Attachment 3 CLIN_Pricing_Schedule.pdf

PDF 473 KB Posted

Attached to
Laughlin AFB Building 8 Carpet Replacement Federal contract opportunity
Solicitation number
FA3099-23-Q-1031
Issued by
Department of the Air Force Air Education and Training Command

About this file

This document is a pricing schedule for a federal contract solicitation to replace carpet at Laughlin Air Force Base Building 8. The schedule includes three contract line items for carpet material, adhesive material, and carpet removal and installation services. Item 0001 requests pricing for carpet material on a firm-fixed-price basis, item 0002 for adhesive material on the same basis, and item 0003 for removal of approximately 1,600 square feet of existing carpet and installation of new carpet at the specified building location. The solicitation number is listed as FA3099-23-Q-1031 and is issued by the Department of the Air Force Air Education and Training Command for carpet replacement services at Laughlin Air Force Base. Offerors are requested to provide pricing, payment and delivery information, vendor details, and confirmation of ability to invoice electronically through the WAWF system.

View the file

Other files for this federal contract opportunity

Other files attached to Laughlin AFB Building 8 Carpet Replacement, newest first.
File Type Posted
Amendment 01- Statement of Objective Memorandum.pdf PDF
Amended Attachment 1 SOO CARPET Installation Laughlin Fuels POL B8 14Aug23.pdf PDF
Combo Synopsis Solicitation.pdf PDF
Attachment 1 SOO CARPET Installation Laughlin Fuels POL B8 4Aug23.pdf PDF
Attachment 4 Wage Determination.pdf PDF
Attachment 5 EAL.pdf PDF
Attachment 2 building 8 Floor plan.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Attachment 3 – Contract Line-Item Number / Pricing Schedule

FA3099-23-Q-1031

CONTRACT LINE ITEMS – PRICING SCHEDULE:

CLIN DESCRIPTION QTY UNIT UNIT PRICE TOTAL PRICE

0001 Carpet Cost

FFP

Material Cost Only

1 LO

0002 Adhesive Cost

FFP

Material Cost Only

1 LO

0003 Building 8 Carpet Removal and Installation Services

FFP

The contractor shall provide all materials, labor, tools, equipment, transportation, supervision, and all other incidentals. Cove Base shall remain in place. Removal of existing carpet and adhesive, inspect and repair subflooring, and install new carpet, (est. 1,600 Sq. Ft.)

*IAW Attachment 1 Statement of Objective.

Delivery Location: Project work is to be performed on Laughlin AFB, Building 8, located at 55 Kansas Ave Laughlin AFB, Texas 78843.

Please provide the information below:

FOB Destination Shipping Cost Included? Yes No

Payment Terms: Delivery Date:

Company Name: UEI #

Cage Code:

POC: Telephone #

E-Mail Address: Tax ID#:

Warranty Information:

Do you have capacity to invoice electronically through WAWF? (Yes/No)

Carpet Company you have chosen to go with:

DESCRIPTION:
0001:
Carpet Cost FFP Material Cost Only:
1:
UNIT PRICELO:
TOTAL PRICELO:
0002:
Adhesive Cost FFP Material Cost Only:
UNIT PRICELO_2:
TOTAL PRICELO_2:
0003:
1Building 359 Carpet Removal and Installation Services FFP The contractor shall provide all necessary labor equipment parts and material to lift or disassemble and reassemble of system furniture and free standing furniture Cove Base shall remain in place Removal of existing carpet and adhesive inspect and repair subflooring install new carpet and place system furniture and freestanding furniture in original locations est 4697 Sq Ft IAW Attachment 1 Statement of Objective:
LOBuilding 359 Carpet Removal and Installation Services FFP The contractor shall provide all necessary labor equipment parts and material to lift or disassemble and reassemble of system furniture and free standing furniture Cove Base shall remain in place Removal of existing carpet and adhesive inspect and repair subflooring install new carpet and place system furniture and freestanding furniture in original locations est 4697 Sq Ft IAW Attachment 1 Statement of Objective:
UNIT PRICEBuilding 359 Carpet Removal and Installation Services FFP The contractor shall provide all necessary labor equipment parts and material to lift or disassemble and reassemble of system furniture and free standing furniture Cove Base shall remain in place Removal of existing carpet and adhesive inspect and repair subflooring install new carpet and place system furniture and freestanding furniture in original locations est 4697 Sq Ft IAW Attachment 1 Statement of Objective:
TOTAL PRICEBuilding 359 Carpet Removal and Installation Services FFP The contractor shall provide all necessary labor equipment parts and material to lift or disassemble and reassemble of system furniture and free standing furniture Cove Base shall remain in place Removal of existing carpet and adhesive inspect and repair subflooring install new carpet and place system furniture and freestanding furniture in original locations est 4697 Sq Ft IAW Attachment 1 Statement of Objective:
Yes: Off
Payment Terms:
Delivery Date:
Company Name:
UEI:
Cage Code:
POC:
Telephone:
EMail Address:
Tax ID:
Warranty Information:
Do you have capacity to invoice electronically through WAWF YesNo:
Carpet Company you have chosen to go with:

File details come from the government source that posted it. Updated .