Roof Requirements Contract
Task Description Fort Leonard Wood Military Reservation Task Qty U/M Unit Price Total Qty U/M Unit Price Total Task Qty U/M Unit Price Total Remove Shingles system down to roof sheathing, including flashing, edge metal, boots and vents. All roofing materials and accessories shall be removed down to the roof sheathing. (up to two layers)
1 400 SQ 101 400 SQ 201 1000 SQ
Remove Shingles system down to roof sheathing, including flashing, edge metal, boots and vents. All roofing materials and accessories shall be removed down to the roof sheathing. (up to three layers)
2 50 SQ 102 50 SQ 202 300 SQ
Remove Deteriorated roof sheathing and replace with new 3 1000 SF 103 1000 SF 203 1000 SF
Remove Deteriorated roof framing and replace with new 4 1300 BF 104 1300 BF 204 1300 BF
Remove existing soffit and fascia and install new soffit and fascia. See DWG No. 2 at the end of the specifications. 5 1200 LF 105 1200 LF 205 1200 LF
Remove existing residential gutters and downspouts 6 1500 LF 106 1500 LF 206 1500 LF Remove existing commercial gutters and downspouts 7 1500 LF 107 1500 LF 207 1500 LF Remove existing built-up roof system, including membrane, insulation, fasteners, protection board, and vapor barrier. All roofing materials and accessories shall be removed down to the roof decking.
8 200 SQ 108 200 SQ 208 200 SQ
Remove existing fully-adhered EPDM roof system, including membrane, insulation, fasteners, protection board, flashings, and vapor barrier. All roofing materials and accessories shall be removed down to the roof decking.
9 600 SQ 109 600 SQ 209 600 SQ
Remove existing fully-adhered TPO roof system, including membrane, insulation, fasteners, protection board, flashings, and vapor barrier. All roofing materials and accessories shall be removed down to the roof decking.
10 600 SQ 110 600 SQ 210 400 SQ
Remove EPDM membrane, edge metal, boots and flashings only (no insulation). 11 1400 SQ 111 1400 SQ 211 600 SQ
Remove walkways 12 600 SF 112 600 SF 212 300 SF Demolish, remove and dispose of metal roof panels (corrugated, or ribbed and the underlying wood purlins if applicable (no insulation).
13 400 SQ 113 400 SQ 213 400 SQ
Demolish, remove and dispose of metal roof panels (standing seam and the underlying top hat and clips if applicable (no insulation).
14 400 SQ 114 400 SQ 214 400 SQ
Remove ballast from EPDM roof membrane 15 200 SQ 115 200 SQ 215 200 SQ Remove existing deteriorated termination bar and install new termination bar. 16 100 LF 116 100 LF 216 100 LF
Remove and install new metal facia system including support clips with inverted standing seam to match line fifty-one (51).
17 4800 SF 117 4800 SF 217 4800 SF
Remove and install new metal vented soffit system including supports. 18 3200 SF 118 3200 SF 218 4800 SF
Remove, cut masonry and install counter flashing 19 100 LF 119 100 LF 219 100 LF Remove thermoplastic polyolefin (TPO) roof system to include membrane, edge metal, boots and flashings only (no insulation).
20 600 SQ 120 600 SQ 220 600 SQ
Install new asphalt-saturated fiberglass plain shingles , with new asphalt-saturated felt underlayment, new edge strips, and new flashing, including new roof vents and boots. See DWG No. 1 at the end of the specifications.
21 200 SQ 121 200 SQ 221 600 SQ
Option Year 2Base Year Option Year 1
Install new asphalt-saturated fiberglass archechitectural shingles , with new asphalt-saturated felt underlayment, new edge strips, and new flashing, including new roof vents and boots. See DWG No. 1 at the end of the specifications.
