS

Required / Enclosed

Not Applicable

1 X Design Criteria Or Project Brief 2 X Building Log Book

GENERAL HANDOVER CERTIFICATES

3 X Completion Of Design Certificate 4 X Project Design & Checking Engineer Certification 5 X Design Compliance Certificate 6 X Structural Design Calculations 7 X Building Regulations Construction Certificate 8 X Certificate Of Completion Of Construction 9 X Certificate Of Facility / Works Acceptance

10 X Certificate Of Completion Of Main Contract

BUILDING, CIVIL & PUBLIC HEALTH ENGINEERING

11 X Project Particular Specification 12 X As-Installed Drawings 13 X Design Drawings 14 X Schedule Of Principal Materials Used In Construction 15 X Maintenance Procedures For The Building Or Structure 16 X Details Of Construction Methods 17 X Demolition Procedures For The Building Or Structure

MECHANICAL ENGINEERING

18 X Project Particular Specification 19 X As-Installed Drawings 20 X Design Drawings 21 X Operating & Maintenance Manual 22 X Schedule Of Principal Materials Used In Construction 23 X Schedule Of Planned Maintenance Requirements

Form DE USF 141 (07/08) Page 2 of 3

ELECTRICAL ENGINEERING

24 X Project Particular Specification 25 X As-Installed Drawings 26 X Design Drawings 27 X Operating & Maintenance Manual 28 X Schedule Of Principal Materials Used In Construction 29 X Schedule Of Planned Maintenance Requirements

ENERGY MANAGEMENT CONTROL SYSTEM (EMCS)

Enclosed Not Applicable

30 ? EMCS Information 31 ? Commissioning Sheets 32 ? Temperature / Time Graphs

TEST & COMMISSIONING CERTIFICATES

33 X Schedule Of Commissioning Certificates 34 X Public Health Engineering Installations 35 X Electrical Installations - Internal 36 X Electrical Installations - External 37 X Earthing & Lightning Protection 38 X Lighting Levels (General) 39 X Emergency Lighting (Maintenance & Testing) 40 X Gas Installation – Internal 41 X Gas Installation – External 42 ? Lifts & Lifting Equipment 43 X Pressure Systems 44 X Tanks & Vessels 45 X Heating Systems – Internal 46 X Heating Systems – External 47 X Boiler(s) 48 X Air Compressors 49 X Mechanical Ventilation, A / C Plant & Installations 50 X Refrigeration Installation 51 X Anchor / Ring Bolt Load Test Certificates

STATUTORY DOCUMENTATION

52 X Lifts & Lifting Equipment – Competent Person Report Of Examination 53 X Pressure Systems – Written Scheme Of Examination 54 X Pressure Systems – Competent Person Report Of Examination 55 X Legionella Risk Assessments 56 X Local Exhaust Ventilation (LEV) Risk Assessment 57 X Energy Performance Certificates (EPC’s) 58 X Fluorinated Greenhouse Gases (“F Gas” Regulations)

FIRE PROTECTION CERTIFICATION & DOCUMENTS

59 X Fire Acceptance Certificate (For ansul, add. to FA system & LPG interface) 60 X Fire Alarm Certificate Of Design 61 X Certificate Of Installation 62 X Certificate Of Commissioning (For ansul) 63 X Record Of Sound Levels Attained During Commissioning 64 X Emergency Lighting Certificate 65 X Emergency Lighting Operational Test Certificate 66 X Cooker Hood Fire Suppression System Test 67 X Sprinkler Pipe Line Pressure Test Certificate 68 X Sprinkler Commissioning Certificate 69 X Fire Doors Certification 70 X Smoke Curtain Test / Certification

Form DE USF 141 (07/08) Page 3 of 3

OTHER INFORMATION & DOCUMENTS

71 X As-Installed Drawings (Specialist Installations) 72 X Backup Software

73 X Installed Emergency Systems Not Referenced In The Previous Sections

74 X Remaining Hazards In The Design & The Resulting Risks 75 X Extended Guarantees

Enclosed Not Applicable

76 X Copyright Approval For All Literature Supplied 77 X Users Operating Manual 78 X Certificate Of Compliance With Montreal Protocol 79 X HV / LV Grading Of Protection Curves 80 X Statement Of Mechanical & Electrical Systems Compliance 81 X Schedule Of Confined Spaces 82 X Schedule Of Keys / Tools / Equipment 83 X COSHH Data Sheets 84 X Asbestos Clearance (Air Sampling) Certificate 85 X Provision & Use Of Work Equipment Regulations (PUWER) Report 86 X Energy Rating 87 X Air Tightness Test & Commissioning 88 X Environmental File 89 X Defect Liability Notice File

SUPPLEMENTARY INFORMATION

CPM / FSC / PSP-3*

I certify that these documents are complete & compliant.

Position : Portakabin Project Manager Date :

Name : Title :

Signature :

US PROJECT MANAGER

I acknowledge receipt of the documentation indicated above.

Position : USAF Project Manager Date :

Name : Title :

Signature :

NOTES

i) A Principal Contractor is only required for notifiable projects

ii) The CDM Regulations 2007 only require a Health and Safety File to be provided for notifiable projects

iii) Health and Safety Files must be compiled by the CDM Co-ordinator

iv) BUT: USF Division requires a Health and Safety File to be produced for every project

v) For projects that are not notifiable, the Health and Safety File shall be produced by the contractor

SCHEDULE OF DOCUMENTS - PROJECT HANDOVER
BUILDING, CIVIL & PUBLIC HEALTH ENGINEERING
MECHANICAL ENGINEERING
ENERGY MANAGEMENT CONTROL SYSTEM (EMCS)
TEST & COMMISSIONING CERTIFICATES
STATUTORY DOCUMENTATION
FIRE PROTECTION CERTIFICATION & DOCUMENTS
OTHER INFORMATION & DOCUMENTS
CPM / FSC / PSP-3*
US PROJECT MANAGER