Attachment 3 APPENDIX B - Inspection and Maintenance Schedule.pdf
PDF 210 KB Posted
- Attached to
- FM200 System Inspection and Repairs Federal contract opportunity
- Solicitation number
- W911KF-21-Q-0046
About this file
This document contains an appendix outlining inspection and maintenance requirements for kitchen ventilation hoods and fire suppression systems. It provides a table summarizing the minimum NFPA inspection, test, and maintenance activities required on a weekly, monthly, quarterly, semi-annual, annual, and every 12 years basis according to manufacturer instructions and NFPA standards. These include inspecting nozzles, actuators, tamper indicators, maintenance tags, pressure gauges, blowoff caps, equipment modifications, power shutoffs, cleaning exhaust systems, replacing fusible alloy elements, cleaning other detection elements, inspecting detectors, containers, releasing devices, piping, and performing pressure tests, operating checks on recirculating systems, and cleaning hood plenums and blowers. Monthly and annual maintenance tags must be attached to record inspection details such as initials and dates. Manufacture and installation dates must also be marked on inspection tags for systems using fusible links.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Revised Statement of Work.pdf | ||
| W911KF21Q0046_Amendment 0002.pdf | ||
| W911KF21Q0046_Amendment 0001.pdf | ||
| W911KF21Q0046.pdf | ||
| Attachment 1 Statement of Work.pdf | ||
| Attachment 5 Request for Technical Literature.pdf | ||
| Attachment 7 Wage Determination.pdf | ||
| Attachment 2 APPENDIX A - Building Inspection List.pdf | ||
| Attachment 6 Past Performance Questionnaire.pdf | ||
| Attachment 4 Evidence of Authority to Sign Offers.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
APPENDIX B
Inspection and Maintenance Schedule
Summary of NFPA Inspection, Test, and Maintenance Requirements for Kitchen Ventilation Hoods
Weekly Monthly Quarterly Semi‐Annual Annual Every 12 years
Extinguishing system nozzles are located directly above grease producing equipment Inspection ✓
The Manual actuators are unobstructed Inspection ✓
The tamper indicators and seals are intact Inspection ✓
The maintenance tag or certificate is in place Inspection ✓
No obvious physical damage or condition exists that might prevent operation Inspection ✓
The pressure gauge(s) are in operable range Inspection ✓
The nozzle blow‐off caps are intact and undamaged Inspection ✓
Neither protected equipment nor hazard has been replaced, modified, or relocated Inspection ✓
Gas and electric power shutoff are operational Test ✓
Water‐wash hood cleaning systems are operational in conjunction with hoods protected by sprinkler systems
Test ✓
Remove grease from exhaust system Maintenance ✓
Fixed temperature sensing elements of the fusible alloy type Replace ✓
Clean fixed temperature sensing elements other than the fusible alloy type Maintenance ✓
Restorable‐type Heat detectors condition for damage or buildup of foreign debris Maintenance ✓
Restorable‐type Heat detectors operational/functional test Maintenance ✓
Restorable‐type Heat detector calibration verification test Maintenance ✓
Inspections, tests, and maintenance on kitchen ventilation hoods and fire suppression systems shall be performed in accordance with the manufacturer's instructions, NFPA 17 (latest edition), NFPA 17A (latest edition), NFPA 72 (latest edition), and NFPA 96 (latest edition). The following list highlights the minimum requirements, however, this list is not meant to replace manufacturer's instructions and updated code requirements.
Monthly and annual maintenance tags shall be attached to each fire suppression system for recording the inspector’s initials, date, and confirmation on maintenance/inspections performed. Where fusible links are used, the manufacture and the installation dates for the links shall be marked on the system inspection tag.
PERIODIC FREQUENCY
ACTIVITYITEM
Summary of NFPA Inspection, Test, and Maintenance Requirements for Kitchen Ventilation Hoods
Weekly Monthly Quarterly Semi‐Annual Annual Every 12 years
Nonrestorbale Heat detectors functional test Maintenance ✓
Manual release stations are operational and send a signal to the building fire alarm control panel
Test ✓
Automatic release devices are operational and send a signal to the building fire alarm control panel
Test ✓
Water flow, valve tamper, and low water pressure cutoffs are operational Test ✓
Verify the agent distribution piping is not obstructed Test ✓
Examine detectors, expellant gas containers, agent containers, releasing devices, piping, hose assemblies, nozzles, signals, and all auxiliary equipment
Maintenance ✓
Hydrostatic pressure test (agent containers, auxiliary pressure containers, hose assemblies)
Test ✓
Recirculating systems operation and safety interlocks perform in accordance with manufacturer's instructions
Test ✓
Recirculating systems ‐ Clean electrostatic precipitators Maintenance ✓
Recirculating systems ‐ Clean entire hood
Plenum and blower section Maintenance ✓
ITEM ACTIVITY
PERIODIC FREQUENCY
| SOW QA70-20 FM200, dated 7-6-2021 18 |
| SOW QA70-20 FM200, dated 7-6-2021 19 |
| SOW QA70-20 FM200, dated 7-6-2021 20 |