22 200 SQ 122 200 SQ 222 600 SQ
Install new commercial aluminum gutters, gutter screens and downspouts. 23 1200 LF 123 1200 LF 223 2500 LF
Install new residential aluminum gutters, gutter screens and downspouts. 24 1200 LF 124 1200 LF 224 1800 LF
Provide liquid gutter sealer per spec. 25 500 SF 125 500 SF 225 500 SF Install Spash blocks at gutter down spouts. 26 50 EA 126 50 EA 226 50 EA
Install new continuous ridge vents, with external baffling extending 12 inch below ridge opening each side of ridge. 27 400 LF 127 400 LF 227 400 LF
Install new fully-adhered EPDM roof system, curbs and flashings only (boots and edge metal separate line item) (no insulation), including over the peripet wall.
28 400 SQ 128 400 SQ 228 400 SQ
Install new fully-adhered thermoplastic polyolefin (TPO) roof system, curbs and flashings (boots and edge metal separate line item) (no insulation), including over the peripet wall.
29 900 SQ 129 900 SQ 229 900 SQ
Install new mechanically attached and thermally welded thermoplastic polyolefin (TPO) roof system w/, curbs and flashings (boots and edge metal separate line item) (no insulation), including over the peripet wall.
30 300 SQ 130 300 SQ 230 200 SQ
Install ¼” glass mat gypsum roof board 31 1100 SQ 131 1100 SQ 231 800 SQ Install ½” glass mat gypsum roof board 32 500 SQ 132 500 SQ 232 300 SQ Provide edge metal for roof edge. 33 200 LF 133 200 LF 233 400 LF Provide weldable edge metal for TPO roof system 34 1000 LF 134 1000 LF 234 800 LF Provide metal Hat channel for Metal/Standing seam roof 35 800 LF 135 1000 LF 235 500 LF Provide treated wood nailers around perimeter of roof on single ply roof system. 36 1600 BF 136 1600 BF 236 1000 BF
Install new R-10 foam insulation 37 800 SQ 137 800 SQ 237 600 SQ Install new R-20 foam insulation 38 200 SQ 138 200 SQ 238 150 SQ Install new R-30 foam insulation 39 100 SQ 139 100 SQ 239 75 SQ Install tapered insulation 1/4" per foot. 40 500 BF 140 500 BF 240 500 BF Install tapered insulation 1/2" per foot. 41 250 BF 141 250 BF 241 250 BF Provide snow Rail system. 42 500 LF 142 500 EA 242 300 EA Provide snow guards 43 500 EA 143 500 EA 243 500 EA Provide residential gutter screens 44 800 LF 144 800 LF 244 1000 LF Provide comercial gutter screens 45 600 LF 145 600 LF 245 600 LF Remove and Install coping 46 1000 LF 146 1000 LF 246 600 LF Provide 26 Gauge Aluminum Coping on TPO and EPDM roofs to 24 inch width. 47 2000 SF 147 2000 SF 247 1000 SF
Provide 26 Gauge Aluminum Coping on TPO and EPDM roofs over 24 inch width. 48 800 SF 148 800 SF 248 400 SF
Provide new steel ribbed roof panels with ice-dam protection membrane. 49 200 SQ 149 200 SQ 249 200 SQ
Provide standing seam roof system with vented ridge and ice dam protection membrane and no exposed fasteners or screws.
50 800 SQ 150 800 SQ 250 800 SQ
Provide standing seam roof system with non-vented ridge and ice-dam protection membrane and no exposed fasteners or screws .
51 1300 SQ 151 1300 SQ 251 1300 SQ
Install walkways on EPDM roofs 52 500 SF 152 500 SF 252 200 SF Install walkways on TPO roofs 53 750 SF 153 750 SF 253 500 SF Patching of holes in existing EPDM membrane, to include sweeping away of ballast, washing the membrane with water to reveal holes, and visually locating each hole and patching it and replacing ballast.
