Attachment_3_-_BFO_HVAC_Submittal_Register.pdf
PDF 444 KB Posted
- Attached to
- Burley Fire Office HVAC System Replacement Federal contract opportunity
- Solicitation number
- 140L2624Q0071
About this file
This document is a Submittal Register for the Burley Fire Office HVAC Replacement project. It lists various submittals the contractor is required to provide, including product data, samples, test reports, certifications, operation and maintenance data, and project schedule. Key details include:
The project involves demolishing and installing new HVAC systems at the Burley Fire Office in Idaho. The contractor must provide all labor, materials, transportation, and storage to perform the work. A site visit is scheduled for September 5, 2024, and questions are due by September 11, 2024. The period of performance is 45 calendar days after the notice to proceed, which will be issued 10 days after contract award. The project is valued between $25,000 and $100,000 and is a Total Small Business Set-Aside under NAICS code 238220. The government intends to award a single Firm-Fixed Price contract.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Sol_140L2624Q0071_Amd_0001.pdf | ||
| Attachment_1_-_BFO_HVAC_SOW_12_SEP_24_0001.pdf | ||
| Government_Responses_to_Vendor_Questions_0001.pdf | ||
| Sol_140L2624Q0071.pdf | ||
| Attachment_1_-_BFO_HVAC_SOW.pdf | ||
| Attachment_4_-_WD__ID20240022_12_JAN_24.pdf | ||
| Site_Visit_Meeting_Location.jpg | JPG image | |
| Attachment_2_-_BFO_HVAC_Drawings.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
2.4.1 3.5 T 60,0000 BTU Furance, 3.5T AC, 17" Coil X X
2.4.2 4 T 80,0000 BTU Furance, 4T AC, 21" Coil X X
2.4.3 3/4" PVC X X
2.4.5 Air Filter 1" Throaway MERV 8 X X
2.4.6 Thermostat X X
3 Preliminary Schedule X X With Proposal
3 Initial Project Schedule X X 10 Days after NTP
10 Quality Control Plan, DFOW X X 9 Environmental Protection Plan X X 8 Accident Prevention Plan (APP) X X
Submittal Register X X
Precon & update monthly w/ Govt QA
4 O&M Data/Manuals X X X
Site Plan to include temp storage/laydown/field office as applicable
X X
7.1 Contractor Warranty POC's X X During duty and non duty
7.2 Extended Warranties X X
14 Access List of Personnel/Subcontractor list X X
REMARKS
CLASSIFI-
CATIONS
DATE SU
BM
IT
TE
D T
O G
O
VE
RN
M
EN
T
SUBMITTAL REGISTER
TYPE OF SUBMITTAL
CONTRACT NUMBERPROJECT NUMBER PROJECT TITLE
Burley Fire Office HVAC Replacement
AC
TI
VI
TY
N U
M
BE
R
ITEMS OR DESCRIPTION OF ITEM
PR
EC
O N
ST
RU
CT
IO
N
SH
O
P D
RA
W
IN
G
S
O
PE
RA
TI
O N
A N
D M
AI
N
TE
N
AN
CE
D
AT
A
IT
EM
N U
M
BE
R
SP
EC
IF
IC
AT
IO
N
PA
RA
G
RA
PH
RE
Q
U
IR
ED
S
U
BM
IS
SI
O N
D
AT
E (o r p rio r t o
D
FO
W
Pr ep ar at or y)
G O
VE
RN
M
EN
T
AP
PR
O
VA
L
PR
O
D U
CT
D
AT
A
SA
M
PL
ES
D
ES
IG
N
D
AT
A
TE
ST
R
EP
O
RT
S
CE
RT
IF
IC
AT
ES
TR
AN
SM
IT
TA
L
D at e Re ce iv ed b y G ov t
CONTRACTOR SHEDULE DATES
CONTRACTOR
ACTION
GOVERNMENT
ACTION
M
AN
U
FA
CT
U
RE
R'
S
IN
ST
RU
CT
IO
N S
M
AN
U
FA
CT
U
RE
R'
S
FI
EL
D
R
EP
O
RT
S
D
AT
E of
A ct ito n
AP
PR
O
VA
L N
EE
D
ED
B
Y
M
AT
ER
IA
L N
EE
D
ED
B
Y
CO
D
E
CL
O
SE
O
U T
SU
BM
IT
TA
LS
FO
R
IN
FO
RM
AT
IO
N
O N
LY
SU
BM
IT
CO
D
E
TO BE COMPLETED BY PROJECT ENGINEER
File details come from the government source that posted it. Updated .