54 1000 SF 154 1000 SF 254 1000 SF
Repair seams in existing EPDM membrane by covering seam with 12-inch wide cured self-adhesive EPDM tape. 55 1000 LF 155 1000 LF 255 1500 LF
Repair EPDM roof edge termination according to the sheet "DETAIL: EPDM EDGE TERMINATION REPAIR" at the end of the specifications
56 700 LF 156 700 LF 256 400 LF
Patching of holes in existing TPO membrane, to include washing the membrane with water to reveal holes, and visually locating each hole and patching it.
57 1000 SF 157 1000 SF 257 800 SF
Repair seams in existing TPO membrane by hot air welding with 12 inch seam patch. 58 500 LF 158 500 LF 258 500 LF
Remove and provide new roof drain. 59 20 EA 159 20 EA 259 15 EA
Repair seams in existing TPO membrane by hot air welding. 60 600 LF 160 600 LF 260 600 LF
Replace exposed screws and caulking with new, including removal and reinstallation of ridge cap, joint metal covers, and edge metal for removal of old caulking and installing new.
61 4000 LF 161 4000 LF 261 3000 LF
Provide white liquid elastimeric coating to roof, with primer (with rust inhibitor), seam tape and heavy caulking over screws. Including repairs per spec.
62 400 SQ 162 400 SQ 262 600 SQ
Provide white liquid elastimeric coating to roof, with primer, seam tape and heavy caulking over screws to extend warrantee to ten years after roof work or at end of privious warrantee.
63 100 SQ 163 100 SQ 263 100 SQ
EPDM boot to 6 inches compatible with Manufacturers material for EPDM roofing 60 mils thick minimum. Sealant inside and out at top and bottom as recommended by manufacturer. Attached with clamp on top and screws or anchors at bottom.
64 50 Each 164 75 Each 264 30 Each
TPO boot to 6 inches compatible with Manufacturers material for TPO roofing 60 mils thick minimum. Sealant inside and out at top and bottom as recommended by manufacturer. Attached with clamp on top and screws or anchors at bottom.
65 75 Each 165 100 Each 265 30 Each
EPDM boot 7 to 11 inches compatible with Manufacturers material for EPDM roofing 60 mils thick minimum. Sealant inside and out at top and bottom as recommended by manufacturer. Attached with clamp on top and screws or anchors at bottom.
66 30 Each 166 30 Each 266 15 Each
TPO boot 7 to 11 inches compatible with Manufacturers material for TPO roofing 60 mils thick minimum. Sealant inside and out at top and bottom as recommended by manufacturer. Attached with clamp on top and screws or anchors at bottom.
67 30 Each 167 30 Each 267 15 Each
Split TPO boot to 6 inches compatible with Manufacturers material for EPDM roofing 60 mils thick minimum. Sealant inside and out at top and bottom as recommended by manufacturer. Attached with clamp on top and screws or anchors at bottom.
68 50 Each 168 50 Each 268 30 Each
Split EPDM boot to 6 inches compatible with Manufacturers material for EPDM roofing 60 mils thick minimum. Sealant inside and out at top and bottom as recommended by manufacturer. Attached with clamp on top and screws or anchors at bottom.
69 50 Each 169 50 Each 269 30 Each
Split EPDM boot 7 to 11 inches compatible with Manufacturers material for EPDM roofing 60 mils thick minimum. Sealant inside and out at top and bottom as recommended by manufacturer. Attached with clamp on top and screws or anchors at bottom.
70 20 Each 170 20 Each 270 15 Each
Split TPO boot 7 to 11 inches compatible with Manufacturers material for TPO roofing 60 mils thick minimum. Sealant inside and out at top and bottom as recommended by manufacturer. Attached with clamp on top and screws or anchors at bottom.
71 20 Each 171 20 Each 271 15 Each
Spray Closed cell form insulation, Per inch thick per Square. 72 200
SQ x inch
172 200 SQ x inch
272 100 SQ x inch